This letter is to advise you and confirm to you that Shaw Construction, as the General
Contractor for Vail Plaza Hotel & Club, has posted a one hundred thousand dollar
($100,000.00) bond for the benefit of the Town of Vail. The bond will be held while a
satisfactory solution and remedy has been completed concerning the entrance/exit door at
the Vail Plaza Hotel & Club loading dock. The bond is posted for the purpose of insuring
that the work is completed by June 30, 2007. If a resolution is not completed by this date
the Town of Vail may call the bond.
Various options to remedy the issue, pending appropriate approvals, are as follows and !'!'
will be executed in the order listed:
ti
k.-J,
1.) Verify that a thirteen foot six inch (13'- 6 ") WB -40 truck can enter and clear the
loading and delivery garage. (After relocation of the sprinkler heads. No attempt
has been made to verify non - compliance).
2.) Removal of the horizontal wood trim at the bottom of the door header, which „
achieves a thirteen foot eleven inch (13' -11 ") opening.
3.) Rework of steel to achieve a fourteen foot (14') opening — coupled with i4l adjustments to the door as well as the addition of brush seals.
4.) Apply for a variance from CDOT and the Town of Vail to remove, re -grade and
replace the loading dock drive in order to change the drive slope to a straight
grade from the south edge of the mandated two percent (2 %) cross -slope on the
crosswalk to the trench drain.
We are sure a solution can be achieved by using a combination of the above. Number 2.)
will be completed before December 12, 2007 for verification.
16 VAIL ROAD, VAIL, COLORADO 81657
970-477 -8000 TOLL FREE: 877-888-1540 FAx: 970-477-8012
www.vailplazabotel.com
Page - 2 -
Until the time a viable solution is achieved, the Vail Plaza Hotel will inform all delivery
companies and all merchants within SDD #6 that all deliveries are to be delivered in
vehicles that are no more than twelve foot six inch (12' -6 ") in height and at no time will
delivery vehicles be permitted to load/unload within the Vail Road and or South Frontage
Road right of ways, unless a permit has been obtain from the Town of Vail. In addition,
no vehicle will be permitted to stop /stand or back up within any travel lanes of Vail Road
and or South Frontage Road.
A Violation of this requirement will result in a traffic violation ticket and or the possible
revocation of the Hotel's TCO as determined necessary by the Town of Vail as this
requirement is deemed a condition of the TCO.
Sincerely,
Vail Plaza Hotel & Club
aldix R. Prado
President/Owner
i
�s
i
ka
300 Kalamath Street
SHAW Denver, CO 80223
Office 303- 825 -4740
Fax 303- 825 -6403
LETTER OF TRANSMITTAL
Vail Plaza Hotel
- Project No: 1668=
PO Box 1250
Tel: 970 - 477 -4710
Vail, CO 81658
Fax: 970 -476 -1791
DATE: 92106107 TRANSn41TT AL No. 504
TRANSAFIrFED To:
Tom Kassmel,
Town of Vail
9309 Elkhorn Drive
Vail, CO 89657
Tel: 970 - 479 -2946
Fax: 970 -479 -2452
Suair -=
Parking/Construction Staging
TRANsun 7ED BY:
Shaw Construction LLC
Tel.,
Fax:
Email:
ITEM; DOCUh1=_NT COPIES REh9ARKS
NOTES:
Parking/ Construction Staging Plan Vail Plaza Hotel
Building A Level 148'- 59 Total Spaces: One space removed for access to electrical panes, One space with
mechanical height issue, 57 spaces remaining.
Building A Level 137' -6" - 61 Total Spaces: No issues
Building B Level 137'-V'-Total Spaces 76, Six spaces for Temp. construction staging, One space with possible width
issue, Eight spaces not counted due to possible drive access issue, 69 Spaces remaining.
Total at time of TCO- 57+61 +69 =187 Available Spaces.
SIGNATURE
M,
DATE
PE
� m extol"
W-01. SA
-
OPNWDIPA
1310H VZVld IIVA
.
.........
fi
w" voos�vaNV N 3 N H 3 Z
.
.........
