Loading...
HomeMy WebLinkAboutB11-0361 O 0�28-2014 Inspection Request Re•orting ,� .Q . , Page 1 Requested Inspect Date• ondayy,March 03 2014 ./%% ((J1.5 Site Addre -: 122 E MEADOW DR VAIL C,� VILLAGE CENTER BUILDIN • A/P/D Information Activity B11-0361 Type: COMBO Sub Type: AMF Status: ISSUED Const Type Occupancy:_ Use: R-2 Insp Area: Owner BURGHARDT, KURT&ALISONYG. Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001 Description: COMMON ELEMENT: BUILDING A OWNERS WOULD LIKE TO ADD AN ELEVATOR TO THE NORTHEAST CORNER OF THE BUILDING.THERE WILL BE AN ADJACENT ELEVATOR EQUIPMENT ROOM AT LOWER LEVEL THAT WILL BE SUB-GRADE. THE ELEVATOR WILL BE 3500 LBS CAPACITY AND WILL FULFILL IBC 3002.4(2009)FOR FIRE DEPARTMENT ACCESS. Requested Inspection(s1 Rem• 90 BLDG-Final Requested Time: 04:00 PM Requestor NEDBO CONSTRUCTION INC Phone: 970-845-1001 Comments 977-032. Assigned To SG' Y Entered By: JMONDRAGON K Action eeJt..i. Time Exp: Comment pe LT '- en ion rom last inspection Comment M `' FINAL F 2-0071 PRIOR TO REQUESTING A BUILDING FINAL Comment sign't'e for Elevator cert. tern elevator inspector ..\4.1\S "ii t 1, Inspection History Item: 10 BLDG-FOOTING **Approved** 06/05/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Elevator footing viewed stamed set of drawing on site with changes TOV has not released the revised set under review pour at your own risk 06/18/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Ok per SI report 06/22/12 Inspector: JRM Action: PI PARTIAL INSPECTION Comment: approve slab 07/12/12 Inspector: sgremmer Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel **Approved** 06/14/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: CMU wall first tier to bond beam ok per SI report for dowels 06/18/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 2nd tier to bond beam ok per SI report for Dowels 06/20/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: 1st tier at elevator equipment room dowels ok per SI report 06/21/12 Inspector: sgremmer Action: NR NOT READY FOR INSPECTION Comment: need SI report for all steel at third tier of CMU 06/25/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: tier#4 ok per SI report for dowels 06/27/12 Inspector: sgremmer Action: AP APPROVED Comment: last tier of CMU ok per SI report for dowels Item: 120 ELEC-Rough **Approved* 10/19/12 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH-Rough **Approved** 01/22/13 Inspector: sgremmer Action: AP APPROVED Comment: Item: 30 BLDG-Framing **Approved** 09/21/12 Inspector: mdenney Action: AP APPROVED Comment: Framing of roof structure. Item: 50 BLDG-Insulation Approved** 09/26/12 Inspector: sgremmer Action: AP APPROVED REPT131 Run Id: 14750 Ncd Caiorad o COUNCIL Of GOVERNmEN'S i To: Martin Haeberle Town of Vail, CO. BLDG. DEPT. From: GENE MORSE, ELEVATOR INSPECTOR 970 - 468 -0295 ext. 108 or elevatorPnwc.cog.co.us Date: 2/25/2013 Project Name: VILLAGE CENTER ASSOC BP# 811 -0361 ❑ Conveyance Plan Review Conveyance Test and Inspection Location: 120 WILLOW BRIDGE RD. VAIL, Co. Permit Number: NWCCOG 12 -054 Conveyance Type: HYDRAILIC PASSENGER ELEVATOR ❑ The plans; have been reviewed and found to conform to all applicable ASME 17.1 and IBC codes The rated speed of the conveyance meets ASME A17.1 requirements, speed in up direction 150 FPM, speed in down direction 150 FPM j The Conveyance at the above location was inspected and tested on 1/30/2013 and a: ❑ TEMPORARY Certificate; has been issued. 0, FINAL Inspection Certificate; has been issued. ❑ NO certificate; is being issued. ❑ FOR CONSTRUCTION USE ONLY Comments: Signature---C J Northwest Colorado Council of Governments ♦ PO Box 2308 • Silverthome ♦ CO s 80498 970 -458 -0295 ♦ Fax 970468.1208 ♦ www.nwc.cog.co.us CERTIFICATE OF INSPECTION NORTHWEST COLORADO COUNCIL OF GOVERNMENTS ELEVATOR PROGRAM This certifies that the _ CONVEYANCE was inspected on the date below and meets the minimum requirements for operation. ID Number: EBA116 Type: HYDRAULIC PASSENGER ELEVATOR Location: 126 WILLOW BR. RD. VAIL, CO. Date of Inspection: 1/30/2013 Inspector: �.` Date of Issue: 212 !2013 Expiration Date: 1/31/2014 Department of Community Development 75 South Frontage Road TOWN OF MVAIL Vail, CO 81657 Tel: 970 -479 -2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: B1 1-0361 Village Center Bldg A Elevator Addition Project Street Address: 124 Willow Bridge Road (Number) (Street) Building /Complex Name: Village Center Bldg A Contractor Information Business Name: Nedbo Construction Business Address: PO Box 3419 City Vail (Suite #) State: CO Zip: 81658 Contact Name: Rollie Kjesbo Contact Phone: 970- 845 -1001 Contact E -Mail: rollie @nedbo.com I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances oft Town appli 7 h ereto X Owner /Owner's Represent ive ignature (Required) n Applicant Informatio Applicant Name: Nedbo Construction Applicant Phone: 970- 845 -1001 Applicant E -Mail: rollie @nedbo.com For Office Use Only: Fee Paid: Received From: Cash Check # CC: Visa / VIC Last 4 CC # Auth # exp. date: Revisions Response to Correction Letter _attached copy of correction letter O Deferred Submittal 0 Other Description / List of Changes: Revised Electrical Engineering Plans (use additional sheet if necessary) Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: Mechanical: Total: Date Received: �C� IEodE D JUL 18 2012 lo;h�zwi TOWN OF VAIL 0 Department of Community Development 75 South Frontage Road TOWN OF VAIL :x' � Vail, CO 81657 Tel: 970 - 479 -2128 -- - www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Revision Submittals: 1. "Field Set' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: Project Street Addres 1 Q?l LJ , 17—o in/_ (Number) (Street) (Spite #) Buildina /Complex Name: ('I I h/ S , _C .eff,)d Gr Contractor Information J Business Name: Business Addre s: CQ City State: C—L) Zip: Contact Name: Contact Phone: / /(/ ' `"l / / " Contact E -Mail: I hereby acknowleZrge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's ng and subdivision codes, design review ap- proved, IntozatiRnal Building and Residential Codes and other ordinancM of the Town aoolicablwAreto. ' Owne?t9wraer's Repr s tativb�ignature (Required) Applicant Informs n Applicant Name: Applicant Phone: Applicant E -Mail: For Office Use Only: Fee Paid: Received From: Cash Check # _ CC: Visa / MC Last 4 CC # Auth # exp. date: ( ) Response to Correction Letter _attached copy of correction letter ( ) Deferred Submittal ( ) Other De criptio / 'st f Changes: J C 9 (use additional sheet if necessary) Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: $ Plumbing: $ Electrical: $ Mechanical: $ Total: $ Date Received: D EC E ow TI 2012 TOWN OF VAIL NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: 1311 -0361 Job Address: 122 E MEADOW DR VAIL Location......: VILLAGE CENTER BUILDING A Parcel No....: 210108209001 OWNER BURGHARDT, KURT & ALISON G. 09/23/2011 985 7TH ST BOULDER CO 80302 APPLICANT NEDBO CONSTRUCTION INC PO BOX 3419 VAIL CO 81658 License: C000003087 CONTRACTOR NEDBO CONSTRUCTION INC PO BOX 3419 VAIL CO 81658 License: 0000003087 09/23/2011 Phone: 970-845-1001 09/23/2011 Phone: 970-845-1001 Description: COMMON ELEMENT: BUILDING A OWNERS WOULD LIKE TO ADD AN ELEVATOR TO THE NORTHEAST CORNER OF THE BUILDING. THERE WILL BE AN ADJACENT ELEVATOR EQUIPMENT ROOM AT LOWER LEVEL THAT WILL BE SUB - GRADE. THE ELEVATOR WILL BE 3500 LBS CAPACITY AND WILL FULFILL IBC 3002.4 (2009) FOR FIRE DEPARTMENT ACCESS. Project #: Applied.....: Issued... PRJ11 -0332 09/23/2011 10/13/2011 Occupancy: R -2 Type Construction: VA Valuation: $280,000.00 ................«..........................,... ............_...... +........... FEE SUMMARY ...... x........»................,..._..,...... ... +x....x..................... Building Permit ------ - - - - -> $2,001.75 Bldg Plan Check ----- - - - - -> $1,301.14 Use Tax Fee------------------ - - - - -> $5,400.00 Electrical Permit ---- - - - - -> $115.00 Elec Plan Check ------ - - - - -> $74.75 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $240.00 Mech Plan Check ---- - - - - -> $60.00 Additional Fees--------------- - - - - -> $0.00 Plumbing Permit --- - - - - -> $0.00 Plmb Plan Check ---- - - - - -> $0.00 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $15.00 TOTAL PERMIT FEES -- ----------- > $9,207.64 Payments -- ---------------------------- > $9,207.64 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:p) PM. —� mature of Owner or Contractor Date SkPb,q 01'. lk-1-- Print Name combination permit_012811 films CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0361 Address: 122 E MEADOW DR VAIL Owner: BURGHARDT, KURT & ALISON G. Location: VILLAGE CENTER BUILDING A x*** xxx#* k**** k***#*#* kk**** x####* kx* x** k *k *k # * # * *x * * #x # * * * * * * *k # * * *k * ** kkk* kk# k##****#***##** xkk*** kkkkk#*##*##** x* k**### xx # # * *x * *k * #kk * * *kk * * #k * * * *kk * *k #kkk #k *k *kk *kkkk * #kkkkkkk *k Cond: CON0012229 1. The condensing unit shall be screened by painting to match and be screened with landscaping. combination permit_012811 OF VAIL �/ REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0361 Address: 122 E MEADOW DR VAIL Owner: BURGHARDT, KURT & ALISON G. Location: VILLAGE CENTER BUILDING A Item: 00010 BLDG - FOOTING Item: 00020 BLDG - Foundation /Steel Item: 00120 ELEC -Rough Item: 00200 MECH -Rough Item: 00030 BLDG - Framing Item: 00050 BLDG - Insulation Item: 00060 BLDG - Sheetrock Nail Item: 00190 ELEC -Final Item: 00390 MECH -Final Item: 00090 BLDG -Final combination permit_012811 TOWN OF VAIL, COLORADO Statement Statement Number: R110001469 Amount: $7,906.50 10/13/201101:15 PM Payment Method: Check Init: DR Notation: CK# 40824 NEDBO ----------------------------------------------------------------------------- Permit No: Bll -0361 Type: COMBINATION BLDG PERMIT Parcel No: 2101 - 082 - 0900 -1 Site Address: 122 E MEADOW DR VAIL Location: VILLAGE CENTER BUILDING A Total Fees: $9,207.64 This Payment: $7,906.50 Total ALL Pmts: $9,207.64 Balance: $0.00 ACCOUNT ITEM LIST: Account Code -------------- - - - Description Current Pmts - -- BP 00100003111100 ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 2,001.75 EP 00100003111100 ELECTRICAL PERMIT FEES 115.00 MP 00100003111100 MECHANICAL PERMIT FEES 240.00 PF 00100003112300 PLAN CHECK FEES 134.75 UT 11000003106000 USE TAX 416 5,400.00 WC 00100003112800 ----------------------------------------------------------------------- WILL CALL INSPECTION FEE 15.00 - - - - -- 0 Project Street Address: 124 Willow Bridge Rd. (Number) (Street) Department of Community Development 75 South Frontage Road Vail, Colorado 81657 Tel: 970 - 479 -2128 Web: www.vailgov.com Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Building /Complex Name: Village Center Contractor Information Business Name: Nedbo Construction Inc. (Suite #) Business Address: Po Box 3419 City Vail State: Co Zip: 81658 Contact Name: Rollie Kjesbo Contact Phone: 970- 977 -0268 Contact E -Mail: rollie @nedbo.com Contractor R gistration Number: 251 A X �✓l /�r�� . Owner /Owner's Repres ,,jFSfgW ture (Required) Project Informatic n Owner Name: Zt °I-cfz- o9 -o01� Ztpl- OSrZ- o4 -�oS Parcel #: Z10t- oK2- pq- poy1Zlol- 0g2-01_010 Uol- dit- 09 -0 /1 (For Parcel # contact Eagle Co my Assessors Offl a at (970- 328 -8640 or visit Project #: PIZZ 1 k- 0 33;L DRB #: J�n-l!li `� a�&F ,) Building Permit #: 1611 - 036 1 Lot #: Block # Subdivision: Work Class: New ( ) Addition ( ✓ ) Alteration ( ) Type of Building: Single - Family ( ) Duplex ( ) Multi - Family ( ) Commercial (✓) Other ( ) Work Type: Interior ( ) Exterior (✓) Both ( ) Valuation of Value of all work being performed: $ ZMCW.00 (value based on IBC Section 109.3 & IRC Section 108.3) www.eaglecounty.us /patle) Electrical Square Footage iDp Detailed Scope and Location of Work: Add one ThyseenKrupp Elevator to the North East Corner of the Village Center Building. (use additional sheet if necessary) For Office Use Only: Fee Paid: Received From: Cash Check # _ CC: Visa / MC Last 4 CC # Auth # exp date: Date Received: D PC— [E V LS SEP 19 2011 OF VAIL O1- Jan -I1 Work Included Plans Included Work Electrical (/)Yes ( )No (,/)Yes ( )No Mechanical (,()Yes ( )No (✓)Yes ( )No 1145 40 Plumbing ( )Yes ( )No ( )Yes ( )No Building (/)Yes ( )No (/)Yes ( )No Z6500 Value of all work being performed: $ ZMCW.00 (value based on IBC Section 109.3 & IRC Section 108.3) www.eaglecounty.us /patle) Electrical Square Footage iDp Detailed Scope and Location of Work: Add one ThyseenKrupp Elevator to the North East Corner of the Village Center Building. (use additional sheet if necessary) For Office Use Only: Fee Paid: Received From: Cash Check # _ CC: Visa / MC Last 4 CC # Auth # exp date: Date Received: D PC— [E V LS SEP 19 2011 OF VAIL O1- Jan -I1 State of Colorado Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two - Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single - family dwelling: any dwelling unit that is used primarily for a single family, including multi - family /condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State - certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: F Will not disturb more than the threshold limits identified above. ETested negative, or at 1% or below (1 copies of test results included) FTested positive at more than 1 %, requires abatement (1 copies of test results included) • Even recent construction projects may include asbestos - containing materials, so buildings of qny age require testing • The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos - containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: Fire Prevention Bureau Vail Fire Department 75 S Frontage Rd Fire—inspectors@vailgov.com 970 - 479 -2252 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303 - 692 -3158 asbestos@state.co.us www.cdDhe.state.co.us 01-Jan-1 r COMcheck Software Version 3.8.0 e�4 Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Village Center Bldg A Elevator Construction Site: Owner /Agent: Designer /Contractor: Willow Bridge Rd Chuck Langston Vail, CO 81657 AEC 40801 US Hwy 6 &24 Ste 214 Avon, CO 81620 970 -748 -8520 chuck@aec-vaii.com com Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts t ft2 (B x C) Elev, Mach Room (Warehouse) 118 0.8 94 Total Allowed Watts = 94 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description t Lamp 1 Wattage Per Lamp t Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Elev. Mach Ream ( Warehouse 118 sq.ft.) Linear Fluorescent 1: A: Linear - Industrial 124' T8 17W 1 Electronic 2 2 34 68 Total Proposed Watts 68 Section 4: Requirements Checklist Lighting Wattage: J t. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 94 68 YES Controls, Switching, and Wiring: U 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. ❑ 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: • Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. • Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. J 4. Independent controls for each space (switch/occupancy sensor). Exceptions: J Areas designated as security or emergency areas that must be continuously illuminated. Project Titte: Village Center Bldg A Elevator Report date: 09115/11 Data filename: PACurrent Projects \11073,00 - Village Center Elevator Addition,CalculationsiCOMcheck !11073- Comeheck.ock Page 1 of 6 iLJ Lighting in stairways or corridors that are elements of the means of egress. 5. Master switch at entry to hotellmotel guest room. 6. Individual dwelling units separately metered. 0 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps.. switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exceptions: Only one luminaire in space_ An occupant - sensing device controls the area. The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Wattstsq.ft, 9. Automatic lighting shutoff control in buildings larger than 5,000 sqA_ Exceptions: © Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. 10.Photoceiltastronomical time switch on exterior lights_ Exceptions: L] Lighting intended for 24 hour use. U 11.Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts ). Exceptions. L] Electronic high - frequency ballasts; Luminaires on emergency circuits or with no available pair_ Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application_ The proposed lighting system has been designed to meet the 2009 IECC requirements in COMrheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title �Sigrnature - Date Project Title: Village Center Bldg A Elevator Report date: 09115111 Data filename: P:iCurrent Projectst11073,00 - Village Center Elevator Add ltion\ Calculations \COMcheck111073- Comcheck.cck Page 2 of 6 COMcheck Software Version 3.8.0 Mechanical Compliance Certificate 2009 IECC Section 1: Project Information Project Type: New Construction Project Title : Village Center Bldg A Elevator Construction Site: Owner/Agent: Designer/Contractor-, Willow Bridge Rd Chuck Langston Vail, CO 81657 AEC 40801 US Hwy 6&24 Ste 214 Avon, CO 81620 970-748-8520 chuck@aec-vail-corn Building Location (for weather data): Vail, Colorado Climate Zone: 6b Section 3: Mechanical Systems List Quantity System Type & Desch tion 1 HVAC System 1: Cooling: Cooling equipment (Split System), Capacity 24 kBtulh, Efficiency: 13,00 SEER, Air-Cooled Condenser I Single Zone Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : 1 Equipment minimum efficiency: Split System, 13.0 SEER Generic Requirements: Must be met by all systems to which the requirement is applicable: -- 1 1, Plant equipment and system capacity no greater than needed to meet loads * Exception: Standby equipment automatically off when primary system is operating * Exception: Multiple units controlled to sequence operation as a function of load J 2. Minimum one temperature control device per system 0 3, Minimum one humidity control device per installed humidificationidehumidification system Ll 4- Load calculations per AS HRAEIACCA Standard 183 Li 5, Automatic Controls: Setback to 557 (heat) and 85 °F (cuol); 7-day clock, 2-hour occupant override, 10-hour backup ❑ Exception: Continuously operating zones I I Exception: 2 kW demand or less, submit calculations 6. Outside-air source for ventilation: system capable of reducing OSA to required minimum Ll 7. R-5 supply and return air duct insulation in unconditioned spaces R•8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly ❑ Exception: Ducts located within equipment J Exception: Ducts with interior and exterior temperature difference not exceeding 15'F. Li & Mechanical fasteners and sealants used to connect ducts and air distribution equipment L) 9. Ducts sealed - longitudinal seams on rigid