2 story building
temporary egress for buildings G G H N
a CL
<c �
Ay fA .e1/ � �J tr"" '•��.GJ/ t! >P" Er^"�`•'�' � A / �i/6/lCi kF �
Google Earth : Directions 10/31 /2007
rytlA
a
f
i
's.
n
Page I
story building
temporary egress plan for buildings A ET, IfJ 00 P
r
s � • T � �. s t ;
s •
• f Directions
,O 8
T
® 3
3V ppp
u s
F
f
—� �
- -- - -- —
/
�
�
�
'~
..
�
.�
/
/
!
'
�
/
�
/
/
�
!
�
|
/
�
|
/
n
�
,
�
|
-
|
`
|
i
r
|
�~ ,^
,
/
/
|
--
_ - —
'
-
|
/
|
/
�
�
|
'
^
^
/
/
-
/
CE U
LLI
LLI
Ld
to
SAM
En
NEW 2x6 BLOCKING rA111111111011A C:)
GENERAL NOTES
2003 INTERNATIONAL BUILDING CODE
LOADS-
SNOW LOAD = 80 PSF EXISITNG EXTERIOR WALL
SEISMIC ZONE I
WIND LOAD 85 MPH, EXP B, 3-SEC GUST
All
1. DO NOT SCALE DRAWINGS 14 CONSTRUCTION OBSERVATIONS- IF THE PROFESSIONAL
2. IF CRITICAL DIMENSIONS DO NOT APPEAR ON DRAWINGS, SERVICES OF THE ENGINEER DO NOT EXTEND TO THE EXISTING SOFFIT FRAMING
NOTIFY ENGINEER BIDDING PHASE, CONTRACT ADMINISTRATION, AND THE
3. ALL DIMENSIONS LOCATING EXTERIOR WALL SYSTEMS ARE SITE OBSERVATION OF THE CONTRACTOR'S WORK OR
TO EXTERIOR FINISHED FACE OR INTERIOR FINISHED FACE NEW 2X6 TOP RAIL NOTE:
/'_'- EXISTING ROOF TRUSSES
PERFORMANCE, THEN BY THE ACCEPTANCE OF THESE Cn W
UNLESS OTHERWISE NOTED DRAWINGS AND SPECIFICATIONS, IT IS AGREED THAT THE ALL EXISITNG HAND RAILS SHALL BE
REPLACED
4 THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND OWNER WILL DEFEND, INDEMNIFY, AND HOLD HARMLESS Z-1 Elm NEW 2X6 RAIL ATTACHED TO
DIMENSIONS AT THE JOBSITE PRIOR TO COMMENCING THE ENGINEER FROM ANY CLAIM OR SUIT WHATSOEVER, EXISTING SCABBED 2x6 RAFTER
WORK. CONTRACTOR SHALL IMMEDIATELY REPORT ALL INCLUDING, BUT NOT LIMITED TO, ALL PAYMENTS, NEW 44 POST W/ (2) 3/8"0 LAG SCREWS
DISCREPANCIES OR DEVIATIONS IN THE DRAWINGS AND EXPENSES OR COSTS INVOLVED, ARISING FROM OR L1_ 1.1, NEW (2) 2x6 RAFTERS ATTACHED TO
EXISTING CONDITIONS TO THE OWNER'S REPRESENTATIVE ALLEGED TO HAVE RISEN FROM THE CONTRACTOR'S LU a-m EXISTING RAFTERS, TYPICAL AT EACH RAFTER LOCATION.
