HomeMy WebLinkAboutUtility Plan, issue.Vail Mountain View on Gore Creek
Utilities Plan
October 15, 2008
There was a gas line broken at this project today by the earthwork and utilities
subcontractor WVC. This is the forth time utilities have been damaged by this
subcontractor on this project. Three times were gas, and once was electric.
The project was evacuated and emergency crews responded and repaired the line. Also
during the incident an excavation was observed that was of a depth that required a trench
box. This excavation was for the completion of the water main and installation of a
permanent fire hydrant to replace the temporary hydrant on the east side of the project.
While no one was working in the excavation at the time, there was evidence of recent
(same day) water line work, and no trench box or ladder was present. This excavation
requires a trench box for work to continue and due to wet soils, backfill as soon as
possible is important.
The gas line that was struck is a temporary gas line installed by Arby Inc., a
subcontractor for Excel Energy. This line runs along the South, East, and West sides of
the project. For the past week Excel and RA Nelson had been working to determine if
this line could be used for the permanent gas line. The tracer wire had been compromised
and WVC over the past 3 days had been in the process of potholing to find and repair
tracer wires, and to confirm the location of the gas line. Based on the condition of the
tracer wire and the pipeline, and the lack of adequate bedding material, it was determined
that the gas line may have been compromised and it was decided that it would be prudent
to replace the South portion of the line. The west portion had already been replaced, and
the east run needed to be replaced due to conflicts with a sewer main.
RA Nelson's Safety Director is conducting an investigation and will be issuing a formal
report today. OSHA responded to a complaint and was onsite 10/15 and again 10/16.
WVC has been put on formal notice that they are in default under the terms of their
subcontract and in breach of RA Nelson's safety plan. WVC personnel worked with RA
Nelson supervisors and management to develop the enclosed plan for completing the
work. We believe that with the appropriate change in attitude by WVC, the project is best
served by allowing them to complete their contract, but only if the appropriate changes
are made.
The completion of the utility work on this project is complicated and requires careful
coordination and planning. The remaining work consists of:
1. Install 2 fire hydrants, one at the top of the driveway and one near the location of
the temporary fire hydrant on the east end.
2. Clean flush and flow test the water mains
3. Install the sanitary sewer along the east end of the project
The sanitary sewer to be installed and the temporary gas main on the east end of the site
are in the same area. The permanent gas main runs parallel to the building and out of the
alignment of the new sewer service. We believe that the most prudent sequence of work
is to get the permanent gas main installed ASAP and abandon the temporary line. This
will enable us to install the deep sewer without endangering the temporary gas line and
will take a potentially compromised gas line out of service.
We believe that the best solution to the water hydrant excavation is to rapidly complete
this work and get the excavation filled in. The trench box has been installed and the
excavation has been clearly marked with caution tape.
RA Nelson's excavation permit process will be used for all remaining work on this
project. This is a daily pre - planning and communication tool that should prevent future
problems and provide accountability for proper planning and coordination.
Please see attached work plan documents and excavation permit for additional
information.
We appreciate the ongoing help and value the working relationship that we have
established and intend to continue with all town personnel.
Mike Cuthbertson
Vail Valley Regional Manager
Vail Mountain View Utility action plan
As we are all aware we have encountered several issues of concern at the Mountain View
project including the gas line break which occurred today 10- 15 -08. In order to mitigate
any further incidents RA Nelson will propose the following plan and process for the
remainder of the utilities on this project. Below I have outlined this process for your
review and approval.
WATER LINE
1. Currently the water line on the east side has been excavated and is ready for the
fire hydrant installation. The trench box has been installed and RA Nelson and
WVC will insure this work is performed to all the required safety measures and
OSHA standards.
2. It is our plan to install the hydrant on 10 -16 -08 including the required thrust
blocks and backfill this area after your inspection of this work.
3. Upon completion of this work WVC will proceed with the excavation and
installation of the fire hydrant at the drive entrance to the garage.
4. The excavation in this area will be approximately 8' deep so the trench box will
again be utilized and the installation will take place on 10 -16 -08 and 10- 17 -08.
5. Upon completion of this hydrant and thrust block we will again backfill this area
after your inspection and approval of this installation.
6. This will complete the water line installation and we will then start plans for the
clean and flush of the water mains and will coordinate this work with the Fire
Dept.
GAS LINE
1. The existing temp gas service was cut today while attempting to install the
new gas service above the existing line. In order to properly coordinate this
work it is necessary to install the permanent line in its proper location prior to
the excavation and installation of the sewer line.
2. The progress as of today is as follows. The west tie in has been hand
excavated and the trench along the south side of the building is excavated. In
order to continue with this work we will need to complete the following work.
3. WVC will need to excavate from the exposed break around the corner to the
north following the building and crossing the site approximately 50' to the
north.
