HomeMy WebLinkAboutB11-0271 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
,�
�w�o���; �.
Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B11-0271
Project #: PRJ11-0411
Job Address: 600 VAIL VALLEY DR VAIL Applied.....: 08/12/2011
Location......: NORTHWOODS UNIT F6 Issued.. . : 08/23/2011
Parcel No....: 210108119006
OWNER NORTHWOODS F-6 LLC 08/12/2011
1414 INDIAN NW
ANLANTA
GA 30327
APPLICANT NEDBO CONSTRUCTION INC 08/12/2011 Phone:970-845-1001
PO BOX 3419
VAIL
CO 81658
License:C000003087
CONTRACTOR NEDBO CONSTRUCTION INC 08/12/2011 Phone:970-845-1001
PO BOX 3419
VAIL
CO 81658
License:C000003087
Description:
REPLACE THREE EXISTING WINDOWS WITH LARGER OPERABLE WINDOWS
ON NORTH ELEVATION.RAISE EXISTING HEAD HEIGHT AT LIVING
ROOM WINDOWS
Occupancy: Type Construction: Valuation: $15,500.00
.....................__.,,...+..........,............��......,.,+........,........ FEE SUMMARY ......,,,,.,...............................,,..................,...__,._._.....
Building Permit-----------> $265.25 Bldg Plan Check----------> $172.41 Use Tax Fee-----------------------> $110.00
Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $5.00
TOTAL PERMIT FEES-------------> $552.66
Payments---------------------°-------> $552.66
BALANCE DUE-----------------------> $0.00
.........................,,.............,,,....,.......,,,.....,>.�.,x.......,.....�,,,.,..................,,�.........,..,,...............,,......��.........,...,,..x,....,,..........,,..,,�......
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.4T9.2149 OR AT OUR OFFICE FROM
8:00 AM-4:00 PM
� % �-23r1 �
:�
Sign e o O�� Con�tpr � Date
�J �� S
Print Name
combination permit_012811
f
�
TO�N OF YAIL '
.......................�......,..........,......,..,........,.,,.,,,,.......,,,,,.,,,,,,....,,..,�..,.,......xxx,,,,,.............,.......................,,,..,.....x,.,....,.......
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: B11-0271 Address: 600 VAIL VALLEY DR VAIL
Owner: NORTHWOODS F-6 LLC Location:
NORTHWOODS UNIT F6
.....................................................................................................................................................................................
combination permit_012811
�
#
t V TI'!�! V� 4`��, �
„***.*..,**..*,,,,.,.,.*,,.,*«***,,.,.,.,,,««.,.,.,****.,.,*«******«*«*.,,,************,.,,*,***««.,*************„*************...******.,*.,*.,.,****.,**.,«**.,,.***,.*.��****.,*.,.,
REQUIRED INSPECTIONS AND STATUSES
Permit#: B11-0271 Address: 600 VAIL VALLEY DR VAIL
Owner: NORTHWOODS F-6 LLC Location:
NORTHWOODS UNIT F6
**********,.*,,,,**«*******.*********�******.*******,,,,.,.,«***,.**********««**«*««*«***************************«*�*�*,�**************,.***********««*«******«
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Nail
Item: 00542 PLAN-FINAL
Item: 00090 BLDG-Final
combination permit_012811
B11-0271: Entries for Item:90 - BLDG-Final 10:11 01/17/2014
Action Comments By Date Unique_
Ke
AP sgremmer 10/24/2011 A000146
057
Total Rows: 1
Page 1
Department of Community Development
75 South Frontage Road
TOWN OF VAIL' � � va�i, co s�ss�
Tel:970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm &sprinkler)
Proj�etl��A-f L SS✓.�t,[...,...,._�___.___��� �.
n � b II Project#: Q���—�`l ��
� �� ./1
';(Number) (Street) (Suite#) I DRB#: �„� �� �3 3�
', Building/Complex Name: N��TM�b�S �hfl�.
; Building Permit#: ^ \!``'�� \
� .�� �.�.���
Contractor Information � Lot#: Block# Subdivision:
� B�S�ness Name: Nedbo Construction, InC. ,
; Work Class: New( ) Addition( ) Alteration(./j ;
j Business AddressVail CO 81658
.,-__—�,. ...�, _. ...______ --___. ..-_ ,:-_ . , ,
' (g70) 845-100 C rype of Buiiding:
!City State: Zip:
��`� � � Single-Family( ) Duplex( ) Multi-Family( )
;Contact Name: �'�'J��- Commercial(✓) Other( )
Contact Phone: -I�O � �1�-O� Z�-( ����.�.����M,�_� ��...�..����_.��.....�....W.�-� _.,..._�;
` Work Type Interior( ) Exterior( ) Both(� '
