Loading...
HomeMy WebLinkAboutB11-0507 Department of Community Development 75 South Frontage Road TOWN OF VAIL ` ��J va�i, co s�ss7 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Revision Submittals: 1. "Field SeY'of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved&the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum), and are due upon issuance. Permit#(s) information applies to: Attention: ' Revisions Response to Correction Letter B11-0507 attached copy of correction letter Vail Village Inn Parking Garage OOthe�red Submittal � Project Street Address: 68 E Meadow Dr (Number) (Street) (Suite#) Building/Complex Name: Vail Village Inn Description/List of Changes: Vail Village Inn- Parking Garage- Phase 2 of Repairs Contractor Information Business Name: Nedbo Construction -Remove and Replace damaged concrete slab Business Address: PO Box (Structural Steel Modifications/ Repairs were Vail CO 81620 �nstalled last fall under original permit) City State: Zip: Contact Name: Wa�ren Krok Contact Phone: 9�0-845-1001 (use additional sheet if necessary) Contact E-Mail: Warren@nedbo.com Revised ADDITIONAL Valuations(Labor&Materials) (DO NOT include original valuation) I hereby acknowledge that I have read this application,filled out 50000 in full the information required,completed an accurate plot plan, Building: $ and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town Plumbing: $ ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- Electrical: $ proved, International Building and Residential Codes and other Xrdinance,�qf�the Tow�app_ licable t . Mechanical: $ G�� "►�-- i.% Total: $ 50000 Owner/Owner's Representative Signature(Required) Applicant Information Applicant Name: Nedbo Construction Date Received: Applicant Phone: 9�0-845-1001 Applicant E-Mail; Warren@nedbo.com D � � � 0 v � For Oftice Use Only: uAV � ` �0�� Fee Paid: ������ `� (� Received From: � � � cash �"e`k# ? TOWN OF VAIL CC: Visa/MC Last 4 CC# exp.date: �------------ Auth# 01-Oct-1 I NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES _� j� Y V#1.i1 t/�Y,£1IA��� - Town of Vail, Community Development, 75 South Frontage Road,Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11-0507 Project #: PRJ11-0721 Job Address: 68 E MEADOW DR VAIL Applied.....: 12/09/2011 Location......: parking garage level 2 Issued.. . : 12/14/2011 Parcel No....: 210108254060 OWNER STAUFER COMMERCIAL LLC 12/09/2011 100 E MEADOW DR 31 VAIL CO 81657 APPLICANT NEDBO CONSTRUCTION INC 12/09/2011 Phone:970-845-1001 PO BOX 3419 VAIL CO 81658 License: C000003087 CONTRACTOR NEDBO CONSTRUCTION INC 12/09/2011 Phone:970-845-1001 PO BOX 3419 VAIL CO 81658 License: C000003087 Description: structural repairs to the ceiling of parking level 2 by adding steel reinforcement Occupancy: Type Construction: Valuation: $97,000.00 ..........,>..............,,...._.......,.,,..,.................,,.....«......,.,, FEE SUMMARY ........,......,,....,..,,,........,..,...........,...,........................ Building Permit-----------> $972.75 Bldg Plan Check----------> $632.29 Use Tax Fee-----------------------> $1,740.00 Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Restuarant Plan Review--------> $0.00 Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $5.00 TOTAL PERMIT FEES-------------> $3,350.04 Payments------------------------------> $3,350.04 BALANCE DUE-----------------------> $0.00 .........................................>,.........................................,.....,..............,....<........,...............................,....................,x.,....... DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required, completed an accurate plot plan,and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes,design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM-4:00 Ptll�. �? � ��::�1�.���.-�--J � �.. / � � � � l l Signa re of Own or Contrac or Date ��� /,�:���J �� - ��� Print Name combination permit_012811 8 . � �����1� i ....................................................................................�..��....,,......,.,,..,<.,,.,,,....,...,....�.,.............,..,,.......,,.,,.......,......,.... CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit#: B11-0507 Address: 68 E MEADOW DR VAIL Owner: STAUFER COMMERCIAL LLC Location: parking garage level 2 ...........................................................................................................................................>.....,......<.......,.....,,>.,..,....... combination permit_012811 . .. � T��V�VF�A� : *********.,**„*************,.****************************,.************************.**�************�****,************************.*************.,******* REQUIRED INSPECTIONS AND STATUSES Permit#: B11-0507 Address: 68 E MEADOW DR VAIL Owner: STAUFER COMMERCIAL LLC Location: parking garage level 2 .,,.********«.,*.,***.,****«*..�*.**********,,.,,,****************„«**„*.,,....*.******************,,,,..,,.w**************.,.****.,.,.,*****.,**********„*********** Item: 00020 BLDG-Foundation/Steel Item: 00420 Special Inspect-final rept Item: 00090 BLDG-Final combination permit_012811 ******************************************************************************************** TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: R110001770 Amount: $2, 717.75 12/14/201102:41 PM Payment Method: Check Init: SAB Notation: 16580 - nedbo ----------------------------------------------------------------------------- Permit No: B11-0507 Type: COMBINATION BLDG PERMIT Parcel No: 2101-082-5406-0 Site Address: 68 E MEADOW DR VAIL Location: parking garage level 2 Total Fees: $3, 350.04 This Payment: $2, 717.75 Total ALL Pmts: $3, 350.04 Balance: $0.00 ********************************�****�******�*********************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 972.75 UT 11000003106000 USE TAX 4� 1,740.00 WC 00100003112800 WILL CALL INSPECTION FEE 5.00 ----------------------------------------------------------------------------- �������������������������������������������������������������������������������������������� TOWN OF VAIL, COLORADOCopy Reprinted on 12-09-2011 at 16:46:27 12/09/2011 Statement �������������������������������������������������������������������������������������������� Statement Number: R110001759 Amount: $632.29 12/09/201104 : 44 PM Payment Method: Check Init: LC Notation: #16569 / NEDBO CONSTRUCTION ----------------------------------------------------------------------------- Permit No: B11-0507 Type: COMBINATION BLDG PERMIT Parcel No: 2101-082-5406-0 Site Address: 68 E MEADOW DR VAIL Location: parking garage level 2 Total Fees: $3, 350.04 This Payment: $632.29 Total ALL Pmts: $632.29 Balance: $2, 717 .75 �������������������������������������������������������������������������������������������� ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 632.29 ----------------------------------------------------------------------------- '. ia�„'+ .^` ..9�'�",�as .:'C'..� ,«, r m�;.. �-:w.. ;::�:,�a- .. ,. . ,. .. . . � ,6�:. ... .,..-.. ' . . . .. . . ... � �.��� ���� 1+ �.;� , T Department of Community Development � . -. . v � �,, � , 75 South Frontage Road ... �, , ., ., � I �.� . . � , , � #, .;�.� �{�` " � �� �, �� Vail, Colorado 81657 .�'� �-`,. ��< �M ° "�� �, �. � � `"'� Tel: 970-479-2128. �_ 5 f °�', � : . : � � M��� ,��� �,�-�-.��"���#t� .,� Web: www.vaiigov.com t � µ �� � � ,� ,��"�� Development Review Coordinator . , . � � � ; . . �������'.���'�� _... . - M� �- � �:c x d� .;' , . n� . n;. � . ,. . .�:,. t �^ p ^ a ��y.y�. . Y. • •• ..• r , � � P�.uWtlf4"���$C.�'e'�R'Y'G6�k��1.,.«n: ...�.. BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: �J (� I1 �1 Project#: V �`l-v�TZ ( I UD C /�11ndv w t�r (Number) (Street) (Suite#) DRB#: Building/Complex Name: v'+'� V����►yC. �n n Building Permit#: ���� V�j��- �a✓k�',� lcv�c� 2 Lot#: Block# Subdivision: Contractor Information Business Name: Ntd�v �cvr-s�'n�c�,:.� Work Class: New( ) Addition ( ) Alteration (,�O Business Address:_ 1�C� 1�o��C 3�t ty Type of Building: City 1/��� State: �U Zip: 4S�(9�fS Single-Family( ) Duplex( ) Multi-Family( ) Contact Name: /�-el��t ILi YSbo Commercia� (� other( ) Contact Phone: y7U' �77' UZ(o� Work Type: Interior(�() Exterior( ) Both ( ) Contact E-Mail: (�d I���c � Yt,���0,(b►'rl Valuation of Work Included Plans Included Work Contractor Regystration Number: Z � Electrical ( )Yes (�No ( )Yes (x)No X / , - 4 �' Mechanical ( )Yes (�No ( )Yes ( X)No Owner/Owner's Represen tive S' na ure (Required) Plumbing ( )Yes ( }�)No ( )Yes (x)No Project Information Building (�()Yes ( )No (,�(,)Yes ( )No �17�UU Owner Name: 5'E�w�i.' �err►m�e.