4. At the south east corner of the site the final grade has not been established due
to missing walls. At this location the exposed pipe will be sleeved with
schedule 40 pipe and protected with barricades from damage until the final
grading is achieved. This will take approximately 2 weeks to complete the
final grade in this area
5. By installing the new line now and before the new sewer is installed the
benefits and safety mitigation are as follows.
6. Currently the temp gas service is directly over the sewer service excavation.
By moving this line over now we will not have to encounter this line until we
cross it at the new tie in.
7. At the cross over location we will leave this area partially exposed and
covered with road base. In this way we can easily identify the cross over
location during the sewer line excavation.
8. If we are allowed to continue this work on 10 -16 -08 we can have this work
installed and backfilled in 2 days.
SEWER SERVICE LINE
1. The third and last line to install is the sewer service line. This line runs from the
south east side of the site to the north along the project.
2. This excavation will be approximately 16' deep and will require a trench box for
this excavation and installation.
3. With the gas line installed shallow to the west we will only need to cross this line
perpendicular to at the tie in location.
4. Currently if we are allowed to proceed with this plan we will be prepared to start
the excavation and installing of the sewer service on Monday and will take
approximately 4 days to complete this work.
In closing RA Nelson will insure proper supervision and safety enforcement of this work
at all times during this process. Any construction deviations or changes to this plan will
not take place without prior approval of the TOV and / Vail Fire Prevention District.
Regards
Paul Burbidge
General Superintendent
Vail Mountain View
PAT
Jai
it
je
Or
IRK
FS
- —
�rgFys:.m- �*+w- tmVtt'"bv�i.�x"v "�s'�.rw .x-' •$Y • —_ u', � -� ;
F �
r•�
j
rr 1
�g 33
- J:r
f�
3 it
i
�11'MIIR
I �
8
d3 3
Y.
�rgFys:.m- �*+w- tmVtt'"bv�i.�x"v "�s'�.rw .x-' •$Y • —_ u', � -� ;
F �
r•�
j
rr 1
�g 33
- J:r
f�
3 it
i
�11'MIIR
I �
8
(10/15/2008) Mike McGee - Scan 001.pdf _Page 1
FACILITY LOCATION SKETCH
:/�lli6'1'�iDUllrl
1
(719) 471 -0229
acf�rtors, L[c.
TICKET #
Z
Z
;�)
Area #:
LOG #: Footage:
ADDRESS:
t�3L / ' ice/ ✓ �L ' I �/j
EXCAVATOR:
How Marked: O Paint Dfleas O NylM MIskere - Pdrd# Time Arrived
Time Completed
PRPMY OWNED FACILITIIS MAYBE IN DIG AREA. THESE INCLUDE, BUT ARE NOT LIMITED M SECONDARY ELECTRIC, WATER, AND AFTER METER GAS SERVICES. R IS THE EXCAVATORS RESPONSIBILITY
TO GET THESE MARKED. 40AIARKS PROVIDED BY UNDERGROUND LOCATORS ARE COURTESY ONLY WITH NO WARRANTY.
NORTH
O DIG ALERT
One or more of the following
high profile facilities has been
located In or near your dig area.
Please pot hole and verify
location.
_..
fi iSf
? 0 Electric Feeder
ct >tN
O Fiber Optic
0 Duct Run
0 H.P. Gas
O fi00 Pair or -
Greater. Telephone -
0 4` or Bigger Gas
0 Watch &Protect/
r' 4 �'' `
Standby Required
r2
Please l 71-0229
tint
�
to sc hedu le a e.
EXCAVATOR .NOTIFIED
Name
' J Date
AM
PM
'
Time
.-•
E - Electric
G ^^
G - Gas
TV - CATV
Crl-;n- [ AtS T___
T - Telephone
+�---
W - Water ,
F/O - Fiber Optic
-
DR - Duct Run
S - Sewer
' LDCDE MARKS ARE ONLY GOOD FOR 30 DAYS OR WHILE VISIBLE. CALL FOR RE-Ml IF PAINT MARKS ARE DESTROYED OR WEIDNERED.
YOURTICKETIS NOT VALID :IFHARKS ARE:DESTROYFD.
