HomeMy WebLinkAboutPRJ06-0005 B06-0004.PDF SECTION 15010 C DIG TRENCHE;TO DEPTH,WIDTH,CONFIGURATION,AND GRADE APPROPRIATE TO THE
PIPING BEING IVSTALLED.DIG TRENCHES TO 6"BELOW THE LEVEL OF THE BOTTOM OF A INSTALL PIPES AND PIPE FITTINGS IN ACCORDANCE WITH RECOGNIZED INDUSTRY SECTION 151�0 �
GENERAL PROVISIONS THE PIPE TO BE INSTALLED INSTALL 6"BED OF PEA GRAVEL OR SQUEEGEE, PRACTICES WHICH WILL ACHIEVE PERMANENTLY❑LEAK PROOF PIPING SYSTEMS,
MECHANICALL''TAMP TO PROVIDE A FIRM BED FOR PIPING,TRUE TO LINE AND GRADE CAPABLE OF PERFORMING EACH INDICATED SERVICE WITHOUT PIPING FAILURE INSTALL SUPPORTS,AVCHORS AND SEALS
WITHOUT IRR�ULARITY PROVIDE DEPRESSIONS ONLY AT HUBS,COUPLINGS,FLANGES, EACH RUN WITH MINIMUM JOINTS AND COUPLINGS,BUT WITH ADEQUATE AND • � , A1 C 1 1�� �S
1 1 GENERAL OR OTHER NORMAL PIPE PROTRUSIONS ACCESSIBLE UNIONS FOR DISASSEMBLY AND MAINTENANCE/REPLACEMENT OF VALVES 1 1 GEN_RAL
AND EQUIPMENT
A ALL BIDDERS SHALL BECOME FAMILIAR WITH SITE CONDITIONS PRIOR TO SUBMITTING D. BACKFILL TO 12 INCHES ABOVE TOP OF PIPING WITH PEA GRAVEL OR SQUEEGEE,THE A. ALL PIPE HANGERS SHALL BE THREADED ROD WITH CLEVIS OR TRAPEZE SUPPORTS.
BIDS SAME AS USEC FOR PIPING BED,COMPACT PROPERLY 1 USE FITTINGS FOR ALL CHANGES IN DIRECTION AND ALL BRANCH CONNECTIONS
1 INSULATED PIPING• COMPLY WITH THE FOLLOWING INSTALLATION REQUIREMENTS
B ALL WORK SHALL BE EXECUTED IN ACCORDANCE WITH LOCAL AND STATE CODES E CONTINUE BACKFILL TO FINISH GRADE,USING FRIABLE MATERIAL FREE OF ROCK AND 2 INSTALL PIPING AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS DIAGONAL
OTHER DEBRI�. INSTALL IN 6 INCH LAYERS,EACH PROPERLY MOISTENED AND RUNS ARE NOT PERMITTED,UNLESS EXPRESSLY INDICATED 2 SHIELDS PROVIDE PROTECTIVE SHEET SHIELDS,MSS TYPE 40 ON COLD PIPING 2"
C EQUIPMENT SCHEDULES ESTABLISH A QUALITY AND DESIGN STANDARD SUBSTITUTIONS MECHANICALL"COMPACTED PRIOR TO INSTALLATION OF ENSUING LAYER COMPACTION AND LESS SHIELDS SHALL SPAN AN ARC OF 180 DEGREES AND SHALL BE MINIMUM
MUST BE EQUIVALENT IN PERFORMANCE,MATERIAL,SPACE,AND CONFIGURATION gY HYDRAULICJETTING IS NOT PERMISSIBLE 1 3 PIPING TESTS 8"LONG.
REQUIREMENTS THE PROJECT ENGINEER OR ARCHITECT'S DECISION WILL BE FINAL
AND MAY BE BASED ON BOTH CERTIFIED TEST DATA AND SUBJECTIVE REASONING F USE SUITABLEEXCAVATED MATERIAL TO COMPLETE THE BACKFILL,INSTALLED IN 6 INCH A. GENERAL: PROVIDE TEMPORARY EQUIPMENT FOR TESTING,INCLUDING PUMP AND 3 INSULATION INSERTS PROVIDE ASBESTOS-FREE CALCIUM SILICATE INSERT 2301 BLAKE ST., STE.#100
LIFTS AND MECHANICALLY COMOPACTED TO SEAL AGAINST WATER INFILTRATION GAGES TEST PIPING SYSTEM BEFORE INSULATION IS INSTALLED WHEREVER FEASIBLE ENCASED WITH A VAPOR BARRIER AND A SHEET METAL SHIELD FOR COLD PIPING DENVER,COLORADO 80205
1 2 EXAMINATION OF BIDDING DOCUMENTS COMPACT TO�%FOR THE UPPER 30 INCHES BELOW PAVING AND SLABS AND 90°� AND REMOVE CONTROL DEVICES BEFORE TESTING TEST EACH NATURAL SECTION OF 2-1/2"AND LARGER 303 861 8555 F 303 861 3027
A EXAMINE THE BIDDING DOCUMENTS CAREFULLY,NOT LATER THAN SEVEN DAYS PRIOR ELSEWHERE EACH PIPING SYSTEM INDEPENDENTLY BUT DO NOT USE PIPING SYSTEM VALVES TO B ALL DUCT HANGERS SHALL BE SHEET METAL STRAP OR ANGLE IRON IN COMPLIANCE 0225 MAIN STREET. UNIT C101
TO THE DATE OF RECEIPT OF BIDS WRITTEN REQUEST FOR INTERPRETATIONS OR ISOLATE SECTIONS WHERE TEST PRESSURE EXCEEDS VALVE PRESSURE RATING FILL W�TH SMACNA GUIDELINES EDWARDS,COLORADO 81632
CORRECTIONS OF ANY PERCEIVED DISCREPANCIES,AMBIGUITIES,INCONSISTENCIES,OR 1 6 MECHANICAL q1BMITTALS EACH SECTION WITH WATER AND PRESSURIZE FOR INDICATED PRESSURE AND TIME 970 926.8960 F 970.926.8961
ERRORS DISCOVERED SHALL BE SUBMITTED TO THE ARCHITECT ANY INTERPRETATION A THE MANUFACTURER'S MATERIAL OR EQUIPMENT LISTED IN THE SCHEDULE OR B TEST ALL PIPING SYSTEMS AS SPECIFIED CORRECT LEAKS BY REMAKING JOINTS END OF SEC110N
OR CORRECTION WILL BE ISSUED AS AN ADDENDUM BY THE ARCHITECT ONLY A IDENTIFIED BYNAME ON THE DRAWINGS ARE THE TYPES TO BE PROVIDED FOR THE REMOVE EQUIPMENT NOT ABLE TO WITHSTAND TEST PROCEDURE DURING TEST
WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING NO ESTABLISHMEflT OF SIZE,CAPACIN,GRADE AND QUALITY IF ALTERNATES ARE USED IN -
BIDDER SHALL RELY UPON INTERPRETATIONS OR CORRECTIONS GIVEN BY ANY OTHER LIEU OF THE SCHEDULED NAMES,THE COST OF ANY CHANGES IN CONSTRUCTION C SYSTEM TESTS SECTION 15190
METHOD IF DISCREPANCIES,AMBIGUITIES,INCONSISTENCIES,OR ERRORS ARE NOT REQUIRED BY-HEIR USE SHALL BE BORNE BY CONTRACTOR
COVERED BY ADDENDUM OR WRITTEN DIRECTIVE,INCLUDE IN THE BID LABOR, 1 HYDROSTATIC TEST. THE TEST SHALL BE ACCOMPLISHED BY HAND PUMPING THE IDENTIFICATION
MATERIALS,AND METHODS OF CONSTRUCTION RESULTING IN HIGHER COST AFTER B BEFORE STARIING WORK,PREPARE AND SUBMIT TO THE ARCHITECT/ENGINEER SHOP SYSTEM TO THE SPECIFIED WATER PRESSURE,AND MAINTAINING THAT PRESSURE
AWARD OF CONTRACT,NO ALLOWANCE OR EXTRA COMPENSATION WILL BE MADE DUE DRAWINGS AND DESCRIPTIVE DATA FOR ALL MECHANICAL EQUIPMENT AND MATERIALS UNTIL THE ENTIRE SYSTEM HAS BEEN INSPECTED FOR LEAKS,BUT IN NO CASE FOR CATOR, Ri,[MA �r ASSOCIATES, O
TO FAILURE OF MAKING THE WRITTEN REQUESTS AS DESCRIBED ABOVE REQUIRED FOF,THE PROJECT A TIME PERIOD OF LESS THAN FOUR HOURS 1 1 GEN_RAL
A PRO'✓IDE ADHESIVE BACKED OR PRE-CURLED SNAP-ON LABELS WITH FLOW ARROWS CONSULTING MECHANICAUELECTRICAL ENGINEERS
B BE RESPONSIBLE FOR ITS PROMPT DELIVER OF REQUEST FAILURE TO SO REQUEST 1 7 RECORD DOCUMENTS a HYDRONIC AND DOMESnC WATER SYSTEMS 100 PSIG TEST PRESSURE FORALL PIPING PROVIDE ENGRAVED PLASTIC LAMINATE TAG FOR ALL MAJOR 1550 DOVER ST,SUITE 2
CLARIFICATION OF ANY INADEQUACY,OMISSION,OR CONFLICT WILL NOT RELIEVE � EQUPMENT(FANS,BOILERS,ETC) LAKEWOOD,COLO 80215
RESPONSIBILITY OF DOING SO THE SIGNING OF THE CONTRACT WILL BE CONSIDERED A. CONTRACTOR 3HALL KEEP A COMPLETE SET OF RED-LINED RECORD DOCUMENT PRINTS
AS IMPLICITLY DENOTING A THROUGH COMPREHENSION OF THE FULL INTENT AND IN CUSTODY DURING ENTIRE PERIOD OF CONSTRUCTION AT THE CONSTRUCTION SITE END OF SECTION
SCOPE OF THE WORKING DRAWINGS AND SPECIFICATIONS SIGNING OF THE CONTRACT ONE(1)SET OF RECORD DOCUMENTS SHALL BE PROVIDED TO THE ENGINEER 1. MANUFACTURERS ALLEN SYSTEMS,BRADY CO,SETON NAME PLATE ISSUE/REVISION DATE NO.
