Loading...
HomeMy WebLinkAbout10-039 Slump Air 11-18-10 Koechlein Consulting Engineers, Inc. Geotechnical and Materials Engineers 12364 W. Alameda Pkwy YSuite 115 YLakewood, CO 80228-2845 � www.KCE-Denver.com LAKEWOOD GRAND JUNCTION (303) 989-1223 (970) 241-7700 (303) 989-0204 FAX (970) 241-7783 FAX To: Town of Vail Tom Kassmel,P.E. Job No: 10-039 Town Engineer Date: 11/18/10 Department of Public Works/Transportation Sheet: 1 of 1 1309 Elkhorn Drive Vail,Colorado 81657 Report of Concrete Placement Observations Project: Lionshead Transit Center, Vail, Colorado Specifications: Slump 4�1.5 inches Air Content: 5%�1.5% Supplier Lafarge Mix LD. RMXCE40GD87 Ambient Temp. Range 28°-39°F Test Truck Time Time Time Mix Cubic Yards Water No. Na Ticket No. gatched Arrived Placed Time Sampled Design Load/ Added Strength Cumulative Gallons 1 4780525 85909588 10:18 am ]0:53 am 1 1:07 am 1 l:07 am 4000 9.25/l 60.00 0 2 4780730 85909589 10:39 am 11:25 am 1 1:29 am 11:30 am 4000 19.25/160.00 5 3 4780612 85909590 11:06 am 11:51 am 11:59 am 12:02 pm 4000 29.25/160.00 0 4 4780048 85909601 2:06 pm 2:45 pm 2:49 p m 2:51 pm 4000 107.00/160.00 0 5 4780612 85909608 3:44 pm 4:24 pm 4:31 pm 4:33 pm 4000 156.25/186.25 0 Air �'et Test Unit Concrete Slump (In.) Content Yield Remarks No. �o�o� Weight Temp.( F) (PCF) 1 3.25 3J 145.0 N/A 60 Tested at point of discharge. 2 3.25 3.9 145.1 N/A 64 Tested at point of discharge. 3 3.00 3.5 145.9 N/A 66 Tested at point of discharge. 1 set of 4 c linders cast. 4 3.50 4.5 143.8 N/A 64 Tested at point of discharge. 1 set of 4 cylinders cast. 5 5.25 5.4 142.3 N/A 60 Tested at point of discharge. 1 set of 4 c linders cast. Progress Report: Don Sneed Scott B. Myers, P.E. Field Observer Reviewed By