Loading...
HomeMy WebLinkAboutB11-0017 permit issued shoring deferred submittal 05-05-11Lionshead Transit Center> 10 May 2011 Page 1 10 May 2011 Mr. Martin Haeberle Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 !._ Chie e McGee, De & Chief Mik u ire Marshall Town of V Department 42 W. adow Drive CO 81657 Lionshead Transit Center Permit Application # B10- 0166/167 Dear Sirs 00 k 4 Mr. Tom Kassmel Town Engineer Town of Vail Public Works 1309 Elkhorn Drive Vail, CO 81657 arren Ca Chief o ing Dep ent o munity Development 5 South Frontage Road Vail, Colorado 81657 1. Attached is a revised sheet for concrete reinforcing at the pedestrian bridge. Additional bar has been added to the north attachment. Attached: S121 Please contact me with any additional comments or questions. Best Regards, E Tracy Hart LEED AP Senior Associate <cc: Tom Kassmel /Town of Vail E. Randal Johnson /4240 21064.00/3.2 p �C ILI P. MAY 10 hii TOWN Or VA Revision Submittals: 1- "Field Set' of approved plans MUST accompany revisions_ roved &the p ermit is re issued. 2. No further inspections will be performed until the revisions are app P 3_ Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: O Revisions i () Response to -Correction Letter attached copy of correction letter g-Deferred Submittal ( )`Other Project Street Address: i (Number) (Street) BuildinglComplex Name: (Suite #) Contact Information: Company: Z A Company Address: City: State: Zip: Contact Name: ?A 'A y" ay.+�3 �_ Contact Phone- � Tv 6 0 y i E -Mail G Jf I G reyie k liven Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical i Mechanical: Total: (use additional sheet if necessary) Date Received: MAY 05 2011 TOWN OF VAIL TRANSMITTAL FORM Description 1 List of Changes: �Li SU MI L • SUBMITTAL REVIEW Contractor's review is for general conformance with the Contract Documents Subcontractor or Supplier are responsible for verifying all field dimensions, fabrication and construction means, methods, sequences and coordination with affected trades. This review does not alter, supersede or replace the requirements of the Subcontract Agreement or Purchase Agreement. This review does not relieve the Architect and / or Engineers of their contractual responsibilities. EREVIEWED ❑ MAKE CORRECTIONS NOTED ❑ REVISE AND RESUBMIT ❑ REJECTED R. A. NELSON & ASSOCIATES, INC. Reviewed by: Jeremiah Wendell Date: 0 5 . 0 3.11 Submittal# S02- 10 -02 &i -oo17 REVIEWED FOR DESIGN LOADS ONLY AS THEY AFFECT THE PRIMARY STRUCTURE NOT RESPONSIBLE FOR DESIGN, DIMENSIONS OR QUANTITY OF MATERIAL. BY: ERS DATE: 05/04/2011 MARTIN /MARTIN INC. Lionshead Welcome Center Soil Nail Wall DESIGN CALCULATIONS ❑ NO EXCEPTIONS TAKEN O EXCEPTIONS AS NOTED ❑ REVIEWED FOR XRETAINED FOR RECORD INFORMATION ONLY ❑SEE IF CHECKED ABOVE FABRICATION MAY BE UNDERTAKEN. THIS DOES NO] F AUTHORIZE CHANGES TO CONTRACT SUM OR TIME UNLESS STATED IN CHAN(, P re pa red I or: ORDER. C+ IF CHECKED BELOW FABRICATION MAY NOT BE UNDERTAKEN. RESUBMIT CORRECTED COPIES. ❑ REVISE AND RESUBMIT REVIEWING IS ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACI DOCUMENTS. THE CONTRACTOR 15 RESPONSIBLE FOR DIMENSIONS TO BF CONFIRMED AND CORRELATED AT THE SITE; FOR INFORMATION THAT PERTAINS SOLELY TO THE FABRICATION PROCESS OR TO THE MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES OF CONSTRUCI