Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E10-0275
TOWN OFYAII. ' Town of Vail Community Development 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149 ELECTRICAL PERMIT Job Address: 292 W MEADOW DR VAIL Permit #...: E10 -0275 Location.......: DOBSON ICE ARENA Parcel No.....: 210106407005 OWNER TOWN OF VAIL C/O FINANCE DEPT 75 S FRONTAGE RD VAI L CO 81657 APPLICANT BEST ELECTRIC THE 10/15/2010 P O BOX 273 EAGLE CO 81631 License: 101 -E CONTRACTOR BEST ELECTRIC, THE P O BOX 273 EAGLE CO 81631 License: 101 -E 10/15/2010 Phone: 970-328-1610 Project #..: PRJ10 -0701 Issued......: 10122/2010 10/15/2010 Phone: 970 - 328 -1610 Desciption of Work: DOBSON ICE ARENA: ADD RECHARGING STATION TO ZAMBONI GARAGE Valuation: $500.00 Square feet: 0 CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 INSPECTIONS If more than two inspections are performed an additional inspection fee will be applied for each inspection requested /needed. All electrical inspections are performed on Tuesdays and Thursdays. Requests must be received the day before and not later than 4 p.m. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. SIGNATURE: Date (Master / homeowner / or non - licensed contractor performing work) PRINTED NAME: elec_permi100109 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADOCopy Reprinted on 01 -11 -2013 at 09:39:00 01/11/2013 Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R100001670 Amount: $193.75 10/22/201012:57 PM Payment Method:Credit Crd Init: LC Notation: credit card from Scott O'Connell VRD ----------------------------------------------------------------------------- Permit No: E10 -0275 Type: ELECTRICAL PERMIT Parcel No: 2101 - 064 - 0700 -5 Site Address: 292 W MEADOW DR VAIL Location: DOBSON ICE ARENA Total Fees: $193.75 This Payment: $193.75 Total ALL Pmts: $193.75 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code Description Current Pmts 00100003111100, GFPO ELEC PERMIT FEES- GFP012 85.00 EP 00100003111100 ELECTRICAL PERMIT FEES 30.00 PF 00100003112300 ELEC PLAN REVIEW 74.75 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 opment ELECTRICAL PERMIT Project Street Address,: SZ Lic?nshe� -� (Number) (Street) 1l (Suite #) Building /Complex Name: Contractor Infor ation: Company: Office Use: A �0"r. T. MPgX►N (Puz Twa-V►4) Project #: _ A IO—o :2 1 Building Permit #: / L-) 'C,391 Electrical Permit #: f /D - 0,9-25 Company Address: r, 6, 'x ,7. 