HomeMy WebLinkAbout10-039 Daily Field Reports 67 to 73 REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: ll/29/10
Tom Kassmel,P.E.
Town Engineer Report#: 67 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny ❑ Cloudy ❑ Rain � Snow Temp: 25°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Spread Footing
Location of Observations: Gridlines E E to North Drive-ii�/Drive-out Wall, 50' West of E-1
Sheet or Plan Number: 6/5319
Meets Project Spec.
SpTead FOOting Rebal': Gridlines E-E to North Drive-in/Drive-out Wall,50' West of E-1 yeS n0
Bottom: Size: 4 - #5 Spacing: Continuous � ❑
Horizontal: Size: #5 Spacing: 1'-0" o.c. at top � ❑
Horizontal L-bar: Size: #7 Spacing: 0'-9" o.c. � ❑
Dowels: Size: #7 Spacing: 0'-9" o.c. � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Mike Brath Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: ll/30/10
Tom Kassmel,P.E.
Town Engineer Report#: 68 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 20°F±
Construction Activities/Observations: Field engineer arrived on site, as requested,to observe waterproofing for the
interiar of the foundation walls on Gridlines A B/0, G2.8-6.1, A-C/6.1, and B-C/0-3.2 (5100 and S101).
Waterproofing was in place from the base to the top of the interior walls on Gridlines A-B/0, G2.8-6.1, and A-C/6.1,
and at approxirnately 4 feet from the base to the top of the interior of the foundation wall on Gridlines B-C/0-3.2.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/2/10
Tom Kassmel,P.E.
Town Engineer Report#: 69 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 36°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): West Retaining Wall
Location of Observations: Gridlines E E to North Drive-ii�/Drive-out Wall, 50' West of E-1
Sheet or Plan Number: 5205 and 5319
Meets Project Spec.
WOSt R0ta111111g Wall Rebal': Gridlines E-E to North Drive-in/Drive-out Wall,50'West of E-1 yeS n0
Horizontal: Size: #5 Spacing: 1'-0"o.c. inside face � ❑
Horizontal: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Vertical: Size: #5 Spacing: 1'-0" o.c. outside face � ❑
Vertical: Size: #7 Spacing: 0'-9"o.c. inside face � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 5'-10.5"at horizontal � ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REPORT OF CONSTRUCTION ACTIVITIES
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/3/10
Tom Kassmel,P.E.
Town Engineer Report#: 70 Sheet: 1 of 1
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 32° - 41°F±
Construction Activities/Observations: Field engineer arrived on site, as requested,to observe the removal of frozen
soil and to observe the placement of fill below the interior and exterior slab-on-grade at 11' north of Gridlines A-GO-
3.2 and 11' north of Gridlines A-C/3.5-6 (5100).
The frozen soil was removed at 11 feet north of Gridlines A C/0-3.2. Field engineer was informed that m fill will be
placed in the area today. The contractor was in the process of removing the frozen soil at 11 feet north of Gridlines A-
G3.5-6.
The area at 11 feet north of Gridlines A C/0-3.2 was free of frost and has met project specifications. Field engineer
recommends that this area be protected from weather prior to fill placement.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/4/10
Tom Kassmel,P.E. Report#: 71 Sheet: 1 of 1
Geotechnical and Materials Engineers
Town Engineer Lalcewood-(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transportation Grand Junction-(970)241-7700 Fill below Interior and Exterior
1309 Elkhorn Drive Slabs-on-grade
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
205 Gridlines A.9/0.8 -18.0± 130.3 7.9 123.4 11.0 95 Pass Curve#1
SAND Gravell Sil
206 Gridlines B.2/5.5 -17.0± 130.3 7.9 123.3 ll.6 95 Pass Curve#1
SAND Gravell Sil
207 Gridlines B.2/2.3 -17.0± 130.3 7.9 127.8 10.4 98 Pass Curve#1
SAND Gravell Sil
208 Gridlines A.3/4.3 -16.0± 130.3 7.9 125.8 10.6 97 Pass Curve#1
SAND Gravell Sil
209 Gridlines A.6/2.6 -16.0± 130.3 7.9 128.3 9.9 98 Pass Curve#1
SAND Gravell Sil
210 Gridlines A.5/4.5 -15.0± 130.3 7.9 128.3 10.4 98 Pass Curve#1
SAND Gravell Sil
211 Gridlines A.5/1.9 -15.0± 130.3 7.9 128.0 101 98 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 36°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99,+2°/o to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Tracichoes, 1-Bobcat � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Progress Report: Field engineer arrived on-site, as requested, to observe and test tl�e
structural fill below the interior slabs-on-grade 1'north of Gridlines A-GO-3.2 and 11' north
Number of Passes: Varies Thickness of Lift: 8 inches of Gridlines A-C/3.5-6. The frost was removed from ll'north of Gridlines A-C/3.5-6 prior to
Method of Adding Moisture: None fill placement. Due to the moisture content, there was minor deflection of the soils but the
Tl�is re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit. &Y01S W0T'0ri't pUffiplrig. E�ItllOUgl1 t110 ffiOIStUT'e CORtentS WeT'0 OUt Of Sp0C1fIC1t10riS� lt 1S