PRIOR TO COMMENCING WORK. C)
5 ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS PERFORMANCE OR THE FAILURE OF THE CONTRACTOR'S INSTALL NEW 2x2 BALUSTERS SPACED WITH A MAX. EDGE DISTANCE _j
WORK TO CONFORM TO THE DESIGN INTENT AND THE (2) SIMPSON 1/4"OX4 1/2" SDS SCREWS
ARE INTENDED TO BE TYPICAL AND SHALL BE CONTRACT DOCUMENTS. THE ENGINEER AGREES TO BE sn- CLEARANCE OF 4" BETWEEN BALUSTERS USE GALV 1/4"OXY LAG SCREWS > < 0
CONSTRUED TO APPLY TO ANY SIMILAR SITUATION RESPONSIBLE FOR HIS/HER OWN OR HIS/HER C) 0 8" O.C, TYPICAL @ EACH RAFTER LOCATION AND WASHERS FOR ATTACHMENT 0
LU
ELSEWHERE IN THE WORK EXCEPT WHERE A DIFFERENT C-D
EMPLOYEE(S) NEGLIGENT ACTS, ERRORS OR OMISSIONS. M SIMPSON H2 5 TIE @EACH JOIST LOCATION W
DETAIL IS SHOWN. 15. ALL TRADES SHALL INSPECT SITE AND FAMILIARIZE
6. IT IS THE INTENT OF THE ENGINEER THAT THIS WORK BE THEMSELVES NTH THE PLANS AND SPECIFICATIONS IF NEW 44 POST AT MAXIMUM 6'-0" O.C. Uj 0
IN CONFORMANCE WITH ALL REQUIREMENTS OF THE
THERE ARE DISCREPANCIES IN PLANS AND
BUILDING AUTHORITIES HAVING JURISDICTION OVER THIS
SPECIFICATIONS OR UPON SITE INSPECTION, THE OWNER
TYPE OF CONSTRUCTION AND OCCUPANCY ALL ITEMS OF CD
AND ENGINEER SHALL BE N011FIED IMMEDIATELY. IF NOT
WORK SHALL BE ACCOMPLISHED IN A WORKMANLIKE
MANNER, AND IN ACCORDANCE NTH BEST MODERN FILED WITHIN A TEN DAY PERIOD IN WRITING, NO EXTRA
COSTS WILL BE CONSIDERED OR APPROVED BY OWNER SIMPSON HD2A TO CONNECT POST T ry <
CONSTRUC11ON PRACTICE. ALL MATERIALS, EQUIPMENT, EXISTING DECK BOARDS REPLACE AS NECESSARY WITH LIKE MEMBERS <
AND WORK SHALL COMPLY NTH ALL CURRENTLY
ALL DIMENSIONS SHOULD BE VERIFIED EXISTING DECK JOIST 0- >
APPROVED OR ACCEPTED PROVISIONS OF APPLICABLE 16 LOCA11ONS OF U11LITIES REPRESENT THE BEST-KNOWN EXISITNG BEAM EXISTING 2x8 JOISTS W
CODES AND STANDARDS, AND ALL FEDERAL, STATE, LOCATIONS AT THE TIME OF PREPARATION OF DRAWINGS. ATTACH NEW 44 RAILING POST Uj
COUNTY, AND MUNICIPAL CODES LAWS, AND ORDINANCES THE CONTRACTOR SHALL FIELD-LOCATE ALL UTILITIES IN TO EXISTING DECK W/ (2) 1/2"0 THROUGH BOLTS
ADVANCE OF EXCAVATION. RELOCATION OF UTILITIES MAY
SUCH CODES, STANDARDS, LAWS AND ORDINANCES
SHALL, UNLESS OTHERWISE MUTUALLY AGREED UPON, BE OR MAY NOT BE NEEDED AFTER THEY ARE EXPOSED -PLAN VIEW
THOSE THAT WERE IN EFFECT ON THE DATE OF THE BID ACTUAL RELOCATION OF LINES WILL NOT BE THE
OPENING. RESPONSIBILITY OF THE CONTRACTOR; BUT THE TYPICAL STAIR EAVE REPAIR j
CONTRACTOR SHALL COOPERATE WITH UTILITY
7. ALL DAMAGES TO LANDSCAPING, UTILITIES, OR OTHER 0 NTS
EXISTING COMPANIES TO COORDINATE THE RELOCATION EFFORT Or;
'STMUCTURES AS A RESULT OF CONSTRUCTION it
LINES NOT RELOCATED SHALL BE PROTECTED BY THE
SHALL BE RESTORED-TO ORIGINAL CONDITION EXCEPT
CONTRACTOR IN PLACE. NO ADDITIONAL PAYMENT WILL
WHERE MODIFICATIONS ARE NOTED
BE ALLOWED FOR THE MINOR ADJUSTMENT OF
8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL
NECESSARY BUILDING PERMITS COPIES SHALL BE STRUCTURES IN ORDER TO CLEAR A CONFLICTING
FORWARDED TO OWNERS REPRESENTATIVE PRIOR TO UTILITY CONTACT UTILITY COMPANIES 48 HOURS IN
START OF CONSTRUCTION ADVANCE WHEN WORKING ADJACENT TO THE UTILITY. INSTALL NEW 1/2"0 LAG SCREWS @ 32" 0 C.