2 �— Detailed Description of Work:., && City: State: (�Q Zip: ;' �' LK��n, 1-7G NQc-�/ CMfwr.2 ^.' RJ �Ga r1� I1 Contact Name -, L ; _ L� #F 6 �t --4 A -c q Contact Phone:' Z� — n E -Mail -Amy '5_'_(2 .44&- n _e r (use additional sheet if necessary) Town of it Contractor Registration No.: Work Class: X New ( ) Addition (X) Remodel ( ) Repair ( ) Other ( ) Con actor Signature (required) Type of Building: - - Single- Family ( ) Duplex ( ) Multi - Family (X Commercial Property Information ( ) Restaurant( ) Other( ) Parcel #: 1O�0640100S- (For parcel #, contact Eagle County Assessors. Office at 970 - 328 -8640 or visit www.eaglecounty.us/patie) Date Received: Tenant Name: V N Owner Name: 70. n C,� y;'; COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUA- TION OF WORK (Labor & Material) Amount of SQ Ft.: A✓ W_ Electrical $: Soo Ad (Y 75 FE OCT ] 4 2010 TOWN OF VAIL 29- May -09 al MA Irl C ,n L %I 0 0 ECT: DOBSON ICE ARENA ECT #: 10062 4TING: SURFACE • FYISTIKIr, IPHASE I A� ljJ _,l A 7j C BKR P ply qi it -J al MA Irl C ,n L %I 0 0 ECT: DOBSON ICE ARENA ECT #: 10062 4TING: SURFACE • FYISTIKIr, < < CIZ L_ Itt -d-r- C::� 0 U v vi IF - J-J; j I 6 ".j 1,j j � . IPHASE I A� DESCRIPTION A 7j C BKR P ply qi it -J o < BKR A B c DESCRIPTION 0 C, (Y- [4044 ryry < < CIZ L_ Itt -d-r- C::� 0 U v vi IF - J-J; j I 6 ".j 1,j j � . ENGINEER: STAN VOLTAGE: 277/480V, 3P, 4W MAINS: 400A MLO All'• 4A Lr IPHASE I A� DESCRIPTION A B C BKR P CIR CIR P BKR A B c DESCRIPTION [4044 ryry ZAMBONI 20 3 ENGINEER: STAN VOLTAGE: 277/480V, 3P, 4W MAINS: 400A MLO All'• 4A Lr IPHASE I PHASE DESCRIPTION A B C BKR P CIR CIR P BKR A B c DESCRIPTION [4044 ZAMBONI 20 3 1 2 0 SPACE 4044 3 4 0 SPACE 4044 1 15 —6 1 is 12000 2KVA XFMR THIS RM EXHAUST FAN AT COMP RO(667 15 3 7 8 13 30 3333 HVAC 1667 9 10 3333 _PUFF'— 1 667 11 12 3333 667 1 15 3 13 14 3 15 667 IPUMP #3 667 15 16 667 667 17 118 667 PUMP 667 15 13 19 120 3 15 667 BOILER 667 21 22 667 667 23 24 667 EXHAUST FAN AT ZAMBONI 667 15 3 25 26 3 15 667 PUMP #4 667 27 28 667 667 29 .30 667 BASEBOARD HEAT 3000 20 1 31 132 1 20 1000 TIME CLOCK BASEBOARD HEAT 3000 20 1 33 134 1 20 1000 N.W. MAIN BASEBOARD HEAT 3000 20 1 35 136 1 20 2000 EM LTS PANEL LA XFMR 10000 60 3 37 38 3 60 18437 PANEL HlB ARENA LTG 10000 39 40 18437 10000 41 42 118437 1" LOAD CALCULATION SUMMARY NEW LOAD FOR ZAMBONI IS HIGHLIGHTED IN BOLD. 0 R G/S CALCULATED POWER FACTOR, CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMA AM B84 UGHTfNG 67312 81 67312 RECEPTACLES 12000 14 11000 13 01, MHANICAL 57132.6 81 60165.8 85 .$� � E.0 1<17 , 'CHEN 0 0 0 0 T/_-l7AL 136445 176 138478 179 L . k CD c- ox, .7 L. k I CD 2L cl ILL At& -j 4- 1 << L-1 51-a VIC LA 0 0 cot ROJECT: DOBSON ICE ARENA ROJECT #: 10062 IIOUNTING: SURFACE YPE: EXISTING ENGINEER: STAN VOLTAGE: 277/480V, 3P, 4W MAINS: 400A MLO Air,• IA V IPHASE PHASE DESCRIPTION A 8 C BKR li-J CIR CIR P BKR A B c DESCRIPTION ZAMBONI 4044 20 3 1 2 0 :SPACE 4044 3 4 0 SPACE 4044 5 15 6 1 15 51-a VIC LA 0 0 cot ROJECT: DOBSON ICE ARENA ROJECT #: 10062 IIOUNTING: SURFACE YPE: EXISTING ENGINEER: STAN VOLTAGE: 277/480V, 3P, 4W MAINS: 400A MLO Air,• IA V i 10 IPHASE PHASE DESCRIPTION A 8 C BKR P CIR CIR P BKR A B c DESCRIPTION ZAMBONI 4044 20 3 1 2 0 :SPACE 4044 3 4 0 SPACE 4044 5 15 6 1 15 1 2000 2KVA XFMR THIS RIM EXHAUST FAN AT COMP RO(667 15 3 7 8 3 30 13333 HVAC 667 9 9 10 3333 667 11 12 3333 PUMP 667 1 15 13 13114 3 15 667 Pump #3 667 15 16 667 667 17 18 667 PUMP 667 15 3 19 20 13 15 667 BOILER 667 21 22 667 667 23 24 667 EXHAUST FAN AT ZAMBONI 667 115 3 25 26 3 15 667 PUMP #4 667 27 28 667 667 29 30 667_ BASEBOARD HEAT 3000 20 1 31 32 .1 20 1000 TIME CLOCK BASEBOARD HEAT 13000 20 1 33 34 1 20 11000 N.W. MAIN BASEBOARD HEAT 3000 20 1 35 36 1 20 2000 EM LTS PANEL LA XFMR 10000 60 3 37 38 3 60 18437 PANEL H18 ARENA LTG 10000 39 40 18437 10000 141 42 18437 LOAD CALCULATION SUMMARY NEW LOAD FOR ZAMBONI IS HIGHLIGHTED IN BOLD. 0 CALCULATED POWER FACTOR: Off` H 093 CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AIM 9 8 4 0 �XP LIGHTING 67312 81 67312 $1 C, '17 REC-EPTACLES 12000 14 11000 13 ECHANICAL 57132.6 81 60165.8 85 NAOEC�N - ��' KFI i "CHEN 0 0 0 0 Tk-,,,7AL 136445 176 138478 179 i 10 11�^ r' Q- C D 6 c d f -1 IN Qz G C 0 cn I / ,� i ..,fib •Ly M_ r 1 f rte` 1 �1 I CD << 0 zk i b7 y U U _ J5 I �ti, L I.•,� �1.� ! �'d Z_li ,`I t•{ 'Df � ''' ";•.,Pf' �:,,al � � _ ._ r -I � ``� �� t..- �=� �°,�,"� �„c� i "�, � u � J �� : 1 ��� �'°�� t l._. 9X , I 11 (-- 1 PROJECT: DOBSON ICE ARENA PROJECT #:"10062 MOUNTING: SURFACE TYPE: EXISTING PANEL HA I i Lj LJ LzJ I_m I € , g. -�� I CD << 0 zk i b7 y U U _ J5 I �ti, L I.•,� �1.� ! �'d Z_li ,`I t•{ 'Df � ''' ";•.,Pf' �:,,al � � _ ._ r -I � ``� �� t..- �=� �°,�,"� �„c� i "�, � u � J �� : 1 ��� �'°�� t l._. 9X , I 11 (-- 1 PROJECT: DOBSON ICE ARENA PROJECT #:"10062 MOUNTING: SURFACE TYPE: EXISTING PANEL HA ENGINEER: VOLTAGE: MAINS: AIC: STAN 277l48OV, 3P, 4W 400A MLO 14 K PHASE PHASE DESCRIPTION A B C BKR P CIR CIR P BKR A B C DESCRIPTION ZAMBONI 4044 20 3 1 2 0 SPACE _ - 4044 3 4 0 SPACE 4044 5 16 1 15 2000 2KVA XFMR THIS RM EXHAUST FAN AT COMP RO 667 15 3 7 8 3 30 3333 HVAC 667 9 10 3333 ° 667 11 12 3333 " PUMP 667 15 3 13 14 3 15 667 PUMP #3 667 15 16 667 " _ 667 17 118 667 " F 11IV1F 667 15 3 19 20 3 15 667 BOILER 667 21 22 667 667 23 24 667 " EXHAUST FAN AT ZAMBONI 667 15 3 25 26 3 15 667 PUMP #4 667 27 28 667 _ 667 29 30 667 " BASEBOARD HEAT 3000 20 1 31 32 1 20 1000 TIME CLOCK BASEBOARD HEAT 3000 20 1 33 34 1 20 1004 IN.W. MAIN BASEBOARD HEAT 3000 20 1 35 36 1 20 2000 EM LTS PANEL_ LA XFMR 10000 60 3 37 38 3 60 18437 PANEL H 1 B ARENA LTG -- 10000 39 40 18437 " 10000 141 142 18437 " LOAD CALCULATION SUMMARY NEW LOAD FOR ZAMSONI IS HIGHLIGHTED IN BOLD. C R G15, CALCULATED POWER FACTOR: o CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAN M $40 L[GHTdNG 67312 81 67312 $1 S, RECEPTACLES 