HomeMy WebLinkAbout10-039 Daily Field Reports 33 to 45 REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E.
Town Engineer Report#: 33A Sheet: 1 of 6
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, to observe a proof-roll for the
westbound lane of Frontage Road between Sta. 6+50 and Sta. 10+00.
The proof-roll was performed using a fully loaded water truck. The area observed was at grade and consisted of full
depth reclaimed pulverized asphalt inillings.
At the time of this observation, field engineer observed no pumping or rutting of the material at grade.
Based on our observations, it is our opinion that the westbound lane of Frontage Road between Sta. 6+50 and Sta.
10+00 has been properly prepared and has met project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E.
Town Engineer Report#: 33B Sheet: 2 of 6
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, and observed the contractor
excavating on the east side of East Lionshead Circle between Stations 3+50 and 4+00 to a depth of approximately 1'-
6".
The material at the base of the excavation for the proposed crosspan was slightly silty sand with scattered cobbles. The
base of the excavation was slightly moist and compacted. No organics or debris was observed.
Based on our observations, it is our opinion that the area has been properly prepared and has met project
specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E. Report#: 33C Sheet: 3 of 6
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transportation Lalcewood—(303)989-1223 Curb and Gutter Final Grade
1309 Elkhorn Drive Grand Junction—(970)241-7700 Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborato Field
Depth Mauimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cfj (%) c� (%)
90 Retest of Test#87,dated 10/6/10 Grade± 142.5 5.6 135.9 4.1 95 Pass Proctar by Others
G sum Pit-3/a"ABC
91 Curb and Gutter: South side of Frontage Grade± 142.5 5.6 136.2 3.9 96 Pass Proctor by Others
Road at 200'East of Sta. 12+00 G sum Pit-'/4"ABC
92 Retest of Test#86,dated 10/6/10 Grade± 142.5 5.6 135.8 6.0 95 Pass Proctar by Others
G sum Pit-3/a"ABC
93 Sta.2+50,West side of East Lionshead Grade± 142.5 5.6 1361 5.8 96 Pass Proctor by Others
Cirde G sum Pit-'/a"ABC
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 70°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Modified Proctor ASTM D 1557, ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
+2%to-2°/o of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Bobcat � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Vibe plate, 1-Jumping jack Progress Report: Field engineer arrived on-site, as requested, to observe and test curb
and gutter final grade. Test results indicate that moisture and density tests performed at
Number of Passes: Varies Thickness of Lift: 6 inches the noted locations have met project specifications.
Method of Adding Moisture: Water truck
This report prosents opinions formed as a result of our observations and/or compaction testing of the fill during this visit.
We have relied o��the contractor to continue applying the recommended compactive effort and moistu�e to the fill during
times when our observer is not observing operations. Tests are made of the fill only as belicved necessary to calibrate our
observer's jud ment. Test data are not tl�e sole basis for o inions on whether the fill meets s ecificatious.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E.
Town Engineer Report#: 33D Sheet: 4 of 6
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): lvorth and South Drive-in/Drive-out walls
Location of Observations: 80' West to Gridlines E.1/E-E.7
Sheet or Plan Number: 5200, 10/5212, and 11/5212
Meets Project Spec.
South Drive-in/Drive-out Wall Rebar: 80' West to Gridlines E.1/E-E.7 yes no
Dowels: Size: #5 Spacing: 1'-0" o.c. each face � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. each face � ❑
Horizontal: Size: #6 Spacing: 1'-0" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Meets Project Spec.
North Drive-in/Drive-out Wall Rebar: 80' West to Gridlines E-1/E-E.7 yes no
Dowels: Size: #5 Spacing: 1'-0" o.c. � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. � ❑
Horizontal: Size: #6 Spacing: 1'-0" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E.
Town Engineer Report#: 33E Sheet: 5 of 6
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Cantilever wall(Tall)with Planter and
South Cantilever Wall(Short)with Planter
Location of Observations: North Drive-ii�/Drive-out
Sheet or Plan Number: 5/5213 and 11/5213
Meets Project Spec.
Cantilever Wall Tall with Planter Rebar: North Dnve-1n/Dr1ve-out yes no
Dowels: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Dowels: Size: #9 Spacing: 0'-6"o.c. inside face � ❑
Vertical: Size: #9 Spacing: 0'-6"o.c. inside face � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Horizontal: Size: #6 Spacing: 1'-0" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Meets Project Spec.
South Cantilever Wall(Short)with Planter Relj�T': NOTtIl�T1V2-Il]��P1V0-OUt yeS ri0
Dowels: Size: #6 Spacing: 1'-0"o.c. inside face � ❑
Dowels: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Vertical: Size: #6 Spacing: 1'-0"o.c. inside face � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Horizontal: Size: #6 Spacing: 1'-0" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/7/10
Tom Kassmel,P.E.
Town Engineer Report#: 33F Sheet: 6 of 6
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): North and South Planter Walls of
Drive-in/Drive-out
Location of Observations: North Wall(Planter)—Drive-in/Drive-out
Sheet or Plan Number: 5/5213
Meets Project Spec.
North Planter Wall Rebar: Drive-u�/Drive-out yes no
Horizontal: Size: #5 Spacing: 1'-0" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 2'-6" � ❑
Meets Project Spec.
South Planter Wall Rebar: Drive-in/Drive-out yes no
Horizontal: Size: #5 Spacing: 1'-0" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 2'-6" � ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/9/10
Tom Kassmel,P.E. Report#: 34A Sheet: 1 of 3
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Pipe Column Base
1309 Elkhorn Drive Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborato Field
Depth Mauimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cfj (%) c� (%)
94 East Pipe Column Base Grade± 130.3 7.9 131.5 8.3 100 Pass Curve#1
SAND Gravell Sil
95 West Pipe Column Base Grade± 130.3 7.9 117.6 ll.9 90 Fail Curve#1
SAND Gravell Sil
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 50°F± ❑ Fill Tested Meets Specifications.
