HomeMy WebLinkAboutB11-0421 comment letter
Date:10/20/2011
Re:2605 Davos Lane
Dear Mr. Bingel,
RESPONSE INSTRUCTIONS
● Submit two complete sets of revised construction documents containing the requested information
with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each comment.
BUILDING COMMENTS
Architectural
Comments:
1. The proposed stair does not comply with section R311.7.7.3 IRC. Revise plans to reflect code compliance.
2. Please incorporate details into plan sheets. All plan sheets
to be of the same size paper per Town of Vail submittal requirements.
Structural Comments:
1. Per Town of Vail ordinance boulder walls 4’ or more shall be required to be designed
by a structural engineer. Detail and plan elevations conflict. Please clarify and or provide a design by a structural engineer.
Plumbing Comments:
NA
Mechanical Comments:
NA
Electrical
Comments:
NA
PLANNING COMMENTS
Reviewed and accepted
FIRE COMMENTS
NA
PUBLIC WORKS COMMENTS
1. Obtain approval of the public works department for termination point of drain pipe for the boulder
wall
Sincerely,
Martin A. Haeberle
Chief Building Official