Loading...
HomeMy WebLinkAboutB11-0017 CCD8-12 permit issuedNOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWN OF V Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 ADD /ALT COMM BUILD PERMT Permit #: B11 -0017 Project #: Job Address: 395 E LIONSHEAD CIR VAIL Location......: ADJACENT TO LIONSHEAD PARKING STRUCTURE Parcel No....: 210106407012 CONTRACTOR R.A. NELSON & ASSOCIATES, IN 04/14/2011 Phone: 970 - 949 -5152 PO DRAWER 5400 AVON Colorado 81620 License: 170 -A APPLICANT TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 OWNER TOWN OF VAIL 02/23/2011 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 Description: LIONSHEAD TRANSIT CENTER- PHASE II: TRANSIT WELCOME CENTER; NEW CONSTRUCTION OF AN AUXILLARY BUILDING ADJACENT TO LIONSHEAD PARKING STRUCTURE. NEW TRANSIT WELCOME CENTER IS 3 STORIES AND CONNECTS TO EXISTING GARAGE ON ALL FLOORS. Occupancy: Type Construction: Status .. : Applied. . Issued ... . Expires ...: fam -(q&�5 ISSUED 02/23/2011 11/04/2011 07/01/2011 Valuation: $5,092,322.00 Total Sq Ft Added: 0 .................. ................ +. »_. +.._...... .........,...... ».,.,,...... FEE SUMMARY ......,..,......,..........�. , ...,.,......... _.............,........., Building Permit Fee ------ > $20,548.20 Will Cal Fee --------------------- > $4.00 Total Calculated Fees ------------- > 137,534.97 Plan Check--------------- - - - - -> $13,356.33 Use Tax Fee --------------------- > 101,646.44 Additional Fees------------------ - - - - -> 37,534.97) Add'I Plan Check Hours -> $1,980.00 Restuarant Plan Review - - - - -> $0.00 TOTAL PERMIT FEES --- ---------- > $0.00 Investigation------------ - - - - -> $0.00 Recreation Fee------------ - - - - -> $0.00 Payments -- ---------------------------- > $0.00 Total Calculated Fees--- - - - - -> 137,534.97 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the informatior as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE ENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00AM- 4:0071. /l a Signature of Owner or Co / ntractor Ote d r�r �c SSsu� — / Print Name b I d_a It_co n st ru ct i o n_pe rm it_041908 APPROVALS Permit #: B11 -0017 as of 11 -04 -2011 Status: ISSUED Item: 05100 BUILDING DEPARTMENT 03/10/2011 Martin Action: CR See B11 -0017 comment letter 031011 laser fiche 04/22/2011 Martin Action: CR Sheet Al21 B and A814 still need to be revised to comply with Figure 604.3 A117.1 ANSI missing sheets A710, A720, E404 Revise structural calcs to the 2009 IBC and provide sealed plans 05/06/2011 Martin Action: AP 05125/2011 JRM Action: AP APPROVED DEFERRED SUBMITTAL SOIL NAIL DESIGN 06/09/2011 JRM Action: AP APPROVED REVISONS. 06/27/2011 JRM Action: AP APPROVED REVISONS TO ELEC AND MECH DATED 6/9/11 Item: 05110 ELECTRICAL REVIEW 03/10/2011 Martin Action: CR 05/06/2011 Martin Action: AP 06/20/2011 sgremmer Action: AP Revisions accepted on 6/9/2011 plan review ok Item: 05120 MECHANICAL REVIEW 03/10/2011 Martin Action: CR 04/22/2011 Martin Action: AP Item: 05130 PLUMBING REVIEW 03/10/2011 Martin Action: CR 04/22/2011 Martin Action: AP 06/27/2011 JRM Action: AP APPROVED REVISONS. (GREASE INTERCEPTOR) REVISION SUBMITTED 6/9/11 Item: 05400 PLANNING DEPARTMENT 03/01/2011 Warren Action: AP 05/05/2011 Warren Action: AP Planning approved the B. D. Responses dated April 11, 2011, including the revised sheets. 06/02/2011 Warren Action: AP Plan set CCDO03 is approved by planning. 06/07/2011 Warren Action: AP CCDO05 is approved by Planning. The expansion of the west storage area did not affect any of the development parameters of the General Use District. 07/27/2011 Warren Action: AP CCD09 is approved by planning. 