HomeMy WebLinkAbout10-039 Fireproofing 1-27-11 � j FIREPROOF'INC 8494WHEATGRASSCIRCLE.
PARKER, CO 80134
Il`ISPECTION REPORT 303-957-8436
WESTERN STATES
INSPECTION
PAGE 1 oF 2
CLIENT KOECHLIEN CONSULTWG ENG[NEERS
PROJECT/JOB# KCE# 1 0-039 CLIENT PO# LIONSHEAD TRANS[T CENTER
DATE 1-27-1 1 CODE INTERNATIONAL BUILDING CODE
HOURS OF SHIFT 1 2:00 PM To 6:00 PM SPECIFICATION PROJECT SPECS.
MILEAGE TO 1 OO MILEAGE FROM 1 OO DAY OF WEEK THURSDAY
INSPECTOR ROBERT H. POLLOCK TOTAL HOURS TODAY (6)
ASSISTAN7 N/A TOTAL MILEAGE 200
P�R DIEM YES NO X CLIENT REP. SCOTT MEYER (KCE)
REPORT# LTC-07
REMARKS:
LIONSHEAD TRAfVSIT CENTER
350 S. FRONTAGE RD.
VAIL, CO.
1) TRAVEL TO PROJECT S1TE, AS REQUESTED.
2) CONDUCT VISUAL INSPECTION AND REQUIRED THICKNESS TESTING OF"SPRAY APPLIED FIRE
RESISTNE MATER[AL'� ON BUILDWG STRUCTURAL MEMBERS.
3) THE FOLLOWING TYPES OF TESTWG WILL BE CONDUCTED,AS APPLICABLE:
[,�I VISUAL INSPECTION &THICKNESS TESTING (ASTM sPEC. E605 & IBC)
[B] DRY DENSITY TESTING OF II�I-PLACE SFRM (ASTM sPEC.. E605 &IBC)
[C] ADHESION/COHESION TESTWG OF IN-PLACE SFRM (ASTM sPEC. �736 & lBC)
4) SEE ATTACHED REPORT FOR DETAILS.
� ��\
� Q,�G ,Z'�.
� �,\� �j0
Py �R
�G
� ICC SPEGIAL INSPEGTOR �SPRAY APPLIED FIREPROOFI[VG� CERT. #087521-86 ~
SIGI�IATURE ROBERT H. POLLOCK � • v4C��
(ICC SPECIAL INSPECTOR)
F I R E P ROO F I N G 8494 WHEATGRASS CIRCLE.
PARKER, CO 80134
. �
INSPECTIOI`I REPORT 303-957-8436
WESTERN STATES
WSPECT[ON
Pa�E 2 oF 2
CLIENT KOECHL[EIV CONSULTING ENGINEERS
PROJECT/JOB# KCE# 1 0-039 CLIENT PO# LIONSHEAD TRANSIT CENTER
DATE 1-27-1 1 CODE IIVTERNATIOI�IAL BUILDWG CODE
HOURS OF SHIFT PG. �I PM TO PG. l PM SPEC[FICATION PROJECT SPECS.
MILEAGE TO PG. 1 MILEAGE FROM PG. 1 DAY OF WEEK THURSDAY
INSPECTOR ROBERT H. POLLOCK TOTAL HOURS TODAY PG. 1
ASSISTANT N/A TOTAL MILEAGE PG. 1
PER D1EM YES NO X CLIENT REP. SCOTT MEYER (KCE)
REPORT# LTC-07
REMARKS:
� STAIR CANOPY STRUCTURAL STEEL FRAMING �
1) OBSERVE APPLICATION OF'INTUMESCENT MAST►C FIREPROOFING� (ALBI CLAD 80O) W PROGRESS
AT WEST CAI�IOPY. NO DISCREPANCIES WILL BE NOTED.
*WEST CANOPY*
2) CONDUCT VISUAL INSPECTIOt�i OF AREAS HAVING FINAL COAT OF PRODUCT APPLIED TO VERT.
COLUMNS A[VD BEAMS.THE REQUIRED THICKNESS IS BE1NG ACHfEVED,APPLICATION SHALL BE
COIVSIDERED ACCEPTABLE. (WEST CAIVOPY)
�EAST CANOPY�
3) CONDUCT VISUAL 1NSPECTION OF APPLICATION OF PRIMER,AND LATHE. NO DISCREPANCIES
V�IILL B�NOTED.
4) ADDITIONAL INSPECTION WILL BE CONDUCTED AS NEEDED.
� \�
� QF 4�6
� F� �6
� QQ��c '�`
QD
� 1CC SPECIAL INSPECTOR '�SPRAY APPLIED FIREPROOFING� CERT. #08752'[-86 �
SfGNATURE ROBERT H. POLLOCK �R • \��\���
(ICC SPECIAL INSPECTOR)