INDICATES AGREEMENT TO ALL OF THE CONDITIONS IN THIS SPECIFICATION INDICATING FINAL PROJECT CONDITIONS AFTER COMPLETION OF WORK
SECTION 15100 B LOCATE PIPE LABELS EVERY 25',EXCEPT WHERE CONCEALED ABOVE NON-ACCESSIBLE
1? MECHANICAL INSTALLATIONS 1 8 OPERATION A�D MAtNTENANCE DATA CEIIJNGS OR IN NON-ACCESSIBLE SHAFTS LOCATE LABELS SO ALL PIPING WITHIN VIEW 100%CONSTRUCTION/PERMIT 01-10-2006
VALVES OF PN ACCESS DOOR CAN BE IDENTIFIED
A DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND DO NOT NECESSARILY INDICATE A CONTRACTOR 3HALL PREPARE TWO(2}SETS OF MAINTENANCE MANUALS AND SHALL BUILDING DEPARTMENT 02-07-2006
EVERY REQUIRED OFFSET,VALVE,FITTING,ETC INSTRUCT OWItER ON OPERATION OF SYSTEMS MAINTENANCE MANUALS SHALL 1 1 GENERAL: � END OF SECl10N � REVIEW COMMENTS
INCLUDE ALL MECHANICAL WARRANTIES A ALL MECHANICAL COMPONENTS SHALL BE PROVIDED WITH VALVES AND UNIONS FOR
B DO NOT SCALE DRAWINGS VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF SERVICES AND REMOVAL SECTION 15250
WORK REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS B THE TESTING FJVD BALANCING REPORT SHALL BE SUBMITTED AND RECEIVED BY THE
ENGINEER AT IEAST FIFTEEN CALENDAR DAYS PRIOR TO THE CONTRACTOR'S REQUEST g p,�L VALVES SHALL COMPLY WITH MSS SP-92,MSS VALVE USER GUIDE INSULATION
C DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY WHATEVER IS CALLED FOR IN FOR FINAL OB;ERVATION TIME FRAME REQUIREMENTS,AND SHALL BE INCLUDED IN THE
EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH O&M MANUAL C PROVIDE STEM EXTENSIONS FOR INSULATED SYSTEMS 1 1 PIPIIIG INSULATION
� BEFORE ANY WORK IS INSTALLED,DETERMINE THAT EQUIPMENT WILL PROPERLY FIT THE END OF SECTION 1 2 PRODUCTS A. FIBERGLASS PIPING INSULATION ASTM C547,CLASS 1,"K"FACTOR SHALL BE MAXIMUM
SPACE,THAT REQUIRED PIPING GRADES CAN BE MAINTAINED AND THAT DUCTWORK CAN 0 24 AT 75DEG F AND ALL PURPOSE JACKETING,ASTM C921 UNLESS SPECIFIED
BE RUN AS CONTEMPLATED WITHOUT INTERFERENCES BETWEEN SYSTEMS,WITH
STRUCTURAL ELEMENTS OR WITH THE WORK OF OTHER TRADES SECTION 15050 A BALL VALVES 2"AND SMALLER. ANSI 616 34,CLASS 150 WSP,600 WOG,RATED FOR 150 OTH=RWISE AND HAVE RATINGS OF 25 OR LESS FLAME SPREAD AND 50 OR LESS SMOKE
PSI AT 3500F. TWO PIECE END ENTRY BODY STYLE,BRONZE BODY CONFORMING TO DEVELOPMENT
E COORDINATE THE INSTALLATION OF MECHANICAL MATERIALS AND EQUIPMENT WITH ALL MECHANICAL SYSTEMS FIRE STOPPING ASTM 6584,SINGLE FULL PORT,STAINLESS STEEL BALL AND STEM OF ASTM A276 TYPE
TRADES 316,15%GLASS REINFORCED PTFE SEATS,PTFE PACKING AND BLOW OUT PROOF STEM, B PIPItlG INSULATION APPLICATION
VINYL COATED STEEL HANDLE
F COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO 1 1 GENERAL 1 DOMESTIC COLD WATER PIPING '/'THICK
ACCOMMODATE THE INSTALLATION OF MECHANICAL EQUIPMENT AND MATERIALS MANUFACTURERS CONBRACO(APOLLO),CRANE,STOCKHAM,NIBCO
A PROVIDE FIRE STOP SYSTEMS LISTED IN THE UL FIRE RESISTANCE DIRECTORY PROVIDE 2 HEATING WATER PIPING 1-1/2'THICK,EXCEPT'/"THICK FOR 2"AND SMALLER
G INSTALL MECHANICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR SYSTEMS WRH FIRE RESISTANCE'F"RATINGS EQUAL TO THE FIRE RESISTANCE RATING B BUTTERFLY VALVES 2-112"AND LARGER MSS SP-67,CAST-IRON BODY CONFORMING TO RUNOUTS TO INDIVIDUAL TERMINALS,LESS THAN 20'LONG
REPLACEMENT OF EQUIPMENT COMPONENTS AS MUCH AS PRACTICAL,CONNECT OF THE WALL OR FLOOR ASSEMBLY FOR ALL PENETRATIONS IN ADOITION,PROVIDE ASTM A125 CLASS B,ALUMINUM BRONZE ASTM B148 DISC,ONE-PIECE 316 STAINLESS 3 STEAM PIPING 2"THICK FOR PIPE SIZES UP TO AND INCLUDING 1-INCH,2-1/2"THICK
EQUIPMENT FOR EASE OF DISCONNECTING,WITH MINIMUM OF INTERFERENCE WITH SYSTEMS WITH A T RATING EQUAL TO THE FIRE RESISTANCE RATING OF THE WALL OR STEEL STEM,EPDM SEAT,BRONZE BEARINGS,NON-METALLIC BUSHING AND STEM SEAL, FOR PIPE SIZES 1-1/4 INCHES THROUGH 4 INCHES,AND 3-1/2"THICK FOR PIPE SIZES
OTHER INSTALLATIONS FLOOR ASSEMBLY IN THE FOLLOWING APPLICATIONS ANSI CLASS 125 FLANGE STANDARD,RATED FOR 200 PSI DROP-TIGHT SHUT OFF DEAD
END SERVICE,WITH DOWNSTREAM FLANGE REMOVED. PROVIDE EXTENDED NECK FOR 2" OVER 4°INCHES
H CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES AND PERMITS 1 PENETRAfING ITEMS LARGER THAN 4"DIAMETER OR 16 SQUARE INCHES IN THICK INSULATION. ALL VALVES SHALL BE FACTORY TESTED TO 110%OF PRESSURE 4. BOILER FEEDWATER AND BLOWDOWN PIPING 1-1/2°THICK
CORRIDOR WALLS RATINGS ALL BUTTERFLY VALVES SHALL BE FULL LUGGED BODY,DRILLED AND TAPPED
1 4 REMODEL PROJECTS 2 PENETRA�ING ITEMS LARGER THAN 4"DIAMETER OR 16 SQUARE INCHES WHEN �O REGO�'
THEY ARE BELOW THE CEILING IN ANY FIRE RESISTIVE WALL MANUFACTURERS KEYSTONE,CENTERLINE,NIBCO 5 STEAM CONDENSATE PIPING 1-1/2"THICK FOR PIPE SIZES UP TO AND INCLUDING 2 ��«.� ��A
INCH,2'THICK FOR PIPE SIZES 2-1/2 INCHES THROUGH 6 INCHES �r "qd
A IN AS MUCH AS DESIGN FOR REMODEL AND/OR REHABILITATION REQUIRES THAT 3 ANY FLOOR PENETRATIONS NOT WITHIN A WALL OR CHASE. �O �F,S �� R,
CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS,AND BECAUSE 4 ANY FLOOR PENETRATfONS LARGER THAN 4"IN DIAMETER OR 16 SQUARE INCHES C. STEAM SERVICE BALL VALVES 250 WSP,600 WOG RATED FOR 250 PSIG SATURATED C PRO✓IDE ALUMINUM JACKET FOR PIPING EXPOSED TO WEATHER ° ` .
SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING STEAM TWO PIECE AND ENTRY BODY SME,BRONZE BODY CONFORMING TO ASTM r� ;
OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING,THE ENGINEER B594,STANDARD PORT 316 STAINLESS STEEL BALL AND STEM CARBON AND GRAPHITE °�, g 3 � i `�
CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL END OF SECl10N �9. ��.
CONSULTING SERVICES HEREIN ENCOMPASS AL CONTINGENCIES FIELD COORDINATION B MANUFACTURERS• REINFORCED PTFE BLOWOUT PROOF STEM,VINYL COVERED STEEL HANDLE THREADED
<�N 2 9 200�'b%
ENDS APOLLO 70-140-64 �}e,, ,.^�
DURING CONSTRUCT�ON IS IMPERATIVE MAKE REASONABLE ALLOWANCES FOR UNSEEN `�• °'°•••••�°�,�C9
CONDITIONS 1 3M D. STEAM SERVICE GLOBE VALVES(2 INCHES AND SMALLER) MSS SP-80,CLASS 150 BODY, SECTION 155i5 �J-�'l�i��L Cr
2 NELSON FIRESTOP PRODUCTS BONNET,BONNET RING CAST BRONZE ASTM B-62 TYPE 420,STAINLESS STEEL DISC AND
B THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION 3 TREMCO CONSTRUCTION PRODUCTS BREECHINGSAND STACKS
CONTINUED OPERATION OF THE FACILITY SHALL NOT BE HINDERED BY THIS WORK 4 METALINES SEAT RING,UNION BONNET,NON-ASBESTOS TEFLON IMPREGNATED STEM PACKING,
COPPER-SILICON BRONZE STEM,BRASS PACKING GLAND AND MALLEABLE IRON HANDLE
ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED DUE TO THE C. SUBMIT PRODUCT DATA APPLICATION DRAWINGS INDICATING THE DETAILS OF EACH STOCKHAM FIG B-29 1 1 GEN=RAL
DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES,FURNITURE,EQUIPMENT, PROPOSED AS3EMBLY,FOR ALL TYPES OF FIRE RATED CONSTRUCTION AND E STEM SERVICE GLOBE VALVES(2-1/2 INCHES AND LARGER) MSS SP-85,CLASS 125,CAST
ETC,AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE ACCESSIBLE IRON BODY ASTM A-126,CLASS B,BOLTED BONNET BRONZE MOUNTED,RISING STEM A PRO✓IDE UL LABELED BREECHING AND STACKS WITH REQUIRED ACCESSORIES OF SIZES
WHEN COMPILING HIS BID PENETRATING ITEMS ENCOUNTERED,IDENTIFYING INTENDED PRODUCTS AND BRONZE DISC AND SEAT,OS 8 Y,NON-ASBESTOS TEFLON IMPREGNATED STEM PACKING INDICATED ON DRAWINGS TO MAKE A COMPLETE OPERATING SYSTEM
APPLICABLE UL SYSTEM NUMBER,OR UL CLASSIFIED DEVICES AND CAST IRON OR MALLEABLE IRON HAND WHEEL STOCKHAM FIG G-512 Vail
C BE RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT OR DUCTWORK REMAINING TO 1 2 ALL STEEL,POSITIVE PRESSURE,DOUBLE WALL VENTS
BE RECONNECTED TO NEW OR EXISTING SYSTEMS PROVIDE DUCTWORK,PIPING, D 'COLD"PIPING(DOMESTIC COLD WATER,STORM,AND CHILLED WATER)SHALL BE F STEAM SERVICE BUTTERFLY VALVES 2-1/2 INCH AND LARGER MSS SP�7 AND SP-68
CONTROLS,DIFFUSERS,ETC,AS REQUIRED TO RESTORE CONTINUITY OF SYSTEMS(S), INSTALLED WI1H THE INSULATION CONTINUOUS THROUGH THE WALL OR FLOOR CARBON STEEL ASTM A216-WCB BODY,316 STAINLESS STEEL DISC,17-4 PH STAINLESS
ASSEMBLY PP,OVIDE FIRE STOPPING SYSTEMS FOR INSULATED PIPE A DESCRIPTION UL LABELED DOUBLE WALL METAL STACKS FOR USE WITH BUILDING V all�
OR TO MAKE NEW WORK MEET EXISTING CONDITIONS,WHETHER INDICATED OR NOT STEEL STEM,RTFE SEAT WITH STAINLESS STEEL BACKUP RING,316 STAINLESS STEEL HEATING EQUIPMENT BURNING GAS,SOLD,OR LIQUID FUELS NOT EXCEEDING 1000DEG F v
E REVIEW ARCHIfECTURAL DRAWINGS TO DETERMINE THE LOCATION AND RATING OF FIRE NITRATE BUSHING,TFE PACKING,STEAM TRIM ACCESSORIES ANSI CLASS 150 EXTENDED CONTINUOUS AND CAPABLE OF MAINTAINING AIRTIGHT INTEGRITY AT PRESSURES UP TO J
D PROVIDE MECHANICAL DEMOLITION REQUIRED REFER TO ARCHITECTURAL DEMOLITION NECK FOR 2 INCHES THICK INSULATION ALL VALVES SHALL BE FACTORY TESTED AT 72•W C AS DESCRIBED IN NFPA 211 AND UL 103 M edical
DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED. VISIT SITE PRIOR TO RESISTIVE COIISTRUCTION THEIR RATED PRESSURES ALL BUTTERFLY VALVES SHALL BE FULL LUGGED BODY,
BID TO DETERMINE EXTENT OF WORK INVOLVED EXISTING FIXTURES,MECHANICAL END OF SECTION DRILLED AND TAPPED. KEYSTONE K-LOK SERIES FIG 362 B CONSTRUCTION_ALL STACKS AND BREECHINGS WILL HAVE INNER WALLS OF 20 GA TYPE
EQUIPMENT,ETC BEING REMOVED SHALL BE RETURNED TO THE OWNER DISPOSE OF 304 STAINLESS STEEL. THE OUTER JACKET SHALL BE 24 GA ALUMINUM COATED STEEL
_ ALL REMOVED PIPING,DUCTWORK,ETC UNLESS NOTED OTHERWISE G STEAM SERVICE SWING CHECK VALVES-2-1/2 INCHES AND SMALLER MSS SP-80,CLASS FORSIZES UP TO 24"I D AND 20 GA FOR SIZES I D AND LARGER THERE SHALL BE A �
SECTION 15060 125 WSP 200,CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62,ASTM 661 FOR MINI�AUM 1"AIR SPACE BETWEEN THE INNER AND OUTER WALLS � � � �
E COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO COMMENCING WORK 200 BRONZE,HORIZONTAL SWING DESIGN,Y-PATTERN WITH A BRONZE DISC,STAINLESS D
UTILIZE X-RAY AND VISUAL INVESTIGATION OF EXISTING CONDITIONS AS REQUIRED pIPE AND FITTINGS STEEL PIN AND HAVING THREADED OR SOLDER ENDS CLASS 150 VALVES MEETING THE C ACC_SSORIES UL LABELED TEES,ELBOWS,INCREASERS,DRAFT HOOD CONNECTORS,
PRIOR TO DRILLING OR CUTTING ABOVE SPECIFICATIONS MAY BE USED WHERE PRESSURE REQUIRES OR CLASS 125 ARE MET,�L CAP WITH BIRD BARRIER,ADJUSTABLE ROOF FLASHING,STORM COLLAR,
NOT AVAILABLE SUPPORT ASSEMBLY,THIMBLES,FIRE STOP SPACERS,AND FASTENERS FABRICATED OF �UL 0 5 2006
1 5 EXCAVATION AND BACKFILLING 1 1 GENERAL SIMILAR MATERIALS AND DESIGNS AS STRAIGHT SECTIONS
H STEAM SERVICE SWING CHECK VALVES 2-1/2 TO 3 INCH MSS SP-71,CLASS 125(CLASS
A CONTACT OWNERS OF ALL UNDERGROUND UTILITIES TO HAVE THEM LOCATED AND A DOMESTIC WArER ABOVE GRADE INSIDE SHALL BE HARD DRAWN COPPER TUBING,ASTM 175 FM APPROVED FOR FIRE PROTECTION PIPING SYSTEMS),CAST IRON BODY AND END OF SEC110N
MARKED,AT LEAST 2 BUSINESS DAYS BEFORE EXCAVATION IS TO BEGIN ALSO,PRIOR ggg,n(pE L,WTH 95/5 TIN/ANTIMONY SOLDERED JOINTS BOLTED CAP CONFORMING TO ASTM A 126,CLASS B,HORIZONTAL SWING,WITH A TOWiV OF VAI L
TO STARTING EXCAVATION BRIEF EMPLOYEES ON MARKING AND COLOR CODES AND BRONZE DISC OR CAST IRON DISC WITH BRONZE DISC RING AND FLANGED ENDS VALVE
TRAIN EMPLOYEES ON EXCAVATION AND SAFETY PROCEDURES FOR NATURAL GAS g HEATING,COO_ING AND DRAIN PIPING SHALL BE BLACK STEEL PIPE,ASTM A53, SHALL BE CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE FOR SECTION 15851 B o i l e r Ro o m Re m od e I
LINES WHEN EXCAVATION APPROACHES GAS LINES,EXPOSE LINES BY CAREFULLY SCHEDULE 40 OR HARD DRAWN TEMPER COPPER TUBING,ASTM B88,TYPE L. SEWAGE EJECTOR AND SUMP PUMP DISCHARGE SWING CHECK VALVES 2-1/2 INCHES
PROBING AND HAND DIGGING AND LARGER,PROVIDE OUTSIDE LEVER WITH WEIGHT OR SPRING TO ASSIST DISC TO EXHAUST FAPIS
C STEAM PIPINGSHALL BE SCHEDULE 40 BLACK STEEL AND CONDENSATE PIPING SHALL BE CLOSE RAPIDLY
B IN GENERAL,FOLLOW ALL REGULATIONS OF OSHA AS SPECIFIED IN PART 1926,SUBPART SCHEDULE 80 S e co n d F I o o r
P,°EXCAVATIONS,TRENCHING AND SHORING" FOLLOW SPECIFICATIONS OF DIVISION 15 END OF SECTION 1 1 MANJFACTURERS
AS THEY REFER SPECIFICALLY TO THE MECHANICAL WORK 1 2 PIPING INSTALLATION
A LOREN COOK
181 W. Meadow Drive
Vail , Colorado 81657 `
�
ECHANICAL SPECIFICATI4N .t
��
DATE 10 JANUARY 2006 �``' �
DRAWN BY LKL
CH K�D BY BLV�Olit�t'1 O'� �c'11I �
SHEET FIL ��"� � �
� �R r"�r�� ,i,
� COPYRIGHT 2005 BY DAVIS PARTNERSHIP P.0, ARCHffECTS
SHEET NUMBER:
c
■
D.P.A. PROJECT# 05945.00
Cator, Rumo & Assoc FILENAME P \2005 2005-365 WMC STEAM BOILER ADDITION (MECH CAD MECH P—SPEC DWG _ M1 01 PLOT 06 29 2006 � 1 44pm REV 01 10 2006 CAD b XREF tb dwg
_ � .�. _ - — _
se a�--°
B CARNES A OPERATE ALL TEMPERATURE CONTROL SYSTEMS WTH THE TEMPERATURE CONTROL
GENERAL LEGEND FIRE PR4TECTIDN N�TES:
CONTRACTOR'S REPRESENTATIVE FOR PROPER SEQUENCE OF OPERATION AND (Not oll symbols listed below rne used an tnese drowmgs) 1. EXTEND EXISTING FlRE PROTECTION SYSTEM TO PROVIDE A COMPLETE SYSTEM .
C PENN VENTILATOR CALIBRATION REPORT IN WRITING ANY DEFIDCIENGES TO THE ENGINEER IMMEDIATELY ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION FOR AREA OF WORK.
D GREENHECK 1 6 REQUIREMENTS OF WORK sECnaN oE�a�unorr 7 CAP END OF PIPE 2. fURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR • • � Arc h i t �S
E ACME THE INSTALLATION OF COMPLETE AND PROPERLY FUNCTIONING FIRE
A BALANCING PROCEDURE SHALL BE IN ACCORDANCEWITH NEBB ORAABC GUIDELINES X s�cnoN oRAwn ori TMis sH�r XX PITCH DOWN IN OIREC71dV OF ARROW PROTECTION SYSTEM.
FOR PROPORTIONAL BALANCE SUBMIT REPORT ONSTANDARD NEW FORMS OR SUBMIT x x,x
1 2 PROPELLER FANS FORMS FOR REVIEW PRIOR TO BALANCING MEASUFEMENTS SHALL INCLUDE ALL sECnoN cur oN n��s s�r —�E— �a� �wc�oR 3. ALL FlRE PROTEC110N SYSTEMS INSTALLED SHALL BE IN ACCORDANCE WITH
A GENERAL DESCRIPTION BELT-DRIVEN OR DIRECT-DRIVE PROPELLER FANS AS INDICATED MOTOR AMPERAGE AND VOLTAGE READINGS,MOTOR AND FAN RPMS,STATIC PRESSURE _ NFPA-13, 14, 20, ETC. AND LOCAL BUILDING CODES ANO ORDINANCES.