ducts: transverse seams on all ducts; UL 181A or 181E tapes and mastics Project Title: Village Center Bldg A Elevator Report date: 09115/11 Data filename: P:\Current Projectskl 1073,00 - Village Center Elevator Addition\Calculations\COMcherk11 1073-Comcheck.cck Page 3 of 6 10. Hot seater pipe insulation: 1 in. for pipes —1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigerant/brine pipe insulation: 1 in. for pipes < -1.5 in. and 1.5 in, for pipes >1.5 in. Steam pipe insulation: 1.5 in, for pipes ­11.5 in. and 3 in. for pipes >1.5 in. J Exception: Piping within HVAC equipment. J Exception: Fluid temperatures between 55 and 105 °F. J Exception: Fluid not heated or cooled with renewable energy. J Exception: Piping within room fan -coil (with AHR1440 rating) and unit ventilators (with AHRI840 rating). J Exception: Runouts <4 ft in length. © 11.Operation and maintenance manual provided to building owner © 12. Balancing devices provided in accordance with 1MC (2006) 60117 13. Demand control ventilation (DCV) present for high design occupancy areas ( >40 person/ 1000 112 in spaces >500 U) and served by systems with any one of 1) an air -side economizer. 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than 3000 cfm. [J Exception: Systems with heat recovery. [l Exception: Multiple -zone systems without DDC of individual zones communicating with a central control panel. [J Exception: systems with a design outdoor airflow less than 1200 cfm. 0 Exception: Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 14.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings J Exception: Gravity dampers acceptable in buildings <3 stories J Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan 15.Automatic controls for freeze protection systems present Q 16. Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70°% outside air fraction or specifically exempted J Exception. Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. Exception: Systems serving spaces that are heated and not cooled to less than 60 °F. J Exception: Where more than 60 percent of the outdoor heating energy is provided from site recovered or site solar energy. J Exception: Heating systems in climates with less than 3600 HDD, J Exception: Cooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64 °F_ J Exception: Systems requiring dehumidification that employ energy recovery in series with the cooling coil. J Exceptiom Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements. a) at least 75 percent of exhaust flow rate, b) heated to no more than 2 "F below room setpoint temperature, c) cooled to no lower than 3`F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2009 IECC requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements Checklist. if Name - Title Signature Date Project Title: Village Center Bldg A Elevator Report date: 09/15/11 Data filename: PACurrent Projectsi11073.00 - Village Center Elevator AdditiontCalculations \COMcheckl11073- Comcheck.cck Page 4 of 6 �( COMcheck Software i 8.0 Mechanical Requirements Description The following list provides more detailed descriptions of the requirements in Section 4 of the Mechanical Compliance Certificate. Requirements Specific To: HVAC System 1 : The specified heating and!or cooling equipment is covered by the ASHRAE 90.1 Code and must meet the following minimum efficiency: Split System: 13.0 SEER Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible, within available equipment options. Exception, The equipment and /or system capacity may be greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment andior system is operating. Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 2. Each heating or cooling system serving a single zone must have its own temperature control device. 3. Each humidification system must have its own humidity control device. 4. Design heating and cooling loads for the building must be determined using procedures in the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 5. The system or zone control must be a programmable thermostat or other automatic control meeting the following criteria: a) capable of setting back temperature to 55'F during heating and setting up to 85'F during cooling, b) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedules, c) have an accessible 2 -hour occupant override, d) have a battery back -up capable of maintaining programmed settings for at least 10 hours without power. Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously. - Exception: A setback or shutoff control is not required on systems with total energy demand of 2 kW (6,826 Btu/h) or less. 6_ The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. If the ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must be capable of reducing outdoor -air flow to the minimum required levels. 