Specification Compaction&Material: 98%of Standard Proctor AASHTO T 99,+2%to � Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content 94 and Should be Removed or Reworked.
Type and Number of Earth Moving Units: � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Tamping plate Progress Report: Field engineer arrived on-site, as requested, to observe and test pipe
column base. Test results indicate that moisture and density tests performed at the noted
Number of Passes: Varies Thickness of Lift: locations have failed to meet project specifications.
Method of Adding Moisture:
This report prosents opinions formed as a result of our observations and/or compaction testing of the fill during this visit.
We have relied on the contractar to continue applying the recommended compactive effort and moisture to the fill duri��g
times when our observer is not observing operations. Tests are made of the fill only as belicved necessary to calibrate our
observer's'ud*ment Test data are not the sole basis for o inions on whether the till meets s ecifications.
David Hasbrouck Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/9/10
Tom Kassmel,P.E.
Town Engineer Report#: 34B Sheet: 2 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 50°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Wall and Grade Beam, and Footing
Location of Observations: Level 1,Area C along Gridlines E-E and E-1 and Gridlines E F and E-1
Sheet or Plan Number: 5210, 5212, and 5202
Meets Project Spec.
Wall Rebar: Gridlines E-E and E-1 yes no
(Tau wau) Horizontal: Size: #6's Spacing: 1'-0"each face � ❑
�Tau wai��Vertical: Size: #5's Spacing: 1'-0"outside face � ❑
(Ta��wai�)Vertical: Size: #9's Spacing: 0'-6"inside face � ❑
(short wan) Vertical: Size: #6's Spacing: 1'-0"inside face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Footing Rebar: Gridlines E F and E-1 yes no
Horizontal: Size: 5 - #5's Spacing: Each way, single mat � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
David Hasbrouck Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/9/10
Tom Kassmel,P.E.
Town Engineer Report#: 34C Sheet: 3 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 50°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Drive in/Drive out Beams
Location of Observations: Level 1,Area C along Gridlines E-E and E-1 and Gridlines E F and E-1
Sheet or Plan Number: 8/5212
Meets Project Spec.
Wall and Grade Beam Rebar: Gridlines E-E and E-1 yes no
Horizontal: Size: 7 - #9 Spacing: Continuous top and bottom � ❑
Stirrups: Size: #4's Spacing: 0'-8" � ❑
Stirrups: Size: #5's Spacing: 0'-8" o.c. � ❑
Dowels: Size: #4's Spacing: 1'-0" � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
David Hasbrouck Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/10/10
Tom Kassmel,P.E. Report#: 35 Sheet: 1 of 1
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Obs�rvation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 West Pipe Column Base
1309 Elkhorn Drive Grand Junction—(970)241-7700 Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laboratory Field
Depth Maximum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevafion Density Content Density Content Compaction
(feet) (pc� (%) (pc� (%)
96 Retest of Test#94,dated 10/9/10 Grade± 1303 7.9 119.2 9.5 91 Fail Curve#1
SAND Gravell Si]
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 51°F± ❑ Fill Tested Meets Specifications.
Specification Compaction&Material: 98%of Standard Proctor AASHTO T 99,+2%to � Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content 96 and Should be Removed or Reworked.
Type and Number of Earth Moving Units: � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: Tamping plate Progress Re,port: Field engineer arrived on-site, as requested, to observe and test the
west pipe column base. Test results indicate that moisture and density test performed at
Number of Passes: Varies Thiekness of Lift: the noted]ocation has failed to meet project specifications.
Method of Addin Moisture:
This report presents opinions fonned as a result of our observations and/or compaction testing of the fill during this visit.
We have relied on the conYract�or fo conYinue applying the recommended coinpacfive effort and inois[ure to tl�e fill duri��g
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's�ud menL Test data are no[the sole basis for o inions on whether the fiLl meets s ecificaYious.
David Hasbrouck Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/ll/10
Tom Kassmel,P.E.
Town Engineer Report#: 36A Sheet: 1 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 60°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, and observed the excavation in
the ECO Building area along Gridlines A.0-C.0/8.0 with Brandon of FCI.
Field engineer observed a trackhoe removing fill to a depth of approximately 10 feet in order to identify the elevation of
natural soil.
At the time of this observation, field engineer encountered native material at the same elevation from the southeast
comer to the northeast corner of the proposed building.
The fill present in these areas will need to be removed and compacted at 98 percent of the maximum standard Proctor
density in the areas beneath all footings.
Based on our observations, it is our opinion that the excavation for the ECO Building area along Gridlines A.0-C.0/8.0
has not been properly prepared and has failed to meet project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/ll/10
Tom Kassmel,P.E.
Town Engineer Report#: 36B Sheet: 2 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 60°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, to observe the material exposed
in the exca�ation far the continuous footing along Gridlmes C.0/6.0-8.0 for the ECO Building.
The excavation varied in depth from approximately 10.0 to 10.5 feet from the adjacent ground surface. The material
exposed in the base of the excavation consisted of a natural, brown, moist, dense, slightly silty sand with scattered
cobbles. Neither ponded water nor organic materials were observed in the base of the excavation.
