HomeMy WebLinkAboutB11-0503NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
�_._�,
,.
�w� �� yr� .
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B11-0503
Job Address: 5187 BLACK GORE DR VAIL
Location......: UNIT 3
Parcel No....: 209918214003
OWNER PATAI, J.W., JR & BARBARA J, 12/07/2011
7969 S VINCENNES WY
ENGLEWOOD
CO 80112
APPLICANT BZ CONSTRUCTION 12/07/2011 Phone: 970-904-5209
BRIAN ZAIKIS
PO BOX 2728
VAIL
CO 81658
License: C000003388
CONTRACTOR BZ CONSTRUCTION
BRIAN ZAIKIS
PO BOX 2728
VAI L
CO 81658
License: C000003388
12/07/2011 Phone:970-904-5209
Description:
REMOVE TWO NON BEARING WALLS, REBUILD STAIRS TO MEET CODE,
MOVE TWO LIGHT SWITCHES, INTERIOR FINISHES
Occupancy: R-2 Type Construction: VB
Project #:
Applied.....:
Issued. . . :
P RJ 11-0716
12/07/2011
12/22/2011
Valuation: $2,800.00
,,. ..............,.,.........».......,,.......,,,.......,.......,...,_..«...<.....,,. FEE SUMMARY ..<..,.......«....x.....>..,...,.................,........,.................>..
Building Permit -----------> $83.25 Bldg Plan Check ----------> $54.11 Use Tax Fee-----------------------> $0.00
Electrical Permit ---------> $115.00 Elec Plan Check -----------> $74.75 Restuarant Plan Review--------> $0.00
Mechanical Permit ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit --------> $0.00 Plmb Plan Check ---------> $0.00 Recreation Fee--------------------> $0.00
I nvestigation-----------------------> $0.00
Will Call------------------------------> $10.00
TOTAL PERMIT FEES-------------> $337.11
Payments--------------°----°--------> $337.11
BALANCE DUE-----------------------> $0.00
................................................x,,....,_,.,,,,>,,..,......,........,....,,..,.............>...�..,....«.....,....�......�,>..............,.......»..........�,........
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:OOAM-4:OOP
/,;' �
�r�t,wn �.� Z )
Signature Owner or Contractor D te
t
f iG,/1 � �� 5
Print Name
combination permit_012811
�
.. �
1 V 111! V� Y� ,
, w.........,,,.� ............................»...........,.,,,................,x,.,,,,,».,...,........,.>.,.........,.......,....,,...,.............x,...,.........,..,,..,,.«.........
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B11-0503 Address: 5187 BLACK GORE DR VAIL
Owner: PATAI, J.W., JR & BARBARA J, -JT Location:
UNIT 3
....................�.....,...,,,............«.�..,.>......,........,x.,............,.x.........,,,.,...,x...........<..�...,..........,............,....,,,x.....................,..
combination permit_012811
f
, #
+k Y �� {f.i t � Yi! � i
* + fi r *+ *,t * � * * * * * * *,t * � * * * * * * *,t * * *,t * * * * * * * * * * :r * *,r * * ,t * * w * w * * * * * * * *,t * *,t * * * * * ,t * * t * * * * * � * * *,r,r * *,t * * * * * *,r * * * * * * *,t * * * * * * * * * tr * * *,r,t,t,t * * * *,r t * * r r,t t * * w *+* * * * * *+r * * *
REQUIRED INSPECTIONS AND STATUSES
Permit #: 611-0503 Address: 5187 BLACK GORE DR VAIL
Owner: PATAI, J.W., JR & BARBARA J, -JT Location:
UNIT 3
***«*****««.******«*******«**«*********,,.�*******.*«.,***«*****«*«„*.*�*«*,,.*.***«**�*****«*******««.*.************.,.*.,********��***..*****.*.**«*..**
Item: 00010 BLDG-FOOTING
Item: 00020 BLDG-Foundation/Steel
Item: 00120 ELEC-Rough
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Nail
Item: 00190 ELEC-Final
Item: 00090 BLDG-Final
combination permit_012811