ON AND FOR COORDINATION OF THE WORK OF ALL TRADES. BY BRANDON MIXON 4240 REVIEWED BY _ DATE 5.4.2011 R.A. Nelson 51 Eagle Road #2 Avon, CO 81620 May 3 2011 Prepared By: Natalie Smiley, E.I.T. Yenter Companies, Inc. 20300 West Highway 72 Arvada, CO 80002 D EcE�MI� D MAY O5 2011 TOWN OF VAIL Reviewed By: M.C. "Mick" Muller, P.E. Yenter Companies, Inc. 20300 West Highway 72 Arvada, CO 80002 UO f I. 236 rr; t a t J/'1A tAt - ..t This design, including drawings and calculations, are intended solely for use by Yenter Companies, Inc., its subcontractors, and suppliers for the construction of the improvements indicated in this design. Yenter Companies, Inc. retains sole ownership of this design, drawings, and calculations and they shall remain the property of Yenter Companies, Inc. These drawings and calculations may not be copied, reproduced, or used without the prior express written permission of Yenter Companies, Inc. Copyright 2011, Yenter Companies, Inc. All Rights Reserved INDEX 1 References and Design Parameters 2-6 SnailWin Analysis: Wall Height = 7 Feet 7-11 Temporary Shotcrete Facing Design: Wall Height = 7 Feet REFERENCES FHWA Publication No. FHWA -IF -03 -017 Geotechnical Engineering Circular No. 7 Soil Nail Walls California Trenching and Shoring Manual California Department of Transportation Division of Structures — Office of Structure Construction Geotechnical Report Proposed Lionshead Transit Center Auxiliary Building Koechlein Consulting Engineers, Inc. Job No. 10 -050 Dated: November 2, 2010 Software: SnailWin Version 3.1 MathCad Version 11.1 Soil Design Parameters: y = 135 pcf C = 100 psf T = 35° Q = 12 psi 1 Date: 05 -02 -2011 Snai lei = 3.ip®shead Welcome Center - Minimum Factor of Safety = 1.43 7.0 ft Behind Wall Crest At Wall Toe H= 7.0 ft LEGEND: PS= 32.0 Kips FY= 45.0 Hsi Sh= 5.0 ft Sv= 5.0 ft GAM PHI CON SIG pcf deg psf psi 1 135.0 35 100 12.0 Scale = 10 ft Surcharge 0 File: Lionshead Welcome Center - 7ft ******************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * CALIFORNIA DEPARTMENT OF TRANSPORTATION * ENGINEERING SERVICE CENTER * DIVISION OF MATERIALS AND FOUNDATIONS * Office of Roadway Geotechnical Engineering * Date: 05 -02 -2011 Time: 16:32:36 ******************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Project Identification - Lionshead Welcome Center --- - - - - -- WALL GEOMETRY --- - - - - -- Vertical Wall Height = 7.0 ft Wall Batter = 0.0 degree Angle Length (Deg) (Feet) First Slope from Wallcrest. = 0.0 0.0 Second Slope from 1st slope. = 0.0 0.0 Third Slope from 2nd slope. = 0.0 0.0 Fourth Slope from 3rd slope. = 0.0 0.0 Fifth Slope from 3rd slope. = 0.0 0.0 Sixth Slope from 3rd slope. = 0.0 0.0 Seventh Slope Angle. = 0.0 --- - - - - -- SLOPE BELOW THE WALL --- - - - - -- There is NO SLOPE BELOW THE TOE of the wall Revise as required per Alpine's --- - - - - -- SURCHARGE --- - - - - -- comments on submittal. THE SURCHARGES IMPOSED ON THE SYSTEM ARE: ZZ Begin Surcharge - Distance from toe = 2.0 ft Note: existing garage was End Surcharge - Distance from toe = 11.5 ft designed for 5000psf bearing. Loading Intensity - Begin = 4000.0 psf /ft Loading Intensity - End = 4000.0 psf /ft --- - - - - -- OPTION #1 --- - - - - -- Factored Punching shear, Bond & Yield Stress are used. --- - - - - -- SOIL PARAMETERS --- - - - - -- Unit Friction Cohesion Bond* Coordinates of Boundary Soil Weight Angle Intercept Stress XS1 YS1 XS2 YS2 Layer (Pcf) (Degree) (Psf) (Psi) (ft) (ft) (ft) (ft) 1 135.0 35.0 100.0 12.0 0.0 0.0 0.0 0.0 * Bond Stress also depends on BSF Factor in Option #5 when enabled. 