Loading...
HomeMy WebLinkAboutPEC100001 Approval Action Form 032210Planning and Environmental Commisson ACTION FORM TOWN ,W H11 DE ELOP MEhaT Department of Community Development 75 South Frontage Road Vai I Colorado 81657 tel: 970.479.2139 fax: 970,479.2452 web: www.vailgov.com Project Name: Timber Ridge Redevelopment PEC Number: PEC100001 Project Description: Participants: REQUEST FOR VARIANCE FROM SECTION 14 -6 -7: RETAINING WALLS, TO ALLOW FOR CONSTRUCTION OF RETAINTING WALL IN EXCESS OF SIX FEET IN HEIGHT OWNER TIMBER RIDGE AFFORDABLE HOUS 01/12/2010 IN CARE OF NAME FINANCE DIRECTOR 75 S FRONTAGE RD W VAI L CO 81657 APPLICANT PYLMAN & ASSOCIATES 01/12/2010 RICK PYLMAN 137 MAIN ST, SUITE 170 EDWARDS CO 81632 Project Address: 1280 N FRONTAGE RD W VAIL Location: TIMBER RIDGE Legal Description: Lot: C -1, Block: A TO Subdivision: LION'S RIDGE FIL. 1 Parcel Number: 2103 - 121 - 0500 -8 Comments: See conditions BOARD /STAFF ACTION Motion By: Kurz Action: APPROVED Second By: Viele Vote: 6 -1 -0 (Kjesbo opposed) Date of Approval: 03/22/2010 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond : 300 (PLAN): PEC approval shall not be not become valid for 20 days following the date of approval. Cond: CON0012372 Any approvals granted by the Town of Vail Planning & Environmental Commission (PEC) shall only be effective upon the approval date of each of the three development application requests. Should one or more of the development applications be denied or fail to be approved, then none of the applications are approved and the proposal is denied in its entirety. Cond: CON0012373 The Developer shall submit a revised set of drawings to the Town of Vail Community Development Department for review and approval depicting the rockfall mitigation fence along the south side of Lions Ridge Loop within the property boundaries of Lot 2, Timber Ridge Subdivision. The mitigation fence shall be designed and constructed in accordance with the regulations prescribed in Chapter 12 -21, Hazard Regulations, of the Town of Vail Zoning Regulations. The revised set of drawings must fully comply with the applicable regulations of the Town of Vail prior to the issuance of any building permit for the Project. Cond: CON0012374 The Developer shall submit a detailed waste removal management and operations plan specifically describing how waste and recycling will be accommodated and managed on the site. The plan shall be submitted to the Community Development Department for review and approval prior to the issuance of a building permit for the Project. Cond: CON0012375 The Developer shall submit an executed deed restriction for Lot 2, Timber Ridge Subdivision, approved by the Town of Vail, demonstrating compliance with Chapter 12 -6I, Housing District, and Chapter 12 -13, Employee Housing, Zoning Regulations of the Town Vail, prior to the issuance of a building permit for the Project. The deed restriction shall be noted on the Final Plat prior to recording the Final Plat with the Eagle County Clerk & Recorder's Office. The deed restriction shall be recorded with the Eagle County Clerk & Recorder's Office prior to the issuance of any Certificate of Occupancy on Lot 2, Timber Ridge Subdivision. Cond: CON0012376 The Developer shall submit a revised architectural site plan and landscape plan to the Town of Vail Community Development Department for review and approval depicting a reconfigured fire lane /pedestrian path alignment which relocates trees from above the location of the water and sewer lines, narrows the width of the fire lane /pedestrian path to 14 feet maximum in the spaces between the fire staging areas, delineates the pedestrian portion of the path from the bicycle portion and provide physical improvements that discourages vehicles from entering onto the fire lane /pedestrian path. The revised plans shall fully comply with applicable regulations of the Town of Vail prior to the application for a building permit. Cond: CON0012377 The Developer shall submit a construction staging plan to the Town of Vail Community Development Department for review and approval which addresses such matters as materials staging, construction parking plan, construction and occupancy phasing, temporary access, construction schedule, temporary utilities, traffic control, emergency access, etc. The Developer shall demonstrate full compliance with the applicable regulations of the Town of Vail prior to the issuance of a building permit for the Project. Cond: CON0012378 The Developer shall record a revocable right of way permit for any and all private property improvements located with the Town of Vail right of way. Said permit shall be recorded with the Eagle County Clerk & Recorder's Office prior to the issuance of a building permit for the Project. Cond: CON0012379 The Developer shall submit a Shoring and Excavation Plan to the Town of Vail Community Development Department for review and approval, which addresses such matters as excavation phasing, engineered shoring plans, detailed profiles and cross - sections, existing utilities, materials storage, permanent and temporary easements, etc. The Developer shall demonstrate full compliance with the applicable regulations of the Town of Vail prior to the issuance of a building permit for the Project. Cond: CON0012380 The Developer shall submit revised plans to the Town of Vail Community Development Department demonstrating compliance with the list of issues identified in the memorandum to George Ruther, Director of Community Development, from Tom Kassmel, Town Engineer, dated March 16, 2010 and attached for reference (Attachment E). Said plans shall be submitted for review and approval and fully comply with all applicable regulations of the Town of Vail, pursuant to the date specified with the memorandum. Planner: George Ruther PEC Fee Paid: $0.00