7_ Air ducts must be insulated to the following levels a) Supply and return air ducts for conditioned air located in unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum of R -5. Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garages. b) Supply and return air ducts and plenums must be insulated to a minimum of R -8 when located outside the building_ c) When ducts are located within exterior components (e.g_, floors or roofs), minimum R -8 insulation is required only between the duct and the building exterior, - Exception: Duct insulation is not required on ducts located within equipment. - Exception: Duct insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15`F. 8 Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to fans and other air distribution equipment, including multiple -zone terminal units. 9. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments: mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics must be listed and labeled in accordance with UL 181A and shall be marked'181A -P' for pressure sensitive tape, '181A -M' for mastic or'181A -H' for heat - sensitive tape_ Tapes and mastics used to seal flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked '181 B -FX' for pressure- sensitive tape or '1818 -M' for mastic. Unlisted duct tape is not permitted as a sealant on any metal ducts. 10. All pipes serving space - conditioning systems must be insulated as follows: Hot water piping for heating systems: 1 112 in. for pipes ­1 112 -in. nominal diameter, 2 in. for pipes >1 112 -in. nominal diameter, Chilled water, refrigerant, and brine piping systems. Project Title'. Village Center Bldg A Elevator Report date: 0911501 Data filename' PaCurrent Projectsi11073.00 - Village Center Elevator AdditionlCalculationslCOMcheek111073- Comcheck.cck Page 5 of 6 1 10 in. insulation for pipes `=11/2-in. nominal diameter, 11/2 in. insulation for pipes '11/2-m, nominal diameter- Steam piping: 1 112 in, insulation for pipes *~I 1x2-m. nominal diameter, 3 in. mxv|aonn for pipes =11o'in. nominal diameter. Exception: Pipe insulation m not required for factory-installed piping withmxVAC equipmen/ Exception. Pipe insulation is not required for piping that conveys fluids having a design operating temperature range between os^p and 105T, Exception: Pipe insulation /, not required for piping that conveys fluids that have not been heated cv cooled through the use mrfossil fuels u, electric power, Exception: Piping within room fan-coil (with AHRI440 rating) and unit ventilators (with AHRIB40 rating)- Exception: Pipe insulation is not required for runout piping not exceeding 4 ft in length and I in. in diameter between the control valve and Hv»Ccoil. 11, Operation and maintenance documentation must be provided to the owner that includes at least the following infon-nation: a> equipment capacity (input and output) and required maintenance actions u) equipment operation andmumxennnnomanua|m c) HVAC system control maintenance and calibration information, including wiring diagrams, schematics, and control sequence descriptions; desired or field-determined set points must be permanently recorded on control drawings, at control devices, or, for digital control systems, in programming comments d} complete narrative or how each system /s intended tooperate. 12. Balancing devices provided in accordance with |mc(x0UO) O031T 13, Demand control ventilation (DCV) required for high design occupancy areas (>40 person;1000 U in spaces >500 ft2) and served by systems with any one of 1) an air-side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor airflow greater than o00wcfn, Exception: Systems with heat recovery, Exception: Multiple-zone systems without DDC of individual zones communicating with a central control panel, Exception: Systems with o design outdoor airflow less than 1uoncfn Exception: Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. /^ Outdoor air supply and exhaust systems must have motorized dampers that automatically shut when the systems or spaces served are not in use. Dampers must be capable of automatically shutting off dunng preoccupancy building warm-up, ocol-down, and setback. except when ventilation reduces energy costs (e.g,, night purge) or when ventilation must be supplied to meet code requirements. Both outdoor air supply and exhaust air dampers must have a maximum leakage rate of 3 cfrn/ft2 at 1 .0 in w.g. when tested io accordance With mwoA Standard 500, s^»optmw: Gravity (non 'mutonzod) dampers are acceptable