HomeMy WebLinkAbout10-039 Daily Field Reports 85 86 SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/27/10
Tom Kassmel,P.E. Report#: 85A Sheet: 1 of 4
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood-(303)989-1223 Gradc Beam/Foundation Walls,Grade
1309 Elkhorn Drive Grand Junction-(970)241-7700 Beams,and Interior Slab-on-grade
Vail,Colorado 81657 ECO Building
Lionshead Transit Center
Vail,Colarado
Laborato Field
Depth Maximum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) c� (%) c� (%)
284 2.0'North of Gridlines A.0/0.5(exterior -3.0± 131.1 7.7 1331 9.4 100 Pass Curve#2
rade beam/foundation walls SAND Gravell Sil
285 2.5'North of Gridlines A.0/2.7(exterior -3.0± 131.1 7.7 129.8 9.3 99 Pass Curve#2
rade beam/foundation walls SAND Gravell Sil
286 Gridlines A.1/09(interior slab-on-grade) -4.0± 131.1 7.7 124.5 10.8 95 Pass Curve#2
SAND Gravell Sil
287 Gridlines A.2/4.6(interior slab-on-grade) -5.0± 131.1 7.7 130.7 10.8 100 Pass Curve#2
SAND Gravell Sil
288 Gridlines A I/2.5(interior slab-on-grade) -3.0± 131.1 7.7 125.2 10.2 95 Pass Curve#2
SAND Gravell Sil
289 2.0'North of Gridlines A.0/3.8(exterior -2.0± 131.1 7.7 129.3 9.4 99 Pass Ciuve#2
rade beam/foundation walls SAND Gravell Sil
290 3.0'North of Gridlines A.0/5.0(exterior -1.0± 131.1 7.7 129.7 8.5 99 Pass Curve#2
rade beam/foundation walls SAND Gravell Sil
Weather: ❑ Sunn � Cloud ❑ Rain ❑ Snow Tem : 30°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctar ASTM D 698, ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
+2%to-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Trackhoes � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind, 1-Jumping jack Progress Report: Field engineer arrived on-site, as requested, to observe and test the fill
placed for the exteriar grade beam/foundation wa11s, the interior side of the grade
Number of Passes: Varies Thickness of Lift: 8 inches beam/foundation walls and grade beams, and the interior slab-on-grade. Test results
Method of Adding Moisture: None indicate that moisture and density tests performed at the noted locations have met project
This report presents opinions formed as a result of our observations and/or compaction testing of the fill during this visit SpeClflGatlOriS.
We have relied on tlie coi�trac[ar to continue applying the recommended compactive effort and�noisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o i��ions on whether the fill meets s ecifications.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/27/10
Tom Kassmel,P.E. Report#: 85B Sheet: 2 of 4
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 Gradc Beam/Foundation Walls,Grade
1309 Elkhorn Drive Grand Junction—(970)241-7700 Beams,and Interior Slab-on-grade
Vail,Colorado 81657 ECO Building
Lionshead Transit Center
Vail,Colarado
Laborato Field
Depth Maximum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) c� (%) c� (%)
291 Gridlines A.3/49(interior slab-on-grade) -3.0± 131.1 7.7 131.5 8.7 100 Pass Curve#2
SAND Gravell Sil
292 Gridlines A.6/2.0(interior grade Grade± 131.1 7.7 131.1 9.7 100 Pass Curve#2
beam/foundation walls SAND,Gravell ,Sil
293 Gridlines A.5/1.0(interior grade Grade± 131.1 7.7 130.5 9.8 100 Pass Curve#2
beam/foundation walls SAND Gravell Sil
294 Gridlines A.3/3.2(planter slab-on-grade) Grade-±- 131.1 7.7 129.4 8.7 99 Pass Curve#2
SAND Gravell Sil
295 2.0'North of Gridlines A.0/3.5(planter Grade± 131.1 7.7 124.5 10.8 95 Pass Curve#2
slab-on- rade SAND Gravell Sil
Weather: � Sunn ❑ Cloud ❑ Rain ❑ Snow Tem : 31°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctar ASTM D 698, ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
+2%to-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Trackhoes � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Jumping jack, 1-Walk behind Progress Report: See Sheet 1 of 4.
Number of Passes: Varies Thickness of Lift: 8 inches
Method of Adding Moisture: None
This re�ort presents opinions formed as a result of our observations and/or compaction testing of tl�e fill during this visit.
We have relied on the contractor to continue applying the recommended compactive effort and inoisture to the fill during
times when our observer is not observing operations. Tests are made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not the sole basis for o i��ions on whether the fill meets s ecifications.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/27/10
Tom Kassmel,P.E.
Town Engineer Report#: 85C Sheet: 3 of 4
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 31°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): ECO Building: Interior Slab-on-grade and
Typical Slab-on-grade Sump Pit
Location of Observations: Gridlines A.0-C.0/6.1-8.0 and A.2/6.4
Sheet or Plan Number: S 101, 1/5316 typical, S 100, and 7/5316
Meets Project Spec.
Interior Slab-on-grade Rebar: Gridlines A.0-C.0/6.1-8.0 yes no
Bottom: Size: #4 Spacing: 1'-4"o.c. each way � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) yes Length: 2'-4.25" � ❑
Meets Project Spec.
Typical Slab-on-grade Sump Pit Rebar: Gridlines A.2/6.4 yes no
Vertical sides: Size: #4 Spacing: 1'-0" o.c. � ❑
Horizontal sides: Size: #4 Spacing: 1'-0" o.c. � ❑
Bottom: Size: #4 Spacing: Each way,was omitted ❑ �
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has not been properly placed and has not met project specifications. ❑ �
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/27/10
Tom Kassmel,P.E.