Based on our observations, it is our opinion that the subgrade for the continuous footing along Gridlines C.0/6.0-8.0 for
the ECO Building has been properly prepared and has met project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/11/10
Tom Kassmel,P.E. Report#: 36C Sheet: 3 of 3
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Frontage Road
1309 Elkhorn Drivc South Side
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colarado
Laborator Field
Maximum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compaction
�� (P�� (P��1
97 Sta. 11+50 ls` 154.4 145.1 145.1 94 Pass SX w/20%RAP
Mix ID 532
98 Sta. 12+00 ls` 154.4 147.5 147.5 96 Pass SX w/20%RAP
Mix ID 532
99 Sta. 12+50 15f 154.4 144.9 144.9 94 Pass SX w/20%RAP
Mix ID 532
100 Sta. 13+00 ls` 154.4 145.6 145.6 94 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 60°F± � Asphalt Tested Meets Specifications.
Specification Compaction: 92%-96%of Maximum Theorerical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown, 1-Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 280°F± Progress Report: Field engineer arrived on-site, as requested,to conduct density tests
far the asphalt placed for the Frontage Road on the south side. Test results indicate that
Thickness of Lift: 3 inches asphalt densities at the noted locations have met project specifications.
This report presents opinions formed as a result of our observations and/or compaction testing of tha as'phalt. We have relied
on the coutractor to con[inue applying the recommended compactive effort to the asphalt during times when our obse�ver is not
observing operations. Tests are made of the asphalt only as believed necessary to calibrate our observer's judgment. Test data
arenot the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/12/10
Tom Kassmel,P.E.
Town Engineer Report#: 37A Sheet: 1 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 50°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, and observed the contractor
compacting the fmal grade for the pedestrian walkway retaining wall footings adjacent to the retaining wall on the west
side of the existing parking structure at Gridlines E-B, E-B.4, E-B.8, E-C.3, E-D, and E-D.4.
At the time of this observation, field engineer did not observe any soft or saturated soils at grade.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/12/10
Tom Kassmel,P.E.
Town Engineer Report#: 37B Sheet: 2 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 50°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Footing Pads
Location of Observations: Gridlines E-B, E-B.4, E-B.8, E-C.3, E-D, and E-D.4.
Sheet or Plan Number: 5205 and 3/5205
Meets Project Spec.
Footing Pads Rebar: Gridlines E B.4, E-B.8, E-C.3, E-D, and E-D.4. yes no
Horizontal: Size: 3 - #5 Spacing: Continuous on each side � ❑
Dowels: Size: #5 Spacing: 1'-0"o.c.,through wall epoxied in � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: Gridlines E B yes no
Horizontal: Size: 7 - #5 Spacing: 1'-0"o.c. continuous � ❑
Transversals: Size: #5 Spacing: 1'-0" o.c. � ❑
Dowels: Size: #5 Spacing: 1'-0" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/13/10
Tom Kassmel,P.E. Report#: 38A Sheet: 1 of 2
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 East Lionshead Circle
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
101 Sta. 1+00,5'Right of centerline ls` 154.4 143.2 143.2 93 Pass SX w/20%RAP
Mix ID 532
102 Sta.2+00, 10'Left of centerline 15` 154.4 142.4 142.4 92 Pass SX w/20%RAP
Mix ID 532
103 Sta.3+00, 15'Right of centerline ls` 154.4 143.7 143.7 93 Pass SX w/20%RAP
Mix ID 532
104 Sta.4+00,Center ls` 154.4 143.6 143.6 93 Pass SX w/20%RAP
Mix ID 532
105 Sta.0+50,Center 2"d 154.4 142.9 142.9 93 Pass SX w/20%RAP
Mix ID 532
106 Sta. 1+50, 10'Left of centerline 2"a 154.4 144.0 144.0 93 Pass SX w/20%RAP
Mix ID 532
107 Sta.3+50, 15'Right of centerline 2°d 154.4 142.1 142.1 92 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 60°F± � Asphalt Tested Meets Speci6cations.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown/Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 260°F± Progress Report: Field engineer arrived on-site, as requested,to conduct density tests
far the asphalt placed for East Lionshead Circle and Frontage Road. Test results
Thickness of Lift: 2.5 inches indicate that asphalt densities at the noted locations have met project specifications.
This report presents opinions formed as a result of our observations and/or compaction testing of the asphalt. We havc relied
on the contractar to continue applying dte recommended compactive effort to the asphalt during times when our obse�ver is not
observing operations. Tests are made of the asphalt only as believed necessary to calibrate our observer's judgment. Test data
are not the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/13/10
Tom Kassmel,P.E. Report#: 38B Sheet: 2 of 2
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Frontage Road
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
108 Sta.0+50, 10'Right of centerline ls` 154.4 145.1 145.1 94 Pass SX w/20%RAP
Mix ID 532
109 Sta.2+50,20'Right of centerline ls` 154.4 144.4 144.4 94 Pass SX w/20%RAP
Mix ID 532
110 Sta.4+50,2'Right of centerline ls` 154.4 143.5 143.5 93 Pass SX w/20%RAP
Mix ID 532
111 Sta.6+50,5'Right of centerline ls` 154.4 144.6 144.6 94 Pass SX w/20%RAP
Mix ID 532
112 Sta. 8+50,25'Right of centerline ls` 154.4 145.4 145.4 94 Pass SX w/20%RAP
Mix ID 532
113 Sta. 10+50, 10'Right of centerline ls` 154.4 144.0 144.0 93 Pass SX w/20%RAP
Mix ID 532
ll4 Sta. 12+00, 15'Right of centerline ls` 154.4 143.8 143.8 93 Pass SX w/20%RAP
MiY ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 60°F± � Asphalt Tested Meets Speci6cations.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown/Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 268°F± Progress Report: See Sheet 1 of 2.