✓'Gti��� I.LC. �' Value of all work being performed: $ �f7CTCJd Parcel#: Z 101" D�SZ' Sw ^ �� (value based on IBC Section 109.3&IRC Section 108.3� � (For Parcel#,contact Eagle County Assessors Office at(970328-8640 or visit www.eaglecounty.us/patie) Electrical Square Footage Detailed Scope and Location of Work: ����w�►� �N�� �to +�- G�c�r��►-N e� j�u�Jl�„.y j,�vc� Z b,. Hdd�'�. b�tiei r�;n�, (use additional sheet if necessary) For Office Use Only: Date Received: ��3 � f� �r-� � n �� Fee Paid: �l)�Z • "'1 J '� Receive d From: � p c L L, v��C��1_ ' I Cash Check # 1 V �C� � �E� 0� 2011 �' ' CC: Visa / MC Last 4 CC # exp date: L� _.J Auth # � O1-Jan-11 D � � � � M � ' DEC 0 g 201� State of Colorado �v Asbestos Testing &Abatement Requirements , TOV1�I� �� '��R!L Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of�age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO3 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailgov.com www.cdphe.state.co.us 01-Jan-11 DEC 0� 2011 ,d � �� . � � �� � �� Asbestos Inspection and Sampling Report Vail Village Inn Parking Garage 100 E. Meadow Dr., Vail, Colorado _.__......._.............._...._....._.........-----...---...................................._....................................................................._......................._..._.._._...._................�............................_.......................................................................................:..................... ................................ Presented To: Mr. Roland Kjesbo NEDBO Construction PO Box 3419 Vail, CO 81658 Performed& Prepared By: Mr. Dave Sinkbeil DS Consulting, Inc. PO Box 6864 Avon, CO 81620 (720) 201-6611 Project Details: Project IVumber: 4977 Conducted: November 14, 2011 TABLE OF CONTENTS PROJECT OVERVIEW � 1.0 Introduction 2.0 Scope of Work 3.0 Site Description 4.0 Certifications 5.0 Inspection, Sampling&Analytical Procedures 5.1 Inspection Procedures 5.2 Sampling Procedures 5.3 Analytical Procedures 6.0 Homogeneous Areas 6.1 Material Friability 6.2 Material Classifications 6.3 Material Conditions 6.4 Sample Quantities 7.0 Overview of Findings 8.0 Conclusion &Recommendations 9.0 Asbestos Abatement&Demolition Requirements 10.0 Major Asbestos Spill Response 11.0 Disclaimer&Limitations APPENDIX A Inspector&Firm Asbestos Certificates APPENDIX B Analytical Data 2 PROJECT OVERVIEW _ . .. . __ _ __ _ _ 1.0 Introduction On November 14, 2011, Mr. Dave Sinkbeil with DS Consulting, Inc. (DSC) conducted a limited asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACM) within a portion of the Vail Village Inn parking garage located at 100 E. Meadow Dr.,Vail, Colorado. The purpose of the limited inspection was to identify and sample potentially hazardous friable and non- friable ACM in spray-on insulation on the ceilings and structural beams of the parking garage that may be impacted by planned renovation activities. 2.0 Scope of Work The scope of the limited inspection and bulk-sampling was limited to specific areas of the parking garage defined by the renovation company. These areas included various ceilings and structural beams that are scheduled to be replaced in the underground parking garage referenced above. The remaining areas within the Vail Village Inn property were not included in the scope of the inspection. The limited asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. 3.0 Site Description The underground parking garage is a portion of a large condominium complex. 4.0 Certifications The limited asbestos inspection and bulk-sampling was conducted by Mr. Dave Sinkbeil with DSC. DSC is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm, Registration No. 14912. Mr. Sinkbeil is a CDPHE certified Building Inspector; having certification number 13015 (see AppendixA for certi�cates). 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and CDPHE certified Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk-samples. 5.2 Sampling Procedures Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE Regulation Number 8, Part B - Asbestos (Reg. 8). 3 DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. Some minor destructive sampling was conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B -Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited to,the appropriate asbestos training for the type of material being removed/disturbed as well as having , a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers, I personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be I� landfill disposal requirements for these materials, depending on the facility. DSC recommends that all demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been completed, but before any containments are dismantled and the area is reoccupied. 5.3 Analytical Procedures All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see Appendix B for laboratory report). The percentage of asbestos within each individual bulk-sample can vary depending on sample location, homogeneity of the material, and the type of application. Any sample reporting a "TRACE" amount of asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the point-count method and verified to be less than 1%. 6.0 Homogeneous Areas A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of application. The asbestos content of the bulk-samples collected within a homogeneous area can be applied to the entire homogenous area if they conform to the above characteristics and the regulated minimum sample quantities of each type of material are collected and analyzed. 6.1 Material Friability A material can either be friable or non friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 6.2 Material Classifications Sampled materials are divided into one of the following three categories: • Surfacing Material: sprayed or troweled onto structural building members • Thermal System Insulation (TSI): any type of pipe, boiler,tank, or duct insulation • Miscellaneous Material: all other materials not classified in the above two categories 4 6.3 Material Conditions Sampled materials are placed into one of the three following categories of conditions: • Good: none to very little visible damage or deterioration • Damaged: the surface is crumbling, blistered,water-stained, gouged, marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized • Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 6.4 Sample Quantities DSC collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required. The following outlines the minimum sample quantities required per homogeneous area: • Surfacing Materials: up to 1,000 ftz of material requires a minimum of three (3) samples; between 1,000 ftz and 5,000 ftz of material requires a minimum of five (5) samples; over 5,000 ftz of material requires a minimum of seven (7) samples; one (1) sample of each patch • Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T's. • Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content 7.0 Overview of Findings Asbestos was not reported within any of the bulk-samples collected and analyzed. DSC collected a total of six (6) asbestos bulk-samples of one (1) homogeneous area. Table 1 below describes the materials composing each homogeneous area as well as the locations of each bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of material to be removed and/or disturbed,as well as the asbestos content within each bulk-sample. 