*****************************************+**************************************************
TOWN OF VAIL, COLORADO Statement
********+*********************�***+*********************************************************
Statement Number: R110001794 Amount: $284.82 12/22/201102:37 PM
Payment Method: Check Init: SAB
Notation: 101-BZ
CONSTRUCTION
-----------------------------------------------------------------------------
Permit No: B11-0503 Type: COMBINATION BLDG PERMIT
Parcel No: 2099-182-1400-3
Site Address: 5187 BLACK GORE DR VAIL
Location: UNIT 3
Total Fees: $337.11
This Payment: $284.82 Total ALL Pmts: $337.11
Balance: $0.00
*********************************************************************+**********************
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
EP 00100003111100
PF 00100003112300
WC 00100003112800
Description Current Pmts
------------------------------ ------------
BUILDING PERMIT FEES 83.25
ELECTRICAL PERMIT FEES 115.00
PLAN CHECK FEES 76.57
WILL CALL INSPECTION FEE 10.00
-----------------------------------------------------------------------------
BUILDING PERMIT APPLICATION
(Separate appiications are required for alarm & sprinkler)
Project Street Address:
��1� /,¢ � �.���rz. �
(Number) (Street) (Suite #)
Building/Complex Name:
Contractor Information
Business Name:
� h �
Business Address: Q_d' . � �ji( 272x
City Vd�, State: � Zip: �' o�,�
Contact Name: f � ��j
Contact Phone: °t�(� � ���' �j ��
Contact E-MaiL- ZA�K�S (N C.dw'� "[��,�. 1'�P�
Registration
(Required)
Project Information . '
Owner Name: �j,,� � ,�'�,�- ,.f.�,q�
Parcel #: �� �_� � �,i (��
(For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit
www.eaglecounty.uslpatie)
Detailed Scope and Location of Work: j���v v�
t"1PP T L,.cfaG �Na.diM(�' '� 4�J[�, �.
;I���i'10i'� �Anf Z '�
(use additional sheet if necessary)
For Office Use Only:
Fee Paid: �� �
Received From: �.'.e'�-�-4 �—
Cash Check #
CC: Visa / MC Last 4 CC # exp date:
Auth #
Project #:
G
DRB #:
Building Permit #: ��, l � v �
Lot #: Block # Subdivision:
Work Class: New ( ) Addition ( ) Alteration �)
Type of Building:
Single-Family ( ) Duplex ( ) Multi-Family �j�} � ��ex
Commercial ( ) Other ( )
Work Type: Interior ( y) Exterior () Both ()
��
Valuation of
Work Included Plans Included Woric
Electrical (�)Yes ( )No ( )Yes (�No �
Mechanical ( )Yes (x)No ( )Yes (�)No
Plumbing ( )Yes (�)No ( )Yes � )No
Building (�)Yes ( )No (,�)Yes ( )No �0 G(}
Value of all work being performed: $ C�Q �(�Q
(value based on IBC Section 109.3 & IRC Section 108.3�
Electrical Square Footage � (� �
0
6rtt *
�
0
, �
oEC o� 2or�
�.___._____ _ __ _ -
Date ReceivekT` 1 ` ��
� '�I �"'" �n �t
� � � ' -.. ... •k .._.._ .
.+'�
�' �
' ... �__;� i
�_
� �
�-- - �. __ .. �_. � : . .��..___
O1-Jan-11
State of Colorado
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly
for their requirements at the contact info listed below.
When is asbestos testinq required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two-Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including
multi-family/condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The
clearance letter must be submitted to the Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
� Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (1 copies of test results included)
� Tested positive at more than 1%, requires abatement (1 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos-containing materials, so buildings of � age require testing.