08/26/2011 Martin Action: AP per Warren Revisions 8,9,10,11,12 approved Item: 05401 PLANNING DEPT REVISION 08/31/2011 Warren Action: AP The revisions which include the technical information for the bld_a It struction_perm it_041908 installayion of the stone facade are approved by planning 10/06/2011 Warren Action: AP CCD17 is approved by planning Item: 05600 FIRE DEPARTMENT 03/11/2011 Martin Action: CR per correction letter 05/06/2011 Martin Action: AP Per Mike V 05/25/2011 mvaughan Action: AP third set dated may 19 approved 06/06/2011 MVAUGHAN Action: AP REVISION DATED JUNE 1 2011 Item: 05500 PUBLIC WORKS 03/10/2011 TK Action: AP Approved with condition that all comments dated 2/22/11 shall be resolved prior to start of construction. 04/18/2011 TK Action: AP Approved 06/02/2011 TK Action: AP Approved Revisions noted as CCD 3 06/02/2011 TK Action: AP Approved Flue additions and Storage wall changes 07/29/2011 tk Action: AP Revisions CCD8 thru CCD12 are approved Item: 05501 PUBLIC WORKS REVISION 10/19/2011 TK Action: AP CCD's 13 -18 are approved Item: 05101 BUILDING DEPT REVISION 08/26/2011 Martin Action: AP #8,9,10,11,12 09/20/2011 Martin Action: CR Revision # 14 Tom, Per our conversation yesterday, the proposed artwork has glazing within the stairway area that is required to be safety glazing. Reference section 2406 IBC. The glazing must show conformance with CFR 1201 and have a minimum of category II classification. Please provide verification that the safety glazing shall comply with this standard and code section. Also, the structural design for attachment is to be provided as well. This is to be designed and sealed by an engineer licensed in the State of Colorado. Thank you Martin 11/03/2011 Martin Action: AP CCD 14 11/03/2011 Martin Action: AP CCD16 11/03/2011 Martin Action: AP Fire proofing hilti See the Conditions section of this Document for any that may apply. bld_a It_con stru ction_pe rm it_041908 CONDITIONS OF APPROVAL Permit #: B11 -0017 as of 11 -04 -2011 Status: ISSUED Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0012301 Special inpsection required for hilti fire proofing b Id It_co nstruction_pe rm it_041908 Lionshead Transit Welcome Center 18 July 2011 Page 1 Im 18 July 2011 Mr. Martin Haeberle Chief Building Official Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Mr. Tom Kassmel Town Engineer Town of Vail Public Works 1309 Elkhorn Drive Vail, CO 81657 Chief Mike McGee, Deputy Chief & Chief Mike Vaughan, Fire Marshall Town of Vail Fire Department 42 W. Meadow Drive Vail, CO 81657 Lionshead Transit Welcome Center Permit Application # 1311 -0017 Dear Sirs Mr. Warren Campbell Chief of Planning Department of Community Development 5 South Frontage Road Vail, Colorado 81657 Attached is a current PDF of all of the contract documents for your use. Included changes since our last submission to the building department are CCD 8 —12. The descriptions of each CCD are listed below. CCD08: Revises the routing of the snowmelt piping through the existing garage. M101 M300 CCD09: Removed two step lights at the west exterior stair and added a bollard light at the top of the stair. E202 CCD10: Revised veneer types and locations on the north wall. Added an electrical closet at the northeast corner of the building to all for photovoltaic equipment. Al21 B, A201, A520, S121 B CCD11: Revised mechanical and electrical drawings for the storage / ski locker area under the west stair at level 1. Al21A, M001, M101, M201, E101, E201 CCD12: Revised mechanical and electrical drawings that address the future needs of the tenant space under the west stair at level 1. M101, M201, E101, E201 Additional changes through sketches Added detail 12/S301 Added detail 12/S304 Added detail 2/S305 Added detail 9/S350 Please contact me with any additional comments or questions. Best Regards, Fyv L. Tracy Hart LEED AP Senior Associate <cc: Tom Kassmel /Town of Vail E. Randal Johnson /4240 21064.20/3.2 Attachment