II Contact E-Mail: 4v� 1� �C-UVVI ',
___._. _.__........ .._ .__ .._. .._.. ---- -- .. ___._.. .._�. . ...
X Valuation of
Work Included Plans Included Work
I Owner/Owner's Representative Signature(Required) Electrical ( )Yes ( )No ( )Yes ( )No �
,Applicant Information Mechanical ( )Yes ( )No ( )Yes ( )No N �
',Applicant Name: ���,�;,;, i;��nstruction, �t1C_ Plumbing ( )Yes ( )No ( )Yes ( )No � � ;
'Applicant Phone: P.�. BOX 34�9 Building ( )Yes ( )No ( )Yes ( )No ��;
�
�Applicant E-Mail: �970� 845-�OO� Value of all work being performed: $ (5�S��(�
__�,,,..s�___.,,_�_.,,,,,-----�.�;— �,,;;w� _,;��,,;;_�.__� _.._.,, (value based on IBC Section 109.3&IRC Section 108.3) i
�
Project Information Electrical Square Footage
Owner Name: N��� S �� �-�- -
�
_---.. . ..._.__._ ...._.____.__...�.___._... . --. _....._ _ . . .._�
Parcel#: �',O1 ' � �� - 1��� -�
(For Parcel#,contact Eagle County Assessors Office at(970-328-8640 or visit
;www.eaglecounty.us/patte)
� p ��,��� 3 w,�,po...._..�.��.._...�.._..�.�...._ .mm.�.._.____..�.��____�......w.
Detailed Sco e and Location of Work: � f Y'm�� W � � NnQ'I�N k.r�fl�f{ON'
; I�( NaEl(ot-�� ��'�` - IZ.i9-t S �l/�1 G I-1 N loW7- �' �
� �-1 V't FJ�, YLc�n wl �,�!��-�1 p Ot,./s 1rJ� ��.1.� - nr o�2-ry{�� t�
` w lrrp
� � �/L�✓� �f �W�i ' 3� !
F(use additional sheet if necessary) I
r_____�_..�._....,....._._.___..,�,___ _.,�,
For Off ce Use Only: Date Received:
Fee Paid: l�¢� •� '.z��0 � � � Q � �
Received From: �?.� ��- ��`U D
CC:hVisa / MC Last 4 CC � exp date: � AUG 1 4 2011
Auth #
TOWN OF VAIL
O1-Jan-11
State of Colorado
Asbestos Testing &Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testina reauired?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One-and Two-Family Dwellings: 32 square feet .
All Others(commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including
muiti-family/condominium units,and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The
clearance letter must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My proje falls into the category checked below:
Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (1 copies of test results included)
� Tested positive at more than 1%, requires abatement (1 copies of test results included)
Tips&Facts:
• Even recent construction projects may include asbestos-containing materials, so buildings of a�n�age require testing.
.
�� �� ��
The 1989 Ban on asbestos-containin materials is commonl misunderstood. In fact in 1991 the U.S. Fifth Circuit
9 Y ,
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO3 81657.
Town of Vail Contact: State of Colorado Contact:
Fire Prevention Bureau Colorado Department of Public Health
Vail Fire Department and Environment
75 S Frontage Rd Asbestos Compliance Assistance Group
Fire_inspectors@vailgov.com 303-692-3158
970-479-2252 asbestos@state.co.us
www.vailgov.com www.cdphe.state.co.us
O l-Jan-I 1
�
10-18-2011 Inspection Request Reporting Page 12
4:36 qm Vail, C(� - Citv Of
Requested Inspect Date: Wednesday October 19, 2011
Site Address: 600 VAIL VALLEY DR VAIL
NORTHWOODS UNIT F6
A/P/D Information
Activity: B11-0271 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: Insp Area:
Owner: NORTHWOODS F-6 LLC
Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Description: REPLACE THREE EXISTING WINDOWS WITH LARGER OPERABLE WINDOWS ON NORTH
ELEVATION. RAISE EXISTING HEAD HEIGHT AT LIVING ROOM WINDOWS
Requested Inspection(s)
Item: 542 PLAN-FINAL Requested Time: 08:15 AM
Requestor: Phone:
Comments: 77-0329
Assigned To: N Entered By: MHAEBERLE K
Action: � Time Exp:
�v.1�0
��P
tb��G� ��
��
Inspection Historv
Item: 30 BLDG-Framing
Item: 50 BLDG-Insulation
Item: 60 BLDG-Sheetrock Nail **Approved"`
10/04/11 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 542 PLAN-FINAL
Item: 90 BLDG-Final
REPT131 Run Id: 13669