HomeMy WebLinkAboutB11-0310 NOTE: THIS PERM/T MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
r�w�a���u:.
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.4792452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: 611-0310
Project #: PRJ11-0502
Job Address: 950 POTATO PATCH DR VAIL Applied.....: 09/01/2011
Location......: POTATO PATCH CLUB UNIT 32 Issued.. . : 09/08/2011
Parcel No....: 210106306032
OWNER SONGEUR,THIERRY&ADRIANA 09/01/2011
6881 SW 133 TERRACE
PINECREST
FL 33156
APPLICANT A.W. INTERIORS INC 09/01/2011 Phone:970-926-4994
CHRISTOPHER BROOK
0210 EDWARDS VILLAGE BLVD D101, BOX 2020
EDWARDS
CO 81632
License: C000003275
CONTRACTORA.W. INTERIORS INC 09/01/2011 Phone: 970-926-4994
CHRISTOPHER BROOK
0210 EDWARDS VILLAGE BLVD D101, BOX 2020
EDWARDS
CO 81632
License:C000003275
Description:
INTERIOR REMODEL.
Occupancy: R-3 Type Construction: V Valuation: $99,665.00
............................................x.....,,._.,...,........,,............. FEE SUMMARY ...........,.,,.,,....,..............«...........,,,.,,..,.,,,,..,,..,,.........,.,
Building Permit-----------> $993.75 Bidg Plan Check----------> $645.94 Use Tax Fee-----------------------> $1,793.30
Electrical Permit---------> $115.00 Elec Plan Check-----------> $74.75 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit--------> $45.00 Plmb Plan Check---------> $11.25 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $15.00
TOTAL PERMIT FEES-------------> $3,693.99
Payments------------------------------> $3,693.99
BALANCE DUE-----------------------> $0.00
........................................................................�«.....«............,.�...«..,.».«......«..........._..,..,,._.,......,,,...........................,,,,....,,
DECLARATIONS
I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws,and to build this structure
according to the town's zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM-4:00 PM.
�� �`}' 20�/
Signature of Owner or Contractor Dat
rss' c r-�"�
Print Name !
combination permit_012811
:
�
t V�1'!�1 V1 ��L�L •
......................................................................�......x�,�...,�,,....,..,....,>,....,,,,..,..,.....,..,.,...x..,,,........,,...,..,.,...,...,..,,,.,,.........
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: 611-0310 Address: 950 POTATO PATCH DR VAIL
Owner: SONGEUR, THIERRY &ADRIANA Location:
POTATO PATCH CLUB UNIT 32
�...........................................................................................,,....,�.............,,.,,...,....,,,..,.,.........................,....,..,.....,.,......
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
combination permit_012811
2
�
�I�����1 f
+r«�**«+.+.*a*r*,r****«r«*,r**+r«,r«**r*,r*******,rrr****r**********,r,rw,t*****r*rr*r,r**+r««*««,r«,r,r*,r***,�,r*,r*r***«*,r,+*,r,rw****,r,rw,r**,r,r*,t***,r,r,r,r**rr,r*+r,r**«*w****,+•
REQUIRED INSPECTIONS AND STATUSES
Permit#: 611-0310 Address: 950 POTATO PATCH DR VAIL
Owner: SONGEUR, THIERRY &ADRIANA Location:
POTATO PATCH CLUB UNIT 32
***«*****«*«**,.*******************.**�*************«*****«*********,.****,.********,.**********************��****************«***************««««*«*««*«
Item: 00120 ELEC-Rough
Item: 00230 PLMB-Rough/Water
Item: 00220 PLMB-Rough/D.W.V.