11 File: Lionshead Welcome Center - 7ft --- - - - - -- WATER SURFACE --- - - - - -- NO Water Table defined for this problem. --- - - - - -- SEARCH LIMIT --- - - - - -- The Search Limit is from 0.0 to 0.0 ft You have chosen NOT TO LIMIT the search of failure planes to specific nodes. --- - - - - -- REINFORCEMENT PARAMETERS --- - - - - -- Number of Reinforcement Levels Horizontal Spacing Diameter of Reinforcement Element Yield Stress of Reinforcement Diameter of Grouted Hole Punching Shear --- - - - - -- ( For ALL Levels) 2 = 5.0 ft = 1.000 in = 45.0 ksi = 5.3 in 32.0 kips Reinforcement Lengths = 15.0 ft Reinforcement Inclination = 15.0 degrees Vertical Spacing to First Level = 1.0 ft Vertical Spacing to Remaining Levels = 5.0 ft y File: Lionshead Welcome Center - 7ft MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) Toe 5.604 1.4 76.0 5.8 89.9 1.4 Reinf. Stress at Level 1 = 40.977 Ksi (Pullout controls...) 2 = 41.477 ksi (Punching Shear controls..) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 2 2.147 2.8 0.0 2.0 83.2 7.1 Reinf. Stress at Level 1 = 37.231 Ksi (Pullout controls...} 2 = 39.051 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 3 1.619 4.2 0.0 2.1 73.3 7.3 Reinf. Stress at Level 1 = 34.059 Ksi (Pullout controls...) 2 = 38.405 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 4 1.475 5.6 0.0 1.7 60.8 8.0 Reinf. Stress at Level 1 = 31.640 Ksi (Pullout controls...) 2 = 39.262 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 5 1.429 7.0 0.0 2.1 55.0 8.5 Reinf. Stress at Level 1 = 28.752 Ksi (Pullout controls...) = 33 TrIRX � 2 = 37.979 Ksi (Pullout controls... ) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE •1 SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 6 1.518 8.4 0.0 1.7 46.2 9.7 Reinf. Stress at Level 1 = 26.833 Ksi (Pullout controls...) 2 = 38.786 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) s NODE 7 1.564 9.8 0.0 2.0 41.8 10.5 Reinf. Stress at Level 2 _ 24.458 .98 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 8 1.722 11.2 0.0 2.2 38.0 11.4 Reinf. Stress at Level 1 = 22.235 Ksi (Pullout controls...) 2 = 37.154 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE 9 1.979 12.6 0.0 2.5 34.8 12.3 Reinf. Stress at Level 1 = 20.149 Ksi (Pullout controls...) 2 = 36.414 Ksi (Pullout controls...) MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (deg) (ft) (deg) (ft) NODE10 2.291 14.0 0.0 2.8 32.0 13.2 Reinf. Stress at Level 1 = 18.189 Ksi (Pullout controls...) 2 = 35.719 Ksi (Pullout controls...) * For Factor of Safety = 1.0 * Maximum Average Reinforcement Working Force: 13.095 Kips /level laV S M Ground Nail Wall Calcs Soil Nail Facing Design C:\Documents and Settings \natsmi \My Lionshead Welcome Center 5!2/2011 Documents \Natalie's MathCadl Designed by:NS Temporary - 4 inch Checked by:MCM Soil Nail Wall Facing Design psf := lbf pcf := psf kip := 1000•lbf ksf := 1000•psf ksi := 1000•psi fr 2 ft Reinforced shotcrete: th := 4i CF := 2. Vl' := 8i f := 4000ps, F.77 ksi thickness of shotcrete (minimum) frorn table 5.1 width of plate