5 TABLE 1 HA Sample Materia! Sample Material Material Estimated Material Asbestos # ID Description Location Classification Condition Quantity Friability Content 1 INS-1 White Insulation Underground Parking Garage SM G �2,000 ft2 Friable ND at Space#20-21 Underground Parking Garage 1 INS-2 White Insulation at Space#3 SM G �2,000 ftz Friable ND Underground Parking Garage 1 INS-3 White Insulation at Bike Parking Area SM G �2,000 ft2 Friable ND Underground Parking Garage 1 INS-4 White Insulation at Space#16 SM G �2,000 ftz Friable ND Underground Parking Garage 1 INS-5 White Insulation at Lower Entrance Ramp SM G �2,000 ftz Friable ND Underground Parking Garage 1 INS-6 White Insulation at Space#29 SM G �2,000 ftz Friable ND HA- Homogeneous Area ND- None-detect TR-Trace, <1%Visual Estimate G-Good D- Damaged SD-Significantly Damaged CHRY-Chrysotile ACT-Actinolite SM -Surfacing Material MM - Miscellaneous Material TSI -Thermal System Insulation 8.0 Conclusion & Recommendations ACM was not identified within the areas of the underground parking garage that were within the scope of the limited inspection and bulk-sampling performed on November 14, 2011; therefore, no professional abatement activities are required to remove or disturb the above-referenced sampled materials. 9.0 Asbestos Abatement & Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 50 linear ft. on pipes, 32 ft2 on other surfaces, or the volume equivalent of a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ftz on other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated concrete),these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction-related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal- exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 10.0 Major Asbestos Spill Response If ACM is significantly damaged and the total quantiry exceeds the regulatory trigger levels, the area is deemed a "Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section III.T.1. - MajorAsbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: • Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. • Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). • Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. • Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish none-detect air pressure within the contaminated area in accordance with paragraph III.J. (Air Cleaning and None-detect Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings, corridor entrances,grills, drains,grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the contaminated area, or discard these materials. • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all surfaces in the contaminated area. • Discard all materials in accordance with subsection III.R. (Waste Handling). • Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area and • Comply with any other measures deemed necessary by the Division to protect public health. 11.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. No warranty is either expressed or implied. DSC assumes no responsibility or liability for error in public information utilized, statements from sources other than DSC, or developments resulting from situations outside the scope of this project. The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date, the limited number of bulk-samples collected, and the laboratory results of those bulk-samples. The laboratory results contained in this report apply specifically to the materials in which bulk-samples were collected. The results do not include or apply to any other materials within the structure that were not sampled, but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk- sampling activities would be required to determine if any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the Client, with specific application to their project as discussed in the scope of work. The results of any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, etc. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the scope of work for abatement activities, bidding or billing purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. DSC can provide a full scope of work for 8 abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 9 APPENDIX A INSPECTOR & FIRMASBESTOS CERTIFICATES ._._.........._........__.._..�............................... .............. .._............................................. ..........._........................_._................ _.._................... ............_._......_............_......................._. ..................................................._._._........__._......__ ,, f ' �" a�-�` ;� •,,, °�,��s r-;.L!'� ;� fi�''i"�"�`'^1 '' � � �, � � , ; � , � Fr `",,�r �d:ah� v�4� �1 rt �. .�w w� «� v� w '�R a.' �,+✓: `�� -- - ,, " � `-''' ' '"�'` ": , zr. .. � ��� �� STATE (�F COL()RAD(� '� �� ��,: �� ;,�� � ��.<�� :����s�cos � .��•��.-�" c�.irriFrct��rioN� :,� .��� r ,�: � ki"'�' , l .I�radn Uepurtmen[-!t ublie Hrnidi ' "�,� t �„�.. and Em�iranm�.nr �e6 :` .�`��.. AirPullatiooCunirolDi.i�ion ; p ��: ,w � ✓ ' � p �;.:�. This ccrtitie�chai -,� �'�.� �r~ ' ` , r,,� ,. �):1V1(�SlpEthCl� ���. � ; ��' .�� � � _ �*�'.�. Ci�rlificationNo:13015 �.� i , , �fi�.� ,��...� hac met the.ro�uirernents nf.'i.7-SOi,('.N.S,and Au�Quaiity Cor�hol .:��,f Commusian Itcgu{ution Nb.tS.Yart I3,mid is hercby certiticd h}thc � � ��, �� seote of Cuktirndo:n�ha I611o�sin�disc.ipline: -� ,�k�� m�r $ .'y� �,� ��;�.�a�' �� Inspector/M�nagement Plannerw ?t .� �� ; � t,x�«� �r.nnoi� `V� 4,� r, � '��'�" F,ipira.r nn: 412Al2012 „�� t .� ; � �!�� rwuw.a a�+n n.ww�r r � r�. � •na�.Asm.i....rw,w.»+rwara«n�+a.�./a.n,n.mn�w�to„yyw«��wMwr�w.� ' F ��.. � d4.�.� iy.0 w� .r..�M+r� r� °�,V : !a , f i��y , i� 1 �... . , Y �$ ,aY �.„, yr t�""" �, �,^ 3 `�, �, -�'�. �,�+ '! �K` � s4' iR R` Y! a" '�n,' '���". a i � �� r.'' �3,E K g �� w9 �: :'� ��,�,� � .n�� ,.,��.. ,j'L �' 4,� r�f�' �, �'Yh�� h r �r'� ."'.��� 4 v �.y �, �.�. - "�,a,.,2Y'� �. R,.,, ti..�.'�y'�� h.d"' �.,,...' Y! w«e W . .� :'+ji . -`�s! S �r'" rl ''��"�..�! 'W F:` J r'+,`o �-r�r.'4r". a y*',��, ,�,° 4 rJ,J,'. L�`' .!�, �4{�,. . ( +7 � �� ! .�'���l ;! �� ''�r�''[f i � t r j S -N� �y /� �fi�d � , .: ... . . . .� . . .. ... _ . � ,. -. _ ...e., . _ _._, _, . i �t�,, ,aa 5�Tl�T�; �1' �.,�L.�71Zf�U� '�� ��s�� ��� .� - �:�r. :�SE3i�;5'1'OS C'O\S['1.'1'I\C F1R�i !�,._ �,s ' x ; ��`y V1: i ulurado i k�,rtnn�r�l�i F u ;�,-I fadl f� ��� 'Y s. �n.4l;nsiei,nnitnt � -q�� ���� A1rVcrt9utionCor,Cxnl[���mtm ; �r�. °:v l ; 'Jq{ �`c tl::.�en�fiez Ihss �6 J^ 5� '.� 'r Dti('onsultink,inc. ���" �§�, ;' ' ;, ;'�� I�tJE It.�iclnli��o\O..t("I'��.iJ41: ���A�.y� � �� t��' h„ruc�d �u�..i�4 n m ai�csnex t � <.'. l�' C R.S,ai J dr�Au � �`+ e 9 Qus�FrtyG.un�cal e y, £� f'irtmu+c R t Int�v.m�\u.%.Pan Fi.�Mn i is Ixn•hy a�tlau�rcA ri 1 i.rG�nn�a;ixsnn �mudaay ��,: rcuahirc u reqxireJ undcr Re.�r�laiien N,o�Y i'af�G,m.rAe�eue ef f'.n,orado �4y�i .,�f :,',. �: -� ".�,; ,. 1`� MrN� � t';7] �� I anuni: Jaouary 70.28!l � �'��' r // tf ! �ti ��� t:�pues: lauwry)O.At2 "��ry_,G,fi�,„r'f S�F�' ,.,.�*� dKn«io..,.W.,. ,..:�. W e ; � �� '� ,. r� �7 � `an,�y �\ '; � "�I� `�",�S!��! � t Y.* �I� �{'�' �� :,r r �� �tl,, "�ti �'��„ ;" .� ` � ,� r � � ,a.. .�� z° ,a,=: 1� APPENDIX B ANALYTICAL DATA 11 _ .� 13949 W.Colfa�c Ave �� Suite 205 �EROb10IOC�y LAbORATOf2Y Lakewood,C080401 ASSUCtAfES, WC012l�C�ILA7E[� 303232.3746 � �'��; f��� Certificate of Analysis www.aerobioloav.net Name DS Consuhing Date Collected: 11/14/11 address 5366 Flatrock Ct ��a�p Date Received: 11/15/11 �tate ZIP Morrison,CO 80465 � ' Date Analyzed: 11/15/11 David Sinkbeil NVLAP Lab Code 200860-0 Da[e Reported: 1 1/17/1 I Project Name: l00 E.Meadow Dc Vail Project ID: 11013883 Job ID: :quested: 3002,Asbestos in Bulk Samples d: Polarized Light Microscopy/Dispersion Staining(PLM),Method for the Determination of Asbestos in Bulk Building Materials.EPA-600/R-93/116,July 1993. Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix Physical Description of Sample/Layer geneous percentage Asbestos Detected Asbestos Percentage Fiber Material Material Client Lab Sam le Number Y/N Percenta e Percenta e Com osition INS-1 11013883-1 White Insulation N ]00% ND 65 35 C INS-2 11013883-2 White Insulation N 100% ND 65 35 C INS-3 11013883-3 White Insulation N 100% ND 65 35 C INS-4 11013883-4 White Insulation N 100% ND 65 35 C INS-5 11013883-5 White Insulation N 100% ND 65 35 C INS-6 11013883-6 White Insulation N 100% ND 65 35 C ��t...Q_���-�--- ic ar egrzyn Laboratory Analyst �j�� �i��,�-�j1_'�_- au nappe Asbestos Laboratory Supervisor A=Amosite AC=Actinolite AN=Anthophyllite CHRY=Chrysotile CR=Crocidolite TR=Tremolite Trace=Less Than 1% ND=None Detected Q=Quartz P=Perlite C=Carbonates B=Binder G=Gypsum D=Diatoms M=Mica T=Tar NTR=Non-Asbestiform TR NAC=Non-Asbestiform AC 13949 W.Colfax Ave Suite 205 AEROb10�OC�y �AI�ORATOR)/ Lakewood,CO 80401 ASSOCWTES, INCORPORATE� 303.232.3746 �'� ��;��,�/ Certificate of Analysis www.aerobioloqv.net �nsulting Flatrock Ct son, CO 80465 Sinkbeil t Project Name: 100 E. Meadow Dr. Vail a�dcQ�`� NVLAP Lab Code 200860-0 Date Collected: 11/14/11 Date Received: 11/15/11 Date Analyzed: 11/15/11 Date Reported: 11/17/11 Project ID: 11013883 Job ID: ral Notes ND indicates no asbestos was detected;the method detection limit is 1 %. Trace or°<1" indicates asbestos was identified in the sample, but the concentration is less than 1%. All regulated asbestos minerals(i.e. chrysotile, amosite, crocidolite,anthophyllite,tremolite, and actinolite)were sought in every layer of each sample, but only those asbestos �rals detected are listed. Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunerite. Crocidolite is the common name used for the :stiform variety of the mineral riebeckite. Tile, vinyl, foam, plastic, and fine powder samples may contain asbestos fibers of such small diameter(<0.25 microns in diameter)that these fibers cannot be detected by PLM. such samples,more sensitive analytical methods(e.g. TEM, SEM, and XRD)are recommended if greater certainty about asbestos content is required. Semi-quantitative bulk TEM r tile analysis is accepted under NESHAP regulations. These results are submitted pursuant to Aerobiology Laboratory Associates, Inc.'s current terms and conditions of sale, including the company's standard warranty and limitation ability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted. Unless notified in writing to return the samples covered by this report,Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty(30)days re discarding. A shipping and handling charge will be assessed for the return of any samples. Aerobiology does not guarantee the results of tape lifts, microvacs, wipe,and/or debris samples. Accurate analysis cannot be performed due to particle size,media used,and/or unt of material given. Analysis of these materials should be preformed by a TEM. A resu[t of ND does not indicate tlzat the sample area does not contain asbestos. It means the yst could not identify asbestos in the specific sample for the reasons listed above. Required bv NVLAP This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP,NIST, or any agency of the Federal Government. This test report relates only to the items tested or calibrated. This report is not valid unless it bears the name of a NVLAP-approved signatory. Any reproduction of this document must include the entire document in order for the report to be valid. Page 2 of 2 1�949 W C`nlfax AvP RnitP�(1S i.akPwnnri('(l R(14(11 �(l� �3� �74Fi 12/02/2611 13:31 3037778681 ANDREX INSULATION PAGE 61/02 .;. _. . .-----_.__. : ������������ � �� ` . . �� � oEC o � 2011 �p�`�y-Ap�t��� r�re �esis�ive �a�erial f� � CAFCO° BLAZE-SHf�L.D' tl is a portland cement based �j�-� "���C� P�i�QCm�11G� spray-applied fire resfstfve materfal(S�RM)designed to . provide fire resisttve ratin�s for structural steel and G4FC�: B1A�E-SHlELD Il has been extensively tested for fire concrete in commercial const�uctivn. enduran�e by Underwrite�s Labvratories,lnc. (UL)and llnderwraters � Laboratones af Canada (ULC) in accordance with ASTM E149 AppEied �irec`�ly �o d�tic, steel Geams, calurnrss ar (UL 263, CAtf/ULG5101). ,� . concrete surfaces,the outs[anding vaiue and proven�ire _ reststive perfarmance of BLAZE•SHIELD il make it an Fhese tests have resutted in ra;ings oF up to 4 hours for: exeeltpnt choice for concealed commercial errvironmerrts. �.:Floor Assemhiies • ams R���.cpEl� I! �"s 2p�?ied exc!�.:.s^�e�Y �Y .r�,FtO :�cen� _ �ais�s ' . . and trafned contractors. Dur technicat �staff warks +:Columns closel� with buiiding team members to meet ali fire ::Roof Assemblfes protectian needs. ' •:Walts�nd Partitions Gade Complianees Bu�z�-SHiELD II has alSa been tested in accardance witt� d,STM E84• and G,4�t1ULG51p2 and. has; the failowing Surtace 8urning CAFC�BLAZE=SHIELD!1 satSsfies the requirements af the Charac�eristics: � follo�ring: Flame Spread..................0 • • l8t-ln;,ema;ic;,aC Bui(ding Code Sittoka !?evelaped----.-----p . •SBG[1=5ouihem 8uilding Gade Cortgress Intema2ional � c�p�rt�a.���� Thermal Properties �. . � - �CB�—Internat;ona�Confer�nce af Building Officials me unfque formulation of tAFCO�BLQZE-SHIELD�!f makes it a very ����N� �z�� effecCiv!e thermal insutator. This�enefit ts important in r�ducing heat • BOC�I—Buitding Officfais arid Code Admiaistratars ��, pam��r�Y when app,(��to the underside of a roof deGfc, 77�e lntemational � R-vaiire;added b BLAZE-SHIELD • Nev�York Cft�h--MEA Y , 1) may aiiow a reduction in. roof • NSE--Natfonat Buflding Code of Ca�tada,Sections j�sulatiqn, � • 2.5i 3.t.5,and 3.1.7 • . „ � . " BLAZF•�IEtD tl 0.30 8TU lidh�'t�°i )5°F 3.33 . � f0_OA3 Wlmx @(24°C)i Maj�or Speerficat�ons '�wiantestedinaccoMancewithlw"(MC5t8 ; � BLAZE-SWiEl.D I(complies with the mquirements of the • . i • foilorvingspecificatibns: � ACOlISrtCd��Pt"Op�1�lES Ge era[Services Administration (GSA):AIA/SCIGSA: �an eff�cient sound-absorbing fnate,iai, BLAZE-SHIELD 1J adds val� ' •07�11 � to the f�re protec[ian appticatio�in areas where high-naise t�vets � are antldpated.Typical aca�stit�al,peti'orrnan�e is as fotlaws: • Department of the Navy , � NAVFACENGCnM Guide ' g���ap i�. ' ia�n c1a m� I� - Specification NFGS 07$10, � Dee�d sa�m a:�5 . Spr�y�d-OR FTC2PC60f1qA • B[A1fSHIEi�Il 1 inth{p5 mm}? ! s�rd 0.15 ' • 'VVhen teStBd in amordanee�rith AStM Cq23: �VeCer�ans.Administrat9on (V,A): . . . � � H-OS-4 � . ' � . � 1 • � • . - I . . . � . . , • E1.5. AitMY Corps of Engineers. . ; . - CEG5-07841 , eharac�eristic ASTM MStApd Stacr�ar�P6rfOrmanCe` I Fested Pertormaqce" � . Oensi�y � E6Q5 ' 15 pcf(240 kg�o�) ' 16 DCt(256 kp/m�} � ' • U.S; El1Yft4tlfTlefltc3l PfDtECt10f1 ' CombusttbUlp�i E136 • Norrcombustible ' I�nncymDvsg5ls Agency{EPA):�Re�i1�8t�Otl 4O CohBEIuNAdhesion E736� 15b psf(71 kPa) 3S0 psf(272 kPe) ����� E759 No�acks ar Dalaminations No Cre�ks or Delaminations •Gonstructfan Specification aoRa im act . e�sp' Cdf�3dd �CSC) TEK-AID , P NaCacksorDelamina6qas i ►bCra�ksofDelam�etions ' ComAreas��re sire�+gth. E761� ' 75U psi(3i.9 kPa) : I 2,380 ps�(11d kPa) . � ; ' • : Air fmsian Resistertce E859 iass t�an Q.Q25 gPRz(6.27 g/m=) �.OUD glttY(O.OAO��rc� , , Carmslnn ReslStartc¢; �37,�1i1 Std.81q Oas Nbt P�nmu�e Carrcgjpn p{Stee� Dp�s t{pt promote Corroaion at Sae! Saund Ab�rp�un C423 ! 0.75 NRC,il1'(t3mm)onto deck anU Deam i " sisndaN perfarma�ce based oo Genaral Se�vires AdministrationlUA/SClGSA/07817 aceqt tor dens4�v,wh�h is 6ased an UL Re1er Eo iIL ���I�A��� ��8���6�����Q����� . S�a 4V ""Yalues reD�se{It indeD�OeM bCararory teats trndercnntmlled t�ndi6ons � � . ,...:..� � � I� � ��/ (� �-.. _ .lOb N8rt1@: Vail Village Inn Bldg 1 Parking Repairs , i, DEC O ZO�� ,Job AddreSS: 100 East Meadow Dr ���F�� � �� Permit No.: SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tests Scheduled to the Town of Vail for review and approval. Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and his/her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1) (IBC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4. Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for review and approval.( Page 2) 5. The speciai inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6. It is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be noted. A pre-construction conference at the job site is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. All special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re-inspections. BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not tested and/or inspected shall be noted in this statement. A copy of the statement shall be maintained at the job site for th Building Inspe tor's review prior to final inspection. Acknowledge ent: Owner: ���`�`R`�C�v�"��4�— � n ure Print Name Dat �1��r4c..���w R....�{�Ci�tf�lst� Speciallnspe ' n GROUND Engineering Consultants, Inc Agency: Evan Kuhn 12/0 2/2 O 11 ig re Print Name Date Project ������ ��r Arch/Eng: � � � . ignat ,e �' Print Name Date Contractor: �'�-�� " i`,- � �� �i�►U c�( J C�S �i U l � —�l Signatur Print Name Date � -3- � j .... .. .. . .. . ..�...�. . _...,...a."_.....