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Nail
Item: 00190 ELEC-Final
Item: 00290 PLMB-Final
Item: 00090 BLDG-Final
combination permit_012811
B11-0310: Entries for Item:90 - BLDG-Final 11:04 01/16/2014
Action Comments By Date Unique_
Ke
AP sgremmer 11/21/2011 A000146
854
Total Rows: 1
Page 1
***************���**********************�***************************************************
TOWN OF VAIL, COLORADO Statement
****�******�**********************�*******************�*************************************
Statement Number: R110001178 Amount: $3, 049.58 09/08/201101:53 PM
Payment Method: Check Init: SAB
Notation: 2937 - AW
INTERIORS
-----------------------------------------------------------------------------
Permit No: B11-0310 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-063-0603-2
Site Address: 950 POTATO PATCH DR VAIL
Location: POTATO PATCH CLUB UNIT 32
Total Fees: $3, 693.99
This Payment: $3, 049.58 Total ALL Pmts: $3, 693 .99
Balance: $0.00
*****************+*******************+******************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 993 .75
EP 00100003111100 ELECTRICAL PERMIT FEES 115.00
PF 00100003112300 PLAN CHECK FEES 87.53
PP 00100003111100 PLUMBING PERMIT FEES 45.00
UT 11000003106000 USE TAX 4% 1,793.30
WC 00100003112800 WILL CALL INSPECTION FEE 15.00
-----------------------------------------------------------------------------
- Department of Community Development
75 South Frontage Road
TO VUN OF VAIL'�� v��i, co s�ss�
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT' APPLICAT'ION
_ (Separate applications are required for alarm &sprinkler)
Project Street Address: Project#: i�3
!�.J�_ ��' �1�S-t-a ci.2 ��7 ,�—
(Numberj (Street) �uife# DRB#: -/V{�^
�" )
���� �� �l�_ Building Permit#:�1,� ����
BuildinglComplex Name: cc.,
Contractor Informat(on � Lot#:_Block#F_ Subdivision:
Business Name: {-�-•� • �✓i�"l t�fS �vl(`, - --- - -- -- . .
Work Ciass: New( ) Addition( ) Aiteration( ✓J
BusinessAddress: 02.(O �.�".s�c.�s �����.,� �uro Dto�
c
City �',.�",�«r�s State:�Zip: ����;Z TYPeofBuilding;
-7� Single-Family( ) Duplex( j Mulli-Family( ij
Contact Name: �._.�rtS -p P-oc�� Commerciat( ) Ofher( )
Contact Phone: �(`�-� -- 3ao � ��5� -----�--
Work 7ype: Interior(✓s Exterior( ) Both( }
ContactE-Mail: ��--Dak�� Q��3trl�-tY-(pv� cprsl
___y
� �'' ___—___�=.�-._—.. � Valuation of
� �/vL�' Work Included Plans Included Work
Owner/Owner's Representative ignature(Required) Electrical (✓)Yes ( )No ( )Yes (�No �3�
Applicant Information Mectianical ( )Yes ( )No ( )Yes ( )No
Applicant Name: �„l.,c�. �y�`Kr-�oJ�S �r�. - �ns�ir lumbing ( �jYes ( )No ( )Yes (✓fNo {���SQ
Applicant Phone: g'�-() •-3�p --'�-'�� Buildiny (,i)Yes ( )No (✓jYes ( )No`�_9 T7ao
Applicant E-Mail: ��rz,f,k �� �,v�,.ty-zr,�rS.c�
- Value of all work be+ng performed: $ 9
— (value based on IBC SecGon 109.3 8 IRC Seclion 108.3� �
P�oject Informatior�-�-� � Electrical Square Footage
Owner Name: l Vl�cr-�" pv� � �
Parcel#: � � l � d
(For Parcel#,conlact Eagle County Assessors Offico at(470328-8640 or visit
wwvi.e ag lec ou n ty.uslpa tle)
�Detailed Scope and Location of Work:_��j�`_�C.-r�Qr�_�,� �' s q1- _ _____ __
I
I
� - --
%(use addltional sheet if necessary) �
For Uftice Use Onl��` Aate Received; �'
Fee Paid: � ��yy� f � j � (_I \'I �� � •�j�/
Received From: ����ER�� ID �_� � �'' �, �,
Cash _______ Check �t� F'��
CC: Visa/MC Last 4 CC # exp date: �UG 2 9 2011
Auth #
! TOWN OF VAIL
o�-�a��-i�
�
� '' � 3 2 �d�.�?���.. Cl��
� , � • �r����1--.5
Entry
• Remove tile, carpet and base
• Remove framing and drywall to open up Foyer to Kitchen area from top of
drywall opening to backsplash height if possible.
