Loading...
HomeMy WebLinkAboutState Highway Access PermitR COLORADO DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ACCESS PERMIT CDOT Permit No. 306172 State Highway No /Mp /Side Vail, CO 81657 Vail, CO 81657 970 - 476 -1987 970- 476 -1987 070A/176.500/R Permit fee 100.00 of transmittal Date 08/31/2006 Region /Section /Patrol 03/02/19 Local Jurisdiction 1 Eagle Count The Permittee(s); Applicant; Ref No. 06 -134 Ron Byrne Ron Byrne 285 Bridge Street 285 Bridge Street Vail, CO 81657 Vail, CO 81657 970 - 476 -1987 970- 476 -1987 is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked by the issuing authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of the permit. Location: Located on the south side of I -70 Frontage, a distance of 290 feet east of Vail Village Drive, also known as 444 South Frontage Road. Access to Provide Service to: Residential Condominium/Townhouse (24 Units) .......... ............................... 10 DHV 100.00% Other terms and conditions: * See Attached Pages 2 and 3 and Other Enclosures for Additional Temis and Conditions. MUNICIPALITY OR COUNTY APPROVAL Required only when the appropriate local authority retains issuing authority. By Date Title (X) Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to being used. The permittee shall notify Jim Pitkin with the Colorado Department of Transportation in Gypsum at 970- 524 -0627 at least 48 hours prior to commencing construction within the State Highway right -of -way. The person signs� he permittee must be the owner or legal representative of the property served by the permitted access and have full authority to accept the p mrfand it terms and conditions. ejmltte y{� G ' - / /, X Date � n This permit is not valid until signed by a duly authorized representative of the Department. COLORADO DEPARTMENT OF TRANSPORTATION B Date (of issue) Title (X) Copy Distribution: Required: Make copies as necessary for: Previous editions are obsolete and may not be used 1.Region Local Authority Inspector COOT Form #101 8198 2.Appiicant MTCE Patrol Traffic Engineer 3.Staff Access Section STATE OF COLORADO DEPARTMENT OF TRANSPORTATION AL Region 3 Traffic Section OT 222 South 6th Street, Room 100 Grand Junction, CO 81 501 970- 248 -7230 office 970 - 248 -7294 fax August 31, 2006 To: Ron Byrne 285 Bridge Street Vail, CO 81657 Dear Ron Byrne: Permit # 306172 Please review the attached State Highway Access Permit (Form #101) and all enclosed attachments. If you choose NOT to act on the pen please return the permit unsigned. If you wish to APPEAL the Tenns and Conditions of the permit, please refer to the attached Fonn 101 pages 2 & 3 for an explanation of the appeal procedures. If you ACCEPT the permit and its Terrns and Conditions, please sign and date the Access Permit form on the line marked "PERMITTEE ". Your signature confirms your agreement to all the listed Terms and Conditions. - Provide a check or money order made out to the jurisdiction named on the next line for the amount due. Colorado Department of Transportation $ 100.00 Make check or money order payable to Amount Due - Return all copies and attachments of the Access Permit along with your payment back to the Colorado Department of Transportation at the address noted below. The Department will process and return to you a validated (signed and recorded) copy of your State Highway Access Permit. If you fail to sign and return the attached Access Permit within 60 days of the date of this transmittal letter, Colorado Department of Transportation will consider this pen Void. You must obtain a Notice to Proceed. DO NOT begin any work within the State Right -of -Way without a validated Access Pen and Notice To Proceed. Use of this permit without Transportation Department's validation shall be considered a violation of State Law. If you have any questions, please call: Devin Drayton at 970 - 248 -7245 Return Access Permit and attachments to: Region 3 Traffic Section 222 South 6th Street, Room 100 Grand Junction, CO 81501 The transmittal to you of the Access Permit form for your approval constitutes final action by the Colorado Department of Transportation pursuant to section 43 -2 -147 C. R. S., as amended. CDO'i' Ponn tt122 11/99 W „ pm C U B L C W m m`c �6E��m u .4 O) A V m 0 W R T 5 ° €EB $ OB m N m g E � gT »�s��a 9 ma�g c E� € $E €I • ' ° am� o W m N E 3 EN CC di W m LL j . $` 3hg.����• .8 a .c 8g °E�•W�E• Al ng� " q ui E$.�roWif� m C $�� 0 o�•3a8 �•�o A' $� q m g L Q OI - I M as E E c c gg o mg IS � f �S 8 �� N ffi$ N V; 3 Q `� A O m C ;T g LEfi ?„ 1 mE SN $ng aW° N8 $ $_ $gW 0m g y .�a 5a.r6�5mo m 55 3E m M -1 2 um 5 v ro m LO Er° g CL r. J ms € a E fan o F Qu 3 a g N 20 WL i N e m U O. m w a k m m � d c 01 »m o E C q a � � a m c rov W sWD p �E mo� gp L e 6 � E � n ro� v m LP m c w c m B m ` 2 - � W « U > N N c S p n «Vm�s� o �u� C Sq F oufiq$$ L) OM „B a K M i zm°. �� w w 6 w” e W _WO 0 S � N O C G m t�. -ca5 m T m = rErEp ro Q V D O � Q 5 L m E v's per. v $E �i �° x $ >N �m�OS�_ ai -D N�m aE -"l ad's J. ro ro C m P Q T. U g E$ E mmEE._o T W N �*� mm� c 0 2 V a r€ 3 ° d y ' S q •� C C W N •� Ng.05 L+.CW O� c g W r m a� q y pW C o e g J N w o'C a °a tu Jc Ts N AE 88 0; CL c B W 101 ro 5 g r � �$�� - c ° ro z�� n Y/ W yC Q F- Q" �yRn J •iJ p t�jm�S r 2r- N m ®!?�iVNU��O T g N C a " on o�' d ° c S 2 $ E vc$ dca °n s m m 8p g6 . 21! 4m £� -�0 0 �. Q € W p� xE �$ �2� N�$•�4� 5o.m� �T E a o •gm - t m� ° �i E tl e_a �E g " g 5 °m3 m a a c�T$n 8n C m $ ab$o 5 a mS m "� "•- _o D.2 8'_c�$ ' m - cc c-ia� y 9v- £ 5 c o SgQ�m -SI g£$ 'TCr�w �•� °� o s�m $E vQ�$£pQ€a�� ° e . o 'Eaa S V cS�L m 0 L 1 6 - `o €gEom 9� 5a waT N 9 v U $ N m v x o u ro m m c " 5 L m m 0 mE $ og h m g 8 8 8m oE$5 S 4; e o $egy 5 ° -. �g gEmg o ° E ° m �CSS E b'- � m$m m O g ' �� m � � "� jal ' m g t v I m $ $ �c.�cc 4 q� g c „! o � '9$ �tj� ` m• F g m 9 E s m N 8 L �kT y 3 �o "cTa� " '0' .pc c.•c�;c_E § - � L �� m � i E go o� 5�• c m � g o._ $ Ems• N Yi ro p�T LQE -o vS T .E cgiv ua .r— —6 �. £ � rn� e m • ��N N y m v. o$ " � N mW m •ka c mgc� J E O � N p � F C�y m�C L Om mL �+ D m T �pm " 1 C L $ W "U _ "m } C€C L L N m a 0 O. 9 n p P u mL m N l W OL C r m �_ (p _ ° $ 'gyp �$.S m m� "o� Q aq� a m m•= � $�'qa`°� ° ° $0 dJa� �a `�•'� L �OI SN..- :C � T 9.3 �f xx �qL O " --a'" m $� $ " E w m °m �ESJEW{+m3z i'm2f 3� @c $ m s� g �bEr� °•a� s WgL•L$ c z ° 'ce o E a 's ° m•a a £„ -$ m # 3 c' 35 =E mn{m a „ £ Y3 o.Eo �Ti Tm cS ,E� m E m °� E > W fi � m 8 ®= °`- $o'ei. i roo'y EUSmA m'$ €T�n£�cWedcdc E a °5 C tE I o a NO. _ c mO E me g n $,S q ° t N5 S LU' _TW $ ” $ �S D'95 • a . �6�E m L'g _8o"i co$$g 3 €aE $ o ii g,c,m. D . ae -s 6° E�$a"o 5��;�C 1 pa. 4 O,$�,5$� C m O '�$P �io N N.�`L m c g W O W $' °. ` mSc m m ro p yp CYt m„ me �o� � 53_S >F= w 1 hbw Q ~0 /+0 g ° c z rk rom , i. a m ._ 3„ ga o 81 1t— K 5 d 05 m" �1 eL3i�' " r? cm�¢ DoE § a N m C. W n��? c €a' a� L n$ P Q$ NS �•�T 3c��m �W�E "_« moL L N5 • E ao ° fig u mQ$ de - Z U v� 9$1 X& , e OR 2 ,,LL _ � n s 'S JO E $ ! L p � m • p E p T - a. L � I v4 $ C $ K -r m N �t Cp q1 p p w �y�+C C p p A 4 1- ° S Z E O f/ 5 U (V D U �� t+I 5 7 W Y rJ• O V �i G STATE HIGHWAY ACCESS PERMIT 306172 August 31, 2006 Located on 1 -70 Frontage near MP 176.50 Right Issued to Ron Byrne TERMS AND CONDITIONS 1. This permitted access is only for the use and purpose stated in the Application and Permit. This Permit is issued in accordance with the State Highway Access Code (2 CCR 601 -1), and is based in part upon the information submitted by the Permittee. Any subsequent relocation, reconstruction, or modifications to the access or changes in the traffic volume or traffic nature using the access shall be requested for by means of a new application. Any changes causing non - compliance with the Access Code may render this permit void, requiring a new permit. 2. This permit replaces any and all additional access permits that may be in existence. All other State Highway access to the property shall be removed. 3. This access shall be constructed 25 -35 feet wide with turning radii to accommodate the minimum turning radius of the largest vehicle or 30 foot, whichever is greater. The turning radius shall be measured from the white line on the Hwy to the edge of the driveway. 4. The access shall be constructed perpendicular to the travel lanes of the State Highway for a minimum distance of 40 feet from the edge of roadway. Side slopes shall be at a 4:1 slope on the driveway. The driveway shall slope away from the highway at a -2% grade for the first 20 feet of driveway. This design shall be in conformance with section 4 of the State Highway Access Code, 2CCR 601 -1. 