12000 14 11000 13 L` MF=C`I-IANICAL 57132.6 81 60165.8 85 ASS /pNA��N'�� Ki'�'r� HEN 0 0 0 0 r {_T n AL 136445 176 138478 179 t, v5,` '.014) LA 'o N 41 0 0 I 0 cat 0 < 72� < J Or PANEL HA ENGINEER: VOLTAGE: MAINS: AIC: STAN 277/480V, 3P, 4W 400A MLO 14 K PHASE L. PHASE DESC DRIPTION A B c BKR P CIR CIR P BKR A fq c DESCRIPTION LJ LJ Z ZAMBONI 4044 1-- LLJ < 20 3 1 2 0 SPACE '40" Ica. 4 0 SPACE 4044 1 5 16 1 15 12000 2KVA XFMR THIS RM EXHAUST FAN AT COMP RO(667 15 3 7 8 3 30 3333 HVAC 667 9 10 3333 0 u 667 11 12 3333 PUMP 667 15 3 13 14 3 15 667 PUMP #3 667 15 16 667 667 17 18 667 Per MP 667 15 3 19 20 3 15 667 BOILER 667 21 22 667 1667 < 72� < J Or PROJEC'U DOES SON ICE ARENA PHOJECT #: 10062 MOUNTING: SURFACE TYPE. EXISTING PANEL HA ENGINEER: VOLTAGE: MAINS: AIC: STAN 277/480V, 3P, 4W 400A MLO 14 K PHASE L. PROJEC'U DOES SON ICE ARENA PHOJECT #: 10062 MOUNTING: SURFACE TYPE. EXISTING PANEL HA ENGINEER: VOLTAGE: MAINS: AIC: STAN 277/480V, 3P, 4W 400A MLO 14 K PHASE PHASE DESC DRIPTION A B c BKR P CIR CIR P BKR A B c DESCRIPTION ZAMBONI 4044 20 3 1 2 0 SPACE '40" 3 4 0 SPACE 4044 1 5 16 1 15 12000 2KVA XFMR THIS RM EXHAUST FAN AT COMP RO(667 15 3 7 8 3 30 3333 HVAC 667 9 10 3333 667 11 12 3333 PUMP 667 15 3 13 14 3 15 667 PUMP #3 667 15 16 667 667 17 18 667 Per MP 667 15 3 19 20 3 15 667 BOILER 667 21 22 667 1667 23 24 667 EXHAUST FAN AT ZAMBONI 667 1667 15 3 25 26 3 15 667 PUMP #4 27 28 667 667 29 30 667 BASEBOARD HEAT 3000 20 1 31 32 1 20 1000 TIME CLOCK BASEBOARD HEAT 3000 20 1 33 34 1 20 1000 N.W. MAIN BASEBOARD HEAT 3000 20 1 35 136 1 20 2000 EM LTS; PANEL LA XFMR 10000 60 3 37 38 3 60 18437 PANEL H1 B ARENA LTG 10000 39 40 18437 V, 10000 41 42 18437 LOAD CALCULATION SUMMARY NEW LOAD FOR ZAMBONI IS HIGHLIGHTED IN BOLD. CALCULATED POWER FACTOR,- CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAN AM LIGHTING 67312 81 67312 81 RECEPTACLES 12000 14 11000 13 MF("HANICAL 57132.6 81 60165.8 85 K`r7f.',HEN 0 0 0 0 136445 176 138478 179 0 R G 9840, F 0-- NA�- "A r"T, i Type: BALEC Vem 2NO EUCTIWAL PERMIT Sub-Type: ACOM ((Activity) Permit N: FM70-275 Address: 1292W MEADOW DR VAJL Status: FINAL- OWNER: I TOWN OF VAIL Date: 1-0/1572010 11 Mid M 0 Is r"O" 13_© tl Inspection Items for E10-0275 Inspections I Guide Sheet I I Sec Item Id I Description App I Req Item Action I� 190 1 ELEC•Frial AP eaaktop F M Add Item Insert r- D4playUpdateable Item Only Entries for Iteml 20 ELEC•Rough tint Action I Comments I By Date ique-Kel Add ► Entry Acfiwx AP By: sgremmer Date: 11l02t2fn0 Update Begin Tim. End Tim. OR Elapsed Tim Enliy Stad Mks: End Miles�0.� OR Total Mileage: j 0. Delete VeNcle Id: Violations: Entry Refresh Entered Date: Entered By SGREMMER (a Efint TooiEt I ar Ord . r - Select Select multiple r I Multiple for Insp DOC k