Q ��
O
C
nr
VA %won
QPWOFDW
IUOH VZ"d IIVA
la�"eo
wWPWW-*."M.
mmanow
VZOMM
OM N 3 11 H 3 Z
-
C�
7
STEEL SUB - STRUCTURE AS REQUIRED
(BY DOOR MAN. MOUNT ON ISOLATION
PADS
LIGHT FIXTURE CENTERED ON WINDOW
IN FULLY UPRIGHT LOCATION- TYPICAL
i- }FIXTURE TYPE MH, TYP
I- - 4L] l '\ I I
o NFRA -RED HEATER
�- BEYONQ- 1 COMBUSTIBLES
W36X52� BET - - - -- j} -CLEARANCE -__ --
T— U� — — — — — — — — —
LOA lNG DOCK 02 Q
-_..— 410 m u
E
=>A=C= .0
ZE H R E N PWO ECT N—1 PROJECT NO: 041590 DRAIW Il
AND ASSOCIATES, INC. Vail Plaza Hotel IswE ASI 668
ARCNRECT - PLANNING • INTERIORS Vail, Colorado
P.O. Box 1976 -Awn, C.Il 81620 DRAWING TITLE: 64EET:
1970) %%257 FAX (970) 949 -IOW LOADING DOCK DOOR
233E. Gown Pwdi&SL- S.-Barbara, CA 93101 gOALE: Va" I' -0" DATE: 11/21/06 5K -434
(805) %3.6890 FAX (805) 963 -8102
r
Boa —
4% SLOPE
SK -40
Level 06
- -
T/O STEEL
_ _ _ _ _ _
Datum 190' -0"
TRENCH DRAIN,
1
REF: CIVIL —
5/0 STRUCTURE
_
Datum
STRUCTURE AS REG
BY DOOR MANUFAC
�
ISOLATOR TYPICAL
ALL CEILING AND W
rnn
CONNECTIONS —
Level 05
Datum
STEEL SUB - STRUCTURE AS REQUIRED
(BY DOOR MAN. MOUNT ON ISOLATION
PADS
LIGHT FIXTURE CENTERED ON WINDOW
IN FULLY UPRIGHT LOCATION- TYPICAL
i- }FIXTURE TYPE MH, TYP
I- - 4L] l '\ I I
o NFRA -RED HEATER
�- BEYONQ- 1 COMBUSTIBLES
W36X52� BET - - - -- j} -CLEARANCE -__ --
T— U� — — — — — — — — —
LOA lNG DOCK 02 Q
-_..— 410 m u
E
=>A=C= .0
ZE H R E N PWO ECT N—1 PROJECT NO: 041590 DRAIW Il
AND ASSOCIATES, INC. Vail Plaza Hotel IswE ASI 668
ARCNRECT - PLANNING • INTERIORS Vail, Colorado
P.O. Box 1976 -Awn, C.Il 81620 DRAWING TITLE: 64EET:
1970) %%257 FAX (970) 949 -IOW LOADING DOCK DOOR
233E. Gown Pwdi&SL- S.-Barbara, CA 93101 gOALE: Va" I' -0" DATE: 11/21/06 5K -434
(805) %3.6890 FAX (805) 963 -8102
r
Boa —
4% SLOPE
129- SLOPE
T/O STEEL
_ _ _ _ _ _
Datum 111 _11 1/2"
TRENCH DRAIN,
1
REF: CIVIL —
Level 04 I
Datum
STEEL SUB - STRUCTURE AS REQUIRED
(BY DOOR MAN. MOUNT ON ISOLATION
PADS
LIGHT FIXTURE CENTERED ON WINDOW
IN FULLY UPRIGHT LOCATION- TYPICAL
i- }FIXTURE TYPE MH, TYP
I- - 4L] l '\ I I
o NFRA -RED HEATER
�- BEYONQ- 1 COMBUSTIBLES
W36X52� BET - - - -- j} -CLEARANCE -__ --
T— U� — — — — — — — — —
LOA lNG DOCK 02 Q
-_..— 410 m u
E
=>A=C= .0
ZE H R E N PWO ECT N—1 PROJECT NO: 041590 DRAIW Il
AND ASSOCIATES, INC. Vail Plaza Hotel IswE ASI 668
ARCNRECT - PLANNING • INTERIORS Vail, Colorado
P.O. Box 1976 -Awn, C.Il 81620 DRAWING TITLE: 64EET:
1970) %%257 FAX (970) 949 -IOW LOADING DOCK DOOR
233E. Gown Pwdi&SL- S.-Barbara, CA 93101 gOALE: Va" I' -0" DATE: 11/21/06 5K -434
(805) %3.6890 FAX (805) 963 -8102
r
Loading Dock Height Measurements- Nov. 17, 2007
Opening Header Fr
At 4 " =13' -9 15/32"
At 1' = 13' -9 5/8"
At 2' = 13' -9 21/32"
At 3'= 13' -9 21/32"
At 4' = 13' -9 23/32"
At 5' = 13' -9 23/32"
At 6'= 13' -9 23/32"
om East to West
Soffit
East 14' -4'
Middle 14' -3 25/32"
West 14' -2 27/32"
At T= 13' -9 19/32"
At 8' = 13' -9 5/8"
At 9'= 13' -9 19/32"
At 10'= 13' -9 5/8"
At 11' = 13' -9 9/16"
At 12'= 13' -9 9/16"
At 13'= 13' -9 19/32"
Sprinkler Lines
East 13' -11 5/8"
Middle East 13' -11 21/32"
Middle West 13' -11 19/32"
West 13' -10 7/8"
Middle Light 13'-4" to center
At 14'= 13' -9 19/32"
At 15'= 13' -9 17/32"
Heater
At 16'= 13' -9 15/32"
East 13' -6 3/16"
At 17'= 13' -9 15/32"
Middle 13' -6 11/16"
At 18'= 13' -9 13/32"
West 13'-7 9/32"
At 19'= 13'-9 17/32"
At 20'= 13' -9 19/32"
At 21'= 13' -9 9/16"
At 22'= 13' -9 19/32"
At 23'= 13' -9 21/32"
At 24'= 13'-9 9/16"
At 25'= 13' -9 19/32"
At 26'= 13' -9 9/16"
At 27'= 13' -9 9/16"
At 28'= 13' -9 13/32"
At 29'= 13' -9 15/32"
At 30'= 13' -9 9/16"
At 31'= 13' -9 19/32"
At 32'= 13' -9 11/16"
At 33'= 13' -9 29/32"
At 34'= 13' -9 27/32"
Loading Dock Height Measurements- Nov. 17, 2007
Opening Header Fr
At 4 " =13' -9 15/32"
At 1' = 13' -9 5/8"
At 2' = 13' -9 21/32"
At T= 13' -9 21/32"
At 4' = 13' -9 23/32"
At 5' = 13' -9 23/32"
At 6' = 13' -9 23/32"
om East to West
Soffit
East 14' -4'
Middle 14' -3 25/32"
West 14' -2 27/32"
At T= 13' -9 19/32"
At 8' = 13' -9 5/8"
At 9'= 13' -9 19/32"
At 10'= 13' -9 5/8"
At 11' = 13' -9 9/16"
At 12'= 13' -9 9/16"
At 13'= 13' -9 19/32"
Sprinkler Lines
East 13' -11 5/8"
Middle East 13' -11 21132"
Middle West 13' -11 19/32"
West 13' -10 7/8"
Middle Light 13'-4" to center
At 14'= 13' -9 19/32"
At 15'= 13' -9 17/32"
Heater
At 16'= 13' -9 15/32"
East 13' -6 3/16"
At 17'= 13' -9 15/32"
Middle 13'- 611/16"
At 18'= 13' -9 13/32"
West 13'-7 9/32"
At 19'= 13' -9 17/32"
At 20'= 13' -9 19/32"
At 21'= 13' -9 9/16"
At 22'= 13' -9 19/32"
At 23'= 13' -9 21/32"
At 24'= 13' -9 9/16"
At 25'= 13' -9 19/32"
At 26'= 13' -9 9/16"
At 27'= 13' -9 9/16"
At 28'= 13' -9 13/32"
At 29'= 13' -9 15/32"
At 30'= 13' -9 9/16"
At 31'= 13' -9 19/32"
At 32'= 13' -9 11/16"
At 33'= 13' -9 29/32"
At 34'= 13' -9 27/32"