• Install wood cap at opened up area top
• Install new drywall where necessary and skim coat all walls and texture with a
light skip trowel
• Install new Travertine tile
• Install base—we will try to re use the old base
• Install new can lights—total of three in Entry
• Entry to be painted a Taupe color on walls
Living and Dining
• Install new built in at Living Room with cabinets below and a shelf and
telescoping arm for TV above. The upper section is to be built out from wall by
12"
� Remove stucco at fireplace, install tile brick medley stone at hearth and surround
and a box wood mantle sta.ined to match woodwork. Tile surround to be built out
1 %2"from back wall. Mantle stops at edge of wall and the same spot where built
out stucco stops now. Hearth to have quarter round edge to stop tile. Wood box
to have tile on all sides
• Install new floor—4 3/4" Teak Huntington 3/8" Model#HL 108H
• Check switches and label switched outlets for lamps
• Possible replace fireplace doors to get rid of brass, cost to be determined
.
Kitchen
� Remove all appliances and hood and replace with approved appliances per email
confirmation. All Frigidaire appliances
• Insta.11 new floor—4 3/4" Teak Huntington 3/8"Model #HL 108H
• Install new cabinet dra.wer fronts and doors and necessary veneer
• Install new appliances at refrigerator, oven,microwave and dishwasher, cooktop
and hood. Modify cabinets to fit oven.
• Install new sink and faucet and reinstall garbage disposal
• Install new Silestone Tigris Sand counters and tile Ivory Travertine 2x2 mosaic
tile backsplash
• Counter at bar is elevated and will extend 12"past existing
• Install new 4"cans at Kitchen ceiling. Cans switch together. Add three pendants
over bar
• Fix pull out drawer at Kitchen
• Add 2 doors and cabinet above Refrigerator
• Remove outlet at West wall of Kitchen
• Alliance Moving to pack all Kitchen items and move to lower level storage. All
T'V and components stay together. Blue tape=Keep in house; Red tape=remove
from house
Powder Room
• Remove lighting soffit,tile floor
• Install new Travertine tile
• Install new 4"cans at soffit 3 total and new fan light
• Install new countertop and backsplash.New counter stops at edge of cabinet
• Install new mirror in wood frame
� Change lighting switching to be in one box
• Add 4 fixed shelves and a bypass door at the left of toilet. If code allows because
you need 15"to each side of the toilet
Stairs
• Remove carpet
• Install new carpet with waterfall style at treads and risers
• Install wrought iron pickets in between wood ballusters
Master Bedroom
• Install switched outlets at both sides of the bed
• Install hidden door at corner of room that is painted to match the wall
• Add electric outlet and TV cable to the wall in front of bed at 66"centered. Install
conduit from old TV outlet to the new outlet
Master Bath
• Re frame shower for opening at vanity side that starts at 6" above vanity top and
goes to ceiling
• Install new drain and shower floor
• Install new 3/8"thick s����frameless shower glass panels and door
• Install new 4"can lights—8 total—overhead and soffit
• Install new mirror in a frame
�
�
Lower levcl
Bed 1 and Bed 2 and Hall
• See General notes -just new carpet and paint and added thermostat and new door
hinges
Bath 1
� Remove pocket door and wall
• New can lights at soffit
• New tile floor and walls
• Reface cabinet and new counter
� Fix bath fan/heater
• Add glass pane132"off shower side
Bath 2
� New tile and floor
• Reface cabinet and new counter
• Add tub panel—32"off shower head side
Den
• Move TV and Outlet to center of East wall
• Remove heater and relocate 36"heater toward Storage Room
• New carpet,paint and add thermostat and new door hinges
Den bath
• Reframe room
� Add door that swings into Den
• Add Home Depot cabinet and mirror combo
• Add new toilet
• Add new can lights and heat/light fan combo
• Add new shower with same finishes as rest of the house
� Relocate washer and dryer to enter from Hall
• Add 14" shelf above washer and dryer at 60"
• Hamper space on left of washer and dryer
• Add double door from hall
� �,,/
• Add frame glass shower door and panel—obs�"�""-glass
• New paint
, ,
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: Potato Patch Club, Unit 32, Vail, Colorado
Asbestos Sampling Report — Page 1 of 2
February 22, 2011
Chris Brook
AW Interiors
On February 18, 2011, Quentin Danziger conducted an asbestos inspection of the suspect
materials that will be disturbed by the planned remodel. Asbestos was NOT found,as
described below.