• The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 S Frontage Rd
Fire_inspectors@vai Igov.com
970-479-2252
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303-692-3158
asbestos@state.co.us
www.cdphe.state.co. us
Ol-Jan-11
John Patai
From:
Sent:
To:
Subject:
Attachments:
John,
Russ Daniels <rdaniels@ecosenvironmental.com>
Monday, October 03, 2011 11:42 AM
'John Patai'
RE: Black Gore Asbestos results
220603-1.pdf
Attached is the composite result run on the highest content initial PLM test which brought it below the trigger limit for
reg 8 abatement requirements. All OSHA requirements still must be met as they have no minimum threshold. ;
� �vo os�� ,e� -- �- P��--
Thankyou, �� � � ����� O� ( ��
Russ �
,1 /J
/Vb 5 - D'�o 2 1��-st
p - — �
�.i � � �
Bmt�nnm�nt�! & �i�aster Ree�tnr�tic�r�
�c�sctear�s i����a�l��. es 1'it,�; sesx�.�� ��x �� s e�n v���s cs rn +� ex t s t.� o m
From: John Patai jmailto:jpatai@corpsvcs.coml
Sent: Friday, September 30, 2011 5:00 PM
To: 'Russ Daniels'
Subject: RE: Black Gore Asbestos results
Russ, please email me the test results we discussed yesterday.
Thanks
John
From: Russ Daniels [mailto:rdaniels@ecosenvironmental.coml
Sent: Friday, September 16, 2011 1:55 PM
To: i�ataiCa�corpsvcs.com
Subject: Black Gore Asbestos results
John,
Here are the results for the asbestos test I performed for you. Please fill out and send back the information and signed
work authorization that I sent in a previous email.
Thanks, Russ
� � �
.:,F�n�viror�ni�ntal & D3��a�� R��tnr�ti�o
r�Fa;:`rar� E�'r��i�c.� %2c�n�.�a=° r�eca�an+�irasr�itt��tsE,�arn
V
Z
J
Q
H
Z
WC
C
Z
�
/
Z
W
N
�
�
W
N
w
�
N
0
N
N
�
f0
a
0
(D
rn
�
0
v
0
U
�
J
a
z
�
�
0
c°�
#
z
0
m
0
J
d
N
�
U
J
_
O
W
J
m
F
O
V
i
� �� �
� o�� �
E �N a N
�� o�� �
� O (�T� �
p'- Y � t' �
% d G1
C � �
N W
O
Nf/i._m dN 7 d
v� O;g � o, i= a
�wau�c°n'ac.�v�
O
a c .
� o v
� a .?
� V U
� Z Q �
C � �
j U U N p_ �
Z � °� n, T -a >,
� ��E��m
o aa�•�'o�
� • • � N � Q
� �, m
ma�ia�ia:mE°�
w — — _ m c � m
� U U U 0 Q H 0
�n o co u� o r� o c� co r� o o r� o
0 0�o ornao r� rnoo rnrnti oo rnoo
` � v
� O
�a
E
O
C N t� tA OO�A O 00 f� 000 O 00
O � � C o �- M N � C7 N N
N�a�
N� o
Q °'
E
0
�e G�tG G �"�0 G��"�C �u� �"�C
p d Z Z Z Z Z Z Z� Z
�� O
E
«
a
W
G� d G� G� �.d. G1
'�
� O O O O O O
d Z z ZZ E�
� t t L t O t
�� � U U V U C) V
��� o�n o 00 oo�n�n o 00
cna�- �n�ao N Ncfl ���� �r, �rn
a v
m m
C �, C
'fp C C �(6
a '� 'ip n
N �- d N
� r E E s c
cf0i '� 3 m a16i 3 a
a � � � �
N'� 3 U "a U� N
T U � C � ^ —
L (A �
3 �3°1 t
a � '� � m �� N c io Q- ��� � m � m
a� � >.>_ � � � � > > 3 3 3
3a c°�a�nin �°ac°�av�iZ' mZ'
� � —L � N+-' —t"O �'O
>.c°�m 3m�m c��oo�3mm a��im
a� a� a� a� 3 m a� a� ai a� a� 3 a� a� a�
o �L. .. .. w. o . L
� � � � >+> � > � > > T� > �
�a�w� amc� a mc� amc�o w Qm
� (�O �O � CMO
� � � t� �
� � � O) �
� � � � �
1° � w w w w
�� Q Q Q Q
aa
d E£ o�o o�o o�o a�o
-�03
U) Z u� � N �
�
S
o �
r € a
� ���a
��=��e
v
=o
y�
��
y �
u � ^
0
� o �
q V F
v u 1.