BURIED UTILITIES AND CABLE: 1-800-922-1987 TYPICAL EACH LEDGER LOCATION
9 CONTRACTOR SHALL ESTABLISH A WRITTEN SCHEDULE OF
CONSTRUCTION AND REVIEW SAID SCHEDULE NTH 17. TEMPORARY SHORING OF STRUCTURAL ELEMENTS SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR AND
OWNER'S REPRESENTATIVE FOR APPROVAL, PRIOR TO THE
START OF CONSTRUCTION SHALL BE PROVIDED DURING CONSTRUCTION. Al
18. SHOP DRAWING AND EQUIPMENT CUTS EACH TRADE
10. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO S/
- -SHALL SUBMIT SHOP DRAWING OR EQUIPMENT CUTS TO
DETERMINE ERECTION PROCEDURE AND SEQUENCE TO
OWNER FOR APPROVAL PRIOR TO COMMENCING WORK. NOTE:
INSURE THE SAFETY OF THE BUILDING AND ITS (2) SIMPSON LPC6Z POST CAP
;V6 ALL BOLTS AND FASTENERS ARE
19. SCHEDULES: IT IS THE RESPONSIBILITY OF EACH TRADE
COMPONENT PARTS DURING ERECTION.
TO REVIEW AND FOLLOW CONSTRUCTION SCHEDULES IF ...........;/.. Lh cw 12007
MATERIAL, AND DEBRIS FROM THE PREMISES AND LEAVE /0
OWNER SHALL BE NOTIFIED 14 DAYS PRIOR TO DELAYED TO BE HOT DIPPED GALVANIZED OR NEW 6X6 POST TO REPLACE EXISTING
11. CONTRACTOR SHALL REMOVE ALL EQUIPMENT, UNUSED MATERIAL CAN NOT REACH THE SITE ON TIME, THE 0 ?�011 00 STAINLESS STEEL ALL SIMPSON CONNECTORS
THE SITE IN A NEAT AND CLEAN CONDITION . . .......
ARE TO BE ZMAX GALVANIZED (G185). IL
DELIVERY FOR POSSIBLE CHANGES TO MATERIAL THAT F V
12. THE OWNER SHALL RETAIN RIGHT TO APPROVE OR POST AS NECESSARY \NN 0
CAN BE USED WITHOUT ALTERING SCHEDULE.
CERTIFICATION
THESE CONSTRUCTION DOCUMENTS, AS INSTRUMENTS OF
FULLY SUPPORT NEW BLOCKING SIMPSON ABU66 POST
SERVICE, ARE THE PROPERTY OF THE ENGINEER AND r
0 RE
MAY NOT BE USED OR REPRODUCED WITHOUT EXPRESSED AND NEW SISITERED 2x6 RAFTERS Al b -H BASE ATTACHED TO GALV.
WRITTEN CONSENT OF THE ENGINEER. @ EXISTING WALL ..... 5/8"0 ALL-THREAD
EXISITNG SOFFIT 3171
PACK TIGHT W/ NON-SHRICK GROUT
FRAMING (1) LAYER 5/8' TYPE X GYP.
FIRE TAPE ALL JOINTS
HEIGHT SET NUT &
EXISITNG EXTERIOR WALL 2) S ON 1/4'OX4 1/2" SDS SCREWS WRANCHOR ALL-THREAD
@ 8" 0 C., TYPICAL @ EACH RAFTER LOCATION ROD
co
EXISITNG BEAM
CD
co
STAIR EAVE REPAIR SECTION TYPICAL DECK REPAIRS U)
APPROVED
Community Development Department
Tolgi OFVfiA Building Safety and Inspection Services 3: Ln
Section 161:1 I'_
2M3 International Building Codefinternational P,:,
Code Validity of permIL The issuance or granting of a p�
not be ccnStrued to be a permit for,or an approval of,any k :'t
any of t'-.o provisions of this code or of any other ordinance cf L - 0
junsdjction Permits presuming to give authority to violate or cz-,--z;l the z
provision.:,,cf this code or other ordinances of the jurisdiction shall not be
valid Tho icsuance of a permit based on construction documents and JOB NO 062101
other data shall not prevent the building official from requiring the DRAWN VGN
correction of errors in the construction documents and other data.The
building official is also authorized to prevent occupancy or use of a CHECKED NLM
structure where in v ion this ode or of any other ordinances of
this jurisdiction. DESIGNER VGN
PLANS EXAMINE 1 DATE. Lf _22 ISSUE DATE 10/11/07
SCALE AS NOTED
FILE
SHEET
S - 1