Thickness of Lift: 2.5 inches
This report presents opinions formed as a result of our observations and/or compaction testing of the as�halt. We have relied
on the contractar to continue applying dte recommended compactive effort to the asphalt during times when our obse�ver is not
observing operations. Tests are made of fhe asphait only as believed necessary to calibrate our observer'sjudgment Test data
are not the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/14/10
Tom Kassmel,P.E. Report#: 39A Sheet: 1 of 4
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 East Lionshead Circle and Frontage Road
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
115 East Lionshead Circle: Sta. 1+50, 10'Right of Final 154.4 146.6 146.6 95 Pass SX w/20%RAP
centerline Mix ID 532
ll6 East Lionshead Circle: Sta.4+00,5'Right of Final 154.4 144.0 144.0 93 Pass SX w/20%RAP
centerline Mix ID 532
117 East Lionshead Circle: Sta.2+00, 15'Left of Final 154.4 143.6 143.6 93 Pass SX w/20%RAP
centerline Mix ID 532
ll 8 East Lionshead Circle: Sta.4+50,2'Left of Final 154.4 142.2 142.2 92 Pass SX w/20%RAP
centerline Mix ID 532
119 Frontage Road: Sta.0+50,20'Left of centerline ls` 154.4 145.1 145.1 94 Pass SX w/20%RAP
Mix ID 532
120 Frontage Road: Sta.2+50,5'Left of centerline ls` 154.4 142.9 142.9 93 Pass SX w/20%RAP
Mix ID 532
121 Frontage Road: Sta.5+00, 10'Left of centerline ls` 154.4 145.7 145.7 94 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F± � Asphalt Tested Meets Specifications.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown, 1-Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Obs ervation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 270°F± Progress Report: Kevin with Town of Vail informed field engineer he is not satisfied
with the depth of asphalt on eastbound lane of Frontage Road. He has directed
Thickness of Lift: 2 inches contractor to mill from Sta. 11+�5 to Sta. 12+00 and replace. Test results indicate that
asphalt densities at the noted locations have met project specifications.
This report presents opinions formed as a result of our observations and/or compaction testing of the asphalt We have relied
on the contractor to continue applying the recommended compactive effort to the asphalt duriug times when our observer is not
observing operations. Tests are made of the asphalt only as believed necessary to calibrate our observar's judgment. Test data
are not the sole basis fm�o inions on whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/14/10
Tom Kassmel,P.E. Report#: 39B Sheet: 2 of 4
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Frontage Road
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
122 Sta.7+00,3'Left of centerline ls` 154.4 142.9 142.9 93 Pass SX w/20%RAP
Mix ID 532
123 Sta.9+00, 10'Left of centerline ls` 154.4 144.8 144.8 94 Pass SX w/20%RAP
Mix ID 532
124 Sta. 11+00, 15'Left of centerline ls` 154.4 146.0 146.0 95 Pass SX w/20%RAP
MiY ID 532
125 Sta.0+05,5'Right of centerline 2"a 154.4 142.9 142.9 93 Pass SX w/20%RAP
Mix ID 532
126 Sta.2+00, 15'Right of centerline 2"d 154.4 143.7 143.7 93 Pass SX w/20%RAP
M�ID 532
127 Sta.4+00,20'Right of centerline 2"a 154.4 145.2 145.2 94 Pass SX w/20%RAP
Mix ID 532
128 Sta.6+00,22'Right of centerline 2°d 154.4 144.0 144.0 93 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F± � Asphalt Tested Meets Speci6cations.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown, 1-Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 270°F± Progress Report: See Sheet 1 of 4.
Thickness of Lift: 2 inches
This reporT presents opinions fonned as a resulT of our observations and/or compaction testing of the aspl�alt. We have relied
on the contractar to continue applying dte recommended compactive effort to the asphalt during times when our obseiver is not
observing operations. Tests are made of the asphalt only as beiieved necessary to calibrate our observer'sjudgment. Test data
are not the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/14/10
Tom Kassmel,P.E. Report#: 39C Sheet: 3 of 4
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Frontage Road
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
129 Sta. 8+00,6'Right of centerline 2°d 154.4 144.7 144.7 94 Pass SX w/20%RAP
Mix ID 532
130 Sta. 10+00, 15'Right of centerline 2"a 154.4 1431 143.1 93 Pass SX w/20%RAP
Mix ID 532
131 Sta. ll+95,20'Right of centerline 2°d 154.4 143.8 143.8 93 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F± � Asphalt Tested Meets Specifications.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown, 1-Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 270°F± Progress Report: See Sheet 1 of 4.
Thickness of Lift: 2 inches
This reporT presents opinions fonned as a resulT of our observations and/or compaction testing of the aspl�alt. We have relied
on the contractar to continue applying dte recommended compactive effort to the asphalt during times when our obseiver is not
observing operations. Tests are made of the asphalt only as beiieved necessary to calibrate our observer'sjudgment. Test data
are not the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/14/10
Tom Kassmel,P.E.
Town Engineer Report#: 39D Sheet: 4 of 4
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Drive-in/Drive-out Bridge
Location of Observations: Between North and South Drive-ii�/Drive-out Walls at Gridlines E-1
Sheet or Plan Number: 5200 and 6/5212
Meets Project Spec.
�T1Ve-11��P1V0-OUt BT1Clg0 Reba2': Between North and South Drive-in/Drive-out Walls at Gridlines E-1 yeS ri0
Horizontal: Size: #5 Spacing: 1'-0" o.c. � ❑
Transverse: Size: #6 Spacing: 1'-0" o.c. (bottom) � ❑
Dowels: Size: #5 Spacing: 1'-0" o.c. (top) � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/15/10
Tom Kassmel,P.E.
