HomeMy WebLinkAboutLH FS-1-FP2
UP UP UP 1.2 1.3 2.2 2.3 2.4 1.1 2.5 C A 2.1 B MILE HIGH DESIGN GROUP 5151 Bannock St. Denver, CO 80216 303-291-1012 303-383-5023 FAX firesprinkler@amsprink.com A FIRE SPRINKLER DESIGN
COMPANY ACCEPTING THIS COPY IS DEEMED AS AGREEING TO THE FOLLOWING: THIS DRAWING COPY, ITS CONTENTS, INFORMATION AND PRINCIPALS OF DESIGN ARE THE EXCLUSIVE PROPERTY OF THE FIRE PROTECTION
CONTRACTOR LISTED AND MILE HIGH DESIGN GROUP, LLC AND IS BEING SUBMITTED TO YOU WITH THE UNDERSTANDING THAT IT IS NOT TO BE REPRODUCED, COPIED OR MODIFIED IN ANY MANNER; NEITHER SHALL
IT BE RELAYED IN WHOLE OR IN PART TO ANY OTHER INDIVIDUAL OR FIRM FOR ANY OTHER PROJECT OR EXTENSION OF THIS PROJECT EXCEPT THRU WRITTEN AGREEMENT WITH THE FIRE PROTECTION CONTRACTOR
AND MILE HIGH DESIGN GROUP, LLC. ERRORS AS A RESULT OF THIS FILE BEING ELECTRONICALLY TRANSMITTED ARE BEYOND THE CONTROL OF AND ARE NOT THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR
OR MILE HIGH DESIGN GROUP. MILE HIGH DESIGN GROUP IS NOT RESPONSIBLE FOR INSTALLATION OR INSPECTION OF WORK INSTALLED. THESE PLANS ARE DIAGRAMMATICAL ONLY. ON SITE COORDINATION MUST
BE ARRANGED WITH ALL OBSTRUCTIONS, i.e.: MECHANICAL, ELECTRICAL, AND STRUCTURAL. ANY ALTERATIONS FROM ENGINEERED DRAWINGS MUST BE APPROVED BY MILE HIGH DESIGN GROUP. MILE HIGH DESIGN
GROUP IS NOT RESPONSIBLE FOR LAYOUT DESIGN ISSUES OR CONFLICTS WITH ANY OBSTRUCTIONS. IF ADDITIONAL FIRE SPRINKLER PIPING AND/OR FIRE SPRINKLER HEADS ARE REQUIRED THIS WILL BE THE RESPONSIBILITY
OF THE FIRE SPRINKLER CONTRACTOR. ALL CHANGES MUST ME APPROVED BY MILE HIGH DESIGN GROUP, LLC THE OWNER IS RESPONSIBLE TO PROVIDE SUFFICIENT HEAT THROUGHOUT THIS BUILDING TO PREVENT
FREEZING OF WATER IN THE FIRE SPRINKLER SYSTEM -Comment noted, however, as previously discussed, depth of pipe is approved. Recommondation as apposed to a requirement. comment noted.
However, this is an external, non combustible area. VFES believes that installation of sprinklers in this area would be problematic, and ineffective. comment noted. Redesign in accordance
with latest rcp confirm ceiling type with architect. if this head outside? overhangs? confirm. same comment. If this is interior space, adjust sprinkler coverage for entire space In
addition too comment on left, resubmit on rcp, or ceiling height and slope information. Are these beams? If so, how deep? Confirm and advise on resubmittal. Related to the below comment
regarding beams: Adjust spacing of sprinkler if beam exists.