z �a
Q F E
:'.
zFF
a
O
�
N
�
�
�
�
�
w
� ,
"
M
0
�
N
�
W
�
V
�
�� w
rc
��
�
�w �
\ ^
�
��
O �
��` 86
r�
�CI�
\ m
O
� � �
`ffi�
O � e
o n
N ±
�9n
� �
�
�
g
f
�
�"' �
V �
�
�
�
u,i d
o �
� �
r
�
b
�
�
�
�
0�
�
0
o � � : : .�
.�
Z ,� � �
m E�
� i
W �
3 � °
m�a
` ap d� v n o E��
Wu ° n °o `o a ~�r
O m a� LL � �
a ��� b�
� � Q ���
� o ��
� „ o �
0 Q o� y ^ stauiquo� #
.� �� u n n W aPwJ �W
< .. a 3
�¢o� �° g �
y � E�N / ��� �
o= awn�on a�dweg
s�on a�uo ao sivuu�i s.aaidwvs
�on�Y[lueno ' uon�ixuev� • �. :wow
�II�U4uen0 .ro �+ :W g A ..
uo.ne,�yD,enp ,o y« :sneme-g �
� uqieoYll�i/ � �+ :8u11oNl�'J g
tll �!l�UG�anp �a N :�'� Ccp
J �II�O �� /+ �uno� a�eb �iqaay �
Z -/+ 'eNWsfl g
a -!+ :LH�14L0!1�3
Wy+ :a�tquqeS
WH13W -S�INtlJ2t0 ..
� �S $IBIeW 'ewn j Bu!PIdM 'dl�l '8 Vil�2!
W ($��IeW - S'Itl13W
�
ea�+M�ea �i�iol - ,csna
tlH30 �800YL 'YOOYL - W�d �
�d �D�FOSI '��IIV 'luenb�weg
'Weep '-!+ 'OSl 'ZOVL 'll le+�"I d!l3HV - W31
wno� waa 'uoa�, s�w� '�o�, va�s - wid
V
T �
� oM = �
� , I 9 .
� � � w
;rc g �.a
��� o m
°z °c � E �' c� � .
� r ea � °
fnl d � �� � I a ..
i I= p
� C
� �
Q � 7
m � � I C i .
F. arS i..� 0 m� >` ��� �: c
2 b Yf 'O 16 �E N� ry.-� ef . gl
�• „ � o n � I I '>°g
� W
� � H � � r) I M ' ' =I -�. a.. � .
r c` 2 tA .� m
LC pp
a a N:W � v � Y N C O-' $�. 2]
w
� � � Y "� "� "'� � I I I � � �
� � t�� (/i f/J r� ,? O_ N I
� � � � K � N O �' � . �,
y� V� I I I= � ,`o�o
px O �'� � z.�
= p@�j En
i' � } ~ A Q � µ �
�
� � C � y _ a ....
O p 'o E
� 9 m @ '� = ° ^ t�1
o m � �� � � � o� �
m .e a � � _ � s �
g� g �� °o s m
�o � � m � �J � J = ��
F. � �' C � � � y� w � . � 1. ...
W a � v�Qu�i � 00 o a � �� :
m� W gy K� � V. E v F g N
e, n ' 9 n 3 n�'Y �..W. s4 .. 2S. �� r-N.
J z
$
�
�' �
.� a Z
� m
W�
� �}
'��
E 8 �
�° c �
� }
.�
� $ 1
g
� 3W
� m �.
� �
�.
�' �
��
��
g�
.� E �
� q �
�� �
o �, ♦ o �
5 E �, �-i
�� � i
� � �
ii �j
� �� � �
�� � �
ff �� �
�
� ��
a
% $F W 1
� 3 $ y,
�" \
� �€
� �
e �a �
� �p� �
W n
� S � �
Q E�
�
v � �
��
o e
m�
€ �
� $ `
��
�
�0 7
g'
� �s c
� � �.$ .. °
��� ��
��s � �'T
� W� 3 �m
� z' ����Q
tT� �O t0. 1� dD.� W�a�—�� z ��KI
w
E
�
IL
E
W
G G h
� `
V'
� � V
�
� �
� 0 �
9
�
LL lix �
� y�
� � �•
g = �
a � �
r
RE�� ��►��rvr�ir� �'r�vironm�r�►ta1, Inc.
