Loading...
HomeMy WebLinkAboutB11-0276 � Community Development Department 75 South Frontage Road Vail, Colorado USA 81657 CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of Title 10, Section 10-1-2, ADOPTED CODES of the Vail Town Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various ordinances of the town regulating building construction or use for the following: Name and description of project Golden Bear�Sitzmark Lodge unit 3A) Address of project: Owner name and Drive V � Sitzmark Lod$e at Vail Vail Colorado 81657 IBC Edition: 2009 IBC Occupancy Group(s): B Type(s)of Construction: VA Pe mit Number(s): B11-0276 Occupant Load: Martin aeberle, Chief Building Official Sprinkler System Y/N Type: Y 1 �. z�� Date Department of Community Development 75 South Frontage Road TOWN OF VAIL� va�i, co s�ss� Tel: 970-479-2128 www.vailgov.com Development Review Coordinator , � TRANSM ITTAL FORM '�� � Revision Submittals: 1. "Field SeY'of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum),and are due upon issuance. Permit#(s)information applies to: Attention: ( ) Revisions B11-0276 ( ) Response to Correction Letter attached copy of correction letter ( ) Deferred Submittal (�)Other Project Street Address: 183 Gore Creek Drive 3A _ _ _ ._ _-- -- - (Number) (Street) (Suite#) Golden Bear Description/List of Changes: Building/Complex Name: Final Acceptance Letter For Weld Inspections. Contractor Information Business Name: �� L. Viele Construction Business Address: 1000 S. Frontage Road, Suite 202 City Vail State: CO Zip: 81657 Contact Name: Tony Faulhaber Contact Phone: 970-471-5467 (use additional sheet if necessary) ton vi econs ction.com Revised ADDITIONAL Valuations(Labor&Materials) Contact E- ail: y@ (DO NOT include original valuation) ��; X Building: $ Ow ner's Repr ' e Signature(Req ' d) Plumbing: $ Applicant Information Electrical: $ Applicant Name: Mechanical: $ Applicant Phone: Total: $ Applicant E-Mail: For Office Use Only: Date Received: FeePaid: � � � � � � Received From: D Cash Check # QEC � 1 ���� CC: Visa / MC Last 4 CC # exp. date: � Auth # TOWN OF VAIL oi-o�c-i i I November 30, 2011 ' Subject: Summary of Materials Testing Services, I Golden Bear Structural Steel Observations, Vail, Colorado Job Number: 11-6598 TOV Permit#B11-0276 . Mr.Tony Faulhaber JL Viele Construction,Inc 1000 S. Frontage Rd West#202 Vail, Colorado 81657 Attn: Mr. Faulhaber, This letter summarizes the materiais testing GROUND Engineering Consultants, Inc. (GROUND) performed during the improvements to the Golden Bear within the Sitzmark Lodge in Vail, Colorado. The materials testing services were performed at times scheduled by the Owner, Contractor and/or Subcontractors between October 21 and November 30,2011. A certified welding inspector (CWI) visited the project site on October 21, 2011 to observe the fieid welded connections. Based on the fie�d observations to date, RFI's received and/or project documentation received from the design team, it is our opinion that the observed structural steel field welded connections were in general accordance with project plans,specifications, and/or appiicable RFI's. The observations and materials testing as indicated above were performed periodically to provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the general compliance of the materials and/or work with the contract documents at the times of our observation and testing. We did not supervise, direct or have any control over any of the Contractor's or Subcontractor's work. We were not responsible for the Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor performed or completed the work in accordance with the contract documents or construction industry standards. If you have any questions concerning this letter, please contact our office. �,DO UL'� a� ....... P`�`A�F�%o Sincerely, ,,� GROUND Engineering Consultants, Inc. ��5�2 0; � �:: �, �(- 3U- ll;�� . , `��1�o�t�•`-�'ca Evan E. Kuhn Reviewed by Scott Richards, P.E. ROUHn ENGINEERING CONSULTANTS ING IOIA Airpark Dr..Unit 9.PO Bos 464.G}psum.CO 81637 Phone(970)52d-0720 Fa�(970)524-0721 �e�vw.groundeng.cum O�J'ice Locanons Enrlc�cood . Commerce Citp . Lovcland . Granb� . Gypsum . Gr:uid lunction . Casper.WY . 2 �ow�oFV� � Final Report of Special Inspections Project: Golden Bear @ Sitzmark Lodge Permit Number: 611-0276 Project Location: #183 Gore Creek Drive Owner/Client: JL Viele Construction,inc Address: 1000 S Frontage Rd West Suite 202 Specia►Inspectors: GROUND Engineering Consultants,Inc Address: PO Box 464;101A Airpark Dr,Unit#9 City: Gypsum State/Zip: CO 81637 Phone: 970-524-0720 Fax: 970-524-0721 E-Mail Address: EvanK@GroundEng.com; ScottR@GroundEng.com To the best of my information, knowledge,and belief,the special inspections and or testing completed by:GROUND Ensineerin�Consultants, Inc have been completed in accordance with GROUND's Proposol for Materials Testing Services,#1111-1719.dated 11/14/2011. Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be considered an integral part of this final report.Any discrepancies that were noted on the interim reports have been corrected or accepted by the project team. Prepared by: �o ��C� Name: Scott Richards, PE � .••�•.� �, •�,� E ��P ��C✓ � � � Signature: •0 45,�26 0' . / .� �: Date: ( " 3G�Z4�� �•. ��_�.���'�'� �'••....•••'G� ss��pt�' . NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ,. �o�o�v� . Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11-0276 Project #: PRJ11-0173 Job Address: 183 GORE CREEK DR VAIL Applied.....: 08/16/2011 Location......: SITZMARK LODGE UNIT 3A(GOLDEN BEAR RETA Issued.. .: 09/16/2011 Parcel No....: 210108210006 OWNER SITZMARK AT VAIL INC 08/16/2011 183 GORE CREEK DR VAIL CO 81657 APPLICANT J.L.VIELE CONSTRUCTION INC.08/16/2011 Phone:970-476-3082 1000 S FRONTAGE RD W#202 VAIL CO 81657 License: C000003254 CONTRACTOR J.L.VIELE CONSTRUCTION INC. 08/16/2011 Phone: 970-476-3082 1000 S FRONTAGE RD W#202 VAIL CO 81657 License:C000003254 Description: MODIFICATION TO EXTERIOR STOREFRONTS AND STUCCO CANOPY, REPLACEMENT OF 3 TENANCY FRONT DOORS/SDELIGHTS WITH MATCHING FRAMELESS GLASS AND DOOR HARDWARE ALONG WITHNEW WOOD TRIMS AND PAINT COLORS.NEW CLAD WOOD WINDOWS AT THE GOLDEN BEAR TENANCY AND MATCHING BRICK VENEER ASSHOWN ON DRAWINGS. Occupancy: Type Construction: Valuation: $180,000.00 ��.................................�..,,...�.............t....,.,.........«....,. FEE SUMMARY ..,,.....................,>............,,...........,........................_. Building Permit-----------> $1,441.75 Bldg Plan Check----------> $937.14 Use Tax Fee-----------------------> $3,400.00 Electrical Permit---------> $1,121.25 Elec Plan Check-----------> $728.81 Restuarant Plan Review--------> $0.00 Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $10.00 TOTAL PERMIT FEES-------------> a7,638.95 Payments------------------------------> $7,638.95 BALANCE DUE-----------------------> $0.00 ......................................,._...............,........,.,.....,,.....................,.....,..........,..�..,,..,..........,,..........................,..................... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTI N SHAL AD TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM 4,�10 PM. � � W„--. Sigv�ature of -e� Contractor Da �_.�_._....._ cJV� v�. Print Name combination permit_012811 i � ������ � ...................«....__,.,...................._,.,,.......».........,.,..,,,......,..........,,..................,..............�............,..,.__............._.................. CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit#: B11-0276 Address: 183 GORE CREEK DR VAIL Owner: SITZMARK AT VAIL INC Location: SITZMARK LODGE UNIT 3A(GOLDEN BEAR RETA ....,x............................................................................�....,........,.........,.........,..................................,...........................,. combination permit_012811 i . # TO�UN OF VA�' ' .**,***„************************„****�**.,******************************.***�*,*****.,***.,...,,.**.,****..***********.*****�*******,***.,****„************ REQUIRED INSPECTIONS AND STATUSES Permit#: 611-0276 Address: 183 GORE CREEK DR VAIL Owner: SITZMARK AT VAIL INC Location: SITZMARK LODGE UNIT 3A(GOLDEN BEAR RETA ****,.*„*****„***„*.*..****�*********«««****«*****.***********�*«***********************«««**�****�***«.,.**********�*«««««.****.,***«««*..�,.******««*,,.« Item: 00120 ELEC-Rough Item: 00140 ELEC-Misc. Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail Item: 00070 BLDG-Misc. Item: 00534 PLAN - FINAL C/O Item: 00420 Special Inspect-final rept Item: 00190 ELEC-Final item: 00532 PW-TEM P. C/O Item: 00539 PW-FINAL C/O Item: 00090 BLDG-Final combination permit_012811 �.�,�_-•� _._...-�—��.:��-.�..,.,... _,, _..v_.�.��,�,_ �� �- ,.�;i�f. Department of Community Development ����.��: �} , � �,=� 75 South Frontage Road � '{� �� ��ii�, `�"y�. • Vail, Colorado 81657 " _ . .'► Y.�,t •�*y!�': 1 .� .'7 : ��` . , ' � `� � � .Tel: 970-479-2128 ,� }``�"�4 t� ��� ' ' } Fax: 970-479-2452 �, `1 .,�•f � ! : �,f � ' �s����°+�t"° ,�%` Web: www.vailgov.com - i� � - - Development Review Coordinator , � . __. ,� ,, ., uJ�> .. , 1�,, � �'�,, _ ,_ ,� � TRANSMITTAL FORM Revision Submittals: 1. "Field SeY'of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum), and are due upon issuance. Permit#(s)information applies to: Attention: (�)Revisions (�)Response to Correction Letter B11-0276 Martin Haeberle � attached copy of correction letter ( )Deferred Submittal ( )Other Project Street Address: 183 Gore Creek Drive Description/List of Changes: (Number) (Street) (Suite#) Latest DRB approved exterior elevations Building/Complex Name: Golden Bear/Sitzmark Lodge Revised entry door specifications compliant with IECC Clarification of handrails and existing stairs Contact Information: Company: J. L. Viele Construction Revised details for flashing at exterior walls Company Address: 1000 S. Frontage Road, Suite 202 Revised structural details for masonry anchors Vail CO 81657 Notation of items requiring special inspection City: State: Zip: Contact Name: Tony Faulhaber Special Inspection and Testing Agreement Contact Phone: 970-471-5467 Interior and Exterior Lighting Compliance Certificate E-Mail tony@vieleconstruction.com Construction Staging Plan Revised ADDITIONAL Valuations(Labor 8�Materials) (DO NOT include original valuation) Building: $ (use additional sheet if necessary) Plumbing: $ Date Received: Electrical: $ Mechanical: $ . ---- Total: $_��j� j ,-�� � � � I.l V � ..,i i `���,�; SEP 08 2011 J �_ �'��J� OF VAIL Ol-Jan-10 , � TOWN Of VAIL 75 South Frontage Road G"v'est Community Development Department Vail, Colorado 81657 970.479.2138 vailgov.com 970.479.2452 fax 5���t�fer��f��r i. 2011 Date: 8/30l2011 Re: B 11-0276 Dear Mr. Haeberle, Chief Building Official Dear Mr. Faulhaber, RESPONSEINSTRUCTIONS :�s �rci�Extect �t r<�:cvrci, �vv�: �rovi�ie itfe �oiiowiE�r� res�r�nses reyu�sted aiid including two compiete sets af revised construction documents, as noted by you below. All our responses within this letter are in `bald blue' among your text. On the VMDA documents, all revisions pertaining to these responses are `clouded' as Revisian 2 — 916111. We also include minor DRB revisions for new door and windows at Charm School Boutique and new door at Luca Bruno. It is our understanding that Staff review and approval of these DRB revisions will be performed concurrently with your final review for issuance of Building Permit, as discussed with Rachel Dimand. Please feel free to contact our office directly with any questions or clarificatio�s needed. Thank you for this opportunity to update and supplement the original Bi�i!diry P�rmit Dor!