CONSISTING OF FAN BLADES,HUB,HOUSING,ORIFICE RING,MOTOR,DRIVE,AND AT INLET AND OUTLET OF ALL PACKAGED EQUIPMENf,FANS,COILS,AND FILTERS,PITOT X RISER DIAGRIW NUMBER _ PIPE AUGN4ENT GUIDE
TUBE MEASUREMENT OF SUPPLY,EXHAUST,RETURN,AND OUTSIDE AIR MAIN DUCTS,AT 4. FlRE PROTECTION CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW
ACCESSORIES MINIMUM OUTSIDE AIR,AND 100%(ECONOMIZER)OUrSIDE AIR,AIR INLET AND OUTLETS, �-x SFEET RISER IS OR�WN �N ��— uN�ON OR R'4NGE FlRE PROTEC110N EQUIPMENT AND PIPING WITH ALL OTHER TRADES PRIOR TO
WATER FLOW AT ALL FLOW MEASUREMENT STATIONS,INLET AND OUTLET PRESSURE AT SUBMITTAL OF SHOP DRAWINGS ANO SYSTEM INSTALLATION, SO AS NOT TO
B HOUSINGS GALVANIZED,SHEET 3TEEL WITH FLANGED EDGES,AND INTEGRAL ORIFICE EWIPGENT UNIT IDENTIFlCATION --/— CONCEMiPoC PIPE REDUCER 2301 BLAKE ST.,STE.#100
RING PUMPS WITH FLOW CALCULATED FROM THE PUMP CURVE;WATER FLOW,AND PRESSURE U� INTERFERE WITH THE ROUIING OF NEW DUCTWORK, PLUMBING PIPING, ETC. DENVER, COLORADO 80205
DROP AT ALL COILS. EWIPMENT UNIT NUWBER --�— ECCENTRIC PIPE REOUCER 303 861 8555 F 303 861 3027
C WHEELS FORMED-STEEL BLADES RIVETED TO A HEAVY-GAUGE STEEL SPIDER BOLTED B PROVIDE BELTS AND SHEAVES AS REQUIRED FOR DP,IVE CHANGES TO ADJUST FAN 5. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM—OVERS, HANGERS, ETC. TO
TO CAST-IRON HUB SPEED pFFUSER IDENI1FlCAnON aRV —�— PRESSURE REDUqNG vnwE MAINTAIN CONFORMANCE WITH APPUCABLE STANDARDS AND TO POSITION THE
�q� 0225 MAIN STREET UNIT C101
X� a� NEac anu�� SPRINKLER HEADS IN THE PROPER LOCATIONS.
OR C. ADJUST FLOWS TO WITHIN 10%OF REQUIRED QUAN�ITY WHERE ROOM AIR PRESSURE � a�� � p�y � pRESSURE qN0/pR TEUPERATURE R0.1EF vAL� EDWARDS,COLORADO 81632
RELATIONSHIPS ARE REQUIRED TO BE MAINTAINED!,S SHOWN BY A DIFFERENTIAL OF 6. SEAL ALL PIPE PENETRAl10NS 7HROUGH FIRE RATEO WALLS AND CEILINGS 970.926.8960 F.970.926 8961
FAN WHEEL REPLACEABLE,CAST-ALUMINUM BLADES FASTENED TO CAST-ALUMINUM SUPPLY AND EXHAUST/RETURN OR BY NOTE,ADJUS-SUPPLY TO WITHIN 10%AND THEN (E) DOSTING —♦— PLUG VAWE WITH APPROVED FIRE PROOF MATERIALS AS REQUIRED.
HUB FACTORY SET PITCH ANGLE QF BLADES ADJUST EXHAUST/RETURN TO PROVIDE THE INDICAlED ROOM PRESSURE IF ACTUAL
QUANTITY IS IESS THAN 90%,INVESTIGATE CAUSE,ATTEMPT TO RECTIFY AND NOTIFY (N) riEw Gv �� GA7E vA�vE 7. FOR REMODEL AREAS NEW SPRINKLER HEADS SHALL MATCH EXISTING
OR ENGINEER SUBMITTAL OF BALANCE REPORT WITH LESS THAN REQUIRED FLOWS SPRINKLERS.
WITHOUT EXPLANATION IS CAUSE FOR REJECTION OF REPORT. (R? ��►�ID � v�nca. PiaE vawE
FAN WHEEL REPLACEABLE,EXTRUDED-ALUMINUM,AIRFOIL BLADES FASTENED TO 8• PROVIDE FlELD COORDINATION OF PIPING AND SPRINKLER HEAD INSTALLATIONS
CAST-ALUMINUM HUB FACTORY SET PITCH ANGLE OF BLADES 1 7 REPORT OF WORK �F) �� a� �M— a�E �A�vE WITH EXISTING DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC. CATOR, RUN1A � ASSOCIATES, CO
A THE TESTING 8 BALANCING CONTRACTOR SHALL SUBMIT SIX(6)BOUND COPIES OF THE � POINT OF OONNECTION, NEW TO E)OS71NG BFV —F�{i— BUTiER�Y vA�vE 9. 1HIS CON7F2ACTOR IS RESPONSIBLE FOR FIELD VERIFlCATION OF ALL EXISTING
D BELT-DRIVEN DRIVE ASSEMBLY,RESILIENTLY MOUNTED TO THE HOUSING,WITH THE FINAL TESTING AND BALANCING REPORT AT LEAST 15 CALENDAR DAYS PRIOR TO THE CONDI�IONS PRIOR TO PURCHASE OF ANY MATERIALS AND THE
FOLLOWING FEATURES , --�— ar�cnon aF �ow n� �aE ev anu va�vE CONSULTING MECHANICAUELECTRICAL ENGINEERS
MECHANICAL CONTRACTOR S REQUEST FOR FINAL CBSERVATION ALL DATA SHALL BE � COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL NO11FY THE ARCHITECT 1550 DOVER ST,SUITE 2
1 PULLEYS CAST-IRON,ADJUSTABLE-PITCH RECORDED ON APPLICABLE REPORTING FORMS THE REPORT SHALL INCLUDE ALL pUCTw�DRIt, P�MG ANO EOUIP�IENT TO BE RENOVED CV —Vf— CHEqc vA�vE OF ANY DISCREPANCIES FOR RESOLUTION. LAKEWOOD, COLO 80215
OPERATING DATA,A LIST OF ALL EQUIPMENT USED Ifl THE TESTING AND BALANCING
2 SHAFT BEARINGS PERMANENTLY LUBRICATED,PERMANENTLY SEALED,AND WORK,AND SHALL BE SIGNED BY THE SUPERVISING=NGINEER AND AFFIXED WITH HIS a� � a�� ��� so�nao va�vE
SELF-ALIGNING BALL BEARINGS CERTIFICAOTION SEAL FINAL ACCEPTANCE OF THISPROJECT WILL NOT TAKE PLACE ISSUE/REVISION DATE NO
UNTIL A SATISFACTORY REPORT IS RECEIVED w�D w�u ACCESS oOOR iQi Bu��Y sa�ao vn�vE
3 FAN SHAFT TURNED,GROUND AND POLISHED STEEL DRIVE SHAFT KEYED TO
WHEEL HUB 1 S GUARANTEE OF WORK r�C NOT M CONIRACT ��� HOSE END DRAIN VALVE 100%CONSTRUCTION/PERMIT 01-10-2006
4 MOTOR AND DRIVE ASSEMBLY RESILIENTLY MOUNTED TO THE HOUSING. A THE TESTING 8 BALANCING CONTRACTOR SHALL GUARANTEE THE ACCURACY OF THE AFF ABOVE FlNISHED ROOR P/t TP� PRESSURE/TDIPERATURE TAP BUILDING DEPARTMENT
TESTS AND BALANCE FOR A PERIOD OF 90 DAYS FRUA DATE OF FINAL ACCEPTANCE OF � REVIEW COMMENTS 02'07-2006
E ACCESSORIES THE FOLLOWING ACCESSORIES ARE REQUIRED AS INDICATED THE TEST AND BALANCE REPORT DURING THIS PEROD,THE TESTING 8 BALANCING � ��-��►� —}�— STRAINER
CONTRACTOR SHALL MAKE PERSONNEL AVAILABLE AT NO COST TO THE OWNER TO
1 BELT GUARDS EXPANDED METAL WITH REINFORCED EDGES CORRECT DEFICIENCIES THAT MAY BECOME APPARENT IN THE SYSTEM BALANCE �"� �CHAraCA� COr�iw►CTOR —�— SIRAMER w/B�.OwDOwN
2 GRAVITY SHUTTERS GRAVITY-TYPE SHUITERS WITH ALUMINUM BLADES IN STEEL EC E�ECIRICA� CON7RACTOR � FlE)OBI.E PIPE CONNECTOR
FRAMES,MOUNTED ON DISCHARGE SIDE OF FAN END OF SECTION
rcc roaa�ntur� c�rirna�coN�►croa [�] ni�ua��a
END OF SECTION KEC KI7piEN EGUIPMENT CONTRAC70R � FRESSURE GAUGE
C OO�IWON —�— SIpiT GLASS
SECTION 15975
.--•
NC NORMALLY CLOSED CAP ;`�;; CEIUNG A(:CESS PANEL
CONTROLS
NO NORMALLY OPEN —{{�— PUMP
1 1 GENERAL Te � n�susr ei.oac
A PROVIDE CONTROL SYSTEMS C�NSISTING OF THERMOSTATS,CONTROL VAWES,
DAMPERS,OPERATORS,INDICATING DEVICES,tNTERFACE EQUIPMENT,AND OTHER
APPARATUS REQUIRED TO OPERATE MECHANICAL SYSTEM AND TO PERFORM
FUNCTIONS SPECIFIED
B PROVIDE NECESSARY MATERIALS AND FIELD WORK NECESSARY TO CONNECT CONTROL FAN S C H E D U L E
COMPONENTS FACTORY SUPPLIED AS PART OF EQUIPMENT CONTROLLED,UNLESS
SPECIFIED OTHERWISE WHEEL CFM S.P. TIP OUTLET VIBRATION APPROX.