SKMHiS "APPROXIMATE: 1SAMES HORIZONTALLY FROM'EXTERIOR.SDE OF THE FACILITY IS CONSIDERED A "CORRECT LOCATION:
EXTENDED JOB AGREEMENT
.:THIS
Ourcompanyand l reethetthisonginellocate
ticket is an extended job and that boated will be
COMMENTS
done on day- today basis: No excavating will '
: take piecelwNh Vie dig r s received by
o ur
PRINT LOCATORS NAME
y
i L-
% i DATE
Excavators Signature
Signature of person on job site
(10/15/2008) Mike McGee - Scan 001.pdf Page 1 j
PAINT-tAt
Signature t
J DATE`��ayarors SVgneriire
` MM DD
yyyy DDelete
NFIRS -1
r�
03745 20 10 1 l 15J 1 2008 1002 108- 028900" 000 Change
Basic
FDID * State * Incident Date *
Station Incident Number * Exposure * ❑ No Activity
(deck this box to Indicate that the address for this incident is p—ided on the wildland Fire census Tract I I
BLocation* ❑Module In Section B "Alternative Location Specification-. Use only for wildland fires. ICJ
®Street address 4421 IS 1
(FRONTAGE I 1 D 1�
❑Intersection Number /Milepost Prefix
Street or Highway Street Type suffix
❑In front of (Vail I CO 81657 -1�
❑Rear Of Apt./Suite/Room City
State Zip Code
[]Adjacent to I
❑Directions Cross street or directions, as apnlicable
C Incident Type *
Midnight is 0000
$l Date & Times
�+ 2 Shift & Alarms
412 (Gas leak (natural gas or LPG) I
Check boxes if Month Day Year Hr Min Sec
dates are the
same as Alarm ALARM always required
Date. Alarm * 10 15 2008 11:03:39
Local option
JB I " 001
shift or Alarms District
incident Type
D Aid Given or Received*
Platoon
ARRIVAL required, unless canceled or did not arrive
E 3
1 ❑Mutual aid received 111
® Arrival * 10 15 20081111:06:08
U U
2 ❑ Automatic aid recv. Their FDID Their
State
CONTROLLED Optional, Except for wildland fires
Special Studies
3 ❑Mutual aid gives
' I 1
U IL��I
Local Option
4 ❑Automatic aid given I I
nCoatrolled 1 J
I I
5 ❑Other aid given Their
LAST UNIT CLEARED, required except for wildland fires
Unit
Special Special
incident Number
N Hone
Last
' � 5�
® L 10 L--) 2008 14 :41 :11
stray IDs Study Value
Cleared
F Actions Taken *
Gl Resources *
G2 Estimated Dollar Losses & Values
®Check this box and skip this
LOSSES: Required for all fires if known. Optional
section if an Apparatus or
Personnel form is used.
for non fires. Hone
43 (Hazardous materials
Apparatus Personnel
Property $I I , 1 000 , 1 000
Primary Action Taken (1)
Contents $1 , 000 , 000 El
USuppression
I
EMS
PRE-INCIDENT VALUE: Optional
Additional Action Taken (2)
I I I
other I 0003 0001
Property $1 , 000 000
Additional Action Taken (3)
❑ Check box if resource counts
aid received resources.
Contents , 000 000
$1� LUG , LUJ El
Completed Modules
Hl*Casual ties[:]None
H3 Hazardous Materials Release
I Mixed
Use Property
NN
Not Mixed
❑Fire -2
Deaths Injuries
N ❑None
10
Assembly use
❑structure -3
Fire I ' II
II
1 ❑Natural Gas: slow leak, no eveuatiee or HasMet actions
20
Education use
[]Civil Fite CaB. -4
Service U I�
2 ❑Propane gas: <u lb. took fee in hose Hag g =i111
33
Medical use
Fire Serv. Cas. -5
❑
Civilian�J
3 Gasoline: vehicle feel tank or portable container
❑
40
51
Residential use
Row of stores
❑8M8 -6
4 ❑Kerosene: fuel burning nquipeent or portable storage
53
Enclosed mall
Detector
❑HazMat -7
for Confined
Fires.
5 ❑Diesel fuel /fuel Oil:oahicle fuel tank or portable
58
BUS. & Residential
❑wildland Fire -8
Required
1 ❑Detector alerted occupants
6 []Household solvents: hoes /office spill, cleanup only
59
6 0
Office use
Industrial use
®Apparatus -9
7 ❑Motor Oil: free engine or portable container
63
Military use
®Personnel -10
2 ❑Detector did not alert
them
0 e []Paint: free paint cane totaling < ss gallons
65
Farm use
UgArson -11
❑Unkaorn
0 ❑Other: Special HasMat actions required or spill > 559a1.,
1 00
Other mixed use
please cosplete the HazMat fora
341 ❑Clinic, clinic type infirmary 539E] Household goods, sales, repairs
J Property Use* Structures
342E]aoctor /dentist office 579 ElMotor vehicle /boat sales /repair
131 ❑Church, place of worship
361 ❑Prison or jail, not juvenile 571 ❑ Gas or service station
161 [:]Restaurant or cafeteria
41901-or 2- family dwelling 599 [:]Business office
162 ❑Bar /Tavern or nightclub
429 ❑Multi - family dwelling 615 ❑ Electric generating plant
213 ❑Elementary school or kindergarten
439 ❑Rooming /boarding house 629 ❑ Laboratory /science lab
215 ❑High school or junior high
449 ❑commercial hotel or motel 700 E] Manufacturing plant
241 ❑ College, adult education
459 [:]Residential, board and care 819 ❑Livestock /poultry storage (barn)
311 ❑Care facility for the aged
464 ❑Dormitory /barracks 882 ❑Hon - residential parking garage
331 ❑Hospital
519 [:]Food and beverage sales 891 []Warehouse
Outside
936 ❑ Vacant lot 981:0 Construction site
124 []Playground or park
938 ❑Graded /care for plot of land 984 ❑ Industrial plant yard
655 ❑Crops or orchard
946 [-]Lake, river, stream
Lookup and enter a Property Use code only if
669 ❑Forest (timberland)
951 ❑Railroad right of way you have NOT checked a Property Use box:
807 ❑ Outdoor storage area
960 ❑ Other street Property Use 1981
919 ❑gyp or sanitary landfill
961 ❑Highway /divided highway I
(Construction Site
931 O land or field
❑ pen
962 Residential street /driveway
❑ NFIRS -1 Revision 03/11/99
Vail Fire 03745 10/15/2008 08- 0289004
K1 Person /Entity Involved I I 1 - 1J 1
Local Option Business name (if applicable) Area Code Phone Number U
❑Check This BOX if Mrr.s (First Name I Mi I Last Name I suffix
same address as
incident location. I I U I I
Then skip the three I I u
duplicate address Number Prefix Street or Highway Street Type Suffix
lines.
Post Office Box Apt. /Suite /Room City
uI -I
State Zip Code
More people involved? Check this box and attach Supplemental Forms (NFIRS -lS) as necessary
Ka owner Same as person involved?
Then check this box and skip
The rest of this section.
Business name (if
Applicable)
Area Code Phone Number
Local Option
I I (
I U (
I
❑Check this box if Mr.,Ms., Mrs. First
Name
MI Last Name
Suffix
same address as
incident location. I I
I I I
u u
Then skip the three
Number
Prefix Street or
Highway
Street Type Suffix
duplicate address
lines. I
I I
1_
Apt. /Suite /Room City
Post Office Box
u u
-u
State zip Code
L Remarks
Local Option
EXCAVATER HIT 2 IN GAS LINEOUTSIDE THE BUILDINGALSO CALLED IN BYROB PARRISH 748- 7684CALLING
FROM THE JOBSITEAIRED VPDTWO MORE CALLS FROM SITEPD NEEDED FOR TRAFFICCALL EXCELNO WAY TO
MITIGATE THIS GAS LINE BREAK. CONSTRUCTION WORKERS ON SCENE HAVECONTACTED EXCEL ENERGY, AND
THEY'RE EXPECTING A 2 -3 HOUR RESPONSE.FYI PER APOLLO PARK COMMAND.EXCEL ENERGY NUMBERMOVED
TRAF TO ES1 FOR THIS INCIDENTE2 COMMAND REQUESTS ES 1 FOR THIS INCIDENT.THEY DON'T NEED THE
PD TO CLOSE DOWN THE ROAD. THEY HAVE PRETTY GOOD DISTANCE ONTHAT.EXCEL ENERGY NUMBER
IS800- 698 -7811E VAIL;A: @APOLLO PARK A " AT: 10/15/08 11:13:58217 AND 251 CLEAR AWAITING REQ
FROM FIRE FOR ROAD CLOSUREPER COMMAND /UTILITIES ARE SHUT OFF - THIS INFO FROM AN
ELECTRICIAN.PER 405, GAS LINE ON SOUTH SIDE, NEED TO KNOW DIRECTION OF GAS TRAVEL -EAST
ORWESTCALLING EXCELON LINE WITH ROB @EXCELCOMMAND GAVE AN UPDATE OF SITUATIONTHEY HAVE A GUY
IN MINTURN & WILL CONTACT HIM TO SEE IF HE CAN GO OVER TO VAILHE WILL CALL BACK WITH AN ETA2
INCH PLASTIC LINE W/ A SLIT IN IT W/ MODERATE GAS LEAKAGE /APPROXIMATELY 10OPSI.COMMAND WANTS
MOSES, OR AN OFFICER TO MEET HIM AT STAGING UP ON TOP.AJ IN MINTURN WITH EXCEL ON LINE, HE
WILL CONTACT JAKE FARBER TO CONTACT USDIRECTPER AJ, JAKE CONTACTED FIRE DIRECTLYPER 405,
EXCEL DID CONTACT THEM DIRECTPER 460, THEY NEED HELP SECURING THE BIKE PATH. HE WILL CALL
DOWN THERE TIL HELPARRIVES.THERE ARE CONTRACTORS COMING BACK ONTO THE SCENE FROM THAT
LOCATION.THIS IS BEHIND THE APOLLO PARK.WANTS ABMI FOR REHAB & EVALAPOLLO PARK STAGING
REQUESTS AN AMBULANCE FOR REHAB CHECK ON THE FIRE FIGHTERS.MED 1 COPIED DIRECT.NO TONES
DONE.MED1 ON ESIEXCEL ON SCENESCENE TURNED OVER TO 460, ALL UNITS STAGIONGESI CLEARBRUSH 2
IS ACTUALLY B2ITHEY ARE CL THE SCENE AND GOING TO STATION 2AT 1227, 402 ADVISED THAT 460 HAS
TAKEN COMMAND OF THIS SCENE, AND THAT ALLOTHER UNITS ARE CLEAR, AND RETURNING TO ST 2TO PUT
460 ON THE CALLASSIGN CASE NUMBER460 NEEDS PHONE NUMBER FOR RA NELSON CONSTRUCTIONCORRECTION
ON MED2 /THEY WERE NEVER ON THIS CALL.CLEARED OF APOLLO PARK; THEN ENROUTE TO STATION 2LEAVE
CALL OPEN FOR NOW
L Authorization
ISPEL0001 ISpell, James G I1CP istation 2 1 1 10 1 LL5J 1 2008 I
Position or rank Assignment Month Day Year
Officer in charge ID Signature
Box °�f F1 I MCGE0001 I McGee, Michael J I JDC station 2 I 10� 15 2008
same Position or rank Assignment Month Day Year
as Officer Member making report ID Signature
in charge.