Town Engineer Report#: 40A Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 50°F±
Construction Activities/Observations: Engineer arrived on site, as requested, to observe the material exposed in the
excavation for the proposed ECO Building and verify the depth to native materiaL
At the time of our observation, the excavation was approximately 15 to 18 feet in depth from the adjacent street level
elevation. Exposed soils consisted of existing fill to an approximate depth of 15 to 17 feet followed by native soil to the
maximum depth excavated of 18 feet. Tl�e existing fill consists of black,brown,tan,moist,medium dense to dense, silty
sand with cobbles, boulders, organics, and deleterious materials. The native soil consists ofpink,brown, moist, dense,
slightly silty, sand and gravel with scattered cobbles and boulders.
Based on our observations, it is our opinion that the foundation excavation at the base of the existing north wall of the
parking garage is bearing on the native, slightly silty, sand and gravel with scattered cobbles and boulders. The
remainder of the footing excavations for the proposed ECO Building needs to be excavated past the existing fill and
extend into the native slightly silty, sand and gravel with scattered cobbles and boulders.
Katie Shaw Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/15/10
Tom Kassmel,P.E. Report#: 40B Sheet: 2 of 3
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Obs�rvation and Testine
Department of Public Works/Transportation Grand Junction—(970)241-7700 Sidewalk Final Grade
1309 Elkhorn Drive Information Booth Pull-in/Pull-out
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
132 Sta. 11+'75 Grade± 142.5 5.6 137.2 4.9 96 Pass Proctor by Others
G sum Pit-3/a"ABC
Weather: � Sum� ❑ Cloud ❑ Rain ❑ Snow Tem : 70°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Modified Proctor ASTM D 1557, ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
+2%to-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Loader � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Vibe plate Progress Report: Field engineer arrived on-site, as requested, to observe and test
sidewalk final grade for the information booth pull-in/pull-out. Test results indicate that
Number of Passes: Varies Thickness of Lift: 6 inches the moisture and density test perforined at the noted location has met project
Method of Adding Moisture: Hose specifications.
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended co�npactive effort and moisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o inions on whether the fill meets s ecificatio�s.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
ASPHALT COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/15/10
Tom Kassmel,P.E. Report#: 40C Sheet: 3 of 3
Geotechnical and Materials Engineers
Town Engineer Lakewood—(303)989-1223 Subject: Asphalt Compaction Tests
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Frontage Road
1309 Elkhorn Drivc Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborator Field
Ma�mum Measured Corrected Percent
Test Location Lift Theoretical Pass/Fail Asphalt Type
No. No. Density Density Density Compacfion
�� (t��� (P��
133 Sta.0+25,5'Left of centerline 2°d 154.4 145.3 145.3 94 Pass SX w/20%RAP
Mix ID 532
134 Sta.2+25, 10'Left of centerline 2"a 154.4 144.0 144.0 93 Pass SX w/20%RAP
Mix ID 532
135 Sta.4+50, 15'Left of centerline 2°d 154.4 143.7 143.7 93 Pass SX w/20%RAP
MiY ID 532
136 Sta.6+50,20'Left of centerline 2"a 154.4 142.2 142.2 92 Pass SX w/20%RAP
Mix ID 532
137 Sta. 8+50,Center 2"d 154.4 145.9 145.9 94 Pass SX w/20%RAP
Mix ID 532
138 Sta. 10+00,2'Left of centerline 2"a 154.4 145.3 145.3 94 Pass SX w/20%RAP
Mix ID 532
139 Sta. I 1+50, 12'Left of centerline 2°d 154.4 144.2 144.2 93 Pass SX w/20%RAP
Mix ID 532
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 70°F± � Asphalt Tested Meets Speci6cations.
Specification Compaction: 92%-96%of Maximum Theoretical Density ❑ Asphalt Tested Does Not Meet Specifications as Indicated by Test Number(s)
and Should be Removed or Reworked.
Type and Number of Compaction Units: 1-Breakdown, 1-Intermediate, 1-Finish roller � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Number of Passes: Varies Asphalt Temp: 285°F± Progress Report: Field engineer arrived on-site, as requested,to conduct density tests
for the asphalt placed for Frontage Road. Field engineer observed intermittent
Thickness of Lift: 2 inches longitudinal cracking along the south edge of Frontage Road between approximately Sta.
0+00 and Sta. 5+50. Contractor was informed by Kevin with the Town of Vail. Test
This report presents opinions formed as a result of our observations and/or compaction testing of the asphalt. We have relied IOSUItS 111CI]GatO t17at SSpllalt C10riS1t1eS at t110 170teC� IOC2t10riS �laVO 1110t pT"0�0Ct
on the contractar to continue applying dte recommended compactive effort to the asphalt during[imes when our obse�ver is not S�70C1f1Cat10riS.
observing operations. Tests are made of the asphalt o nly as believed necessary to calibrate our observer'sjudgment. Test data
are not the sole basis for o inimis mi whether the as halt meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/18/10
Tom Kassmel,P.E. Report#: 41A Sheet: 1 of 2
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Obs�rvation and Testine
Department of Public Works/Transportation Grand Junction—(970)241-7700 Sidewalk Final Grade
1309 Elkhorn Drive Frontage Road
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
140 Sta.6+50 Grade± 130.3 7.9 130.1 6.2 100 Pass Curve#1
SAND Gravell Sil
141 Sta.7+00 Grade± 130.3 7.9 129.8 6.5 100 Pass Curve#1
SAND Gravell Sil
142 Sta. 11+25 Grade± 130.3 7.9 130.9 5.9 100 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 58°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 100%of Standard Proctor AASHTO T 99,+2% ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
to-2°/o of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Loader � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Vibe plate Progress Report: Field engineer arrived on-site, as requested, to observe and test tl�e
sidewalk final grade along the Frontage Road. Test results indicate that moisture and
Number of Passes: Varies Thiekness of Lift: 6 inches density tests performed at the noted locations have met project specifications.