5. Materials, Placing and Compaction of Driveway Unless the applicant has approval from the Access Manager which may state otherwise, the following will be required for driveway construction. As a minimum the materials for this driveway shall include; Sub -base: class 3 gravel placed in 6 inch lifts, Base: 8 inches of class 6 gravel in two 4 -inch lifts, Surface: 4 inches of pavement in two 2 inch lifts. Compaction of the subgrade, embankments and backfill shall comply with section 203.08 of the Colorado Highway Standard Specifications for Road and Bridge Construction. 6. The access shall be surfaced in accordance with Section 4.7 of the Access Code immediately upon completion of earthwork construction and prior to use. This access shall be hard surfaced in accordance with Section 4.7 of the Access Code a minimum distance of 50 feet from the traveled way or to the CDOT Right -of -Way. Where the hard surface is to abut existing pavement, the existing pavement shall be saw cut and removed a minimum of one foot back from the existing edge for bituminous, or until an acceptable existing cross slope is achieved. Surfacing shall meet the Department's specifications with minimum surfacing to be equal to or greater than existing highway conditions. 7. A Notice to Proceed, CDOT Form 1265, is required before beginning construction on the access or any activity within the highway Right -of -Way. To receive the Notice to Proceed the applicant shall submit a complete packet to CDOT with the following items: (a) A cover letter requesting a Notice to Proceed, and the intended date to begin construction. (b) Construction Plans Stamped (11 "x 17" with a minimum scale of 1" = 50') by a Colorado Registered Professional Engineer in full compliance with the State Highway Access Code The plan shall provide: i) Plan view with driveway dimensions - turn radius, width, slope, sidewalk, etc. ii) Typical road section - existing and proposed sub base, base, pavement, and shoulder dimensions. STATE HIGHWAY ACCESS PERMIT 306172 August 31, 2006 Located on 1 -70 Frontage near MP 176.50 Right Issued to Ron Byrne TERMS AND CONDITIONS (cont.) iii) Centerline profile of the access /Hwy connection showing depths, driveway slope, etc. (c) Certificate of Insurance Liability as per Section 2.3(11)(i) of the State Highway Access Code. (d) A certified Traffic Control Plan in accordance with Section 2.4(6) of the Access Code. The Traffic Control Plan shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during construction. 8. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is required to maintain all drainage in excess of historical flows and time of concentration on site. All existing drainage structures shall be extended, modified or upgraded, as applicable, to accommodate all new construction and safety standards, in accordance with the Department's standard specifications. 9. Open cuts, which are at least 4 inches in depth, within 30 feet of the edge of the State Highway traveled way, will not be left open at night, on weekends, or on holidays, or shall be protected with a suitable barrier per State and Federal Standards. 10. Nothing in this permit shall prohibit the chief engineer from exercising the right granted in CRS 43 -3 -102 Including but not limited to restricting left hand turns by construction of physical medial separations. 11. The Permittee is responsible for obtaining any necessary additional Federal, State and /or City /County permits or clearances required for construction of the access. Approval of this access permit does not constitute verification of this action by the Permittee. Permittee is also responsible for obtaining all necessary utility permits in addition to this access.permit. 12. All workers within the State Highway right of way shall comply with their employer's safety and health policies /procedures, and all applicable U.S. Occupational Safety and Health Administration (OSHA) regulations - including, but not limited to the applicable sections of 29 CFR Part 1910 - Occupational Safety and Health Standards and 29 CFR Part 1926 - Safety and Health Regulations for Construction. Personal protective equipment (e.g. head protection, footwear, high visibility apparel, safety glasses, hearing protection, respirators, gloves, etc.) shall be worn as appropriate for the work being performed, and as specified in regulation. 13. The Permittee shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during and after construction. 