Loading...
HomeMy WebLinkAbout10-039 Discrepancies thru 11-10-10 LIONSHEAD TRANSIT CENTER DISCREPANCY LIST FOR KCE JOB NO. 10-039 PROPOSED LIONSHEAD TRANSIT CENTER, VAIL, COLORADO IN AN EFFORT TO IMPROVE OUR SERVICES AND THE COMMUNICATION BETWEEN TEAM MEMBERS,WE WILL BE PROVIDING THE FOLLOWING DISCREPANCY LIST. THIS LiST WILL INCLUDE ANY DISCREPANCiES IDENTIFIED IN OUR FIELD REPORTS THRU THE LATEST REViEWED FiELD REPORT. CONCRETE AND GROUT DISCREPANCIES WILL ONLY BE NOTED FOR CONCRETE OR GROUT THAT DOES NOT MEET THE 28 DAY STRENGTH REQUIREMENTS. THE DISCREPANCY LiST WILL BE UPDATED ON A WEEKLY BASIS(DAILY FOR CONCRETE)AND WILL BE SENT OUT EVERY WEEK. IF YOU HAVE ANY QUESTIONS,PLEASE CALL. KCE JOB NO.10-039 ll/10/10 SHEET 1 OF 8 LIONSHEAD TRANSIT CENTER EXCAVATION OBSERVATIONS-DISCREPANCIES Date Daily Report No. Discrepancy I.ocation Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 ll/10/10 SHEET 2 OF 8 LIONSHEAD TRANSIT CENTER SOIL COMPACTION,OTHER OBSERVATIONS-DISCREPANCIES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date 08/]7/l0 1 Low densities Tests 1 and 2 08/26/10 09/29/10 26A Low densities Test 69 y 09/30/l0 10/02/10 29 Failed Proof-roll Sta.4+40 to 5+59 10/06/10 32A Low densities Tests 86 and 87 y 10/07/]0 10/09/10 34A Low densit Test 94 l t/04/10 10/]0/10 35 Low density Test 96(Re-test of Test 94) y 11/04/]0 10/1 I/10 36A Fill in base of excavafion FCO Buildin -Gridlines A.0-C.0/8.0 10/20/10 10/15/10 40A Fill in base of excavation ECO Building-Gridlines A.0-C.0/8.0 y 10/20/]0 KCE JOB NO.10-039 ll/10/10 SHEET 3 OF 8 LIONSHEAD TRANSIT CENTER STRUCTURAL STEEL-DISCREPANCIES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date 11/]0/l0 LTC-01 WelderCe�tifcationsNotProvidsd N/A Il/]5/10 KCE JOB NO.10-039 ll/10/10 SHEET 4 OF 8 LIONSHEAD TRANSIT CENTER REINFORCING STEEL(REBAR)-DiSCREPANCIES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date 09/28/l0 25C Rebar laced does not match detail on 6/S210 Gridlines E-1.5 Yo E-3.0/E-A 10/18/10 10/21/10 44C Rebar laced does not match detail o��9/5215 Leve12-U er landing y 11/O1/]0 10/29/10 48B Rebars ecification notin ]ans Level I Stair Slabs KCE JOB NO.10-039 ll/10/10 SHEET 5 OF 8 LIONSHEAD TRANSIT CENTER MASONRY OBSERVATIONS-DISCREPANCIES Date Daily Report No. Discrepancy I.ocation Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 ll/10/10 SHEET 6 OF 8 LIONSHEAD TRANSIT CENTER CONCRETE DISCREPANCIES Did Concrete meet 28 day Compressive Did Concrete meet 28 day Compressive Cast Date Discrepancy Item Cast Approximate I.ocation Strength(yes/no) Strength at 56 days(yes/no) None to date KCE JOB NO.10-039 ll/10/10 SHEET 7 OF 8 LIONSHEAD TRANSIT CENTER ASPAALT DISCREPANCIES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 ll/10/10 SHEET 8 OF 8