C EXTEND EXISTING DDC CONTROLS UTILIZING HARDWARE AND SOFTWARE COMPATIBLE
DESIG. MFR. MODEL FAN TYPE SERVICE DIA. AT IN.W.C. APPROX. SPEED VELOCITY MIN. ISOLATOR DRIVE DAMPER THROAT CONTROL REMARKS Q R�((a�
WITH CURRENT SYSTEM PROVIDE FIELD CONTROL PANELS,INPUT/OUTPUT CARDS, (INCHES) 5280' AT S.L RPM (FPM) (FPM) HP TYPE TYPE TYPE DIM. �O�+"'�"" ���
APPLICATION SPECIFIC CONTROLLERS,LAN CABLING AND ROUTERS AND OTHER SIDEWALL BOILER PROVIDE INTEGRAL �� ��S R (,r���
COMPONENTS AS REQUIRED TO PROVIDE A COMPLETE SYSTEM PERFORM ALL EF-1 GREENHECK SBE-7HZ0-4 pROPELLER ROOM 20.5 2,750 0.25 1,100 5,700 800 1@ -- BELT BACKDRAFT 22 X 22 THERMOSTAT NOTE 1 � � � �� i f�
PROGRAMMING AND MODIFY GRAPHICAL USER INTERFACE AS REQUIRED BY THIS WORK
�
��� 2 s zoo��"
END OF SECTION �•�hNN�MOe��
NOTES:
SECTION 15991 1. PROVIDE FAN W/SHORT WALL HOUSING,WALL HOUSING GUARD,OPTIONAL BACKDRAFT DAMPER,AND WEATHER HOOD laT. MOUNT FAN FLUSH TO THE EXTERIOR. �'���'�
TESTING AND BALANCING
S850-1
1 1 DESCRIPTION OF WORK
A THIS SECTION COVERS TESTING AND BALANCING OF ENVIRONMENTAL SYSTEMS V���
INCLUDING BUT NOT LIMITED TO AIR DISTRIBUTION SYSTEMS,HYDRONIC DISTRIBUTION
SYSTEMS,AND THE EQUIPMENT AND APPARATUS CONNECTED THERETO BOI LE R B U RN E R SC H E D U LE
1 2 QUALIFICATIONS OF CONTRACTOR
MBH MBH GROSS STEAM all�y
A THE CONTRACTOR SHALL PROCURE THE SERVICES OF AN AABC OR NEBB CERTIFIED, DESIG. MFR. MODEL LOCATION INPUT OUTPUT BOILER OUTPUT CONTROL REMARKS
INDEPENDENT TESTING AND BALANCING AGENCY SPECIALIZING IN THE TESTING, AT S.L. AT S.L HORSEPOWER LBS/HR Me d ical
ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS TO PERFORM THE ABOVE
MENTIONED WORK SB-2,3 HURST BOILER 4VT SEWES BOILER ROOM 1265 1004 30 1035 SEE SPEC.
1 3 CODES AND STANDARDS
enter
A NEBB "PROCEDURAL STANDARDS FOR TESTING.ADJUSTING,AND BALANCING OF
ENVIRONMENTAL SYSTEMS"
B ASHRAE ASHRAE HANDBOOK,1987 SYSTEMS VOLUME,CHAPTER 57, TESTING,
ADJUSTING,AND BALANCING
S556-1
1 4 PROJECT CONDITIONS
A AIR AND WATER TESTING AND BALANCING SHALL NOT BEGIN UNTIL THE SYSTEM HAS B o i l e r Roo m Re m od e I
BEEN COMPLETED AND IS IN FULL WORKING ORDER
B PUT ALL HEATING,VENTILATING AND AIR CONDITIONING SYSTEMS AND EQUIPMENT INTO CON D E N SATE RETU RN U N IT
FULL OPERATION AND CONTINUE OPERATION OF SAME DURING EACH WORKING DAY OF
TESTING AND BALANCING DISCHARGE RECEIVER NUMBER S eco n d F I oo r
DESIG. MFR. MODEL GPM HEAD CAPACITY OF MINIMUM RPM CONTROL REMARKS
1 5 TEMPERATURE CONTROLS PSIG GALS. PUMPS HP
BF-2 HURST BOILER FM-D-60-150 3 155 60 2 1.5 3450 SEE SPEC.
181 W. Meadow Drive
Vail , Colorado 81657
S526-2
ECHANICAL SPECIFICATIONS
AND SCHEDULES
DATE 10 JANUARY 2006
DRAWN BY LKL
CHK'D BY BLW
SHEET FILE P—SPEC
COPYRIGHT 2U05 BY DAVIS PARTNERSHIP P.C., ARCHITECTS
SHEET NUMBER
■
D.P.A. PROJECT# 05945.00
Cator, Ruma & Assoc FILENAME P \2005\2005-365 WMC STEAM BOILER ADDITION MECH CAD\MECH\P—SPEC DWG _ M1 02 PLOT 06/29 2006 � 1 45pm REV 01/10/2006 CAD b XREF tb dwg
s
i
, - �
.
' . - � Archit ts
2301 BLAKE ST.,STE.#100
DENVER,COLORADO 80205
303 861 8555 F 303 861 3027
0225 MAIN STREET. UNIT C101
EDWARDS,COLORADO 81632
970 926.8960 F.970 926.8961
CATOR, RUMA �r ASSOCIATES, CO
CONSULTING MECHANICAL/ELECTRICAL ENGINEERS
1550 DOVER ST,SUITE 2
LAKEWOOD, COLO 80215
ISSUE/REVISION DATE NO.
100%CONSTRUCTION/PERMIT 01-10-2006
G � � REVIEW COMMEN SENT 02-07-2006
�" 6
�O �� I ', C 0 R R PRV STATION '� n � EF
"� 4 'O»� 1
' � ' 6� 2 � 4 I I � BF " — � � -r T 6»
r--J � � � SEE�SCHEDU ETMER HOOD.
, N I r� �» I � -�,—►
` � I � I c
34
� � G a � '» BF- 4 1 1/2" 2 1
� I �
M �' ��
- �"- - - - � � 2F �" I _� 10"0 6"
�
�',1 ' UH
=�`�i`�`�� I Ul l � �"D� -`. 1
� �
� � 2 1/2" � �',. � /� v � ' `. `' 2 1 2
J
,f�� � � � T \ � 3 6X14 -'• -�f�� � � 3 4" Z� I i r , 3 6 X 1 4
� r - - � 12" BBS
, � � „ � / � � 12" BBS I 7 3� � --- -
�A 3� � � 3 31_ � � � J �� 20 CFM V � 3�� p 56 o REG��F
IL — — — SPR- — -r —SPR— — — — — ; co � — S R- — -� —SPR — — co 2 �� '+�
N r —I- - - � � - - - - - - - - -1 - M � r —I— �- - - - - - - ,,� N 14 FLUE UP. RUN ��r��SR L���O
� =�s �
a � � � � '.:._ �o � � � � � � » � �` �` .