Homogenous Description Number of %Asbestos Square Type/Friable?
Area Sam les Feet
O1 Texture 3 Non Detect
02 Sheetrock/JC 3 Non Detect
BACKGROUND:
A remodel is planned for a specific area of this home. Indoor Environmental Services
was requested to conduct an asbestos inspection of the suspect materials that will be
disturbed.
This inspection includes only suspect materials that are visible to the inspector. If other
suspect materials become visible during demolition, they must be sampled before they
are disturbed. Examples of suspect materials include but are not limited to: linoleum,
floor tile,ceiling tile,mastic, sheetrock,joint compound,roofing materials, etc. There are
over 3000 known asbestos containing materials.
SAMPLING PLAN:
Colorado State Requirements-For each homogenous area of less than 1000 square
feet, a minimum of three samples must be collected in random areas. For each
homogenous area of 1000—5000 square feet, a minimum of five samples must be
collected in random areas. Areas of 5001 square feet or greater require a minimum of 7
samples. These laws are defined by the EPA (AHERA) and Colorado State Regulation 8.
Determination of homogenous sampling areas—Homogenous Areas are determined by
type of suspect material,texture, color and location.
Determination of random sampling areas—The samples were collected in a random
manner. ,
�
Indoor Environmental Services, Inc
Dba: Q Consulting, Inc.
Project: Potato Patch Club, Unit 32, Vail, Colorado j
Asbestos Sampling Report — Page 2 of 2
Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality
consultants. We look forward to working with you in the future.
Quentin Danziger, BS, CIE,ABI—Colorado Asbestos Inspector Certification# 12781
Indoor Environmental Services, Inc.
Dba Q Consulting, Inc.
970-390-0087
QConsultingInc@yahoo.com
EMSL Analytical, Inc.
200 Route 130 North, Cinnaminson, NJ 08077
Pho�e: (800)2203675 Fax: (856)786-5974 Email: w��str?i;_��t�;st>lah'�EMSL.com
Att": Quentin Danziger
Customer ID: INES78
Q Consulting, Inc. c�to�Po:
PO Box 997 Received: 02/21/17 8:45 AM
Vail, CO 81658 EMSL Order: 041103769
Fax Phone: (970)390-0087
EMSL Proj:
Project: POTATO PATCH CLUB 32-VAIL ,q�alysis Date: 2/22/2011
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
Non-Asbestos pg�s
Sample Description Appearance °� Fibrous �o Non-Fibrous % Type
01-01 -TEXTURE- White 100% Non-fibrous(other) None Detected
a»a��6ynoo� LOWER Non-Fibrous
Heteroger�eous
01-02 BED CLOSET- White 100% Non-fibrous(other) None Detected
oa��a��6y-0002 TEXTURE- Non-Fibrous
UPPER H�erogeneous
01-03 BATH CLOSET- White 100°� Na►-fibrous(other) None Detected
oet�a��ss-000s TEXTURE- Non-Fibrous
UPPER Homogeneous
02-01-Drywall CLOSET- Brwun/Gray 10°k Cellulose 85% Norrfibrous(other) None Detected
oa»a��6ymo4 SHEETROCK/JOI Fibrous 5% Glass
NT COMPOUND- H�����
LOWER
02-01-Jant CLOSET- White 100% Non-fibrous(other) None Oetected
Compound SHEETROCK/JOI Non-Fibrous
oat�a��ss-000an NT COMPOUND-
LOWER H�erogeneous
02-01-Tape CLOSET- Cream 99°� Cellulose 1% Non-fibrous(other) None Detected
oa��a��6�000ae SHEETROCK/JOI Non-Fibrous
NT COMPOUND- Heterageneous
LOWER
Initial report from 02/22/2011 10:37:42
�"e�Analyst(s) . �'��'"�
LesNe McCluskey(8) Stephen Siegel,CIH,Laboratory Manager
Ted Young(4) or other approved signatory
EMSL mainfains�iabiliry limited to the cost of analysis. This report relates only to the samples reported above and may noi be reprotluced,e�xept in full,without written approval by
EMSL. EMSL bears no responsibility for sample cdlecUOn actiHfies or analytical method limitations.InBerpetation and use of test results are the responsibility of the Gient. This report
must not be used by the Gient to Gaim product certificatlon,approval or endarsement by NVLAP,NIST or any agency of the federal goe�emment. The test results contained wRhin this
report meet Ihe requirements of NELAC uNess otherwise specified.Samples received in good condRion unless olherwise noted.