� �, �,,•_- • Submit complete sets of revised construction documents containing the requested information with all plan revision items clouded or othenrvise identified. • Please respond in writing to each comment with a response letter addressing each comment. BUILDING COMMENTS , I n, � � !� � �,!1 f;� Architectural Comments: �'; Sheet A1.2 r.�� $� 0 8 2��� , i i �� � TOWIV OF VAIL � 11-0 a7�,v , , 1. Annotate on plans the required maximum glazing requirements for the storefront doors and windows per Table 502.3 IECC. Note: Storefront to be a maximum of .80 and windows .55 u value. Our substituted door and window products are direct set windows and clad framed doo�s as manufactured by Jeld-Wen and stated U-Factors for each of the three tenancies are as follows: The Golden Bear: Double Doors U-Factor = .35 � Direct Set Windows U-Factor = .32 Charm School Boutique: Single Door U-Factor = .37 8� Clad Wood Windows U-Factor = .33 Luca Bruno: Sir�c�le C�oor U-Factor = .37 2. Show how compliance with section 3411.7 IBC is to be achieved. Note: creating a new step element on the accessible route to a primary function is not considered a p�e- existing candition. � .> i�e�<<�, tiie lab+ci oi� �ur Stair Details is a bit inislcading "N�w Stair Deta�f" inasmuch they are not new stairs on the accessible route to a primary function, but instead new finish treatments to existing stairs. These stairs were part and parcel to the construction of this building annex at the time of Building Permit Application, ensuing construction and issuance of the Certi�cate of Occupancy. We therefore submit our compliance is via Section 3411.7, Exception 1. IBC, as follows: "These existing steps are a function of carefully integrated, stepped concrete super-structure below that shelters parking garage uses in a manner to provide code compliant vertical clearances and cansist of structur�) sp�ns that render the elimination of these steps technically infeasible. This situation is evident from archive structural documents and the visible primary structural elements below. We t�ust this reporting of existing conditions of primary structura! elements sufficiently renders the removal of these steps acceptable to be refinished when accompanied by requisite, code compliant handrails that do not exist today." Sheet A6.2 1. Show how prevention of the accumulation of water is to be achieved at exterior walls to include flashing and water resistive barrier. Reference section 1403 IBC. See details 7 and 8. Gur waU sections cf�picting exterior brick veneer have been updated with additional notations for flashings, weep drainage & water resistive barriers as requested above. Town of Vai( Page2 2. Show on plans the �equired anchor ties for the proposed masonry veneer. Reference section 1405.6 IBC Our wall sections depicting exterior brick veneer have been updated with .�_!��l+'ic�:��l r�i7iations �or r7�asanry anchor ties, as requested at�UVe. Structural Comments: Sheet S1.2 1. Plans reflect field welding of structural elements to be done. Annotate on plans special inspection criteria and submit a signed special inspection agreement upon re- submittal. Reference section 1704.1.1 and 1704.1 IBC. Special Inspection Agreement is attached to this rc-s�,t�r��itt�l. ft�:-suu�7��ct.�i Plans reflect the requirement for Special Inspection Agreernent & conforrnance to crif�ria as r�f�rc►7c���1 in S�ctic�r�s 1i0�.�t.1 ar�fi t?O�i��i 18C PlumbinQ Comments: NA Mechanical Comments: NA v Electrical Comments: Sheet E3.0 1. Provide lighting power calculations for the interior and exterior lighting. Reference Tables 505.5.2 and 505.6.2 of IECC. i r�� iic�l►tiiie� �uwer �;alculat,ui►s reyuc:sted are attached tc� tt�is re-subm�ttal and w�re prepared by a Colorado Licensed Electrical Engineer. PLANNING COMMENTS 1. The applicant shall submit an updated set of plans reflecting recently approved DRB changes to approved plans. it�e I�F�Es Requese for tiJiociiiication has been subil�itted concurrently as d�scussed with Rachel Dimond. The re-submittal drawings provided to yau each reflect the DRB ch�nc�es since the approval. FIRE COMMENTS Received and accepted PUBUC YVORKS COMMENTS 1. Submit a construction staging plan to include timelines of the praposed work. Contact Leonard Sandoval at 479-2198 Town of Vail Page3 The construction staging plan, including time lines of the proposed work, has � : r�_� �� ;.� : .�;� �._r ; �yotiated with Mr. 5andoval and is attached hereto. Sincerely, Martin A. Haeberle Chief Building Official C.��t�;���t;Ctt�iily° SUbt��;;r.'