Loading...
HomeMy WebLinkAboutDRB110354 Plans4� Cl i iv DATE: 05/11/11 FiLE: Aspen -51 DRAWN: TMB FMVISED: REViSED: UA, C 1♦ iR`dE� r � 14211 = 11 -0II GENERAL. N07ES 51=r 1 r I GAT T ON5 This structure has been designed to meet the requirements of the 2004 All framing lumber to be #2 Doug -Fir or better. International Residentiai Code with amendments as adopted by the Town of Vail. All connection hardware to be by the Simpson Company. All omissions or conflicts between various elements of the working drawings and /or specifications shall be brought to the attention of the Structural Engineer Glue "sister" 2x10 "s to existing . joists with PL4OO and nail with two rows gd � 6" O.G. Existing hanger adequate for double Joist. before proceeding with any work so involved. The General Contractor shall verify all dimenslons and conditions at the ,job site and shall be responsible for the means, methods, techniques, sequences and procedures associated wlth this project. Furthermore, he shall be responsible for coordination of all work and materials including those furnished by subcontractors. The Structural Engineer -hail be contacted during the construction phase to make the job site inspections necessary to confirm that the actual field conditions are consistent with the design assumptions and that the construction is proceeding according to the plans and specifications. Live Loads Used in Design: Decks 100 psf Earthquake 5elsmic Zone G Wind qO mph, 3 Second Gust Cl i iv DATE: 05/11/11 FiLE: Aspen -51 DRAWN: TMB FMVISED: REViSED: UA, C 1♦ iR`dE� r � 14211 = 11 -0II