Loading...
HomeMy WebLinkAboutB11-0404 comment letter Date:10/14/2011 Re: 186 East Gore Creek Drive B11-0404 Dear Mr. Cremonese, RESPONSE INSTRUCTIONS ● Submit four complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING COMMENTS Architectural Comments: Sheet A1.1 1. Provide proposed and existing occupancy classification and building type per section 107.2 IBC 2. Show how compliance with section 2902, minimum plumbing fixtures is being achieved. Note: Include plans for travel distance location and fixture calculations. See sections 2902.1.1, 2902.3, 2902.3.1, and 2902.3.2 IBC. Not required if same occupancy classification and occupant load 3. How is the exit discharge to be illuminated. Reference section 1006 IBC Sheet A2.1 1. Please clarify the conflict of plans showing the storage space and office space in the same area. Sheet A3.1 1. Provide the u value of proposed glazing and doors for the storefront showing compliance with the IECC. Sheet A4.1 1. Details do not reflect the required weather protection per section 1405.2 IBC Structural Comments: NA Plumbing Comments: See architectural comments Mechanical Comments: Reviewed and accepted Electrical Comments: See architectural comments PLANNING COMMENTS Reviewed and accepted FIRE COMMENTS Reviewed and accepted PUBLIC WORKS COMMENTS Construction staging plan required if to be in right of way Sincerely, Martin A. Haeberle Chief Building Official