<< '`�' � � P 9� Y� o , * � - �� : ��` � '��,V� ���:� � ,�,� �� �R� Victor Mark Donaldson, Architect of Record Town of Vail Page4 � Sep 07 Z01 1 12:S4PM HP 1.ASER.]ET FA}i p. 1 i I i Job me: �kt ��, ' � � � � Job drea�:,1 i ��Y� � Porm No,: �i 1�0���Z� ep�CU4l IN�C'i'IQH AND'fE8T1N AGREEMF.lt'f (To�ppllc�Ms ofi ploteab raqvlrinp Speclal In�paatlan or �stlnp p�r Sectlon 1701 ot fh�tBCj Th�oWnsr ar hleJftier rapto�anM�ve,on the r�dvfa of the daelpn profoov�o�l In roepv�a(bb ct�ar�e,ahalf Ccrnplsk� e��l� NOn and wbmb a ooqr O� UIO SQ�O�OI IRBp on Aqre�nent �and Strudural 7esls 6c�heduled to th+ Tow�t of V�N for r�vfew a�d appTO�. pnehites ere requlred on bot� D89es� photacopl�or tex�d sipne�turw ste ecasp�bl�. The oN�n9r and hleA�er' p�n�tAl opnUecior, Wh�rO npplicable sh�ll aleo edtno�uladQ� $t� PaUau�nrg oandltior�s ep�l(oabte bv SPe��Inapeo�vn Te�t�I: i. Contractor I� re3ponatblo for propar noi(tloaBon b the I peodon o* 7eb�np oeency !or ltims tlated.(Pepo 1j (l9C 1T04) �, On1y the Destlng labornmry choWd taka e�►mpies e�nd trnneport hem ta thsir laboretory 3. Caplea ot ttq laboretory ropofta end In�usationa eta to bs sent rootly to the Town d Va0 by the Teetlng sflency on a we�kty ba�l�. 4. lnepecUon apency to submtt names and queliftcatiana of or� e epecia!In�p�olo�s b ths Tawn of V�i1 br t�vlow�nd epproval,(Paa�2y i's Th�spedal Inspactor Is tesponalble to Immadtetely not�fy fhe owan d Veu BuUdNg O�lol�l In wrltlnp a�f eny ooncom�e�ndlor probl�rn�on�oun5ered. 8. tt te ths rosponpiblllty ot ths aon�oior bo revioW 1he 7o n bt V�I� approved ptsns tor �ddlqonel �rwpecUai�r I�titnp nqukements ihaf cnny be rtoted. A flre n:VucUot�oot�farence at�a Job alte la recornmendad W review epodal ir�apedton proosdures, r. Ths 4padal irtepectar�hall�e onfy�h�Tovm of Vall approve drowinps. 8. A�apooltil tnspea�on fldd roport� must be I@�t on e�ke tot ovlew by the'f�c�wn ot VaA �ban prlvr ta reQulPed fnsp�c6one or r��n�pactbn8, B�E'ORE OCCUPAidCY WILL 9E t3R+4KtEQ: 'i�e sp�edsl!�s pctlon s9ency�hall subrnft A slprwd �nd sealed otateme:�t ihat slt R�me requirinp t�iS�a ond f�■peaGon re fuIFIA�and r�eport�9d. Thoae ltems not tasted andla�In�pected ah�ll be noted ln thla atatsmer�t. A oopy f ttte 8tatement ahatl be melntalned at the job sito for tbe Buifdinp tnspoctot`�re+new priot to llnpl Incpection Acknowiedgernen•� OWhar:�� �i �� � � �, eipn ' Pri Na flat Sprd�rl Jrt� ��� � � �� Aganayr, u' � tv PrIntNFms al p��ff ��� 1-`�-�+��� '1 � i 9ipn�lurs Prfnt Nems Rel OonReCtOr r � '�r �'1 lyn a f y P Name ....-._✓^ �� 5ep 07 zDil 12a54PM HP LHSERJET FHK P�2 � � TYIWN4FYA(Ir ' e�cuu.t�sr�cr�or�u+tn t�arn�c sc �nu�� p�c��aa� ProjOCt N�rtte: Pe It# �1 t� p��� du�noP4Nama� 'L ci-c.� 9"��{t tA31111��t1�,}6. � �wt � PrSnd 4 • /�e�,ay; �j•�.�� ��u 11 Testirp Inapection s�,.rrn P�+tweu. li.r�6y o.�tr+�iFat�h.T�sUnpnr�p�ctlon n.m.a obar�nas n anpaped to portarm�Au�ol lwts�nd �P.ouor►s du�nca�•�n�,�.cnecaoeo�a,ar�t�er�c�ow �ruon•a ma e�n�e coeg. prbc ta Anai tn�e�ion,th�tr�pecBon Apency sh�p�ub,mlt e etatense thal sU seme of declpc�ated wnrh porformod w�en nporbeci, Arty Ham�checSed tul not te�ted o�lrupsc4�d wl4 p�n eu+d expl�►n+d. Wh�nerrer Any dosipneted tt�ms on the Ust er�roody for�emp�np,ta�tMp,or inspeabn,(l ehell �the taepontlm'Uiy of the Cant�6ct0�to ylva prr.aty noUu m�o Inepactinn ap�enay ev thatM�requtaed esrvloea may pw�l�rmod. RetNFOace�a sTreu uwkcnr HiHa, „". T�cCe i B md,on�s�t p�r fr�s:pet,_,r tona T DaN'/Pmm�rlonl � Ineprc4an dP4cement _ �n p�edan ef S��I Fadicatton ____._ tnepectffon dW�IdUrp I� of RolMorclnpd Fannr � EpQ,9, ,�_ In p.oCon ef Concrw�Loement In of Tbba�ts MA�ONRYs �' 0 �Nl�}6: Pnitn I�cCeptd�oeTWts(M�UnI(s,W�N Pdpt►t) �_ T Dp�4 Sna��p ,,,^�„ 8uhs nt Tat�(Mort�r,Ocou, ald W1�U Pr3�rtf�) • �� IRbp���f'IiCntMM 8�0 GfDUtllIQ _.. P an�rit Wall i�'1 TCJ,_l GrlOU�N,"ID 1AORY r �7RUGTU iTEEk � , 8 N i T��L f�1M fp�tH70 m�mb4t1 D�IOW) : t�.0 tar d�sl a 6 Iod�Kaldhp tnQPecBoa u D o■ w�� L)ttti�b�io C1Td x t � �d��Fhl' �� T�p�� —r � Id WebNp Inapr,�lor1 e■lchP�ntl1�pedba — iQV�rsroNcM�p�cUon •Q1•m "" F b R4di0pnptty a � M tol dedc Wa1d[n ff Ihapaollon CO iN101! MR � m�"� FtR[r!t !'INb: P►�• a�ma�r � �,�on#PRc�mmt e aws a� pplL�: ^ pt�nce�eero M _ M tun•Dmolty Dok+rminsUon O ' : _ P W OebNty Retlorci�p Ta�s D 14�d['!+n _ Itttpattbn of Refntbro�np Pasoetmnt U p Paund�tlon �_ r�noon".t;• — � In�p�tHori dt7e�tlon Pbpurn�nt 6TRUCTU WOOA: ln�pealo�ofC�onoats Pieeament „�� In Motlory of F�1C�qlptl � inep�o�on of Con�»t�6atcAtnp „_,_ p1 pettWn o1 T1AUt.lodtl F�bfkalbn r,,_,,,, ln�p�c9on dParnl/►�lscFx[i�nt 7�Inw[s mp{�1?eeR Coa+pontr+4 Oomprew'an Y��u � In p�cdon ot Gk�l�m fabrlcatbn �„ lmpTa�on o[Sb�in9lfnmter � 11 GKE QON7ROL: 1ML1NG,CN3tDNf,CAP9.71ES: _.._ (n�pecdon dRdntarclnq PlaeemetM _ 8 ECI�L CJ��S: �„_„ tncp+dbn d�o!'KY»u Aleosmut! ,,,__ lnsp�cdoe of Coric'�t�B�tchrp iI'EC1M.1 iPECT10Nt 'mio Rai�lana B�aAj'o!lwrtotEr.fr�ro0o�tor�al�IfrrsDfwf�orroQuNed � v dReQokvmeM. � i I COMcheck Software Version 3.8.1 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title:Golden Bear Construction Site: OwnedAgent Designer/Contractor: Vail,CO Derek Felschow AEC 40801 US Hwy 6 8 24 Suite 214 Avon,CO 81620 970-74&8520 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts!ft2 (B x C) Retail 1261 1.5 1892 Allowance:Jewelry,crystal,china highlighGng/Fix.ID:L2 106(a) 2.5 265(b) Allowance:Jewelry,crystal,china highlighting!Fix.ID:P1 41(a) 2.5 103(b) Supplemental Allowed Watts(c)= 305 Total Allowed Watts= 2564 (a)Area claimed must nol exceed the illuminated area pertnitted for this allowance type. (b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less. (c) Supplemental