Method of Adding Moisture: Water truck
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended co�npactive effort and moisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o inions on whether the fill meets s ecificatio�s.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/18/10
Tom Kassmel,P.E.
Town Engineer Report#: 41B Sheet: 2 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 58°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Retaining Wall
Location of Observations: Gridlines E A.5 to E-B/E.1
Sheet or Plan Number: 11/5211 and 12/5211
Meets Project Spec.
Retaining Wall Rebar: Gridlines E A.5 to E-BB.l yes no
Horizontal: Size: #5 Spacing: 1'-0" o.c. each face � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: Gridlines yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: The drilled dowels for the horizontals were measured at 7.5" to 1'-0" o.c. yes no
each face. Based on our observations, it is our opinion that the reinforcing steel (rebar) noted in this � ❑
Daily Field Report has been properly placed and has met project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/19/10
Tom Kassmel,P.E.
Town Engineer Report#: 42A Sheet: 1 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 65°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, to observe the sidewalk
subgrade adjacent to the bus pull-in from Sta. 7+25 to Sta. 8+25.
The material exposed in the subgrade consisted of a slightly silty sand with some scattered cobbles. The subgrade was
free of organics and debris. The material exposed at the sidewalk grade was dense.
Based on our observations, it is our opinion that the subgrade adjacent to the bus pull-in from Sta. 7+25 to Sta. 8+25
has been properly prepared and has met project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/19/10
Tom Kassmel,P.E. Report#: 42B Sheet: 2 of 2
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transportation Lakewood—(303)989-1223 General Backfill from Northwest Corner of
1309 Elkhorn Drive Grand Junction—(970)241-7700 North Drive-in/Drive-out Wall
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
143 10'North -2.0± 130.3 7.9 129.7 6.4 100 Pass Curve#1
SAND Gravell Sil
144 2'West and 20'North -1.0-�- 130.3 7.9 130.0 6.2 100 Pass Curve#1
SAND Gravell Sil
Weather: � Sum� ❑ Cloud ❑ Rain ❑ Snow Tem : 70°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 100%of Standard Proctor AASHTO T 99,+2% ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
to-2°/o of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Loader, 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 2-Walk-behind Wackers Progress Report: Field engineer arrived on-site,as requested,to observe and test general
backfill from northwest corner of north drive-in/drive-out wall. Test results indicate that
Number of Passes: Varies Thickness of Lift: 8 inches moisture and density tests performed at the noted locations have met project
Method of Adding Moisture: N/A specifications.
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended compactive effort and moisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment Test data are not the sole basis for o inio��s on whether the fill meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/20/10
Tom Kassmel,P.E.
Town Engineer Report#: 43A Sheet: 1 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 74°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, to observe the material exposed
in the exca�ation for the continuous footings 14'-4"West of Gridlines A.0-C.0/1.0-8.5 for the Eco Building.
The excavation varied in depth from approximately 15 feet to 18 feet from the adjacent ground surface. The material
exposed in the base of the excavation consisted of a natural, pink to light brown, moist, dense, gravelly sand with
scattered cobbles. Neither ponded water mr organic materials were observed in the base of the excavation. The
excavated fill was taken off site and put through a 6-inch screen.
Based on our observations, it is our opinion that the subgrade for the continuous footings 14'-4"West of Gridlines A.0-
C.0/1.0-8.5 for the Eco Building has been properly prepared and has met project specifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/20/10
Tom Kassmel,P.E. Report#: 43B Sheet: 2 of 3
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Departmcnt of Public Works/Transportation Lakcwood-(303)989-1223 General Backfill for North Drive-in/Drive-
1309 Elkhorn Drive Grand 7unction-(970)241-7700 out Wall and Sidewalk Final Grade for
Vail,Colorado 81657 Frontage Road
Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
145 Backfill: Fro�n northwest corner of wall, 10' -5.0± 130.3 7.9 124.7 7.0 96 Pass Curve#1
North and 10' East SAND Gravell Sil
146 Backfill: From northwest carner of wall, 15' -4.0-�- 130.3 7.9 126.8 6.5 97 Pass Curve#1
North and 5' East SAND Gravell Sil
147 Backfill: Fro�n northwest corner of wall,20' -3.0± 130.3 7.9 127.2 6.1 98 Pass Curve#1
North and 0' East SAND Gravell Sil
148 Backfill: From northwest corner of wall,2' -10.0± 130.3 7.9 1281 6.0 98 Pass Curve#1
North and 30' East SAND Gravell Sil
149 Backfill: Fro�n northwest corner of wall, 10' -20.0± 130.3 7.9 126.2 6.3 97 Pass Curve#1
North and 50' East SAND Gravell Sil
150 Backfill: From northwest carner of wall, 15' -25.0± 130.3 7.9 124.0 7.2 95 Pass Curve#1
North and 60' East SAND Gravell Sil
151 Sidewalk: Sta.7+50 Grade± 142.5 5.6 136.5 5.2 96 Pass Proctor by Others
G sum Pit-3/4"ABC
Weather: � Sum� ❑ Cloud ❑ Rain ❑ Snow Tem : 71°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99 ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
(sidewalk: 95%of Modified Proctor ASTM D 1557),+2%to-2%of Oprimum Moisture and Should be Removed or Reworked,
Content
Type and Number of Earth Moving Units: 1-Tracichoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Wacker Progress Report: Field engineer arrived on-site,as requested,to observe and test general
backfill for north drive-in/drive-out wall and sidewallc�nal grade for Frontage Road. Test
Number of Passes: Varies Thickness of Lift: 8 to 12 inches results indicate that moisture and density tests performed at the noted locations have met
Method of Adding Moisture: Water truck project specifications.