�.._.:......,.y �ID� �. �� �, ,�,, ,� ,�� � , � DEC O�j 2011 ;� �� ' � TOWN�FVAII� I SPECIAL INSPECTION AND TESTING SCHEDULE (IBC 1704) PfOJ2Ct N2111e: Vail Village Inn Bidq 1 Parkinq Repairs Permit# Owner's Name: Testing InspPyG�fd�'1 Sig ature PrintName Date � GROUND Engineering Consultants, Inc Agency: Evan Kuhn 12/0 2/2 O 11 Testing Inspection Signature Print Name Date Hereby certifies that the Testing/Inspection Agency named above has been engaged to perform structural tests and inspections during construction as checked below,to satisfy all applicable portions of the Building Code. Prior to final inspection, the Inspection Agency shall submit a statement that all items of designated work performed were reported. Any items checked but not tested or inspected will be noted and explained. Whenever any designated items on the list are ready for sampling, testing, or inspection, it shall be the responsibility of the contractor to give timely notice to the Inspection agency so that the required services may be performed. REINFORCING STEEL: UNDERPINNING: Tensile 8 Bend,one set per heat per tons Temporary/Permanent Inspection of Piacement Inspection of Steel Fabrication Inspection of Welding Inspection of Reinforcing&Forms Inspection of Concrete Placement GROLTND Epoxy Inspection of Tiebacks MASONRY: Prelim.Acceptance Tests(Masonry Units,Wall Prisms) SOIL NAILS: Subsequent Tests(Mortar,Grout,Field Wall Prisms) Temporary Shoring Inspection of Placement and Grouting Permanent Wall CONCRETE,SHOTCRETE,GROUT AND MORTAR: STRUCTURAL STEEL: Concrete Shot Grout n�tortar Sample&Test(List specific members below) Aggregate tests for design Shop Identification&Welding Inspection Suitabiiity of aggregates Shop Ultrasonic Inspection Mix Designs Shop Radiography Test Panei GROUND Field Welding Inspection Batch Plant Inspection Field Bolting Inspection Cement Grab Sample Field Ultrasonic Inspection Inspect Placing Field Radiography Compression Tests Metal Deck Welding Inspection Cast Specimens FIREPROOFING: Pick-up Sampies cuourrD Inspection 8�Placement Shrinkage Bars Yield Check SOILS: Air Check Acceptance Tests Foot ing subgrade Dry Unitweight Moisture-Density DeterminationProctor Testing PRECAST CONCRETE: Field Density Reinforcing Tests Drilled Piers Inspection of Reinforcing Placement Deep Foundation Tendon Tests Inspection of Tendon Placement STRUCTURAI WOOD: Inspection of Concrete Placement Inspection of Fabrication Inspection of Concrete Batching Inspection of Truss Joint Fabrication Inspection of Panel Attachment&Inserts Sample&Test Components Compression Tests Inspection of Glu Lam Fabrication Inspection of Stressing/Transfer SMOKE CONTROL: PILING,CAISSONS,CAPS,TIES: Inspection of Reinforcing Placement SPECIAL CASES: Inspection of Concrete Placement Inspection of Concrete Batching SPECIAL INSPECTION: Seismic Resistance Specify other tests,inspections or special instructions required. Wind Requirements -4- agrts�M ws��a M Fan x�n� Eva n K u h n °"`°�"'°`"°°°�°�'°�` a�wm<o..m.��,����� ,� � • ., � � � � 10-18-2012 Inspection Request Re orting tl� � Page 3 � 4�20 pm Vail, CO - �it,v 0 �� � � Requested Inspect Date: Friday,October 19,2012 � Site Address: 68 E MEADOW DR VAIL � parking garage level 2 � a A/P/D Information � � E Activity: B11-0507 Type: COMBO Sub Type: ACOM Status: ISSUED � Const Type: Occupancy: Use: Insp Area: E Owner. STAUFER COMMERCIAL LLC 4 � Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001 � � Description: structural repairs to the ceiling of parking (evel 2 by adding steel reinforcement # �: Requested Inspection(s� � Item: 90 BLDG-Final Requested Time: 01:30 PM � Requestor: Phone: � Comments: 977-03 ' Assigned,To: J N Entered By: MHAEBERLE K �' Action: Time Exp: � � Item: 420 Special Inspect-final rept Requested Time: 02:30 PM � Requestor: Phone: � Comments: 977-0328 � Assigned.To: J N Entered By: MHAEBERLE K � Action: Time Exp: ` �� � � s� �°� � l�� Z� � � , \��� � � � Inspection History J � Item: 20 BLDG-Foundation/Steel "*Approved** � 06/20/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment:-pads 1-6 dowles ok per SI report 06/29/12 Inspector. sgremmer Action: PI PARTIAL INSPECTION t Comment: pads 7-9 i 07/26/12 Inspector. sgremmer Action: PI PARTIAL INSPECTION � Comment: Pads 10-14 08/13/12 Inspector: sgremmer Action: AP APPROVED Comment: a Item: 420 Seecial Inspect-final rept � Item: 90 BLDGFinal � E � � �' � € � i {: i � � s C: f [. � REPT131 Run Id: 14618 � � a ,, � � � § � �Y,�,, Department of Community Development � 75 South Frontage Road �; � Vail,CO 81657 � �-��� Q� �A#� ° � Tel:970.479.2128 ; www.vailgov.com > Development Review Coordinator s TRANSMITTAL FORM : � Use this form when submitting additional information for planning applications or building permits. ` This form is also used for requesting a revision to building permits. A two hour minimum building review p fee of$110 will be charged upon reissuance of the permit. y � � �Application/Permit#(s)information applies `' �to: Attention: Q Revisions 4 ; ��r�� �Response to Correction Letter ; ; _ � �� �attached copy of correction letter ; � Q Deferred Submittal x' ; f�Other �raei i /�J1� �J� e ' � f ,n� po� �Project Street Address: �(Number) (Street) S�itg.#� y � I �'� J. �Building/Complex Name: ' l G � Descri tion of Transmittal/List of Changes, Items Attached: � t - � � k rU[,l� - �� � i Applicant Information � � � ;(architect,contractor,ownerlowner's rep) i i n) /'_��. i '',Contact Name:���J cL�� � ' y� �.-�'�1� � ? i ��' ) L.� f ( : i Address: U—�./ ��x �� l I � � ii City �,/�.�-► I State: t_ Zip:�.9- � 'i Contact Name: �T�� l''C���l (use additional sheet if necessary) ' t t � ^ F. !Contact Phone: Building Permits: ° Revised ADDITIONAL Valuations(Labor&Materials) } � � 'Contact E-Mait U � (DO NOT include original valuation) I % i ; ; I hereby acknowledge that I have read this application,filled out Building: $ t I in full the information required,completed an accurate plot plan, I �' ! and state that all the information as required is correct. I agree to Plumbing: $ �: ' comply with the information and plot plan,to comply with all Town ;: I ordinances and state laws, and to build this structure according Electncal: $ ' ; to the town's ning and subdivision codes, design review ap- � �, proved,Inter al Building an Residential odes and other Mechanical: $ ` ' ordinance f the own appl' b ere . � �. "X Total: $� � , � '.Owner/ epre ative Signature(Required) �—�---- --"—'"—�`---�— � "` �' 3 Date Received: "lidn �0 N�101 ` � �j' � S J = ; For Office Use Only: ry�h� � r � Fee Paid: �' �� b ��� Received From: %y�.� a � Check# � � � � Cash �1 � n � � � CC: Visa/MC Last 4 CC# exp.date: �J IJ � Authorization# � � ;. � �: October 16, 2012 Subject: Summary of Materials Testing & Special Inspection Services, Vail Village Inn Building One— Parking Phase 2, Vail, Colorado Job Number: 12-6538 � � � � V l5 D Mr. Warren Krok D�T 1 8 2��2 Nedbo Construction � PO Box 3419 �,�� � M� va�i, Colorado 81658 TOWN OF VAIL Attn: Mr. Warren Krok, `'R F' This letter summarizes the special inspections GROUND Engineering Consultants, Inc. (GROUND) performed for the Vail Village Inn Building One — Parking Phase 2 Project located in Vail, Colorado. The special inspection services were performed at times scheduled by the Contractor and/or Subcontractors befinreen June 14'h and October 5th, 2012. Representatives of our office provided periodic observations for the improvements to the garage structural steel welded connections, concrete structural elements and slabs and inspections of s placement of fire resistant materials as scheduled by the Owner, Contractor or Subcontractor. At the time of our visit, representatives of our office also observed the placement of epoxied dowel reinforcements and tested the physical characteristics of the concrete placed for the garage improvements. � Based on the final test results to date, field observations, and other project documentation received G from the design team, it is our opinion that the materia�s observed for the structural steel welded x � connections, epoxied dowel reinforcing, concrete placement and fire-resistant materials for the garage � improvements were in general accordance with project plans, specifications, or applicable RFI's. r � The observations as indicated above were performed periodically to provide data to the Contractor and Subcontractors to assist them in evaluating the general compliance of the tested materials and/or � work with the contract documents at the times of our observation. We did not supervise, direct or have t any control over any of the Contractor's or Subcontractor's work. We were not responsible for the � Contractor's or Subcontractor's scheduling of our services, means, methods, procedures, techniques, � or sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor z performed or completed the work in accordance with the contract documents or construction industry ; standards. �� � f �ROU�IID � ENGINEERIN6 CONSULTRNTS INC. � 101A Airpark Dr.,Unit 9,PO[�ox 464,Gypsum,CO 81637 Phone(970)524-0720 Fax(970)524-0721 �vww.groundeng�.com � Ofrce l.ocntions: E:nglewood . Commerce City . I_oveland . Granby . Gypswn . Grand Junction . Casper,WY � @ Vail Village Inn Building One—Parking Phase 2 Vail,Colorado If you have any questions concerning this letter, please contact our office. Sincerely, GROUND Engineering Consultants, Inc. ,� Digitally signed o .. "�"`��' by Jason A. � ,�e.e Smith, REM, P.E. � �,�� Date: 2012.10.16 ni.