HomeMy WebLinkAbout10-039 Daily Field Reports 95 96 MASONRY OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 5/5/11
Tom Kassmel,P.E.
Town Engineer Report#: 95 Sheet: 1 of 1
Deparrinent of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: � Sunny ❑ Cloudy ❑ Rain ❑ Snow Temp: 46°F±
Masonry Observations:
Gridline Location(Height): Gridlines C.2/6.0-8.0, A.0-C.0/8.0, A.0/6.1-8.0 (8'-0")
Block Size: 8"x8"x16" Meets Project Spec.
yes no
Block Cells Cleaned(yes/no): Yes � ❑
All Cells with Rebar Grouted(yes/no): Yes � ❑
All Cells without Rebar Grouted(yes/no): Yes � ❑
Rebar Installed in Cells: Qty/Size: 1 /#5 Spacing: 2'-0" o.c. � ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Horizontal Joint Reinforcement Type: Dur-o-wall Spacing: 1'-4" o.c. � ❑
Bond Beam Installed(yes/no): Yes � ❑
Rebar Installed in Bond Beam: Qty/Size: 2 /#5 Spacing: Continuous � ❑
Rebar Installed in Bond Beam: Qty/Size: 2 /#5 Spacing: Corner bars � ❑
Gridline Location(Height):
Block Size: Meets Project Spec.
yes no
Block Cells Cleaned(yes/no): ❑ ❑
All Cells with Rebar Grouted(yes/no): ❑ ❑
All Cells without Rebar Grouted(yes/no): ❑ ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Horizontal Joint Reinforcement: Type: Spacing: ❑ ❑
Bond Beam Installed(yes/no): ❑ ❑
Rebar Installed in Bond Beam: Qty/Size: Spacing: ❑ ❑
Rebar Installed in Bond Beam: Qty/Size: Spacing: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the masonry reinforcing steel yes no
(rebar) observed during this site visit has been properly placed and has met project specifications. � ❑
Don Sneed William H. Koechlein,P.E.
Field Observer Reviewed By
MASONRY OBSERVATION
KOECHLEIN CONSULTING ENGINEERS, INC.
Geotechnical and Materials Engineers
Lakewood—(303)989-1223
Grand Junction—(970)241-7700
To: Town of Vail Job No. 10-039 Date: 5/6/11
Tom Kassmel,P.E.
Town Engineer Report#: 96 Sheet: 1 of 1
Deparrinent of Public Works/Transportation
1309 Elkhorn Drive
Vail,Colorado 81657
Project: Lionshead Transit Center,Vail, Colorado
Weather: ❑ Sunny � Cloudy ❑ Rain ❑ Snow Temp: 66°F±
Masonry Observations:
Gridline Location(Height): ls`Level: B.0-C.0/2.6 and B.0/2.6-3.3 (8'-0"); C.0/1.0-2.0, B.0-C.0/1.0,
B.0-C.0/2.0—double walls (8'-4"); A.0-B.0/0.0 and B.0/0.0-1.0 (3'-ll")
Block Size: 8"x8"x16" Meets Project Spec.
yes no
Block Cells Cleaned(yes/no): Yes � ❑
All Cells with Rebar Grouted(yes/no): Yes � ❑
All Cells without Rebar Grouted(yes/no): Yes � ❑
Rebar Installed in Cells: Qty/Size: 1 /#5 Spacing: 2'-0"o.c. and wall ends � ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Horizontal Joint Reinforcement: Type: Dur-o-wall Spacing: 1'-4" o.c. � ❑
Bond Beam Installed(yes/no): Yes � ❑
Rebar Installed in Bond Beam: Qty/Size: 2 /#5 Spacing. Continuous � ❑
Rebar Installed in Bond Beam: Qty/Size: 2 /#5 Spacing: Corner bars � ❑
Gridline Location(Height):
Block Size: Meets Project Spec.
yes no
Block Cells Cleaned(yes/no): ❑ ❑
All Cells with Rebar Grouted(yes/no): ❑ ❑
All Cells without Rebar Grouted(yes/no): ❑ ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Rebar Installed in Cells: Qty/Size: Spacing: ❑ ❑
Horizontal Joint Reinforcement: Type: Spacing: ❑ ❑
Bond Beam Installed(yes/no): ❑ ❑
Rebar Installed in Bond Beam: Qty/Size: Spacing: ❑ ❑
Rebar Installed in Bond Beam: Qty/Size: Spacing: ❑ ❑
Discrepancies/Remarks: Based on our observations, it is our opinion that the masonry reinforcing steel yes no
(rebar) observed during this site visit has been properly placed and has met project specifications. � ❑
Don Sneed William H. Koechlein,P.E.
Field Observer Reviewed By