Loading...
HomeMy WebLinkAbout10-039 Slump Air 11-10-10 Koechlein Consulting Engineers, Inc. Geotechnical and Materials Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 � www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970) 241-7700 (303) 989-0204 FAX (970) 241-7783 FAX To: Town of Vail Tom Kassmel,P.E. Job No: 10-039 Town Engineer Date: 11/10/10 Department of Public Works/Transportation Sheet: 1 of 1 1309 Elkhorn Drive Vail,Colorado 81657 Report of Concrete Placement Observations Project: Lionshead Transit Center, Vail, Colorado Specifications: Slump 4�1.5 Air Content: 6%�1.5% Supplier Lafarge Mix LD. RMXCE45DG8V Ambient Temp. Range 32°-38°F Test Truck Time Time Time Mix Cubic Yards Water No. Na Ticket No. gatched Arrived Placed Time Sampled Design Load/ Added Strength Cumulative Gallons 1 4780730 85909555 12:24 pm 1:11 pm 1:22 pm 1:22 pm 4500 10/20 25 2 4780729 85909557 l:12 pm 2:01 pm 2:09 pm 2:12 pm 4500 20/20 5 Air �'et Test Unit Concrete Slump (In.) Content Yield Remarks No. �o�o� Weight Temp.( F� (PCF) 1 6.00 5.8 141.2 N/A 71 Tested at point of discharge. 2 4.75 5.5 141.3 N/A 72 Tested at point ofdischarge. 1 set of 4 c linders at edestrian walkwa . Progress Report: Don Sneed Scott B. Myers, P.E. Field Observer Reviewed By