Town Engineer Report#: 85D Sheet: 4 of 4
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 31°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Grade Beams
Location of Observations: Gridlines A.0-B.0/1.0 and A.0-B.0/2.0
Sheet or Plan Number: S 101, 3/5313, and 2/5313
Meets Project Spec.
Grade Beams Rebar: Gridlines A.0-B.0/1.0 and A.0-B.0/2.0 yes no
Bottom: Size: 4 - #7 Spacing: Continuous � ❑
Each side: Size: 3 - #5 Spacing: Continuous � ❑
Stirrups: Size: #3 Spacing: 0'-10" o.c. � ❑
Top: Size: 4 - #5 Spacing: Continuous � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Rebar: yes no
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted 'm this Daily Field Report has been properly placed and has met project specifications. � ❑
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
SOIL COMPACTION TEST RESULTS
To: Town of Vail KOECHLEIN CONSULTING ENGINEERS, INC. Job No. 10-039 Date: 12/28/10
Tom Kassmel,P.E. Report#: 86A Sheet: 1 of 2
Geotechnical and Materials Engineers
Town Engineer Subject: Fill Observation and Testine
Department of Public Works/Transpartation Lalcewood—(303)989-1223 Retaining and Foundation Wall Fill and
1309 Elkhorn Drive Grand Junction—(970)241-7700 West Half of Planter Box
Vail,Colorado 81657 ECO Building
Lionshead Transit Center
Vail,Colarado
Laborato Field
Depth Maximum Optimum
Test Location or Dry Moisture Dry Moisture Percent Pass/Fail Soil Type
No. Elevation Density Content Density Content Compaction
(feet) c� (%) c� (%)
296 3.0'East of Gridlines A.6/8.0(retaining and -3.0± 131.1 7.7 124.2 9.9 95 Pass Curve#2
foundation wall SAND Gravell Sil
297 10.0'East of Gridlines A.3/8A(retaining -4.5± 131.1 7.7 124.1 10.3 95 Pass Curve#2
and foundation wall SAND Gravell Sil
298 2.0'North of Gridlines A.0/6.3(west half of Grade± 131.1 7.7 127.7 10.0 97 Pass Curve#2
lanter box SAND Gravell Sil
299 3.0'North,4.0'East of Gridlines A.0/8.0 -3.0± 131.1 7.7 126.3 8.4 96 Pass Curve#2
retainin and foundation wall SAND Gravell Sil
Weather: � Sunn ❑ Cloud ❑ Rain ❑ Snow Tem : 35°F± � Fill Tested Meets Specifications.
Specification Compaction&Material: 95%of Standard Proctar ASTM D 698, ❑ Fill Tested Does Not Meet Specifications as Indicated by Test Number(s)
+2%to-2%of Optimum Moisture Content and Should be Removed or Reworked.
Type and Number of Earth Moving Units: 2-Tracichoes, 1-Bobcat � Contractor Advised.
❑ Full Time Observation. � Part Time Observation.
Type and Number of Compaction Units: 1-Walk-behind Progress Report: Field engineer arrived on-site, as requested, to observe and test the fill
for the retaining and foundarion walls and the west half of the planter box for the ECO
Number of Passes: Varies Thickness of Lift: 8 inches Building. Test results indicate that moisture and density tests performed at the noted
Method of Adding Moisture: None locations have met project specifications.
This report presents opinions fonned as a result of our observations and/or compaction testing of the fill during tl�is visit.
We have relied on tlie coi�tractar to continue applying the recommended compactive effort and inoisture to the fill during
times when our observer is not observing operations. Tests arc made of the fill only as believed necessary to calibrate our
observer's jud ment. Test data are not tlie sole basis for o inions on whether the fill meets s ecificatioi�s.
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By
REINFORCING STEEL (REBAR) OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 12/28/10
Tom Kassmel,P.E.
Town Engineer Report#: 86B Sheet: 2 of 2
Department of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 35°F±
Reinforcing Steel (Rebar) Observations:
Type of Structure: (Wall, Grade Beam, Footin�, Slab-on-�rade, etc.): Grade Beams and Planter Boxes
Location of Observations: Gridlines A.0-C.0/4.0, A.0-C.0/5.0, A.0-A.6/3.0-3.3, and A.0/3.0-4.0 to 4.0' North
Sheet or Plan Number: S 101, 1/5313, and 9/5313
Meets Project Spec.
Grade Beams Rebar: Gridlines A.0-C.0/4.0 and A.0-C.0/5.0 yes no
Top: Size: 4 - #5 Spacing: Continuous � ❑
Sides: Size: 2 - #5 Spacing: Continuous � ❑
Stirrups: Size: #3 Spacing: 0'-10" o.c. � ❑
Bottom: Size: 4 - #7 Spacing: Continuous � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Meets Project Spec.
Planter Boxes Rebar: Gridlines A.0-A.6/3.0-3.3, and A.0/3.0-4.0 to 4.0' North yes no
Bottom: Size: #4 Spacing: 1'-0"o.c. each way � ❑
Dowels: Size: #3 Spacing: 1'-0"o.c. drilled and epo�ry into walls � ❑
Dowels: Size: #5 Spacing: 1'-0"o.c. for planter walls � ❑
Bottom: Size: 2 - #5 Spacing: Continuous at planter walls � ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Size: Spacing: ❑ ❑
Splices:(yes/no) no Length: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the reinforcing steel (rebar) yes no
noted in this Daily Field Report has been properly placed and has met project specifications. � ❑
Don Sneed Scott B. Myers, P.E.
Field Observer Reviewed By