This report prescnts opinions formed as a result of our observations and/or compaction testing of the fill during this visit.
We have relied on the coi�trac[ar to continue applying the recommended compactive effort and�noisture to the fill during
times when our observer is not obscrving operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o i��ions on whether the fill meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/20/10
Tom Kassmel,P.E.
Town Engineer Report#: 43C Sheet: 3 of 3
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: °F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Bridge Slab
Location of Observations: Gridlines E 1 to E-4/Pedestrian Bridge
Sheet or Plan Number: 4/5210
Meets Project Spec.
Bridge Slab Rebar: Gridlines E 1 to E-4/Pedestrian Bridge yes no
Horizontal: Size: #6 Spacing: 1'-0"o.c. each way, top and bottom � ❑
Horizontal: Size: 1 - #4 Spacing: Continuous each side � ❑
Horizontal: Size: 1 - #4 Spacing: Continuous additional each side � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 2'-6" � ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/21/10
Tom Kassmel,P.E. Report#: 44A Sheet: 1 of 5
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 General Backfill
1309 Elkhorn Drive Grand Junction—(970)241-7700 Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborato Field
Depth Mauimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cfj (%) c� (%)
152 From northwest carner of north drive- -15.0± 130.3 7.9 126.0 7.1 97 Pass Curve#1
in/drive-out wall: I S'North and 50'East SAND Gravell Sil
153 From narthwest corner of north drive- -17.0± 130.3 7.9 124.9 7.8 96 Pass Curve#1
in/drive-out wall: 5'North and 60' East SAND Gravell Sil
154 From northwest corner of north drive- -19.0± 130.3 7.9 124.1 8.4 95 Pass Curve#1
in/drive-out wall: 10'North and 75'East SAND Gravell Sil
155 From narthwest corner of north drive- -18.0± 130.3 7.9 125.6 7.3 96 Pass Curve#1
in/drive-out wall: 15'North and 70'East SAND Gravell Sil
156 From northwest corner of north drive- -17.0± 130.3 7.9 126.2 6.9 97 Pass Curve#1
in/drive-out wall: 5'North and 65'Eas1 SAND Gravell Sil
157 From narthwest corner of north drive- -15.0± 130.3 7.9 125.8 7.2 97 Pass Curve#1
in/drive-out wall: 12'North and 60'East SAND Gravell Sil
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 58°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99,+2°/o to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Wacker Progress Report: Field engineer arrived on-site,as requested,to observe and test general
backfill. Test results indicate that moisture and density tests performed at the noted
Number of Passes: Varies Thickness of Lift: 8 to 12 inches locations have met project speci�cations.
Method of Adding Moisture: Water truck
This report prosents opinions formed as a result of our observations and/or compaction testing of the fill during this visit.
We have relied on tl�e contractor to continue applying the recommended compactive effort and moisture to tlie fill during
times when our observer is not observing operations. Tests are made of the fill only as beli�ved necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o inions o n whether the fill meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/21/10
Tom Kassmel,P.E. Report#: 44B Sheet: 2 of 5
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Structural Fill Below Foundarions
1309 Elkhorn Drive ECO Building
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
158 Gridlines A.5/6.1 -17.0± 130.3 7.9 129.3 6.2 99 Pass Curve#1
SAND Gravell Sil
159 Gridlines B.0/3.3 -16.0± 130.3 7.9 1301 5.9 100 Pass Curve#1
SAND Gravell Sil
160 Gridlines C.0/4.0 -16.0± 130.3 7.9 127.9 6.5 98 Pass Curve#1
SAND Gravell Sil
161 Gridlines B.5/1.5 -15.0± 130.3 7.9 128.4 6.1 99 Pass Curve#1
SAND Gravell Sil
162 Gridlines A.9/5.0 -14.0± 130.3 7.9 129.0 6.3 99 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 59°F± � Fill TestedMeets Specifications.
Specification Compaction&Material: 98%of Standard Proctor AASHTO T 99,+2%to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Wacker Progress Report: Field engineer arrived on-site, as requested, to observe and test the
structural fill being placed below the proposed ECO Building. Test results indicate that
Number of Passes: Varies Thickness of Lift: 8 to 12 inches moisture and density tests performed at the noted locations have met project
Method of Adding Moisture: Water truck specifications.
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended compactive effort and moistwe to the 6ll during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's'ud ment Test d ata are not the sole basis for o inions o��whether the fil I meets s ecificatio�s.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/21/10
Tom Kassmel,P.E.
Town Engineer Report#: 44C Sheet: 3 of 5
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 63°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Grade Beams
Location of Observations: Level 2 Upper Landing, Southwest Corner of Parking Structure
Sheet or Plan Number: 12/5213 and 9/5215
Meets Project Spec.
Grade Beam Rebal': Level 2 Upper Landing, Southwest Corner of Parking StrucYure yeS n0
Horizontal: Size: 6 - #8 Spacing: Top and bottom continuous � ❑
Horizontal: Size: 2 - #4 Spacing: Each side � ❑
Stirrups: Size: #3 Spacing: 0'-5" o.c. � ❑
Standard hook: Size: #4 Spacing: 1'-0" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: � ❑
Meets Project Spec.