Vail Fire 03745 10/15/2008 08- 0289004
' MM DD YYYY
03745 CO 10 15 2008 002 1 08- 0289004 000 complete
Narrative
FDID ,A, State * Incident Date * Station Incident Number * Exposure
Narrative:
EXCAVATER HIT 2 IN GAS LINEOUTSIDE THE BUILDINGALSO CALLED IN BYROB PARRISH 748- 7684CALLING
FROM THE JOBSITEAIRED VPDTWO MORE CALLS FROM SITEPD NEEDED FOR TRAFFICCALL EXCELNO WAY TO
MITIGATE THIS GAS LINE BREAK. CONSTRUCTION WORKERS ON SCENE HAVECONTACTED EXCEL ENERGY, AND
THEY'RE EXPECTING A 2 -3 HOUR RESPONSE.FYI PER APOLLO PARK COMMAND.EXCEL ENERGY NUMBERMOVED
TRAF TO ES1 FOR THIS INCIDENTE2 COMMAND REQUESTS ES 1 FOR THIS INCIDENT.THEY DON'T NEED THE
PD TO CLOSE DOWN THE ROAD. THEY HAVE PRETTY GOOD DISTANCE ONTHAT.EXCEL ENERGY NUMBER
IS800- 698 -7811E VAIL;A: @APOLLO PARK A " AT: 10/15/08 11:13:58217 AND 251 CLEAR AWAITING REQ
FROM FIRE FOR ROAD CLOSUREPER COMMAND /UTILITIES ARE SHUT OFF - THIS INFO FROM AN
ELECTRICIAN.PER 405, GAS LINE ON SOUTH SIDE, NEED TO KNOW DIRECTION OF GAS TRAVEL -EAST
ORWESTCALLING EXCELON LINE WITH ROB @EXCELCOMMAND GAVE AN UPDATE OF SITUATIONTHEY HAVE A GUY
IN MINTURN & WILL CONTACT HIM TO SEE IF HE CAN GO OVER TO VAILHE WILL CALL BACK WITH AN ETA2
INCH PLASTIC LINE W/ A SLIT IN IT W/ MODERATE GAS LEAKAGE /APPROXIMATELY 10OPSI.COMMAND WANTS
MOSES, OR AN OFFICER TO MEET HIM AT STAGING UP ON TOP.AJ IN MINTURN WITH EXCEL ON LINE, HE
WILL CONTACT JAKE FARBER TO CONTACT USDIRECTPER AJ, JAKE CONTACTED FIRE DIRECTLYPER 405,
EXCEL DID CONTACT THEM DIRECTPER 460, THEY NEED HELP SECURING THE BIKE PATH. HE WILL CALL
DOWN THERE TIL HELPARRIVES.THERE ARE CONTRACTORS COMING BACK ONTO THE SCENE FROM THAT
LOCATION.THIS IS BEHIND THE APOLLO PARK.WANTS ABMI FOR REHAB & EVALAPOLLO PARK STAGING
REQUESTS AN AMBULANCE FOR REHAB CHECK ON THE FIRE FIGHTERS.MED 1 COPIED DIRECT.NO TONES
DONE.MED1 ON ESIEXCEL ON SCENESCENE TURNED OVER TO 460, ALL UNITS STAGIONGESI CLEARBRUSH 2 IS
ACTUALLY B2ITHEY ARE CL THE SCENE AND GOING TO STATION 2AT 1227, 402 ADVISED THAT 460 HAS
TAKEN COMMAND OF THIS SCENE, AND THAT ALLOTHER UNITS ARE CLEAR, AND RETURNING TO ST 2TO PUT
460 ON THE CALLASSIGN CASE NUMBER460 NEEDS PHONE NUMBER FOR RA NELSON CONSTRUCTIONCORRECTION
ON MED2 /THEY WERE NEVER ON THIS CALL.CLEARED OF APOLLO PARK; THEN ENROUTE TO STATION 2LEAVE
CALL OPEN FOR NOW
---------------------------
10/15/2008 15:09:25 mjmcgee
Deputy Chief Report
Arrived on scene . Reported to Staging. Assigned to evacuate B Building of Apollo Park. No
one responded to knocks on doors.