�' 10:28:39-06'00' Chris Hutto, CET Reviewed by Jason A. Smith, REM, P.E. 1 a Job No.12-6538 GROUND Engineering Consultants,Inc. Page 2 of 2 �: � � § � f t : �ow�oFV� . FINAL REPORT OF SPECIAL INSPECTIONS Project: Vail Village Inn Building One- Parking Phase 2 Permit Number: Project Location: Vail Village Inn Parking Garage Owner Address City: Zip: SPECIAL IN T R GROUND Engineering Consultants, Inc. Address: PO Box 464 City: Gypsum State: �� Zip: 81637 Phone: 970-524-0720 Fax: 970-524-0721 E-mail: ChrisH@groundeng.com To the best of my information, knowledge, and belief, the special inspections and/or testing required for this project, have been completed in accordance with the contract documents. Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be considered an integral part of this final report. Any discrepancies that were noted in all interim reports have been corrected. Prepared by: ,� Digitally signed Jason A Smith, REM, PE ° ���" �s by Jason A. Type or Print Name 4�8 f Smlth, REM, P.E. �`�•• . �' Date: 2012.10.16 signature �A��' 10:41:01 -06'00' 10-16-12 Date Preparer's Seal and Signature Required { 4 S • � � � � October 15, 2012 { Subject: Materials Testing Summary, Vail Village Inn Building One — Parking Phase 2, Vail, Colorado Job Number: 12-6538 Mr. Warren Krok Nedbo Construction, Inc. PO Box 3419 Vail, Colorado 81657 Attn: Mr. Warren Krok, For the period ending October 13th, 2012, representatives of GROUND Engineering Consultants Inc., were on site to provide construction observations and materials testing services. The reports have been completed in the field as work has been completed. The contractor has been notified of the testing results. This summary report includes the observation reports as well as � the materials test results. Please do not hesitate to contact this office if you have any questions concerning these reports. � Sincerely, GROUND ENGINEERING CONSULTANTS, INC. Digitally signed by Chris Hutto C h r i s H u tt o DN:rn=Chris Hutto,o=GROUND Engineering Consultants,ou, email=chrish@groundeng.com,c=US Date:2012.10.1 S 20:00:04-06'00' Chris Hutto, CET ''�ROU�1I� ENGINEERING C�FJSULTRNTS INC. IOIA Airpark Ur.,Unit 9,1'O BoY 464,Gypswn,CO 81637 Phone(970)524-0720 ['ax(970)524-0721 wN+w.groundeng.corn Uffrce l.ocntrorrs:F.;nglewood . Commerce City . L.oveland . Granby . Gypsum . Grand.lunction . Casper,WY � y 'f Vail Village Inn Building One—Parking Phase 2 Vail,Colorado ; Drill and Epoxy Obseruations � E � � Job#12-6538 GROUND Engineering Consultants,Inc. period ending 10/13/2012 � i � € DE120618-01 Page 1 of 1 E: �ROUK� s ENGINEERING CDNSULTFINTS DRILL AND EPDXY OBSERVATIONS Project: Vail Village Inn Building One-Parking Phase 2 Date: June 18, 2012 Job Number: 12-6538 F Client: Nedbo Construction, Inc. Report Number: 1 PO Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok Location 1.) Parking garage, level 2, West end replacement panels (Holes 1-6). 2.) 3.) Orientation (vertical/horizontal): Horizontal � Drilling Equipment: Hammer drill Hole Diameter I Length (inches): 3/4" diameter/6" depth ; Hole Spacing: 4" O.C.latitude/6" O.C. longitude Method to Clean Hole: Wire brush/Air compressor Rebar/Bolt-Size/Length/Type: #5 bar/30" in length Epoxy Type: Hilti HY150 MAX Placement Method: Hand-set Drawing or RFI referenced: Plans dated 6/5/12 E Additional Reinforcing Steel: N/A Notification (Contractor/Name): Spike with Nedbo Field Representative: Kevin McClure Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O. Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 <t � � DE120628-02 Page 1 of 1 � �ROUHn EN6INEERING CONSULTFINTS DRILL AND EPDXY OBSERVATIONS Project: Vail Village Inn Building One- Parking Phase 2 Date: June 28, 2012 Job Number: 12-6538 Client: Nedbo Construction, Inc. Report Number: 2 PO Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok Location 1.) Level 1 replacement panels 7-9 2.) 3.) Orientation (vertical/horizontal): Horizontal Drilling Equipment: Hammer drill Hole Diameter/Length (inches): 3/4"diameter/6" in depth Hole Spacing: 6" O.C. Method to Clean Hole: Wire brush/Air compressor Rebar/Bolt-Size/Length/Type: #5 bar/30" in length Epoxy Type: Hilti HY150 MAX Placement Method: Hand-set Drawing or RFI referenced: Plans Additional Reinforcing Steel: N/A Notification (Contractor/ Name): Spike with Nedbo Field Representative: Kevin McClure Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 �. t DE120724-03 Page 1 of 1 F �ROUH� ` ENGINEERING CONSULTfaNTS DRILL AND EPDXY OBSERVATIONS Project: Vail Village Inn Building One -Parking Phase 2 Date: July 24, 2012 Job Number: 12-6538 Client: Nedbo Construction, Inc. Report Number: 3 PO Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok Location 1.) Level 1 replacement panels 10-13 2.) 3.) Orientation (vertical/horizontal): Horizontal Drilling Equipment: Hammer drill Hole Diameter/Length (inches): 3/4"diameter/6" in depth Hole Spacing: 6" O.C. &4"when concrete cut back over beams Method to Clean Hole: Wire brush/Air compressor Rebar/Bolt-Size/Length/Type: #5 bar/30" in length Epoxy Type: Hilti HY150 MAX Placement Method: Hand-set Drawing or RFI referenced: Plans Additional Reinforcing Steel: N/A Notification (Contractor/ Name): Spike with Nedbo Field Representative: Steve Buckeridge Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 : F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 �. � DE120810-04 Page 1 of 1 € �ROUHn ENGINEERIN6 CONSULTRNTS DRILL AND EPDXY OBSERVATIONS Project: Vail Village Inn Building One- Parking Phase 2 Date: August 10, 2012 Job Number: 12-6538 Client: Nedbo Construction, Inc. Report Number: 4 PO Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok Location 1.) Slab on metal deck @ GL F.7-G.0/5.2-6.0, F.0-F.4/4.1-4.8, E.7-F.0/3.2-3.6, E.5-E.8/1.2-1.8 2.) 3.) Orientation (vertical/horizontal): Horizontal Drilling Equipment: Hammer drill Hole Diameter/Length (inches): 3/4"diameter/6" in depth Hole Spacing: 6" O.C. &4"when concrete cut back over beams Method to Clean Hole: Wire brush/Air compressor Rebar/Bolt-Size/Length/Type: #5 bar/30" in length Epoxy Type: Hilti HY150 MAX Placement Method: Hand-set Drawing or RFI referenced: Plans Additional Reinforcing Steel: N/A Notification (Contractor/ Name): Spike with Nedbo Field Representative: LeeTal Levran Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O. Box 464 Grand Junction,CO 81501 41 Invemess Drive East Gypsum,CO 81637 ' P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 ` F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 g � DE120822-05 Page 1 of 1 �ROUHn � ENGINEERING CONSULTF�NTS DRILL AND EPDXY OBSERVATIONS Project: Vail Village Inn Building One -Parking Phase 2 Date: August 22, 2012 Job Number: 12-6538 Client: Nedbo Construction, Inc. Report Number: 5 PO Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok Location 1.) Slab on grade @ GL C.0-C.3/2.1-2.2 2.) 