Grade Beam Rebal': Level 2 Upper Landing,Southwest Corner of Parking Structure yeS n0
Horizontal: Size: 4 - #5 Spacing: Top and bottom ❑ �
Dowels: Size: 2 rows 3 - Spacing: 0'-4" o.c. � ❑
#5
Horizontal: Size: 2 - #4 Spacing: Each side � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: � ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. ❑ �
Mike Brath Scott B. Myers,P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/21/10
Tom Kassmel,P.E.
Town Engineer Report#: 44D Sheet: 4 of 5
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 63°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Wall and Structural Slab
Location of Observations: Level 2 Upper Landing, Southwest Corner of Parking Structure
Sheet or Plan Number: 3/5213, 9/5312, 1/5201, and 10/5212
Meets Project Spec.
Wa]I Rebal': Leve12 Upper Landing, Southwest Corner of Parking Structure yeS n0
Epoxied Vertical: Size: #5 Spacing: 1'-0"each face � ❑
Horizontal: Size: #5 Spacing: 1'-0"each face � ❑
Dowels: Size: #4 Spacing: 3' x 3' at 1'-0" o.c. � ❑
Horizontal: Size: #4 Spacing. Continuous at comer of dowels � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
StCL1CtLiTa1 Slab RebaT: Leve12 Upper Landing,Southwest Corner of Parking Structure yes no
HOYIZOntal: slze: �#5 Spacing: 0'-9"o.c. epoxy each way top and bottom � ❑
Dowel: Size: #5 Spacing: 2'-0"o.c. with standard hook � ❑
Horizontal: Size: #5 Spacing: 1'-0" o.c. bottom each way � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 10/21/10
Tom Kassmel,P.E.
Town Engineer Report#: 44E Sheet: 5 of 5
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 63°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Columns
Location of Observations: Northwest and Northeast Stairs Between 2°`�and 3rd Levels of Parking Structure
Sheet or Plan Number: RFI 86 10/5215 and 12/5214 RFI 30
Meets Project Spec.
Relj�: Northwest and Northeast Stairs Between 2°d and 3`d Levels of Parking yeS ri0
COI1111111S Structure
Ties: Size: 3 - #3 Spacing: 1'-0" o.c. � ❑
Vertical: Size: 10 - #7 Spacing: Evenly spaced � ❑
Stirrups: Size: 2 - #3 Spacing: Top and bottom at 0'-3" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 3'-0" � ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/22/10
Tom Kassmel,P.E. Report#: 45A Sheet: 1 of 2
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 General Backfill
1309 Elkhorn Drive Grand Junction—(970)241-7700 Lionshead Transit Center
Vail,Colorado 81657 Vail,Colorado
Laborato Field
Depth Mauimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cfj (%) c� (%)
163 From northwest corner of north drive- -13.0± 130.3 7.9 123.9 7.4 95 Pass Curve#1
in/drive-out wall: 10'North and 65' Eas1 SAND Gravell Sil
164 From narthwest corner of north drive- -11.0± 130.3 7.9 125.7 6.3 96 Pass Curve#1
in/drive-out wall: 15'North and 55' East SAND Gravell Sil
165 From northwest corner of north drive- -5.0± 130.3 7.9 124.3 7.1 95 Pass Curve#1
in/drive-out wall: 5'North and 20'East SAND Gravell Sil
166 From narthwest corner of north drive- -3.0± 130.3 7.9 126.2 6.0 97 Pass Curve#1
in/drive-out wall: 10'North and 10'East SAND Gravell Sil
167 From northwest corner of north drive- -10.0± 130.3 7.9 125.0 6.7 96 Pass Curve#1
in/drive-out wall: 7'North and 75'East SAND Gravell Sil
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 47°F± � Fill TestedMeets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99,+2°/o to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Wacker Progress Report: Field engineer arrived on-site,as requested,to observe and test general
backfill. Test results indicate that moisture and density tests performed at the noted
Number of Passes: Varies Thickness of Lift: 8 to 12 inches locations have met project speci�cations.
Method of Adding Moisture: N/A
This report prosents opinions formed as a result of our observations and/or compaction testing of the fill during this visit.
We have relied on the contractar to continue applying the recommended compactive effort and moisture to the fill duri��g
times when our observer is not observing operations. Tests are made of the fill only as belicved necessary to calibrate our
observer's'ud*ment Test data are not the sole basis for o inions on whether the till meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 10/22/10
Tom Kassmel,P.E. Report#: 45B Sheet: 2 of 2
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transpartation Grand Junction—(970)241-7700 Structural Fill Below Foundarions
1309 Elkhorn Drive ECO Building
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
168 Gridlines B.7/2.0 -13.0± 130.3 7.9 127.7 7.3 98 Pass Curve#1
SAND Gravell Sil
169 Gridlines C.0/4.5 -12.0± 130.3 7.9 129.0 6.5 99 Pass Curve#1
SAND Gravell Sil
170 Gridlines A.8/3.0 -11.0± 130.3 7.9 128.4 7.0 99 Pass Curve#1
SAND Gravell Sil
171 Gridlines B.9/5.5 -10.0± 130.3 7.9 129.5 6.2 99 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 50°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 98%of Standard Proctor AASHTO T 99,+2°/o to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Wacker Progress Report: Field engineer arrived on-site, as requested, to observe and test the
structural fill being placed below the proposed ECO Building. Test results indicate that
Number of Passes: Varies Thickness of Lift: 8 inches moisture and density tests performed at the noted locations have met project
Method of Adding Moisture: N/A specifications.
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended compactive effort and moisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment Test data are not the sole basis for o inio��s on whether the fill meets s ecifications.
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By