in buildings less than three stories mheight. ' smmpnvn: Systems with a design outside air intake or exhaust capacity of 300 cfm (140 Us) or less that are equipped with motor operated dampers that open and close when the unit is energized and de-energized, respectively, 15� All freeze protection systems, including self-regulating heat tracing, must include automatic controls capable of shutting off the systems when outside air temperatures are above 40*F or when the conditions o, the protected fluid will prevent freezing. Snow- and ice-melting systems must include automatic controls capable m shutting off the systems when the pavement temperature is above m)~p and no precipitation isfalling, and uo automatic ur manual control that will allow shutoff when the outdoor temperature w above 4o^p 16- Individual fan systems with a design supply air capacity of 5000 cfm or greater and minimum outside air supply of 70 percent or greater of the supply air capacity must have an energy recovery system with at least a 50 percent effectiveness, Where cooling with outdoor air is required there is a means to bypass or control the energy recovery system to permit cooling with outdoor air. Exceptiom Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use o/ energy recovery systems. Exception: Systems serving spaces that are heated and not cooled tv less than en'F. Exception: Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy, Exception. Heating systems m climates with less than ouou*mn Exception: Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64T. Exception: Systems requiring dehumidification that employ energy recovery in series with the cooling coil. Exception: Laboratory furne hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: u)o/ least 7o percent m exhaust flow rate, u) heated m^v more than 2~p below mmnuotpoint temperature, n)cooled to no lower than YF above room selpoint temperature, d) no humidification added, e) no simultaneous heating and cooling. Project Title: Village Center Bldg AElevator Report date: O91^sn1 Data filename: px:onan pnojoots`1 1073-00 Village Center Elevator ^uumnnx:ewvlanunsxComchoomI1n7o-Comoherxo* Page aoxo 0 -� Heather Barrie KH Webb Architects 710 West Lionshead Circle Unit A Vail, Colorado 81657 970.477.2990 "heather @khwebb.com" October 5, 2011 Martin Haberle Chief Building Inspector Town of Vail 75 South Frontage Rd. West Vail, Colorado 81657 RE: B11 -0361- Village Center Bldg. A Elevator Addition, Building Comments Dear Mr. Haberle, With reference Building Comments from 10/3/2011 for the elevator addition- we have revised the following: 1. Architectural- The location of the condensing unit has been shown on A001(Site Plan), and referenced on A100 (Floor Plan) 2. Structural- S1 has been revised to note that the epoxy product does not require special inspection Please call or email with any questions. We appreciate your help. Sincerely, Heather Barrie Fo 5 2011 OF VAIL I10 WEST LIONSHEAD CIRCLE, SUITE A ►AIL COLORADO 81651 910.411.2990 910.411.2965( F) www.khwebb.com ,AEMBER OF THE AMERICAN INSTITUTE OF ARCNIIECIS Civ MITSUBISHI (CcvV6�,l Al UA& ELECTRIC n If.S5Unnn . COOLING & HEATING Split - ductless A/C and Heat Pumps SUBMITTAL DA 1 NA & MUY-D30NA 30,000 • • AIR-CONDITIONIN I Job Name: I Location: I Date: I Purchaser: Engineer: Submitted to: For ❑Reference ❑Approval ❑Construction System Designation: Schedule No.: GENERAL FEATURES • Catechin and anti - allergy enzyme filters for high air - purification capabilites • Updated sleek, compact indoor unit design • Remote - controlled wide airflow enables ideal horizontal air distribution • Self -check function — onboard diagnostics • Advanced microprocessor control • Auto restart following a power outage • Hand -held Wireless Remote Controller • Anti - allergy Enzyme Filter • Limited warranty: five years on parts and defects and seven years on compressors OPTIONAL ACCESSORIES Outdoor Unit ❑ Drain Socket Assembly (MAC -811 DS) Indoor Unit ❑ Three -pole Disconnect Switch (TAZ- MS303) ❑ Condensate Pump (230V; S13100 -230) Controller Options • Wall- mounted Wired Remote Controller (PAR -21 MAA; req. MAC -3971 F) • MA Contact Terminal Interface (MAC- 3971F) • M -NET Control Adapter (MAC- 3991F) ❑ Remote Temperature Sensor (M 21 -JKO-307) E Lockdown Bracket for Handheld Controller (RCMKPICB) Cooling` Rated Capacity ...... .........................30,700 Btu /h Minimum Capacity ... ..........................9,800 Btu /h SEER ........... ...........................16.0 Btu /h/W Total Input ............ ..........................3,380 W . Rabng Condibons (Cooling) - Indoor: WF (27°C) DO. a7°F (191C) WB: Outdoor 95 °F (35 °C) DB, 75 °F (24 °C) WB. Power Supply .................... 