3.) Orientation (vertical/horizontal): Horizontal &vertical Drilling Equipment: Hammer drill Hole Diameter/ Length (inches): 3/4" diameter/6" in depth Hole Spacing: 6"O.C. Method to Clean Hole: Wire brush /Air compressor Rebar/Bolt-Size I Length/Type: #5 bar&z-shaped bar/30" in length Epoxy Type: AC100 Gold Placement Method: Hand-set Drawing or RFI referenced: Plans Additional Reinforcing Steel: N/A Notification (Contractor I Name): Gilbert w/Vasquez Field Representative: LeeTal Levran Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate O�ce P.O.Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 � � � E Vail Village Inn Building One—Parking Phase 2 Vail,Colorado Concrete Compressive Strength and Field Test Results f t ! Job#12-6538 GROUND Engineering Consultants,Inc. period ending 10/13/2012 �. �ROUHn EN6INEERIN6 CONSULTRNTS CONCRETE FIELD PROPERTIES AND COMPRESSIVE STRENGTH TEST RESULTS Job Name Vail Village Inn Building 1- Parking Phase 2 Job Number 12-6538 Client.• Nedbo Construction, Inc. Address: P.O. Box 3419 Vail, Colorado 81657 Report Number Report Date Attn: 1 June 19, 2012 Mr.Warren Krok On the date specified above, Ground Engineering Consultants, Inc(GROUND)was requested to provide materials testing services for this project on sampled concrete. GROUND performed testing in general accordance with the frequencies required and/or as requested by the contractor or onsite representative of the owner. The following information includes related site observations for the concrete placement and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and may not be onsite during the entire concrete placement,the contractor should be consulted for precise details. This report includes the results of the tests we performed and our observations,however, it is the responsibility of the contractor to perform construction and provide materials that meet the project plans and specifications Placement Date: 06/19/12 Concrete Placed By: Vasquez Concrete Supplier/Mix ID: B&B/37012691 Total Cubic Yards Placed: 15 Weather/Temperature Interior n0's Placement Location: Parking Garage,Level 2,Panels 1-6 Methods Employed: Pump Truck Specifications Required Strength(psi) 4000 Slump Range(in.) N/A Air Range(%) N/A Temperature(°F) 50-90 Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added Spread(in.) (°/a) Temp:°F (pc� (gallons) Panel#410 6041 32141154 8:15AM 9:28AM 3 2.7 70 145.8 Notification of field test results: Spike with Nedbo and Gilbert with Vasquez Compressive Strenath Results (ASTM C39) Cylinder Diameter(in.) 4.00 Cross Secional Area(sq in.) 12.57 Maximum Load(Ibs) 45930 Compressive Strength(psi) 3650 Test Date 06/26/12 4.00 4.00 12.57 12.57 67530 67420 5370 5370 07/17/12 07/17/12 Cylinders Cast from ticket: 32141154 Lab ID 5200 Test Age(days) 7 28 28 Type of Fracture T5 TS T5 Additional Comments Field Technician Kevin McClure Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)5240721 �ROUKa EN6INEERING CONSULTRNTS CONCRETE FIELD PROPERTIES AND COMPRESSIVE STRENGTH TEST RESULTS Job Name Vail Village Inn Building 1- Parking Phase 2 Job Number 12-6538 Client: Nedbo Construction, Inc. Address: P.O. Box 3419 Vail, Colorado 81657 Repo►t Number Report Date Attn: 2 July 25, 2012 Mr.Warren Krok On the date specified above, Ground Engineering Consultants, Inc(GROUND)was requested to provide materials testing services for this project on sampled concrete. GROUND pertormed testing in general accordance with the frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes related site observations for the concrete placement and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and may not be onsite during the entire concrete placement,the contractor should be consulted for precise details.This report includes the results of the tests we performed and our observations,however,it is the responsibility of the contractor to perform construction and provide materials that meet the project plans and specifications Placement Date: 07/25/12 Concrete Placed By: Vasquez Concrete Supplier/Mix ID: B&B/37012691 Total Cubic Yards Placed: 10 1/2 Weather/Temperature Partly Cloudy/70s Placement Location: #10-13 Methods Employed: Pump Truck Specifications Required Strength(psi) 4000 Slump Range(in.) N/A Air Range(%) N/A Temperature(°F) 50-90 Test Sam le Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added p Spread(in.) (%) Temp:°F (pc� (gallons) #10 6042 32141401 9:42AM 11:04AM 2 5.8 72 138.7 2 Notification of field test results: Spike with Nedbo and Gilbert with Vasquez Compressive Strenqth Results (ASTM C39) Cylinder Diameter(in.) 4.00 4.00 Cross Secional Area(sq in.) 12.57 12.57 Maximum Load(Ibs) 46720 65780 Compressive Strength(psi) 3720 5230 Test Date 08/01/12 08/22/12 4.00 12.57 65770 5230 08/22/12 Cylinders Cast from ticket: 32141401 Lab ID 5295 Test Age(days) 7 28 28 Type of Fracture T5 T5 T5 Additional Comments Field Technician Steve Buckeridge Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Invemess Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 CROUII�D ENGINEERING CONSUITRNTS CONCRETE FIELD PROPERTIES AND COMPRESSIVE STRENGTH TEST RESULTS Job Name Vail Village Inn Building 1-Parking Phase 2 Job Number 12-6538 Client: Nedbo Construction, Inc. Address: P.O. Box 3419 Vail, Colorado 81657 Report Number Report Date Attn: 3 August 10,2012 Mr.Warren Krok On the date specified above, Ground Engineering Consultants, Inc(GROUND)was requested to provide materials testing services for this project on sampled concrete. GROUND performed testing in general accordance with the frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes related site observations for the concrete placement and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and may not be onsite during the entire concrete placement, the contractor should be consulted for precise details.This report includes the results of the tests we performed and our observations,however, it is the responsibility of the contractor to perforrn construction and provide materials that meet the project plans and specifications Placement Date: 08/10/12 SpeCifiCations Concrete Placed By: Vasquez Required Strength(psi) 4000 Concrete Supplier/Mix ID: Lafarge/RMXZP40GF87 Slump Range(in.) N/A Total Cubic Yards Placed: 9 Air Range(°/a) N/A Weather/Temperature Sunny/70s Temperature(°F) 50-90 Placement Location: Slab on metal deck @ GL G.7-G.0/5.2-6.0; F.0-F.4/4.1-4.8; E.7-F.0/3.2-3.6; E.5-E.8/1.2-1.8 Methods Employed: Tailgate to wheel barrel Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water,4dded Spread(in.) (/o) Temp:°F (pc� (gallons) GL F.2/4.4 4780811 85910789 1:15PM 2:OOPM 5 1/2 2.9 78 141.0 - Notification of field test results: Spike with Nedbo and Gilbert with Vasquez Compressive Strenqth Results (ASTM C39) Cylinder Diameter(in.) 4.00 Cross Secional Area(sq in.) 12.57 Maximum Load(Ibs) 54630 Compressive Strength(psi) 4350 Test Date 08/17/12 4.00 4.00 12.57 12.57 71890 75220 5720 5990 09/07/12 09/07/12 Cylinders Cast from ticket: g5910789 Lab ID 5343 Test Age(days) 7 2$ 2$ Type of Fracture T5 T5 T5 Additional Comments Field Technician LeeTal Levran Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Invemess Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 �ROUr�n ENGINEERIN6 CONSULTFINTS CONCRETE FIELD PROPERTIES AND COMPRESSIVE STRENGTH TEST RESULTS Job Name Vail Village Inn Building 1-Parking Phase 2 Job Number 12-6538 Client: Nedbo Construction, Inc. Address: P.O. Box 3419 Vail, Colorado 81657 Report Number Report Date Attn: 4 August 23, 2012 Mr.Warren Krok On the date specified above, Ground Engineering Consultants, Inc(GROUND) was requested to provide materials testing services for this project on sampled concrete. GROUND pertormed testing in general accordance with the frequencies required and/or as requested by the contractor or onsite representative of the owner.The following information includes related site observations for the concrete placement and to the best of our knowledge including information from site representatives.As we provide periodic services on most projects and may not be onsite during the entire concrete placement,the contractor should be consulted for precise details.This report includes the results of the tests we performed and our observations,however,it is the responsibility of the contractor to perform construction and provide materials that meet the project plans and specifications Placement Date: 08/23/12 Concrete Placed By: Vasquez Concrete Supplier/Mix ID: B&B/36012474 Total Cubic Yards Placed: 2 Weather/Temperature Cloudy/6os Placement Location: Slab on grade @ GL C.0-C.3/2.1-2.2 Methods Employed: Tailgate to wheel barrel Specifications Required Strength(psi) 4000 Slump Range(in.) N/A Air Range(%) N/A Temperature(°F) 50-90 Test Sample Location Truck No. Ticket No. Batch Time Test Time Slump or Air Content Concrete Unit Weight Water Added Spread(in.) (/o) Temp:°F (pc� (gallons) GL C.0/2.1 6039 32141821 10:53AM 12:OOPM 2 1/2 1.8 77 146.9 10 Notification of field test results: Spike with Nedbo and Gilbert with Vasquez Compressive Strenqth Results (ASTM C391 Cylinder Diameter(in.) 4.00 Cross Secional Area(sq in.) 12.57 Maximum Load(Ibs) 48660 Compressive Strength(psi) 3870 Test Date 08/30/12 4.00 4.00 12.57 12.57 62360 61880 4960 4920 09/20/12 09/20/12 Cylinders Cast from ticket: 32141821 Lab ID 5382 Test Age(days) 7 28 28 Type of Fracture T5 T3 T5 Additional Comments Field Technician LeeTal Levran Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Gra�d Junction,CO 81501 41 Inverness Drive East Gypsum,CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 k � 1 Vail Village Inn Building One—Parking Phase 2 ± Vail,Colorado ` + � r t � Structural Stee1 � � � t � k i y Job#12-6538 GROUND Engineering Consultants,Inc. period ending 10I13I2012 y � - � � , � Page 1 ! ` �r�ouHn ENGINEERIN6 CONSULTRNTS List of Outstanding Discrepancies ; Project Name: Vail Village Inn Building One - Parking Phase 2 Project No: 12-6538 Date 8-10-12 Client: Nedbo Construction, Inc. Address: P. O. Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok � Faxed to : Faxed to : F Date Item Outstanding Discrepancy Date Per Plan/ _ � �� Re orted No. Acce ted Per RFI � 06-14-12 1 GROUND is requesting WPS and WQTR for Black 8/10/2012 Per Plan f Smoke welders on the project site for D1.1 and D1.3. � � k € ; � It is the responsibility of the contractor to notify GROUND once corrections have been made and to schedule re- ' observations. The contractor should provide our office hard copies of any changes or approvals made by the Structural Engineer of Record. 41 Inverness Drive East 7393 Dahlia Street 2468 East 9th Street Englewood,CO 80112 Commerce City,CO,80022 Loveland,CO 80537 Tel:(303)289 1989 Tel:(303)289 1989 Tel:(970)622 0800 Fax:(303)289 1686 Fax:(303)289 6742 Fax:(970)622 0801 � � � � �RaUKn � f � ENGINEERING CONSULTRNTS a� ; FIELD REPORT � � Project Name: Vail Village Inn Building One— Date: June 14, 2012 x Parking Phase 2 ` Project No: 12-6538 Report No: 1 = Client: Nedbo Construction, Inc. Address: P. O. Box 3419 � Vail, CO 81657 ' Attn: Mr. Warren Krok � r As requested, a representative of GROUND arrived at the project site to inspect welded and screwed connections on the Parking Garage floor repairs. � The following is a summary of the services performed on this date: E 1) Inspected welded connections of Headed Anchor Studs (HAS) to beams at Pads 1 thru � 6, are spot-welds of deck to beams and tek screws of deck-to-deck at the Upper Parking ' Level. These connections were found in compliance with the project plans and AWS ` D.1.1-10 Clause 6. � 2) At this time, GROUND is requesting Welding Procedure Specification (WPS) and Welder � Qualification Test Record (WQTR) for welders from Black Smoke for D1.1 and D1.3 — Item #1 on the Discrepancy List. � A copy of this report and Discrepancy List will be provided to Spike with Nedbo Construction, Inc. on GROUND's next visit. Submitted by: GROUND Engineering Consultants, Inc. � Gary S. Lee { Field Representative Grand Junction Office Corporate Office Gypsum Office 1008 3rd Avenue,Suite D 41 Inverness Drive East P.O.Box 464 Grand Junction,CO 81501 Englewood,CO 80112 Gypsum,CO 81637 P:(970)242-4300 P:(303)289-1989 P:(970)524-0720 F:(970)524-0721 F:(303)289-1686 F:(970)524-0721 's � �ROUHn ENGINEERING CONSULTRNTS � FIELD REPORT � Project Name: Vail Village Inn Building One— Date: June 24, 2012 Parking Phase 2 Project No: 12-6538 Report No: 2 � Client: Nedbo Construction, Inc. = Address: P. O. Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok As requested, a representative of GROUND arrived at the project site to inspect welded and screwed connections of composite pour deck for the Parking Garage floor repairs. The following is a summary of the services performed on this date: 4 1) Inspected welded connections of Headed Anchor Studs (HAS), are spot-welds and tek screws at Pads 10 thru 13. These connections were found in general compliance with the project plans, AWS D1.1-10 Clause 6 and AWS D1.3-08 Clause 6 Part "A". ` Spike with Nedbo Construction, Inc. was notified of these results, received a copy of this report and updated Discrepancy List. Submitted by: _' r � GROUND Engineering Consultants, Inc. Gary S. Lee Field Representative f Grand Junction Office Corporate Office Gypsum Office 1008 3rdAvenue,Suite D 41 Inverness Drive East P.O.Box 464 Grand Junction,CO 81501 Englewood,CO 80112 Gypsum,CO 81637 P:(970)242-4300 P:(303)289-1989 P:(970)524-0720 F:(970)524-0721 F:(303)289-1686 F:(970)524-0721 � � � E � �ROU�� ENGINEERING CONSLJLTRNTS p FIELD REPORT ? Project Name: Vail Village Inn Building One— Date: August 9, 2012 ;, Parking Phase 2 ; Project No: 12-6538 Report No: 3 Client: Nedbo Construction, Inc. Address: P. O. Box 3419 Vail, CO 81657 Attn: Mr. Warren Krok As requested, a representative of GROUND arrived at the project site to inspect welded and ` screwed connections of composite pour deck for the Parking Garage floor repairs. The following is a summary of the services performed on this date: � i � 1) Inspected are spot-welds, Headed Anchor Studs and tek screws of pour deck at Pads ; #14, #15, #16 and #17. These connections were found in general compliance with the project plans, AWS D1.3-08 Clause 6 Part "A" and AWS D1.1-10 Clause 7. Spike with Nedbo Construction, Inc. was notified of these results, received a copy of this report. Submitted by: GROUND Engineering Consultants, Inc. � Gary S. Lee Field Representative { 3 ; Grand Junction Office Corporate O�ce Gypsum Office 1008 3rdAvenue,Suite D 41 Inverness Drive East P.O.Box 464 Grand Junction,CO 81501 Englewood,CO 80112 Gypsum,CO 81637 P:(970)242-4300 P:(303)289-1989 P:(970)524-0720 F:(970)524-0721 F:(303)289-1686 F:(970)524-0721 s t � � k � �: Vail Village Inn Building One—Parking Phase 2 Vail,Colorado ; ;. Fireproofing z Y 4 f' Job#12-6538 GROUND Engineering Consultants,inc. period ending 10/13/2012 4 i � FP Beam 121005 Page 1 of 1 �: � �ROUH� � ENGINEERING CONSULTRNTS � ; FIREPROOFING - BEAMS Project: Vail Village Inn Date: October 5, 2012 Job Number: 12-6538 Client: P.O. Box 3419 Test Number: 1 Vail, Colorado 81657 Attn: Mr. Warren Krok Dates Applied: 9/5/2012 Air Temperature(°F): N/A Area Represented: Lower level parking garage, Beam#5, West End Protection I Weather: N/A Visual Observations/ N/A Discrepancies: z Product& Manufacturer Blivard Shield ' i THICKNESS DETERMINATION DENSITY DETERMINATION � Location: Location: Lower Level Parking Garage, � 4 Beam#5 � , - 9 Volume of test sample 22 (cubic cm) � a Dry weight of sample 7.1 (grams) 2 8 9MEASUREMENTS "t� �. AT EACH END OF Density of sample 20.1 (pCfl . '12—INCH LENGTH 3 , Specified Density 15 (pcfl min. 4 6 g PASS � � Recorded Measurement(inches) f � 1.) 1 12/16 1.) 1 12/16 ADHESION DETERMINATION 2.) 1 4/16 2.) 1 8/16 Date: � 3.) 112/16 3.) 112/16 Location: � 4.) 1 4/16 4.) 1 4/16 4� 5.) 1 8/16 5.) 1 8/16 Diameter of specimen: 3.25 (inches) :' r 6.) 1 6.) 1 4/16 Area of specimen: 0.0576 (sq. ft.) � 7.) 1 4/16 7.) 1 4/16 Recorded failure force: 12 (Ibs) � � 8.) 1 8.) 1 4/16 Location of failure: adhesion � 9.) 1 8/16 9.) 1 8/16 ' Adhesion 208.3 (psfl � Specified Adhesion 200 (ps� _ � t: Average Thickness (inches) exGUAi�Flange 1 7/16 PASS 4 Average Thickness (inches) �anpe�ipsonly 1 3/16 Notification:lnstaller I General �contractori name) Specified Min Thickness (in) Flangetipsonly � ` Specified Min Thickness (in) 1 � Individual Measurement PASS Average PASS Field Representative: LeeTal Levran ` ; Notes: ' t Grand Junction Gypsum 1008 3rd Avenue,Suite D Corporate Office P.O.Box 464 Grand Junction,CO 81501 41 Inverness Drive East Gypsum CO 81637 P:(970)242-4300 Englewood,CO 80112 P:(970)524-0720 " i F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 x