�v�` M
'" '-� �
� MPS I I � �� '3z, �� � �� �� I PS I � � I �FLUE ADJACENT TO (E) a; •
P F� �M � 'j' � � � ��� ;� P F� �M � C-- -rt--� 'j' � z $� TERMINATE AT THE � 3095 i� ``,
' � � BF I Sg �1 .' , , ' " k-- `,�� � � B1 I O SB ', � SAME HEIGHT. ���� 9 Z O ��
� IJ e B B D e , , Z, � 10 � -;„,.�� � � e r--B D 1 '�, ; 'L. � 1 � ,` �
�,����
� � C— — — SEPARATOR V � � C— — — SEPARATOR v
2 �� � »
;�
`�' � F S ;; `�' I v F g 1 1/2
I % � M � ;� � M (E) 10" FLUE UP.
, ,
� - - - - - - - � � � � J — - - - � ' � �
� � }� � BBD �� ; M � L_ � BBD � ;
C�EA I� 36x14 C�EA � -
_ a 3/4" 12" A F.F. 3/4" 2 12"'A F F. ����
SUPP ��' SUPP ��i'
� Valley
L65 265 �
Med�cal
C enter
,� C— SECTION C — SECTION
�
PARTIAL SECOND FLOOR HVAC DEMOLITION PLAN PARTIAL SECOND FLOOR HVAC PLAN
� � �� b SCALE: ,�4�-,�-a�� B o i l e r Roo m Re m od e I
b SCALE: 1/4=1 -0
Second Floor
DEMO KEY NOTES: GENERAL NOTES: NEW W�RK KEY NOTES: � 81 w. Meadow �rive
1. CONTRACTOR IS R[SPONSIBLE FOR FlELD VERIFlCATION OF ALL EXISTING VC��� , Colorado 81657
1O STEAM PRV STATION TO BE RELOCATED. RE: NEW WORK PLAN. CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. Oi RELOCATED STEAM PRV STA�ION.
O REMOVE SECTION OF (E) 14"0 BOILER FLUE. 2 COORDINATE WORK WITH ALL TRADES. O 1 1/2" BBD, CONNECT TO (E) BBD SEPARATOR.
3. CONTRACTOR IS R[SPONSIBLE FOR SECURING /WD WEATHERPROOFlNG ANY ROOF O3 2` A11�IOSPHERIC VENT. CONNECT TO (E) AT BF-1.
OPENING NOT COIJPLETED DURING WORKING HOURS. O4 2" (1255 CFH) GAS DOWN TO SB-2/SB-3. CONNECT TO GAS TRAIN. M.C. TO
4. COORDINATE ALL CUCTWORK AND PIPING WITH EQUIPMENT, STRUCTURE, EfC. VERIFY SUPPLY GAS PRESSURE AND BOILER OPERA7ING GAS PRESSURE
REQUIREMENTS.
5. CONTRACTOR SHAL BE RESPONSIBLE FOR DEACTNATION OF ROOF-MOUNTED
EQUIPMENT AND ASSOCIATED INDOOR EQUIPMENT. ONLY ONE UNR SHALL BE OS S7EAM PRV SUPPLIED WITH BOILER FUEL PUMP ASSEMBLY.
TAKEN OUT OF SERVICE AT ANY TIME, WITH REMAINDER OF UNITS LEFT
OPERATiONAL. CO�RDINATE WITH GENERAL CONTRACTOR AND ELECTRICAL O CONTAINMENT CURB AROUND EQUIPMENT RE ARCHITECTURAL. PARTIAL 2nd FLOOR
CONTRACTOR.
O7 71TUS 300 RL 26X18 SUPPLY REGISTER W/ OBD.
6. INSTALL ALL EQUIPMENT PER IuUWUFACTURER'S GUIDEUNES. HVAC PLAN
DATE 10 JANUARY 2006
DRAWN BY MMG
FIRE SPRINKLER N�TES. CHK�o BY B�W
1. CONTRACTOR TO MODIFY EXISTING FlRE SPRINKLER SYSTEM IN AREA OF WORK SHEET FILE P-HVN2
TO PROVIDE COVERAGE IN ACCOROANCE W/NFPA 13 AND LOCAL THIS WORK SHOWN AS EXISTING CONDITIONS
REQUIREMENTS NO�; COPYRIGHT 2005 BY DAVIS PARTNERSHIP P.C, ARCHITECTS
WAS TAKEN FROM OWNER FURNISHED
EXISTING CONDITIONS ARE SHOWN WITH ORAWINGS BY CATOR, RUMA & ASSOCIATES, SHEEf NUMBER•
LIGHT LINE WEIGHT C0. CATOR, RUMA & ASSOCIATES� C0. IS
NEW WORK INCLUDED IN THIS CONTRACT NOT RESPONSIBLE FOR THE ACCURACY OF
IS SHOWN WITH HEAVY L1NE WEIGHT. ANY INFORMATION OR THE ADEQUACY,
CONNECTION OF NEW WORK TO EXISTING SAFETY AND CONFORMANCE TO CURRENT �
PREVAILING CODES OF ANY WORK SHOWN
WORK IS DESIGNATED BY " � ". AS EXISTING ON THE DOCUMENTS. D.P.A. PROJECT# 05945.00
Cator, Ruma & Assoc FILENAME P \2005 2005-365 WMC STEAM BOILER ADDITION MECH CAD MECH P-HVQN2 DWG _ M3 PLOT O6 29 2406 � 1 44pm REV 05/22 2006 CAD b XREF bg2 dwg tb dwg HVQN2 dwg tb-o dwg
_ - -- � � < _
- -- - - - — —- - — ��
*
a�
. J
i
� • ' � QrChlt CtS
2301 BLAKE ST, STE #100
DENVER, COLORADO 80205
303 861 8555 F 303 861 3027
0225 MAIN STREET UNIT C101
EDWARDS, COLORADO 81632
970 926 8960 F 970 926 8961
,
/
i
�
ISSUE/REVISION DATE O �
PERMIT DOCUMENT 4 JAN 06
TOV COMMENTS 9 FEB 06
DRB SUBMITTAL 11 AP 06
EXAM OFFiCE EXAN EXAN EXAM EXAM EXAM CONF/KIT
�2310E 2312 2319 2321 2324 2326 2329 2330 2331 �2332E
EXAM �
2309 EXAM E%AM EI(AM STORAGE XAM TO LET
r 231♦ 2318 2322 2323 2327 23 '�-���p( `�q
1 �l-"V Fl� �� �!I'3��
C���i��! R�ViE�,��
i � 2308E � 11'�!�_�F /i����,1 V P1�
BATH ,
PATIENT 2031 0 ST�RAGE
STAIR L�UNGE
C 25 2030 1 p�
FILES OFFICE 2333
2 32 I E)(AM 2317 RECP 2336 2335 2334 1.���� - _ . �.,.�...�.-.--_r.
2307 2337 {� y� '
lS�'4 M � "'_"_ ' .�
BATH CORR[DOR BATH TOILET �
2'BR 2033 0
2002 1 e 2001I0 2029 � 2316
2-BR E%AM
� 203a 1 2306
C�NF
2028 1
L
N
>
2-BR 2 36 1 EXAM �
BATH 2303 �
2003 1 � 200410 � BATH �
DICT MED 2 0 3 5 0 VAITING PHARMACY MECH ELECT
2026 2 2027 1 2301 2401 2008 2007
EIECT
EXAM 2007 �
2_BR BATH PED T�ILET 2304
� 200610 m 273815 pFFI a�l
2005 1 e 2037 I 2303
NURSE
2025 2 a
CORR alley
274 � � NEW LOUVER � �
BALCONY
273
2_m BATH
20071 e 200810 PED TIILET � � ELEC a ' Med�ca�
2040 1 2739 I S 2�5_ �
PS s °°" 0 NEW LUE � ,
CLEAN J 76 � � ; C enter
BATH 2O2317 �
2-BR 200910 1� POST POST P�ST POST CLEAN � � � � � �
2010 1 e CORRIDOR OFFILE SOIL MECH �STOR pARTUM 1 PARTUM 2 PARTUM PARTUM SUPPLY �
2024 2 2041 1 204216 204324 ��� 232 233 234 235 265
SHOWER �
20 212 202111 ORSECTI�N
JANITOR O
202013 CORR REC�VERY
�a,Rl e zo,210 ��� . T�I o � Boiler Room Remodel .