compressive strength of shotcrete tensile yield strength of the wire & facing rebar horizontal spacing between nails vertical spacing between nails Safety Factors: FSFF := 1.35 facing flexure 1.35 for temp, 1.5 for permanent FSFp := 1.35 facing punching shear 1.35 for temp, 1.5 for permanent FSFS := 2.0 headed stud tensile Facing Design: Design Nail Head Tensile Force: EE9 #8 bar sec rat, S _ Tmax ;= 37.979ksi A Tmax = 30.003 kip max nail stress from SNAIL output SEe pra G - Ta% 13.095ki average from SNAIL for FS =1 (last page) SEE PG S - Ta%g:= 33.3655ksi•A T avg = 26.359 kip calculate from all levels in SNAIL Tavgs Tmaxs Tmax' Tmaxs = 14.906 kip Tavg Smax := max(Sh, Sv) Smax = 5 ft T = T 10.6 + 0.057•r '-- 11 o :- maxs' l � - 3 JJ T = 10.643 kip Tenter companies, Inc. 20300 West Highway 72 Arvada, CO 80007 303 - 279 -4458 Page 1 of 5 around Nail Wall Calcs Soil Nail Facing Design 5/21201• 'Mocuments and SettingslnatsmWy Lionshead Welcome Center Designed by:N: )ocumentslNatalie's MathCadl Temporary - 4 inch Checked by:MCh Flexural Resistance: f c Minimum Reinforcement Ratio: 0.24 — Pmin ma —,0.0018 psi Pmin = 0.00253 f w3 10• psi Maximum Reinforcement Ratio Minimum Area of Steel: Maximum Area of Steel: Select Reinforcement: 0.087 0.174 0.120 0.240 0.058 0.116 ST := 0.080 0.160 0.145 0.167 0.178 0.200, asmmesh := ST .2 asmmesh = 0.087 in ft Venter Companies, Inc. ?0300 West Highway 72 krvada, CO 80007 303 - 279 -4458 Page 2 of'. lOfc 90ksi Pmax := 0.05. f N , y ( 90ksi + fµy) Pmax = 0.02 asmin Pmin asmax Pmax .2 asmin = 0.061n ft 2 asmax = 0.48 in ft A= One Layer of 4x4 W2.9xW2.9 2) Two Layers of 4x4 W2.9xW2.9 3) One Layer of 4x4 W4.OxW4.0 4) Two Layers of 4x4 W4.OxW4.0 5) One Layer of 6x6 W2.9xW2.9 in A = 1 ft 0 Ground Nail Wall Calcs Soil Nail Facing Design 5/2/2011 C: \Documents and Settings \natsmi \My Lionshead Welcome Center Designed by:NS Documents\Natalie's MathCad\ Temporary - 4 inch Checked by:MCM DO := 0.5 i diameter of the vertical reinforcement bar number of vertical reinforcement bars (assumed discontinuous) Dhb 0,5. i diameter of the horizontal reinforcement bar number of horizontal reinforcement bars (assumed continuous) 2 Avb nvb•n'I D b I Avb = 0 in vertical bar area 2 Ahb nhb'n'( Dhb I A hb = 0 m horizontal bar area min (A v b , Ahb) 2 asn asmmesh + asn = 0.087 in area of steel at nail head Smax ft 2 asm asmmesh + hb asm = 0.087 i2t area of steel at midspan S h .2 as = 0.061n check min and max steel area ft in 2 asmax = 0.48 — ft checkl if(as < min(a asn), "OK" , "Problem" checkl = "OK" checkl:= if(asmax> max(asm,asn), "OK" , "Problem ") checkl = "OK" Flexural Capacity: ft Sv th f" RFF := 3.8•kip-CF asm + asn .— . in 2 Sh•12.in 1000psi RFF = 26.448 kip Yenter Companies, Inc. 20300 West Highway 72 Arvada, CO 80007 303 - 279 -4458 Page 3 of 5 I round Nail Wall Calcs Soil Nail Facing Design 5/2/201 ;:\Documents and Settings\natsmi \My Lionshead Welcome Center Designed by:N; )ocuments \Natalie's MathCad\ Temporary - 4 inch Checked by.MCN Calculate Ultimate Loads: DLFF := FSFF•T DLFF = 14.368 kip check3 := if(DLFF < RIFF, "OK" , "Problem" check3 = "OK" Punching Shear Resistance: D := W + th D = 12 in RFp := 4• FC 1 •psi•7t•D RFp = 38.1 kip punching shear capacity Calculate Ultimate Loads: DLFp := FSFp•T DLFp = 14.368kip check4:= if(DLFp 5 RFp, "OK" , "Problem" check4 = "OK" Upper Cantilever Section: h := 1.0 height of upper cantilever section f ib := 0 de angle of the face batter with the vertical angle of backslope with the horizontal := 35de soil angle of internal friction + := 135pcc soil unit weight (2 �) 3 S = 23.3 deg shotcrete /soil interface friction 0 := 90deg + ib K := sin( + X12 2 sin (0) — 5)• 1 + sin � + S •sin � — p sin(0 — 6)•sin(0 + p� a := K additional surcharge (for cantilever) Shear: K = 0.244 6 sh = 33 ps 2 vc := 2 h� y K cos((3} + h� a ft s h v = 49 Ibf Shear load on section (enter Companies, Inc. !0300 West Highway 72 krvada, CO 80007 103- 279 -4458 Page 4 of Ground Nail Wall Calcs Soil Nail Facing Design 5/212011 C: \Documents and Settings \natsrnAMy Lionshead Welcome Center Designed by:N5 Documents\Natalie's MathCad\ Temporary - 4 inch Checked by:MCM the lbf One way unit shear strength of V := 2. 2 f 1-psi V = 3036 ft reinforced shotcrete section V Vns V = 1517.9 Ibf Allowable one way shear strength FSFS ft checks := if (V >_ v "OK" , "Problem!" checks = "OK" Flexure: mn� = 0.173 tmt a y -ft th a y ft ft- kip := Sh 2 1.7•f ft hc'vc me :_ 3•cos(ib) mn mn :_ FSFF me = 16.5 Ibf • ft ft ft mn = 128.1 Ibf •— ft check6 := if(mn >_ mc, "OK" , "Problem!" ) check6 = "OK" I checki = "OK" clleck2 = " OK" I check3 = "OK" I check4 = "OK" I check5 = "OK" chcck6 = "OK" Yenter Companies, Inc. 20300 West Highway 72 Arvada, CO 80007 303 - 279 -4458 Page 5 of 5 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MR OF IN Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT COMM BUILD PERMT Permit #: 1311 -0017 Project #: Job Address: 395 S FRONTAGE RD W VAIL Location......: ADJACENT TO LIONSHEAD PARKING STRUCTURE Parcel No....: 210106407012 CONTRACTOR R.A. NELSON & ASSOCIATES, IN 04/1412011 Phone. 970 - 949 -5152 PO DRAWER 5400 AVON Colorado 81620 License: 170 -A APPLICANT TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 OWNER TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 Description: NEW CONSTRUCTION OF AN AUXILLARY BUILDING ADJACENT TO LIONSHEAD PARKING STRUCTURE. NEW TRANSIT WELCOME CENTER IS 3 STORIES AND CONNECTS TO EXISTING GARAGE ON ALL FLOORS. Occupancy: Type Construction: Status . ISSUED Applied . 02/23/2011 issued...: 0510912011 Expires ._ 11/05/2011 Valuation: $5,092,322.00 Total Sq Ft Added: 0 ......... ..... ....,......,... ---- ..«.,............ .............._............,,.» FEE SUMMARY .„., .... ,,.,..,,...,..,,,...... Building Permit Fee - - -> $20,548.20 Will Cal Fee------- - - - - -> $4.00 Total Calculated Fees--- - - ---> 135,554.97 Plan Check ------------ — ------ > $13,356.33 Use Tax Fee ----- — ------ — ------ > 101,646.44 Additional Fees------------------ - - - --> 35,554.97) Add'I Plan Check Hours -> $0.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES- —> $0.00 Investigation------------ - - - - -> $0.00 Recreation Fee------ ------ - - - - -> $0.00 $0.00 Payments - - -- - - -- - - - - -> Total Calculated Fees - - --> 135,554.97 BALANCE DUE----------- - - - --> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved. International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR It 8:00 AM - 4:00 PM. BE MADE TWENTY -FOUR HOURS IN ADVANCE BY T EP / NE AT 970.479.2149 OR AT OUR OFFICE FROM /�1 �1 actor Date of Own or � Print Name bid alt construction _permit- 041908