Loading...
HomeMy WebLinkAboutB11-0502 REScheck-Web_compliance_report_20111208_081637_061Generated by REScheck -Web Software Compliance Certificate Project Title: Lacher Project Energy Code: 2009 IECC Location: Eagle County, Colorado Construction Type: Multifamily Project Type: Addition /Alteration Heating Degree Days: 8499 Climate Zone: 6 Construction Site: Owner /Agent: 400 E. Meadows Dr. Unit #4 Michael & Judy Lacher Vail, Colorado 81657 460 Park Ave. New York, New York 10022 212- 872 -1500 toplaw @aol.com Designer /Contractor: Raymond Gabriel Contractors General, LLC P.O. Box 2373 Vail, Colorado 81658 970 - 376 -6541 gabriel_ray @netzero.com Ceiling: Flat or Scissor Truss - -- - -- - -- - -- - -- Exemption: Framing cavity filled with insulation. Wall: Wood Frame, 16in. o.c. - -- - -- - -- - -- - -- Exemption: Framing cavity filled with insulation. Window: Wood Frame, 2 Pane w/ Low -E - -- - -- - -- - -- - -- Exemption: Glazing replacement in existing sash or frame. Floor: All -Wood Joist/Truss Over Uncond. Space - -- - -- - -- - -- - -- Exemption: Framing cavity not exposed. Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck -Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Raymond J Gabriel Name - Title Signature Date Project Notes: The project is a 250 square foot addition to unit #4 of the Tyrolean building located a 400 E. Meadows Dr. Project Title: Lacher Project Report date: 12/08/11 Data filename: Page 1 of 4 Compliance: 0.0% Better Than Code Maximum UA: 0 Your UA: 0 The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade -off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Generated by REScheck -Web Software Inspection Checklist Ceilings: ❑ Ceiling: Flat or Scissor Truss Exemption: Framing cavity filled with insulation. Comments: Above -Grade Walls: ❑ Wall: Wood Frame, 16in. o.c. Exemption: Framing cavity filled with insulation. Comments: Windows: ❑ Window: Wood Frame, 2 Pane w/ Low -E Exemption: Glazing replacement in existing sash or frame. Comments: Floors: ❑ Floor: All -Wood Joist/Truss Over Uncond. Space Exemption: Framing cavity not exposed. Comments: Air Leakage: ❑ Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between window /door jambs and framing. ❑ Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather - stripped and insulated (without insulation compression or damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application. ❑ Wood- burning fireplaces have gasketed doors and outdoor combustion air. ❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7 ACH at 50 pascals OR 2) the following items have been satisfied: (a) Air barriers and thermal barrier: Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or repaired. (b) Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed. (c) Above -grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d) Floors: Air barrier is installed at any exposed edge of insulation. (e) Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or sprayed /blown insulation extends behind piping and wiring. (f) Corners, headers, narrow framing cavities, and rim joists are insulated. (g) Shower /tub on exterior wall: Insulation exists between showers /tubs and exterior wall. Sunrooms: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U- factor of 0.50 and the maximum skylight U- factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Project Title: Lacher Project Report date: 12/08/11 Data filename: Page 2 of 4 Materials Identification and Installation: ❑ Materials and equipment are installed in accordance with the manufacturer's installation instructions. ❑ Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R- value. ❑ Materials and equipment are identified so that compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. ❑ Insulation R- values and glazing U- factors are clearly marked on the building plans or specifications. Duct Insulation: ❑ Supply ducts in attics are insulated to a minimum of R -8. All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R -6. Duct Construction and Testing: ❑ Building framing cavities are not used as supply ducts. ❑ All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction. Metal duct connections with equipment and /or fittings are mechanically fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet -metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). ❑ Duct tightness test has been performed and meets one of the following test criteria: 0 ) Postconstruction leakage to outdoors test: Less than or equal to 8 cfm per 100 ft2 of conditioned floor area. (2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 12 cfm per 100 ft2. (3) Rough -in total leakage test with air handler installed: Less than or equal to 6 cfm per 100 ft2 of conditioned floor area. (4) Rough -in total leakage test without air handler installed: Less than or equal to 4 cfm per 100 ft2 of conditioned floor area. Temperature Controls: ❑ Thermostats exist for each dwelling unit (non - dwelling areas must have one thermostat for each system or zone). A manual or automatic means to partially restrict or shut off the heating and /or cooling input to each room is provided. Electric Systems: ❑ Separate electric meters exist for each dwelling unit. Heating and Cooling Equipment Sizing: ❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. ❑ For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and /or Service Water Heating (Sections 503 and 504). Circulating Service Hot Water Systems: ❑ Circulating service hot water pipes are insulated to R -2. ❑ Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R -3. Swimming Pools: ❑ Heated swimming pools have an on /off heater switch. ❑ Pool heaters operating on natural gas or LPG have an electronic pilot light. ❑ Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar- and /or waste - heat - recovery systems. ❑ Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a minimum insulation value of R -12. Exceptions: Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source. Project Title: Lacher Project Report date: 12/08/11 Data filename: Page 3 of 4 Lighting Requirements: ❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a) Compact fluorescent (b) T -8 or smaller diameter linear fluorescent (c) 40 lumens per watt for lamp wattage — 15 (d) 50 lumens per watt for lamp wattage > 15 and — 40 (e) 60 lumens per watt for lamp wattage > 40 Other Requirements: ❑ Snow- and ice - melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement's'). Certificate: ❑ A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window U- factors; type and efficiency of space- conditioning and water heating equipment. The certificate does not cover or obstruct the visibility of the circuit directory label, service disconnect label or other required labels. NOTES TO FIELD: (Building Department Use Only) Project Title: Lacher Project Report date: 12/08/11 Data filename: Page 4 of 4 Energy Certificate Window Door Heating System: Cooling System: Water Heater: Name 0.00 0.00 0.00 Date: Comments: