HomeMy WebLinkAboutB10-0285 plansMOVE BASEBOARD EAST TO NEW WAL
VERIFY WITH OWNER IF TOILET TO REMAI
ALL FINISHES AND FIXTURES TO REMAIN
ALL FINISHES TO BE
DEMOLISHED, UNLESS
OTHER WISE NOTED
ALL DOORS WILL BE
REPLACED, EXCEPT
FRONT DOOR
I�:Z�P►� iiheZi7 ��tli1w
Demo Plan - Level
Imo.! 20 1 ) 1/411 = 1 1 - 011
REMOVE TRIM FROM WINDOWS AND DOOR
REMOVE CARPET AND PAD, STRUCTURE TO REMAIN
ALL FINISHES TO BE
DEMOLISHED, UNLESS
OTHER WISE NOTED
FILTEN `• O••`
1h Demo Plan - Level 1
um
I I EXISTING WALL
DEMOLISHED WALL
REMOVE TRIM FROM WINDOWS AND FRONT DOOR
REMOVE WALL THAT HANGS DOWN FROM CEILING
REMOVE CARPET AND PAD, STRUCTURE TO REMAIN