We have relied on the contractor to continue applying the recommended compactive effort and moisture to the fill during OUT' Op1llI0ri t118t tlle C�OriSIry tOStS ]�0T'fOYII10Cl 3t Y110 riOteC� IOC2t10riS 111V0 TriOt pT'OJeCY
times when our observer is not observing operations. Tests are made of the fill only as belicved necessary to calibrate our
observei's jud ment Test data are not the sole basis for o inions on whether the filL meets s ecifications. Sp0C1f1Cat1011S.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/5/10
Tom Kassmel,P.E. Report#: 72 Sheet: 1 of 1
Geotechnical and Materials Engineers
Town Engineer Lalcewood-(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transportation Grand Junction-(970)241-7700 Fill below Interior and Exterior
1309 Elkhorn Drive Slabs-on-grade
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
212 Gridlines A.4/0.3 -11.5-� 130.3 7.9 126.8 10.3 97 Pass Curve#1
SAND Gravell Sil
213 Gridlines A.7/3.6 -13.0± 130.3 7.9 1321 7.5 100 Pass Curve#1
SAND Gravell Sil
214 3'North of Gridlines A.0/5.3 -13.0± 130.3 7.9 128.4 8.3 99 Pass Curve#1
SAND Gravell Sil
215 Gridlines A.7/1.7 -11.0± 130.3 7.9 131.3 8.3 100 Pass Curve#1
SAND Gravell Sil
216 6'North of Gridlines A/0.7 -11.0± 130.3 7.9 133.3 7.1 100 Pass Curve#1
SAND Gravell Sil
217 Gridlines A.4/2.0 -10.0± 130.3 7.9 132.0 8.1 100 Pass Curve#1
SAND Gravell Sil
218 Gridlines A.1/3.0 -10.0± 130.3 7.9 130.3 8.2 100 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 45°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99,+2°/o to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Tracichoes, 1-Bobcat(broke track) � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 2-Walk-behinds Progress Report: Field engineer arrived on-site, as requested, to observe and test the
structural fill below the interior and exterior slabs-on-grade at 11'north of Gridlines A-C/0.
Number of Passes: Varies Thickness of Lift: 8 inches 3.2 and ll' north of Gridlines A-C/3.5-6. Test results indicate that moisture and density
Method of Adding Moisture: None tests performed at the noted locations have met project speci�cations.
This report presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied m�the contractar to continue applying the recomme�ded compactive effbrt and inoisture to the fill duri�g
times when our observer is not obscrving operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o i�ions on whether the fill meets s ecificatio�s.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/6/10
Tom Kassmel,P.E. Report#: 73A Sheet: 1 of 2
Geotechnical and Materials Engineers
Town Engineer Lalcewood—(303)989-1223 Subject: Fill Observation and Testine
Department of Public Works/Transportation Grand Junction—(970)241-7700 Fill below Interior and Exterior
1309 Elkhorn Drive Slabs-on-grade
Vail,Colorado 81657 Lionshead Transit Center
Vail,Colorado
LaboraYo Field
Depth MaJCimum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) cf� (%) cfl (%)
219 Gridlines A.7/0.4 -8.5± 130.3 7.9 131.9 8.3 100 Pass Curve#1
SAND Gravell Sil
220 Gridlines A.1/2.3 -8.5± 130.3 7.9 1281 8.5 98 Pass Curve#1
SAND Gravell Sil
Weather: ❑ Sum� � Cloud ❑ Rain ❑ Snow Tem : 36°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctor AASHTO T 99,+2%to ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Bacichoes � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 2-Walk-behinds Progress Report: Field engineer arrived on-site, as requested, to observe and test the
structural fill below the interior and exterior slabs-on-grade at 11'north of Gridlines A-C/0.
Number of Passes: Varies Thickness of Lift: 8 inches 3.2. Test results indicate that moisture and density tests performed at the noted locations
Method of Adding Moisture: None have met project specifications.
This report presents opinions formed as a res'ult of our observations and/or compaction testing of the fill during this visit.
We have relied m�the contractar to continue applying the recomme�ded compactive effbrt and inoisture to the fill duri�g
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's'ud ment Test data are not tlie sole basis for o inions on whether the fill meets s ecifications.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/6/10
Tom Kassmel,P.E.
Town Engineer Report#: 73B Sheet: 2 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain � Snow Temp: 40°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Northwest Stairs, Level 2 to 3
Location of Observations: Gridlines E A to E-A.3, E-18.7 to E-19
Sheet or Plan Number: 5204, 1/5215, 2/5215, and 4/5215
Meets Project Spec.
Northwest Stairs, Level 2 and 3 Rebar: Gridlines E A to E-A.3, E-18.7 to E-19 yes no
Top and bottom: Size: #6 Spacing: 1'-0" o.c. � ❑
Top and bottom: Size: #4 Spacing: 1'-0" o.c. transverse � ❑
Top and bottom: Size: #6 Spacing: 0'-8"o.c. each way for landing � ❑
Dowels: Size: #5 Spacing: 0'-8" o.c. top and bottom � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By