watts must be associated with retail merchandise highlighting fixtures.Supplemental watts are not included calculation of lighting complaince percentage. Section 3: Interior Lighting Fixture Schedule A B C D E Fizture ID:Description!Lamp 1 Wattage Per Lamp 1 Ballast Lamps! #of Fixture (C X D) Fixture Fixtures Watt. Ftetail(1261 sq.ft.) LED:D1:Other 1 36 33 1188 LED:D2:Other 1 5 5 25 Compact Fluorescent 1:D3:Triple 4-pin 26W/Electronic 1 7 26 182 LED:L1:Other 1 18 3 54 LED:L2:Other 1 86 6 516 LED:P1:Other 1 26 6 156 Compact Fluorescent 2:Vt:Quad 2-pin 18W/Electronic 2 1 36 36 Total Proposed Watts= 2157 Section 4: Requirements Checklist Lighting Wattage: � 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 2564 2157 YES Controls, Switching,and Wiring: Projecl TiUe:Golden Bear Report date:08l11l11 Data file�ame:P:1Current Projeds111058.00-Golden BearlCalcula6onslCOMchecklGolden Bear COMcheck.cck Page t of 4 � 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controis separate from daylight zones adjacent to vertical fenestration. � 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: 0 Contiguous daylight zones span�ing no more than two orientations are ailowed to be controlled by a singie controlling device. � Daylight spaces enclosed by walis or ceiling height partitions and conlaining hvo or fewer light fixtures are not required to have a separate switch for general area lighting. � 4. Independeni controls for each space(switch/occupancy sensor). Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. � Lighting in stairways or corridors that are elements of the means of egress. � 5. Master switch at entry to hotel/motel guest room. � 6. Individual dwelling units separately metered. � 7. Medical task lighting or arUhistory display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempi lighting. � 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of altemate rows of luminaires,altemate luminaires,or altemate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Excepfions: ❑ Only one luminaire in space. � An occupant-sensing device controls the area. � The area is a corridor,sioreroom,resVoom,public lobby or sleeping unit. � Areas that use less than 0.6 Watts/sq.ft. � 9. Automatic lighting shutoff contrd in buildings larger than 5,000 sq.R. Exceptions: � Sleeping units,patient pre areas;and spaces where automa6c shutoff would endanger safety or security. � 10.PhotocelUasVOnomical time switch on exterior lights. Exceptions: � Lighting intended for 24 hour use. � 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: � Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. �- . . .- ..c Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit applicatio�.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. Derek Felschow ��IC �� �l(� 1 j - —--_..----- -- - --- �----- Name-Title ignature Date Project TiUe: Golden Bear Report date:08H 1111 Data filename:P:1Current Projects\11058.00-Golden BearlCalculationslCOMchecklGolden Bear COMcheck.cck Page 2 of 4 COMcheck Software Version 3.8.1 Exterior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type:New Construction Project Title:Golden Bear Exterior Lighting Zone: 2(Neighborhood business districtj Construction Site: OwnedAgent: DesignedContractor: Vail,CO Derek Felschow AEC 40801 US Hwy 6&24 Suite 214 Avon,CO 81620 970-74&8520 Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts 1 Unit (B x C) (3)retail shop entry doors(Main entry) 9 ft of door width 20 Yes 180 200 walkway in front of shops(Walkway<10 feet wide) 50 ft of walkway length 0.7 Yes 35 260 Total Tradable Watts'= 215 460 Total Allowed Watts= 215 Total Allowed Supplemental Watts"= 60U 'Wattage tredeoffs are only allowed between tradable areaslsurfaces. "A supplemenlal allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp!Wattage Per Lamp!Ballast Lamps! #of Fixture (C X D) Fixture Fixtures Watt. (3)rstail shop entry doors(Main entry 9 fl of door width):Tradable WaCage Incandescent 2:Wt:Incandescent 100W 1 2 100 200 walkway in iront of shops(Walkway<10 teet wide 50 fl of walkway length):Tradable Wattege LED:D4:Other 1 12 15 180 Halogen 1:D5:Halogen MR-16 20W 1 4 2� 80 Total Tradable Proposed Watts= 460 Section 4: Requirements Checklist Lighting Wattage: 0 1. Within each non-Vadable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areaslsurfaces,total proposed watts must be less than or equal to total allowed watts. Compliance:Passes using supplemental allowance watts. Controls,Switching, and Wiring: � 2. All exemption claims are associated with fixtures that have a control device independent of the control of lhe nonexempt lighting. � 3. Lighting not designated for dusk-to-dawn operation is conVolled by either a a photosensor(with time switch),or an astronomical time switch. _ _ _ _ __ _ _ Project Title: Golden Bear Report date:08f11/11 Data filename:P:1Current Projects111058.00-Golden BearlCalculationslCOMchecklGolden Bear COMcheck.cck Page 3 of 4 � 4. Lighting designated for dusk-to-dawn operation is controlled by an asVonomical time switch or photosensor. � 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Exterior Lighting Efficacy: � 6. All exterior building grounds luminaires that operate at greater than 100W have minimum e�cacy of 60 IumeNwatt. Exceptions: ❑ Lighting that has been claimed as exempt and is iden6fied as such in 5ection 3 table above. � Lighting that is specifically designated as required by a heaHh or life safety statue,ordinance,or regulation. � Emergency iighting that is automatically off during normal building operation. � Lighting that is controlled by motion sensor. �- � ��, .