Loading...
HomeMy WebLinkAboutB11-0278 comment letter Date: 8/30/2011 Re: 1406 Moraine Drive B11-0278 Dear Mr. Plavec, RESPONSE INSTRUCTIONS ● Submit three complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING COMMENTS Architectural Comments: Sheet A3 1. How is the boiler to be protected from damage in the garage per section 303.4 IMC Structural Comments: NA Plumbing Comments: Sheet A3 1. Provide gas piping isometrics for the proposed work showing compliance with section 402.3 of the IFGC. 2. Provide the size and efficiency of the proposed boiler. Reference section 403.6 IECC 3. Annotate on the plans gas vent termination to be a minimum of 60” above grade per town amendment to the IFGC. 4. Please clarify that the proposed boiler may be installed in an unconditioned space. 5. Show how the condensate drains to be connected to the floor drain and maintain the required air gap. Reference section 802.2.2 IPC Mechanical Comments: NA Electrical Comments: 1. Please provide electrical plans for the proposed electrical work. Only indication of electrical work is in the construction valuation. PLANNING COMMENTS Reviewed and accepted FIRE COMMENTS NA PUBLIC WORKS COMMENTS NA Sincerely, Martin A. Haeberle Chief Building Official