Loading...
HomeMy WebLinkAbout10-039 Discrepancies thru 12-6-10 I,IONSHEAD TRANSIT CF.,NTER DISCREPANCY LIST FOR KCE JOB NO. 10-039 PROPOSED LIONSHEAD TRANSIT CENTER, VAIL, COLORADO IN AN EFFORT TO IMPROVE OUR SERVICES AND THE COMMUNICATION BETWEEN TEAM MEMBERS,WE WILL BE PROVIDING THE FOLLOWING DISCREPANCY LIST. THIS LIST WILL INCLUDE ANY DISCREPANCIES IDENTIFIED IN OUR FIELD REPORTS THRU THE LATEST REVIEWED FIELD REPORT. CONCRETE AND GROUT DISCREPANCIES WILL ONLY BE NOTED FOR CONCRETE OR GROUT THAT DOES NOT MEET THE 28 DAY STRENGTH REQUIREMENTS. THE DISCREPANCY LIST WILL BE UPDATED ON A WEEKLY BASIS(DAILY FOR CONCRETE)AND WILL BE SENT OUT EVERY WEEK. IF YOU HAVE ANY QUESTIONS,PLEASE CALL. KCE JOB NO.10-039 12/6/10 SH�ET 1 OF 8 I,IONSHEAD TRANSIT CF.,NTER EXCAVATION OBSERVATiONS-DISCREPANCIES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 12/6/10 SH�ET 2 OF 8 I,IONSHEAD TRANSIT CF.,NTER SOIL COMPACTION,OTHER OBSERVATIONS-DISCREPANCIES Date Daily Report No. Discrepancy Loca[ion Resolved(y/n) Resolution Date 08/17/10 1 Low densities Tests 1 and 2 y 08/26/10 09/29/10 26A Low densiCies Tes[69 y 09/30/10 10/02/10 29 Failed Proof-roll Sta.4+40 to 5+59 10/06/10 32A Low densities Tests 86 and 87 y 10/07/10 10/09/I O 34A Low density Test 94 y I L/04/I O 10/10/10 35 I,ow density Test 96(Re-test ot�Test 94) 11/04/10 10/I ULO 36A Pill in base of excavation GCO Building-Gridlines A.0-C.0/8.0 y 10/20/I O 10/15/10 40A Fill in base of excavation ECO Building-Gridlines A.0-C.0/8.0 10/20/10 11/17/10 62 Fill below snow storage slab Tests 200,201,and 202 Partial Test 202(11/l9/10) 11/19/10 64 Fill below snow storage slab Test 203 KCE JOB NO.10-039 12/6/10 SH�ET 3 OF 8 I,IONSHEAD TRANSIT CF.,NTER STRUCTURAL STEEL-DISCREPANCIES Date Daily Report No. Discrepancy Loca[ion Resolved(y/n) Resolution Date 11/10/10 LTGO1 Welder Certifications Not Provided N/A y 1 L/15/10 KCE JOB NO.10-039 12/6/10 SH�ET 4 OF 8 I,IONSHEAD TRANSIT CF.,NTER REINFORCING STEEL(REBAR)-DISCREPANCIES Date Daily Report No. Discrepancy Loca[ion Resolved(y/n) Resolution Date 09/28/10 25C Rebar placed does not match detail on 6/S210 Gridlines L-1 S to C-39/C-A y 10/18/10 10/21/10 44C Rebar placed does not match detail on 9/5215 Leve12-Upper landing y 11/01/10 10/29/10 48B Rebar specification not in plans Level 1 Stair Slabs 11/11/10 57A Rebar Placed does not match plans Gridlines A.0-C.0/6.1 y 11/12/10 I L/13/IO 59D Rebar Placed does not match plans Gridlines CO/LO-6.0 y I L/15/!0 KCE JOB NO.10-039 12/6/10 SH�ET 5 OF 8 I,IONSHEAD TRANSIT CF.,NTER MASONRY OBSERVATiONS-DISCREPANC�ES Date Daily Report No. Discrepancy Location Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 12/6/10 SH�ET 6 OF 8 I,IONSHEAD TRANSIT CF.,NTER CONCRETE DISCREPANCIES Did Concrete meet 28 day Compressive Did Concrete meet 28 day Compressive Cast Datc Discrepancy Item Cast Approximate Location Strength(yes/no) Strength at 56 davs(yes/no) 09/18/10 Low concrete strength Retaining Wall Gridlines GA to B.5 No Yes 09/30/10 Low concrete stren th Pedestrian Bridga Side Wall 20'North oP Gridlines E-A.0/E3.6 No No Sidewalk on South Side of South 10/29/10 Low concrete sCrength 1^rontage Road Sta.11+30 to Sta.12+00 No 60'East of Northwest Corner of South 11/03/10 Low concrete stren th Curb and GutYer Drive-in/Drive-out Wall No KCE JOB NO.10-039 12/6/10 SH�ET 7 OF 8 I,IONSHEAD TRANSIT CF.,NTER ASPHALT DISCREPANCIES Date Daily Report No. Discrepancy Loca[ion Resolved(y/n) Resolution Date None to date KCE JOB NO.10-039 12/6/10 SH�ET 8 OF 8