HomeMy WebLinkAbout10-039 Daily Field Reports 63 to 66 REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: ll/18/10
Tom Kassmel,P.E.
Town Engineer Report#: 63 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 42°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): ECO Building Continuous Footing Pad
Location of Observations: 4' North of Gridline A.0 to A.3 on Gridline 0
Sheet or Plan Number: S 100, S 101, and 3/S 121
Meets Project Spec.
Eco Buildin continuous Footin pad Rebar: 4' North of Gridline A.0 to A.3 on Gridline 0 yes no
Bottom: Size: 5 - #5 Spacing: Continuous � ❑
Bottom: Size: #5 Spacing: 1'-0" o.c. transverse � ❑
Dowels: Size: #5 Spacing: 1'-0"o.c. inside face � ❑
Dowels: Size: #7 Spacing: 1'-0" o.c. outside face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: ll/19/10
Tom Kassmel,P.E. Report#: 64 Sheet: 1 of 1
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 Retaining Wall Footing and Snow Storage
1309 Elkhorn Drive Grand Junction—(970)241-7700 Slab-on-grade
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
203 43'West of Gridlines&1 and E-E.3 Grade± 130.3 7.9 127.1 6.5 98 Pass Curve#1
SAND Gravell Sil
204 Retest of Test#202,dated 11/17/10 Grade± 130.3 7.9 1211 13.3 93 Fail Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : °F± ❑ Fill Tested Meets Specifications.
Specification Compaction&Material: 98%(Retaining Wall)or 95%(Slab-on-grade)of � Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)204
Standard Proctor AASHTO T 99,+2%to-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 1-Trackhoe � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Progress Report: Field engineer arrived on-site, as requested, to observe and test the
structural fill below the retaining wall footing and snow storage slab-on-grade. Test
Number of Passes: Varies Thickness of Lift: N/A results indicate that moisture and density tests performed at the noted location far the
Method of Adding Moisture: None retaining wall have met project specifications. However,test results indicate that moisture
T�,�s re�o�t p�zs�„cs op�n�ons formea as d��suir ofou�oeser�ar��,ns anaior�o�„pa�t�o„resr�ng ofri,e f�u aur�n�rn;s��s�r. and density tests performed at the noted location for the slab-on-grade have failed to meet
We have relied on the contractor to continue applying the recominended compactive effort and mois[ure to the fill during j7r0�0Ct SpeCl�CatlOriS.
times when our observer is not observing operations. Tests are made of the fill only as belicved necessary to calibrate our
observei's jud ment Test data are not the sole basis for o inions on whether the filL meets s ecifications.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 11/20/10
Tom Kassmel,P.E.
Town Engineer Report#: 65 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 46°F±
Construction Activities/Observations: Field engineer arrived on site, as requested, to perform moisture and density
testing below the western-most retaining wall.
The area was excavated to grade from Gridline E-E.0 to Gridline �D.O but had not been compacted. The soils
exposed in the lowest area were not wet and just needed to be compacted. However, at the first step up and on, the
soils in this area were wet and very soft between Gridlines�D.O and�D.S.
The contractor proposes to remove approximately 2 feet of the material, place geogrid, and then bacicfill with suitable
material.
No moisture and density testing was performed during this site visit.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: ll/23/10
Tom Kassmel,P.E.
Town Engineer Report#: 66 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 40°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): wa��ay Topp�ng s�ab ana Eco Bu�id�ng wali
Location of Observations: Gridlines E C to E-D/E-1, E-D.3 to End of Walkway, and A.0-A.5/1.0
Sheet or Plan Number: 4/5316 and 3/S 121
Meets Project Spec.
Walkway Topping Slab Rebar: Gridlines E-C to E-D/E-1 and E-D.3 to End of Walkway yes no
U-bar Size: #3 Spacing: 1'-4"o.c. each side � ❑
Horizontal: Size: 2 - #4 Spacing: Continuous each side � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 2'-0" � ❑
Meets Project Spec.
ECO Building Wall Rebar: Gridlines A.0-A.5/1.0 yes no
Vertical: Size: #5 Spacing: 1'-0"o.c. inside face � ❑
Vertical: Size: #7 Spacing: 1'-0"o.c. outside face � ❑
Horizontal: Size: #5 Spacing: 1'-4" o.c. each face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By