Returned to staging. After Ambi arrived, cleared by Command for Investigation.
Identified Operator as Anthony Alan Fischer, DOB 08/09/80, CDL 97- 112 -0621, 5926 W 93 Ave,
Westminster, CO 80031, dba WVC. Fischer claimed to be the competent person.
WVC holds a Town of Vail
On approach to the site of the gas line cut, I observed a 8 - 9 ft deep hole in and around
work involving a fire hydrant. The hole was cut 1:1, wet, and tools were observed in the
bottom of the hole. No trench box or ladder was present.
--------------------------------------------------------------------------------
10/15/2008 21:39:06 jgspell
E 2 responded from Station 2 on a report of a gas line break at 442 S. Frontage Rd. E.
Arrived to hear from job supervisors that a two inch flexible line had been cut. ETA from
Excell was relayed to E 2 as up to 3 hours due to a problem with the responding vehicle.
Evacuated job site of approximate 70 workers and staged them at Ford Park. Confirmed
utilities to be shut off and made entry into affected area. Found two inch flexible gas line
Vail Fire 03745 10 /15 /lDUa ua- ULU7uV4
MM DD YYYY
03745 CO 10 15 2008 002 08- 0289004 000 Complete
Narrative
FDID * State * Incident Date * Station Incident Number * Exposure
Narrative:
at the bottom of a 2 foot by 2 foot trench. Condition report revealed the possibility of
mitigating the break utilizing fire department clamps. Establish command location, staging
and called for additional resources for RIT and possible Rehab. Sent four firefighters and a
supervisor on air into the area for clamping procedures. RIT and Safety issues were
addressed and gas was shut off at the break within 30 minutes. Sent mitigation group to
Rehab and created Security group from RIT team. Area was secured, turned scene and command
over to Investigation (Deputy Chief McGee) and began Demobilization of two engines, one
utility vehicle and 1 ambulance and crew. All fire units clear of scene. Note: on scene
medical evaluation proved negative for natural gas exposure. Rehab continued at Station 2
and was finalized by all firefighters ordered on air to complete exposure report for file.
402
Vail Fire 03745 10/15/2008 ua- u2a9UU4
A I MM DD YYYY
03745 CO 10 15 2008 002 08- 0289004 1 000 ❑Delete
NFIRS - 9
Apparatus or
FDID * State * Incident Date * Station Incident Number * Exposure * ❑Change
Resources
B Apparatus or *
Date and Times
Sent
Number
Use
Actions Taken
Resource
Check if same as alarm date
O f *
Check ONE box for each
apparatus to indicate
Month Day Year Hour Min
People
its main use at the
incident.
Fil ID 1460 1
Dispatch W1 1011 1511 2008 12:33
❑Suppression
Arrival X1 10 15 2008 12:33
L 11
❑HMS
Type INN J
Clear ® L 10 15 2008 15:00
®other
ID B2
Dispatch ® 1 1011 1511 2008 11:48
❑Suppression
Arrival ® 10 15 1 2008 11:48
®
1 01
El Ems
Type 116 1
Clear ML 10 15 2008 12:25
®Other
3 ID JE2
Dispatch MI 1011 1511 2008 11:03
Suppression
�� u
Arrival [&1 10 15 2008 11:06
a
1 01
[1 Ems
L� u
Type 11
Clear ML 10 15 2008 12 :27
Mother
F4 1 ID
Dispatch ❑
❑ Suppression
�� u
Arrival
Arrival ❑ L� L_ j l ��
❑
L-1
El HMS
�l
Type
❑ L -J L---] L---J
❑Other
F51 ID u
1I
Dispatch L_�L� L� l�
❑Suppression
Arrival L J �� L_� ��
❑
Elms
Type I�
Clear ❑ L-1 L j L----]
❑ Other
ID
Dispatch L-�IL�
❑ Suppression
�I U
I��
Arrival ❑ I� I� L
❑
II
I�
1:1 EMS
I
Ty II II
pe L�
Clear ❑ L_1 L� �1 ��
Other
F71 ID
Dispatch L_ 1 L� �J ��
El Suppression
L-i L--j
Arrival ❑ ��
❑
OHMS
�—j
L-1
'' II
Pe I�
Clear El L-1 L� L---1 ��
❑Other
ID I1
Dispatch l�L -1L1 L_�
El Suppression
"
Arrival ❑ LJ �� L--1 �J
❑
L�
❑ �S
'L--j
" I
tYPe I�
Clear ❑ L--j L� L_�
❑ Other
ID
Dispatch ❑ L�IL� ��
❑ Suppression
"
I��
1��
Arrival 1-1 �� U L_�
❑
L_�
❑ HMS
IL—j'
"
'' II
Pe L�
Clear ❑ L�L-1 L_� L--�
❑Other
Type of Apparatus or Resources
Ground Fire Suppression Marine Equipment More Apparatus?
11 Engine 51 Fire boat with pump Use Additional
12 Truck or aerial 52 Boat, no pump Sheets
13 Quint 50 Marine apparatus, other
14 Tanker & pumper combination
16 Brush truck Support Equipment Other
17 ARF (Aircraft Rescue and Firefighting) 61 Breathing apparatus support 91 Mobile command post
10 Ground fire suppression, other 62 Light and air unit 92 Chief officer car
Heavy Ground Equipment 60 Support apparatus, other 93 HazMat unit
21 Dozer or plow Medical & Rescue 94 Type 1 hand crew
22 Tractor 71 Rescue unit 95 Type 2 hand crew
24 Tanker or tender 72 Urban Search & rescue unit 99 Privately owned vehicle
20 Heavy equipment, other 73 High angle rescue unit 00 Other apparatus /resource
Aircraft 75 BLS unit
41 Aircraft: fixed wing tanker 76 ALS unit NN Node
UU Undetermined
42 Helitanker 70 Medical and rescue unit,other
43 Helicopter
40 Aircraft, other NFIRS -9 Revision 11/17/98
Vail Fire 03745 10/15/2008 08- 0289004
A MM DD YYYY HFIRS - 10
03745 CO 10 15 2008 002 08- 0289004 1 000 ❑Delete
Personnel
FDID * State * Incident Date �, Station Incident Number �, Exposure * E]Change
B Apparatus or *
Date and Times
Sent Number
Use
Actions Taken
Resource
Check if same as alarm date
❑
of *
Check ONE box for each
apparatus to indicate
List up to 4 actions
for each apparatus
Use codes listed below
Month Day Year Hours /wins
People
its main use at the
incident.
and each personnel.
ID 1460 1
Dispatch W1 1011 1511 2008 12:33
Sent
Suppression
Arrival PPI 10 15 20081112:33
�
11
E]EMS
I� u
Type L " =�
Clear ® 10 15 2008 14:41
Mother
Personnel
Name
Rank or
Attend
Action
Action
Action
Action
ID
Grade
❑
Taken
Taken
Taken
Taken
MCGE0001 McGee,
Michael
DC
X
2 IB2
Dispatch El 1011 1511 2008 11:48
Sent
Suppression
u �l
ID
Arrival ® 10 15 2008 11:48
1 01
El EMS
Type 116
Clear ® 10 15 1 20081112:24
®other
Personnel
Name
Rank or
Attend
Action
Action
Action
Action
ID
Grade
Taken
Taken
Taken
Taken
3
Dispatch ® 10 15 2008 11:03
Sent
�guppressioa
ID $2
Arrival ® 10 15 20081111:06
®
101
oms
Type 11
clear ® 10 15 20081112:27
mother
Personnel
Name
Rank or
Attend
Action
Action
Action
Action
ID
Grade
Taken
Taken
Taken
Taken
Vail Fire
HFIRS -10 Revision 11/17/98
03745 10/15/2008 08- 0289004
03745 CO 10 15 2008 002 OS- 0289004 000 Responding
FDID State Incident Date Station Incident Number Exposure IIIIitB/P @ISOnnAl
(unit
(423)
Notify Time
Enroute Time
Arrival Time
Cleared Time
460 Deputy Chief/ Fire Marshall
12:33:27
12:33:28
12:33:29
14:41:11
Staff ID \Staff Name
Name
Activity
Rank
Position
Role
IStaff ID \Staff Name
Activity
Rank
Position
Role
MCGE0001 McGee, Michael J
Code Enforcement
Deputy Chie
deputy chief
Code Enforce
!, B2 Brush Truck
(423)
11:48:12
11:48:20
11:48:26
12:24:19
Staff ID \Staff
Staff ID \Staff Name
Name
Activity
Rank
Position
Role
E2 Engine 2 (411)
11:03:39
11:04:52
11:06:08
12:27:18
Staff ID \Staff Name
Activity
Rank
Position
Role
Vail Fire Page 1 03745 10/15/2008 08- 0289004
MM DD YYYY
03745 CO 10 15 2008 002 08- 0289004 000 Responding Personnel
FDID * State * Incident Date * Station Incident Number * Exposure
Staff ID \Staff Name Unit Activity Position Rank PayScl Hrs HrsPd Pts
MCGE0001 McGee, Michael J 460
Total Participants:)
CE Code
DC DC 1.00 3.63 0.00
Total Personnel Hours: 1.00
An 'X' next to the unit denotes driver.