-�� ...- Section 5: Compliance Statement Compliance Statement: The proposed euterior IighGng design represented in this document is consistent with the building plans,specfications and olher calculations submitted with this permit application.The proposed IighGng system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. �('L'� ��\Sc.{�I�.J -�'� ���r— � � � �l Name- itle Signature Date Project Title:Golden Bear Report date:08/17/11 Data filename:P:\Current Projects111058.00-Golden BearlCalculationslCOMchedclGolden Bear COMcheck.cck Page 4 of 4 Department of Community Development 75 South Frontage Road TOWN OF VAIL ` �� vai�,co s�s5� Tel: 970-479-2128 www.vailgov.com I Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm &sprinkler) Project Street Address: Project#:�IR,S� � — �1�3 183 Gore Creek Drive Unit 3A (Number) (Street) (Suite#) DRB#:���I l���q Sitzmark Lod e Building Permit#: � � � ��, l�.p Building/Complex Name: g Contractor Information Lot#: Block# Subdivision: Business Name: ��L. Viele Construction 1000 S Fronta e Rd W#202 UUork Class: New( ) Addition ( ) Alteration (✓) Business Address: g City Vail State: CO Zip: 81657 Type of Building: Ton Faulhaber Single-Family( ) Duplex( ) Multi-Family( ) Contact Name: y Commercial(✓) Other( ) Contact Phone: 970-471-5467 ton viele onstruct� .c Work Type: Interior( ) Exterior( ) Both (✓) Contact E-�vlail: Y@ ' Valuation of X Work Included Plans Included Work Owner/ ner's Represe tive Signature(Required) Electrical (,r )Yes ( )No ( ✓)Yes ( )No 35,000 Applicant Information Mechanical ( )Yes ( )No ( )Yes ( )No Applicant Name: The Golden Bear- Krissy Bussy Plumbing ( )Yes ( )No ( )Yes ( )No Applicant Phone: 970-476-7515#143 Building ( ✓)Yes ( )No ( ✓)Yes ( )No 145,000 Applicant E-Mail: kristenb@thegoldenbear.com Value of all work being performed: $180,000 (value based on IBC Section 109.3&IRC Section 108.3) Project Information The Golden Bear- Krissy Bussy Electrical Square Footage Owner Name: Parcel#: 2101-082-10-006 (For Parcel#,contact Eagle County Assessors Otiice at(970-328-8640 or visit www.eag lecou nty.0 s/patie) Detailed Scope and Location of Work: Tenant improvement of existing space including new lighting and complete renovation of front exterior facade with new windows, front doors and brick veneer. (use additional sheet if necessary) For Office Use��� Date Recei � � � � � ��} f'=-� ;�, Fee Paid: � - Received From• i �j'J) Cash Check # i j j� Q�� 1 2 2��� CC: Visa/ MC Last 4 CC # exp date: ,� Auth # i -r� � �•w� P°.�: �����_ L�..:: : , . �.�. :. . _,_ Ol-Jan-11 r COMcheck Software Version 3.8.1 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title:Golden Bear Construction Site: Owner/Agent: Designer/Contractor: Vail,CO Derek Felschow AEC 40801 US Hwy 6&24 Suite 214 Avon,CO 81620 970-748-8520 Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts • (ft2) Watts/ft2 (B x C) Retail 1261 1.5 1892 Allowance:Jewelry,crystal,china highlighting/Fix.ID:L2 106(a) 2.5 265(b) Allowance:Jewelry,crystal,china highlighting/Fix.ID:P1 41(a) 2.5 103(b) Supplemental Allowed Watts(c)= 305 Total Allowed Watts= 2564 (a)Area claimed must not exceed the illuminated area permitted for this allowance type. (b) Allowance is(B x C)or the actual wattage of the fixtures given in Section 2,whichever is less. (c) Supplemental watts must be associated with retail merchandise highlighting fixtures.Supplemental watts are not included calculation of lighting complaince percentage. Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fi�cture Fixtures Watt. R�ail(1261 sq.ft.) LED:D1:Other 1 36 33 1188 LED:D2:Other 1 5 5 25 Compact Fluorescent 1:D3:Triple 4-pin 26W/Electronic 1 7 26 182 LED:L1:Other 1 18 3 54 LED:L2:Other 1 86 6 516 LED:P1:Other 1 26 6 156 Compact Fluorescent 2:V1:Quad 2-pin 18W/Electronic 2 1 36 36 Total Proposed Watts= 2157 Section 4: Requirements Checklist Lighting Wattage: � 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 2564 2157 YES Controls, Switching, and Wiring: Project Title: Go�den Bear Report date: 08/11/11 Data filename:P:\Current Projects\11058.00-Golden Bear�Calculations\COMcheck\Golden Bear COMcheck.cck Page 1 of 4 � 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. � 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: ❑ Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. � Daylight spaces enclosed by walis or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. � 4. Independent controls for each space(switch/occupancy sensor). Exceptions: � Areas designated as security or emergency areas that must be continuously illuminated. � Lighting in stairvvays or corridors that are elements of the means of egress. � 5. Master switch at entry to hotel/motel guest room. � 6. �ndividual dwelling units separately metered. � 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. � 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of altemate rows of luminaires,altemate luminaires,or altemate lamps,switching the middle lamp luminaires independenUy of other lamps,or switching each luminaire or each lamp. Exceptions: � Only one luminaire in space. � An occupant-sensing device controls the area. � The area is a corridor,storeroom,restroom,public lobby or sleeping unit. � Areas that use less than 0.6 Watts/sq.ft. � 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: � Sleeping units,patient care areas;and spaces where automa6c shutoff would endanger safety or security. � 10.Photocell/astronomical time switch on exterior lights. Exceptions: � Lighting intended for 24 hour use. � 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: � Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. �- . , .