September 14, 2011 Laboratory Code: RES
Subcontract Number: NA
Laboratory Report: RES 220603-1
Project # I P.O. # Patai
Project Description: 5187 Black Gore Dr., Vail
CO
ECOS Environmental
P.O. Box 11936
Aspen CO 81611
Dear Customer,
Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene
and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab
Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM)
analysis and the American Industrial Hygiene Association (AIHA), Lab ID 101533 - Accreditation Certificate
#480 for Phase Contrast Microscopy (PCM) analysis. This laboratory is currently proficient in both
Proficiency Testing and PAT programs respectively.
Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your
request. The analysis has been completed in general accordance with the appropriate methodology as
stated in the attached analysis table. The results have been submitted to your office.
RES 220603-1 is the job number assigned to this study. This report is considered highly confidential
and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study
with personnel other than those of the client. The results described in this report only apply to the samples
analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or
any agency of the U.S. Government. This report shall not be reproduced except in full, without written
approval from Reservoirs Environmental, Inc. Samples will be disposed of after sixty days unless longer
storage is requested. If you have any questions about this report, please feel free to call 303-964-1986.
Sincerely,
_._
_ �
r..
-- �
, �..�_ .:�� .���-:�.__ � — �.��-� ��N� _ ___
�__.__. �. _� .
Jeanne Spencer Orr
President
i
� ���
Analyst(s):
Paul D. LoScalzo Wenlong Liu
Michael Scales Adam Humphreys
Anita Grigg Robert R. Workman Jr.
Bethany Nichols Jennifer Jones
Anya Angst
P: 303-964-1986 5801 Logan Street, Suite 100 Denver, CO 80216 1-866-RESI-ENV
F: 303-477-4275 www.reilab.com
Page 1 of 2
�
12-05-2012 Ins ection Re uest Re ortin Page 3
4�10 qm p Vail, COq- Citv �� g Q�'���' I(o
Requested Inspect Date: Thursday, December 06 2012
Site Address: 5187 BLACK GORE DR �/AIL
UNIT 3
A/P/D Information
Activity: 611-0503 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: R-2 Insp Area:
Owner: PATAI, J.W., JR & BARBARA J, -JT
Contractor: BZ CONSTRUCTION Phone: 970-904-5209
Description: REMOVE TWO NON BEARING WALLS, REBUILD STAIRS TO MEET CODE, MOVE TWO LIGHT
SWITCHES, INTERIOR FINISHES
Requested Inspection(s)
Item: 190 ELEC-Final
Requestor: BZ CONS RUCTION
Comments: 904-520
Assigned To: J ON
Action: Time Exp:
Item: 90 BLDG-Final
Requestor: BZ CONSTRUCTION
Comments: 904-520
Assigned To: S
Action: Time Exp:
Inspection Historv
Item: 10 BLDG-FOOTING '* Approved *"
02/02/12 Inspector: sgremmer
Comment:
Item: 20 BLDG-Foundation/Steel "" Approved *"
03/14/12 Inspector: sgremmer
Comment: NA
Item: 120 ELEC-Rough "" Approved "*
03/05/12 Inspector: sgremmer
Comment:
Item: 30 BLDG-Framing '* Approved "*
03/05/12 Inspector: sgremmer
Comment:
Item: 50 BLDG-Insulation *" Approved *"
03/12/12 Inspector: gremmer
Comment:
Item: 60 BLDG-Sheetrock Nail *'" Approved *"
03/14/12 Inspector: sgremmer
Comment:
Item: 190 ELEC-Final
Item: 90 BLDG-Final
REPT131
Requested Time: 04:30 PM
Phone: 970-904-5209
Entered By: JMONDRAGON K
Requested Time: 08:00 AM
Phone: 970-904-5209
Entered By: JMONDRAGON K
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Action: AP APPROVED
Run Id: 15031