03745 10/15/2008 08- 0289004
Vail Fire
A . I MM DD YYYY NFIRS - 11
03745 CO 10 15 2008 002 OS- 0289004 000 ❑Delete
Arson
FDID ,k State * Incident Date * station Incident Number * Exposure * ❑ Change
$ Agency Referred To ❑ None
Street Address Their Case Number
I
Agency Name City I�-I+ Their ORI U
Their Federal Identifier (FID) Their FDID
Agency Phone Number State zip Code
C Case Status D Availability of Material First Ignited
1 [:]investigation open 4 ❑ Closed with arrest 1 ❑ Transport to scene
2 ® investigation closed 5 [:]Closed with exceptional 2 ❑ Available at scene
3 ❑ Investigation inactive clearance U ❑ unknown
$ Suspected Motivation Factors Check up to three factors
42 ❑ Vanity /recognition 54 ❑ Burglary
11 ❑Extortion 22 ❑Hate crime 43
❑ Thrills 61 ❑ Homicide concealment
12 ❑ Labor unrest 23 ❑ Institutional 44 ❑ At teat ion/ sympathy 62 ❑ Burglary concealment
13 ❑ insurance fraud 24 ❑ Societal 45 []Sexual excitement 63 ❑ Auto theft consealment
Homicide 64 Destroy records /evidence
14 intimidation 3 1 ❑Protest 51 ❑ ❑
15 ❑ void contract /lease 32 ❑ Civil unrest 52 ❑ suicide 00 []other motivation
21 ❑ Personal 41 ❑ Fireplay /curiosity 53 ❑ Domestic violence UU []unknown motivation
F Apparent Group Involvement H Incendiary Devices select one from each category
Check up to CONTAINER NN [] None
1 [:]Terrorist group three factors
❑ 11 ❑Bottle (Glass) 14 ❑Pressurized container 17 []Box
2 Gang
3 ❑ Anti - government group 12 [:]Bottle (Plastic) 15 ❑ Caa 00 ❑Other container
4 []outlaw motorcycle organiation 13 ❑ Jug 16 [:]Gasoline or fuel can UU []Unknown
5 [:]Organized crime
6 ❑Racial /ethnic hate group IGNITION /DELAY DEVICE NN ❑None
7 ❑ Religious hate group 11 ❑ Hick or Fuse 17 []Road flare /fuse
8 [:]Sexual preference hate group 12 ❑ Candle 18 []chemical Component
0 [:]Other group 13 ❑ Cigarette & Matchbook 19 ❑ Trailer /streamer
N ❑ No Group involvement, acted alone 14 ❑ Electronic Component 20 []Open flame source
* ❑ unknown 15 [:]Mechanical Device 00 [:]Other delay device
Entry Method 16 []Remote Control W ❑ Unknown
FUEL NN ❑ Noae
UI
Entry Method
11 ❑ Ordinary Combustibles 16 ❑ Pyrotechnic material
G'+2 Extent of Fire Involvement on Arrival 12 ❑ Flammable gas 17 []Explosive material
I 14 ❑ ignitable liquid 00 []Other material
U t I 15 ❑ Ignitable solid UU [:]unknown
Extent of Fire Involvement
I other Investigative Information J Property Ownership K Initial Observations
Check all that apply
Check all that apply
1 N windows ajar 5 ❑ Fire department forced entry
1 ® Code violations 1 ❑ Private 2 [:]Doors ajar 6 ❑ Forced entry erior to FD arrival
2 []Structure for sale 2 ❑ City,town,village,local 3 ❑ Doors locked 7 ❑ security system activated
3 ❑ structure vacant 3 []County or parish 4 ❑ Doors unlocked 8 [:]security present,(didn't activate)
4 ih
Oter crimes involved
❑ 4 ❑State or province
5 ❑ Illicit drug activity 5 ❑ Federal L Laboratory Used Check all that apply
6 ❑ Change in insurance 6 [:]Foreign
7 ❑ Financial problem 7 []military 1 [:]Local 3 ❑ ATF 5 ❑ Other 6 ❑ Private
8 ❑ Criminal /Civil 0 ❑ Other 2 ❑ state 4 ❑ FBI Federal N ® None
actions pending NFIRS-11 Revision 11/17/98
Vail Fire 03745 10/15/2008 08- 0289004