Sam les anal EMSL Anal �pl,Inc.Cinnaminson,NJ NVLAP Lab Code 101048-0,AMA-LAP,LLC-IHLAP Lab 100194,NYS ELAP 10872,NJ DEP 03036
Test Report PLM-721.0 Printed:2/22/2011 10:37:42 AM �
EMSL Analytical, Inc.
200 Route 130 North. Cinnaminson. NJ 08077
Phone: (800)220-3675 Fax: (856)786-5974 Email: westmontasblabanEMSL.com
An": Quentin Danzi er
g Customer ID: INES78
Q Consulting, Inc. customer Po:
PO Box 997 Received: 02/21/11 8:45 AM
Vail, CO 81658 EMSL Order: 041103769
Fax: Pho�e: (970)390-0087
EMSL Proj:
Project: POTATO PATCH CLUB 32-VAIL
Anaysis Date: 2/22I2011
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
Non-Asbestos Asbestos
Sample Description Appearance °� Fibrous % Non-Fibrous % Type
02-02-Drywall BED CLOSET- BrowNGray 10°k Cellulose 85°� Norrfibrous(other) None Detected
oa��a3�ss000s SHEETROCK/J01 Fibrous 5% Glass
NT COMPOUND- Heterogeneous
UPPER
02-02-Jar�t BED CLOSET- White 100% Non-fibrous(other) None Detected '
Compound SHEETROCKlJOI Non-Fibrous
04 1 1 03 769-OOOSA NT COMPOUND-
UPPER Heterogeneous
02-02-Tape BED CLOSET- Cream 99°r6 Cellulose 1% Non-fibrous(other) None Detected
oa�ta��ssvoose SHEETROCKlJOI Non-Fibrous
NT COMPOUND- Heterogeneous
UPPER
02-03-Drywall BATH CLOSET- White 15% Cellulose 85% Non-fibrous(other) None Detected
oa��a��6yvoo6 SHEETROCK/JOI Fibrous
NT COMPOUND- Homogeneous
UPPER
02-03-Jant BATH CLOSET- White 100% Nor�fibrous(other) None Detected
Compound SHEETROCK/JOI Non-Fibrous
oatta��s9-000sa NT COMPOUND-
UPPER Homogeneous
02-03-Tape BATH CIOSET- Cream 99% Cellulose 1% Norrfibrous(Mher) None Detected
oe��a��sy,000s8 SHEETROCK/JOI Fibrous
NT COMPOUND- Horrageneous
UPPER
Initial report from 02/22l2011 1037:42
��t�s� 'f�.�c—. .li��r..•�
Les�e McCluskey(8) Stephen Siegel,CIH,Laboratory Manager
Ted Young(4) or other approved signatory
EMSL maintains liabiliry limited to the cost of analysis. This repoA relates only to the samples reported aboue and may not be reproduced,exept in tull,without written approvel by
EMSL. EMSL bears no responsibiliry for sample collecbon activities or analytical method limitations.Inlerpretation and use of test results are the responsibiliry of the Gient. This report
must not be use0 by the Gient to Gaim proeuct certification,approval w endorseme�t by NVLAP,NIST or any agency of the feCerel govemment. fie test results confsined within this
report meet Ihe requirements of NELAC unless otherv+ise specified.Samples receivetl in good condition unless otherwise noted.
Sam les anal ed b EMSL Anal 'cal,Inc.Cinnaminson,NJ NVLAP Lab Code 101048-0,AIHA-LAP,LLC-IHLAP Lab 100194,NYS ELAP 10872,NJ DEP 03036
Test Report PLM-7.21.0 Printed:2/22/2011 10:37:42 AM THIS IS THE LAST PAGE OF THE REPORT. 2