26` SCO E OF WORK
23 _ 233- 235-
❑ BATH a� � � o o ° ° Second Floor
� � EO 69ERBENCE D 271 8 20D 2 1 E202 - 2045 6 269R 26ERI SLOPED ROOFS BEL�W
2-BR 2-BR 2-BR
E264 9 E265 9 E268 9 NURSE �� ❑
lOUNGE LOHBY 181 W. Meadow Drive
� � 2019 7 TELECOM E209 30 � JAN �
ROOM NURSERY , 6
n HOLDING
E87 SF 276 SF LINEN � z44 24N LOCKERS \/a
STAIR 2-BR 2-BR 201623 OFF[CE TILED 258 V �..11l, olora O
CLEAN NURSE C�RRIOOR pANTRY m 247 SLEEP RM
g 26 E260 9 E261 9 OFF[CE 249 254 SHWR
� � � � � � E270 - E273 - 2014 8 201521 2046 5 � 260
IS� C�NF CORR
� �� �� � Q 24 248 251R L 250 I� �
BATH BATH BATH BATH BATH � CORR � UTILIT LOUNGE ❑ �
CLEAN
C�RRID�R E259 - E262 - E263 - E266 - E267 - CORRIDOR 241 255 25�
E248 - E238- CO R U 263
319
256
SHOVER ❑� � SLEEP RM � LOCKERS
� E253 - �� � � BATH SOIL TOILET ST R d RECEPT � �
� � � � m m E236 - E237 - E216- A 26 243 253 2� ❑ 261 �
PASSAGE
� E2 EXTERIOR REVISIONS
BATH BATH qNTE BATH BATH BATH BATH BATH �
E258 - E255 - E249 - E247 - E244 - E243 - E240 - JANIT❑ MED/WK TOIET CORR
E252 - E23418 E232 - DICT E211- 241
PASSAGE E231- 0
LOUNGE
I-BR 1-BR BATH 2-BR 2-BR 2-BR 2-BR 2-BR E239 9 PANTRY CLEAN e
m - m °6 O STOR ARCHITECTURAL PLAN
E257 9 E256 9 E254 - E250 9 E246 9 E245 9 E242 9 E241 9 E23518 � E229_ I E218- 237 238 S�39R
ISO RM ( STOR
E25118 E�UIP ANTE 7 � � � 240
E��82� E219 � - �- 8 DATE 11 APRIL 2006
PASSAGE 225 26- TOIL
E230- � � 231-
icu tcu icu tc � � � DRAWN BY CD
E227 2 E224 22 E223 22 E22 1 B
WAITING
236
S� ' CHK'D BY SN
TDILET TOILET TOILET TOILET � LDRP 1 LDRP 2 LDRP 3 LDRP 4 LDRP 5 LDRP 6 LDRP 7 24Z
E22618 E22518 E22218 E22118 225 226 227 226 229 230 231
SHEET FILE A1-1 FPL dwg
COPYRIGHT 2005 BY DAVIS PARTNERSHIP P C, ARCHITECTS '
SHEET NUMBER
�
�} � SECOND FLOOR PLAN ° 4� $� ,6�
.
A1 . 1 1 �16" = 1 '-0" D.P.A PROJECT# 05950.00
�
• .
� • ' � ArChlt CtS
� 2301 BLAKE ST, STE #100
DENVER, COLORADO 80205
303 861 8555 F 303 861 3027
0225 MAIN STREET UNIT C101
� EDWARDS, COLORADO 81632
970 926 8960 F 970 926 8961
� 5.
l�`�'�S�,M�<<e
� � �
,��,, ��,,,d,,,�'-�,,,,,�,, .
����o� � �° ��
�'' � �,,,��' Q��'"�
.
, �r�b� � t��r � ISSUE�REVISION DATE NO
r„�,S�� 4
I��"� PERMIT DOCUMENT 4 JAN 06
STANDING SEAM METAL TOV COMMENTS 9 FEB 06
ROOF MECHANICAL SCREEN r � � � � � � � � � � � � � � �
� ; ; 4 STANDING MTL ; ' I a ' DRB SUBMITTAL 1 1 AP 06
� , , , EXISTING FLUE 1
MECH ROOF � � � SEAM SIDING I � ( I I 1
�EL.8200'-2" ---------- ----------�----- � � N���� � � .�
._ _ SNOW GUARDS i I I 1 I I I r
�, � � � � � E F I S PARAPET PROJECTION
1".O.,PARAPET a E F I S I i' I I � I ( � SEE SECTIONS COLOR- DARKTAN
'� PROJECTION � � � � � � �
�EL:8189'-10"----� C�41.4R:DAB � I � � � i 1
- '�
`T,0°�CONC ,— J�------ -t.;�.,. '�._• .....,.•r._ _ ....s .;,_-�- _ -- _...- ----�---- ------ ------� - _EIFS -COLORRED • �.,, ,
ROOF DECK / E I F S. �� . ,� , �
--�ii=------------- M C�LOR � - . . . , , :�: '` , ' � 1
=EL 8188'-0" TAN '� � � . , • , , , � , • , . • � , OVERFRAMED RUOF
� k ' �� • • • ' ,� . . . . ° • 1 � � •� � SECTION 51A 0�&ROOF
: � • • .,• ��� �
� • , , � . � �
NIRD FLOOR E7,�i� F/��S . . - . . � PLAN ON A1 02.
�VI�VR ' � ..�i' ��.��� ���� ...r�J..� i � • �.i.�+�� .L��.�1 '�.,�.� �.�a� � ...�L� • � .i.�• �I� ,�.�
�L 8174'-8" -------- -� -- • . 1 " ,
� RED �. � � �. � � � , �
5 , . . .
" STONE ' ' �` '� . , . . i: . , , • � �
„ � � • . , ,
SECOND VENEER • • ' -
�FLOOR ---------- — ------- - ` t - __t-�_�_.a ' _ -__ - - --- ' - ' - �
-�- _-�I_-�L PF1T4"P��L�.=—=�� � -�'_ '�'� � �—
, r -r--�— '�---�-' -sa�.r�r�rr..� ...��a -�.s_ —� —t— — —
;EL.8161'-4° �:i';; •I.�. I I 1 EXISTING LOUVER I 1
E.I F. S ��� �� ����"
� RED�R . ' , - � � NEW LOUVER � ' / ��FF 1�P�11a4�. �
' FIRST . • 1. F. • ^ � I I � �y� �. � � .� � � �� .
�FLOOR --------- --- � • , � � � � � �
�� I I I i / / �
��.a�a7�-a° I I i , I i d i ��'T�•_S!_g`0�? ___.___ __.�.��_._�.
- � � � , � � � �
( I I I EXIST�NG CLINIC BLDG I I I EXISTING ER/CLINIC �.�,��,
' ' ' � Wl GABLED ROOF TO REMAIN � � BLDG TO REMAIN "° ." --- - --- -- -- ---�i�"�
SCOPE OF WORK: �,.���
1 . A NEW 14" a ,
1 �
� EAST ELEVATION ° 4� 8' 16� STAI N LESS STEEL FLU E .�
A1 .2 1 /16'° - � �-o" TO BE ADDED AD�ACENT .
T0� EX I STI N G FLU E; Va.11
H EI G HTS TO MATC H Valley
2 . A NEW 36/3E� .
LOUVER ADDED NORTH Med�cal
OF EXISTING TWO Center � �
LOUVERS ; SIZES AND
HEIGHTS TO MATCH .
Boiler Room Remodel
Second Floor
181 W. Meadow Drive
Vail, Colorado 81657
EXTERIOR REVISIONS
EAST ELEVATION
DATE 11 APRIL 2006
DRAWN BY CD
CHK'D BY SN
SHEET FILE A1-1 FPL dwg
COPYRIGHT 2005 BY DAVIS PARTNERSHIP P C, ARCHITECTS
s
��
{
■
D.P.A. PROJECT# 05950.00