- ..- Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. Derek Felschow ��IC �__�y� $�([ `� Name-Title ignature Date _s_.. .�_� Project Title: Golden Bear Report date: 08/11/11 Data filename:P:\Current Projects\11058.00-Golden Bear�Calculations\COMcheck\Golden Bear COMcheck.cck Page 2 of 4 COMcheck Software Version 3.8.1 Exterior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title:Golden Bear Exterior Lighting Zone: 2(Neighborhood business district) Construction Site: Owner/Agent: Designer/Contractor: Vail,CO Derek Felschow AEC 40801 US Hwy 6&24 Suite 214 Avon,CO 81620 970-748-8520 Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts /Unit (B x C) (3)retail shop entry doors(Main entry) 9 ft of door width 20 Yes 180 200 walkway in front of shops(Walkway<10 feet wide) 50 ft of walkway length 0.7 Yes 35 260 Total Tradable Watts*= 215 460 Total Allowed Watts= 215 Total Allowed Supplemental Watts"= 600 *Wattage tradeoffs are only allowed between Vadable areas/surfaces. *"A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. (3)retail shop eMry doors(Main entry 9 ft of door width):Tradable WaCage Incandescent 2:W1:Incandescent 100W 1 2 100 200 walkway in tront of shops(Walkway<10 feet wide 50 ft of walkway length):Tradable Wattage LED:D4:Other 1 12 15 180 Halogen 1:D5:Halogen MR-16 20W 1 4 20 80 Total Tradable Proposed Watts= 460 Section 4: Requirements Checklist Lighting Wattage: � 1. Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts. Compliance:Passes using supplemental allowance watts. Controls, Switching, and Wiring: � 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. � 3. Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time switch. Project Title: Golden Bear Report date: 08/11N1 Data filename:P:\Current Projects\11058.00-Golden Bear�Calculations\COMcheck\Golden Bear COMcheck.cck Page 3 of 4 � 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor. � 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Exterior Lighting Efficacy: � 6. Ail exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt. Exceptions: � Lighting that has been claimed as exempt and is identified as such in Section 3 table above. � Lighting that is specifically designated as required by a health or life safety statue,ordinance,or regulation. � Emergency lighting that is automatically off during normal building operation. � Lighting that is controlled by motion sensor. �- . � ��, .- - ..- Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.1 and to comply with the mandatory requirements in the Requirements Checklist. V Tl IL°� ���Sc�I/1l;c.✓ -�� �, '_�� �` L( �I Name- itle Signature Date Project Title: Golden Bear Report date: 08/11/11 Data filename:P:\Current Projects\11058.00-Golden Bear�Ca�culations\COMcheck\Golden Bear COMcheck.cck Page 4 of 4 D&D Environmental Consulting, ►nc. 7345 South Pierce Street,Suite 104 Littleton,Colorado 80128 (303)730-7877(0) (303)870-1032(cell) August 3,2011 VIA E-MAIL Mr.Tony Faulhaber J.L. Viele Construction 1000 S.Frontage Rd., Suite 202 Vail,CO 81657 RE: Report of Findings—Limited Asbestos Renovation Survey For The Golden Bear, 183 Gore Creek Drive,Unit 3A Ciurently Wilderness Wonders Vail,Colorado D&D Project No. 110707 Dear Mr.Faulhaber: D&D Environmental Consulting, Ina (D&D)is pleased to provide the results of the walk-through and collection of representarive bulk samples of suspect asbestos containing drywall and drywall joint compound(mud)material that may be impacted by the interior renovation activities for the retail space located at 183 Gore Creek Drive,Unit 3A, Vail,Colorado. The walk-through,collection of representarive bulk samples,and delivery of the bulk samples to an independent analytical laboratory were completed on July 29, 2011 by a D&D Building Inspector,certified and accredited by the Environmental Protection Agency(EPA)and the State of Colorado. UNDERSTANDING& SCOPE OF WORK D&D understands that a representative of J.L. Viele Consiruction was seeking a professional environmental consulting company to conduct a walk-through to view and collect representative bulk samples of drywall and drywall joint compound material that will be impacted by the interior renovations and submit the bulk samples to an independent analytical laboratory for asbestos content analysis based on standard turnaround rime. Reportedly,the renovation activities will impact the drywall and drywall joint compound material only. This report of findings was prepared based on the asbestos content report from the analytical laboratory. ANALYTICAL PROCEDURES The bulk samples collected of suspect asbestos containing materials were delivered to Aerobiology Laboratory Associates, Inc.a National Voluntary Laboratory Accreditation Program(NVLAP)asbestos laboratory located in Lakewood,Colorado for standard turnaround time analysis. All bulk samples are archived for six-months unless otherwise stipulated by the client. According to the analytical laboratory,the bulk samples were analyzed in accordance with EPA Method 600/R- 93/116. Small portions of the sample were placed in Series: E High Dispersion Refractive Index Liquid on a microscope slide. The prepared samples were observed at 100X(power)under polarized light using a McCrone Dispersion Staining Objective. The characterisrics of the fibers were compared to the known properties of asbestos fibers for dispersion color,polarity,extinction and general morphology. Sample content(given by percentage)was made by visual estimates by comparison of asbestos fibers to total materials. Mr.Tony Faulhaber II Asbatos Rrnovauon Survey-183 Gore Crcek Dr. Vail.CO I 110707 j August 3,201 I Page 2 RESULTS The US Environmental Protection Agency(EPA),the Occupational Safety and Health Administration(OSHA), and the State of Colorado Air Quality Control Commission considers a material as asbestos containing if the reported amount of asbestos is greater than one-percent. According to the analytical report,the three-bulk samples of drywall/joint compound were reported as none detected(ND) for asbestos content.Copies of the chain of custody form and the analytical results are attached. RECOMMENDATIONS AND SUMMARY Based on the analytical report,the drywall/drywall joint compound will not require special handling prior to commencing renovation activities to the wall or ceiling surfaces. If additional suspect asbestos containing materials are identified during the demolition/renovations,all activities must stop until these materials are sampled. Work shall not resume until the results are reported and removal completed,if required. D&D's liability is limited to the amount billed for this project. D&D appreciates the opportunity to assist you with your asbestos sampling needs. If you have any questions regarding this report of findings,please do not hesitate to call me at the office(303)730-7877 or on my mobile phone(303)870-1032. Sincerely, D&D ENVIRONMENTAL CONSULTING, INC. �� �� ��� Dou las A.Aldin er � g g General Manager Attachments ✓ 11-30-2011 Inspection Request Reporting Page 12 4:34 pm Va�l, CO - Citv Of Requested Inspect Date: Thursday December 01, 2011 Site Address: 183 GORE CREEK DR VAIL SITZMARK LODGE UNIT 3A(GOLDEN BEAR RETA A/P/D Information Activity: B11-0276 Type: COMBO Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: B Insp Area: Owner: SITZMARK AT VAIL INC Contractor: J.L.VIELE CONSTRUCTION INC. Phone: 970-476-3082 Description: MODIFICATION TO EXTERIOR STOREFRONTS AND STUCCO CANOPY, REPLACEMENT OF 3 TENANCY FRONT DOORS/SIDELIGHTS WITH MATCHING FRAMELESS GLASS AND DOOR HARDWARE ALONG WITH NEW WOOD TRIMS AND PAINT COLORS. NEW CLAD WOOD WINDOWS AT THE GOLDEN BEAR TENANCY AND MATCHING BRICK VENEER AS SHOWN ON DRAWINGS. Requested Inspection(s) Item: 90 BLDG-Final Requested Time: 08:30 AM Requestor� Phone: Comments: 471-5467 Assigned To: "*"""'�`�" Entered By: MHAEBERLE K Action: Time Exp: Item: 420 Special Inspect-final rept Requested Time: 08:15 AM Requestor: Phone: Comments: 471-5467 Assigned To: "*""""""`"`* Entered By: MHAEBERLE K Action: Time Exp: Item: 534 PLAN -FINAL C/O Requested Time: 08:30 AM Requestor: Phone: Comments: 471-5467 Assigned To: BGIBSON Entered By: MHAEBERLE K Action: Time Exp: Item: 539 PW-FINAL C/O Requested Time: 08:00 AM Requestor: Phone: Comments: 471-5467 Assigned To: LSANDOVAL Entered By: MHAEBERLE K Action: Time Exp: �' l � 3��)1 ��� i�DV� (Jln ,�, � n �� �vv►��t Inspection History Item: 120 ELEC-Rough "`Approved"" 11/09/1'f Inspector: sgremmer Action: AP APPROVED Comment: Item: 140 ELEC-Misc. Item: 30 BLDG-Framing '*Approved** 10/19/11 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: PARTIAL FRAMING FURRED OUT WALL ONLY ON EAST SIDE 11/09/11 Inspector: sgremmer Action: AP APPROVED Comment: 11/10/11 Inspector: sgremmer Action: AP APPROVED Comment: checked u-vafues on new windows REPT131 Run Id: 13807 _.. _--- 11-30-2011 Inspection Request Reporting Page 12 4:34 �m __ _ Vail, CO=�it�Qf _ Requested Inspect Date: Thursday December 01, 2011 Site Address: 183 GORE CREEK DR VAIL SITZMARK LODGE UNIT 3A(GOLDEN BEAR RETA A/P/D Information Activity: B11-0276 Type: COMBO Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: B Insp Area: Owner: SITZMARK AT VAIL INC Contractor: J.L. VIELE CONSTRUCTION INC. Phone: 970-476-3082 . Description: MODIFICATION TO EXTERIOR STOREFRONTS AND STUCCO CANOPY, REPLACEMENT OF 3 TENANCY FRONT DOORS/SIDELIGHTS WITH MATCHING FRAMELESS GLASS AND DOOR HARD LONG WITH NEW WOOD TRIMS AND PAINT COLORS. NEW CLAD WOOD WINDOWS GOL BEAR TENANCY AND MATCHING BRICK VENEER AS SHOWN ON DRAWINGS. Re ueste ns ection s Item: 90 BLDG-Final Requested Time: 08:30 AM equestor: Phone: omments: 471-5467 As igned To: "'*"*'*"" Entered By: MHAEBERLE K Action: Time Exp: Item: 420 Special Inspect-final rept Requested Time: 08:15 AM Requestor: Phone: Comments: 471-5467 Assigned To: """"""""'" Entered By: MHAEBERLE K Action: Time Exp: Item: 534 PLAN -FINAL C/O Requested Time: 08:30 AM Requestor: Phone: Comments: 471-5467 Assigned To: BGIBSON Entered By: MHAEBERLE K Action: Time Exp: Item: 539 PW-FINAL C/O Requested Time: 08:00 AM Requestor: Phone: Comments: 471-5467 Assigned To: LSANDOVAL Entered By: MHAEBERLE K Action: Time Exp: r� v � ,1 � V� /� `� Inspection History Item: 120 ELEC-Rough "*Approved" 11/09/1'f Inspector: sgremmer Action: AP APPROVE Comment: Item: 140 ELEC-Misc. Item: 30 BLDG-Framing "'Approved "` 10/19/11 Inspector: JRM Action: PA PARTIAL P VAL Comment: PARTIAL FRAMING FURRED OUT WALL ONLY ON EA S E 11/09/11 Inspector: sgremmer Action: AP APPROV D Comment: 11/10/11 Inspector: sgremmer Action: AP APPRO Comment: checked u-vafues on new windows REPT131 Run Id: 13807