14. The.permittee is required to comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG) that have been adopted by the U.S. Architectural and Transportation Barriers Compliance Board (Access Board), and incorporated by the U.S. Attorney General as a federal standard. These guidelines are defining traversable slope requirements and prescribing the use of a defined pattern of truncated domes as detectable warnings at street crossings. The new Standards Plans and can be found on the Design and Construction Project Support web page at: hftp://iww.dot.state.co.us/DesignSul?12orU then click on Design Bulletins. 15. When it is necessary to remove any highway right -of -way fence, the posts on either side of the access entrance shall be securely braced with approved end posts and in conformance with the Department's M -607 -1 standard, before the fence is cut, to prevent slacking of the remaining fence. All materials removed shall be returned to the Department., STATE HIGHWAY ACCESS PERMIT 306172 August 31, 2006 Located on 1 -70 Frontage near MP 176.50 Right Issued to Ron Byrne TERMS AND CONDITIONS (cont) 16. It shall be the responsibility of the Permittee to maintain adequate site'distance for this driveway. Trimming of vegetation or trees to maintain adequate site distance is the sole responsibility of the permittee. 17. Any damage to present highway facilities including traffic control devices shall be repaired immediately at no cost to the Department and prior to continuing other work. 18. During access construction no construction personnel vehicles will be permitted to park in the state highway right -of -way. 19. If the access has a gate across it, the gate shall be set back far enough from the highway so that the longest vehicle using it can clear the roadway when the gate is closed. 20. Any mud or other material tracked or otherwise deposited on the roadway shall be removed daily or as ordered by the Department inspector. If mud is an obvious condition during site construction, it is recommended that the contractor build a Stabilized Construction Entrance or Scrubber Pad at the intended construction access to aid in the removal of mud and debris from vehicle tires. The details of the Stabilized Construction Entrance is found in the M & S Standards Plan No. M- 208 -1. 21. A fully executed complete copy of this permit and the Notice to Proceed must be on the job site with the contractor at all times during the construction. Failure to comply with this or any other construction requirement may result in the immediate suspension of work by order of the Department inspector or the issuing authority. 22. No work will be allowed at night, Saturdays, Sundays and legal holidays without prior authorization from the Department. The Department may also restrict work within the State Highway right -of -way during adverse weather conditions. 23. Access construction shall not negatively impact other properties or the State Highway ROW. 24. The access shall be completed in an expeditious and safe manner and shall be completed within 45 days from initiation of construction within State Highway right -of -way or in accordance with written concurrence of the Access Manager. All construction shall be completed in a single season. 25. All costs associated with any type of utility work will be at the sole responsibility and cost of the permittee and at no cost to CDOT. 26. Areas of roadway and /or right -of -way disturbed during this installation shall be restored to their original conditions to insure proper strength and stability, drainage and erosion control. Restoration shall meet the Department's standard specifications for topsoil, fertilization, mulching, and re- seeding. 27. Upon the completion of the access and prior to any use as allowed by this permit, the applicant shall notify the Access Manager by certified mail within 10 days to request a final inspection. This request shall include certification that all materials and construction have been completed in accordance with all applicable Department Standards and Specifications; and that the access is constructed in conformance with the State Highway Access Code, 2 CCR 601 -1, including this permit. The engineer of record as indicated on the construction plans, shall be present for this inspection. The access serviced by this permit may not be opened to traffic until written approval has been given from the CDOT Access Manager.