208 / 230V, 1- Phase, 60 Hz Breaker Size ........... .............................25 A Voltage Indoor - Outdoor S1 -S2 ...................... AC 208 / 230V Indoor - Outdoor S2 -S3 ......................... DC 12 -24V Indoor - Remote Controller .. ...................... Wireless OPERATING RANGE Indoor Unit: MSY -D30NA Wireless Remote Controller Outdoor Unit: MUY -D30NA Indoor Unit MCA................ ............................... 1 A Fan Motor ..... ........................... 0.76 F.L.A. Airflow Cooling (Lo - Med - Hi - Powerful) 389 - 639 - 848 - 887 Dry CFM 350 - 576 - 763 - 798 Wet CFM Sound Pressure Level Cooling (Lo - Med - Hi - Powerful) ....... 32 - 42 - 49 - 50 dB(A) Weight ....... .............................40 lbs. / 18 kg External Finish .................... Munsell No. 1.0Y 9.2 / 0.2 Field Drainpipe Size O.D ...................... 5/8" / 15.88 mm Outdoor Unit Compressor ...................... DC Inverter - driven Rotary MCA............... ............................... 21A Fan Motor ...... ............................... 0.93 F.L.A. Sound Pressure Level Cooling ........... .............................55 dB(A) DIMENSIONS DIMENSIONS UNIT INCHES / MM W 46 -1/16 / 1.170 D 11-5/8/295 H 14-3/8/365 Weight ....... .............................40 lbs. / 18 kg External Finish .................... Munsell No. 1.0Y 9.2 / 0.2 Field Drainpipe Size O.D ...................... 5/8" / 15.88 mm Outdoor Unit Compressor ...................... DC Inverter - driven Rotary MCA............... ............................... 21A Fan Motor ...... ............................... 0.93 F.L.A. Sound Pressure Level Cooling ........... .............................55 dB(A) DIMENSIONS INCHES / MM W 33 -1/16 / 840 D 13/330 H 33 -7/16 / 849 Weight ....... ............................126 lbs. / 57 kg External Finish ......................Munsell No. 3Y 7.81 1.1 A IF © 2011 MITSUBISHI ELECTRIC & ELECTRONICS, INC. Indoor Intake Air Temp. Outdoor Intake Air Temp. Refrigerant Type .... ............................... R41 OA Maximum so°F (32 °C) DB , 115 °F (46 °C) DB Refrigerant Pipe Size O.D. 73 °F (23 °C) WB 730F Cooling Gas Side . ............................... 5/8" / 15.88 mm Minimum (11 9-C) De, °F °C) 14 °F I ( -10°C) Liquid Side . ............................... 3/8" / 9.53 mm 57 (14 WB Max. Refrigerant Pipe Length ..................... 100' / 30 m Max. Refrigerant Pipe Height Difference ............. 50' / 15 m Connection Method .. ............................... Flared A IF © 2011 MITSUBISHI ELECTRIC & ELECTRONICS, INC. - - =1 Required Space (Indoor Unit) Piping 41'16 or rare Wuid line 03/819.11/16 (Flared connection e316) 111 0.R 09116 LD Gas line 05/816 -7/8 (Joint connection e5/8) el- 151160.n el -1 /4 La Joint 0518 (Flared connection 05/8) 11.1 16 . 01.1/4 La Drain hml ° a a g i 4y16amon 6- 7Aamae For left; left, back; or left, b bottom piping (using spacer): 5 -1/8 or more z -sns unit _____-1 Air Out Unit : inch 5/16 34 I' Wireless remote controller Drain hose Unit: inch MUY -D30NA REQUIRED SPACE open as rule 20 inch or more if the front and both sides are open 20 -6/32 11 -25/32 1-6/16 4 inch or more / 8 inch or more if 11� there are obstacles Piping Insulation Wuid line 03/819.11/16 (Flared connection e316) 111 0.R 09116 LD Gas line 05/816 -7/8 (Joint connection e5/8) el- 151160.n el -1 /4 La Joint 0518 (Flared connection 05/8) 11.1 16 . 01.1/4 La Drain hml Insulation e1 -1/8 Connected part #9116 01 Unit: inch MUY -D30NA REQUIRED SPACE open as rule 20 inch or more if the front and both sides are open 20 -6/32 11 -25/32 1-6/16 4 inch or more / 8 inch or more if 11� there are obstacles i Open as a rule 3-3/16 '�'4-3/WM6 flit 33- /16 20 inch or more if the back, both sides and top are open t�l \; Indary Standard US C13TEO Intertek FORM# MSY- D30NA/ MUY-D30NA - 201108 0 2011 MITSUBISHI ELECTRIC & ELECTRONICS, INC. AkMITSUBISHI ELECTRIC COOLING & HEATING Live Better 3400 Lawrenceville Suwanee Rd Suwanee, GA 30024 Tele: 678 - 376 -2900 • Fax: 800-889 -9904 Toll Free: 800 -433 -4822 ( 4) www.mehvac.com Specifications are subject to change without notice. 0 to both sides i Open as a rule 3-3/16 '�'4-3/WM6 flit 33- /16 20 inch or more if the back, both sides and top are open t�l \; Indary Standard US C13TEO Intertek FORM# MSY- D30NA/ MUY-D30NA - 201108 0 2011 MITSUBISHI ELECTRIC & ELECTRONICS, INC. AkMITSUBISHI ELECTRIC COOLING & HEATING Live Better 3400 Lawrenceville Suwanee Rd Suwanee, GA 30024 Tele: 678 - 376 -2900 • Fax: 800-889 -9904 Toll Free: 800 -433 -4822 ( 4) www.mehvac.com Specifications are subject to change without notice.