Loading...
HomeMy WebLinkAboutAs-BuiltsALPINE Alpine Engineering, Inc - 0259 Continental Court, #205 Breckenridge, CO 80424 ENGINEERING INC P. 0. Box 4603 Frisco, Colorado 80443 PH: (970) 453 -6064 FAX: (970) 453 -6631 LETTER OF TRANSMITTAL: �`D. P� J u����� 7- To: � ��td" Date: Job No: G Job Title: Attu: B l -- G.L1 We are sending the following items; attached under separate cover via shop drawings reproductions originals specifications copy of letter change order samples other These are transmitted: for approval as requested reviewed for your use fnr rP.V1PW Anri rnmment fnr vnur record after loan to use other Copies to: Signed: ' NOTES: 1. PLACEMENT AND INSTALLATION OF ALL NEW, RESET, AND RELOCATED SIGNS SHALL BE IN ACCORDANCE WITH S -614 -1 AND S- 614-2. 2- LANE MARKINGS SHALL BE EPDXY. WORD / SYMBOL MARKINGS SHALL BE PREFORMED THERMOPLASTIC. 3. IN COOT REGION 3 ALL SIGN POSTS SHALL BE GALVANIZED TUBULAR STEEL. 4. THE CONTRACTOR SHALL CONTACT BRIAN KILLIAN (970 -248 -7293) AT LEAST 2 WEEKS PRIOR TO STRIPING. IF THE PERMITTEE'S CONTRACTOR FAILS TO REVIEW THE SIGNING AND STRIPING WITH COOT, THE PERMITTEE WILL BE RESPONSIBLE FOR ANY CORRECTIONS REQUIRED UPON FINAL INSPECTION OF THE ACCESS. 5. "FULL COMPLIANCE' TEMPORARY PAVEMENT MARKINGS SHALL BE APPLIED PER CDOT SPECIFICATIONS AT THE END OF EACH CONSTRUCTION DAY. INTERIM MARKINGS FOR CENTER LANE LINES CONSIST OF 4 °X4! SEGMENTS WITH 36' GAPS. 6. REMOVAL OF PAVEMENT MARKINGS ML15T BE BY GRINDING OR ANOTHER ACCEPTABLE METHOD THAT IS APPROVED BY THE ACCESS MANAGER, DAN ROUSSIN (UNLESS ASPHALT OVERLAY IS REQUIRED). CURB AND GUTTER TO REMAIN CINB AND GUTifR ro REMAIN REM p ro �""ON SOUTH FRONTAGE ROAD TvPTDAL c SECTION A-A 0" R gcRaN A -A R LANDSCAPE MWAN REFER TO SHEET 17 FOR TYPICAL CONSTRUCTION CROSS SECTION A -A 3 �® 9 . aL R-2&V ?.Cr CONCRETE g PAN R/ W LIP - EXETNC CATCH r5 ILIY41 ED P.AVETt m Lt-t W R_l%w W)- END VAL wM wTm+ xPE PLAZA HOTEL + + MAD[ 666K V GATEWAY BUILDING 1 �I :a 1 VILLAGE INN PLAZA Computer File Information Index of evlsions Dreat;aa Date: 11/15/2004 IaiNals: DLL o ALPINE VAIL PLAZA HOTEL HORIZONTAL CONTROL PLAN Project No. Last Madi6aatloa Dote: 03/12/2007 InItlals: DLL Q 0259 CONTINENTAL COURT, #205 12100.0 BRECKENRIDGE, COLORADO 80424 Full Path: P: \Vail Plaza Hotel \dwg \COOT\ — P.O. BOX 4603 • FRISCO, COLORADO 80443 Designer: D.L. Leinweber Structure Drawing His Name: VPH— RONTAGE O _ • 970 453 -6064 ' FAX 453 -6631 • Details,: D Leinweber Numbers ACAD Ver. 2002 Scale: 1' =30' Units: English O - ENGINEERING INC Sheet Subset X1 Subset Sheets: X Sheet Number 8 NOTES: 1. PLACEMENT AND EXISTINGATION OF ALL NEW, RESET, AND RELOCATED SIGNS SHALL IL- BE IN ACCORDANCE WITH S -614 -1 AND 5- 614 -2. L'I LLJ 2. LANE MARKINGS SHALL BE EPDXY. WORD / SYMBOL MARKINGS SHALL BE 2 Kr PREFORMED THERMOPLASTIC. Ln SKIPPED STRIPING (4" WIDE X 4' LENGTH) 3. IN CDOT REGION 3 ALL SIGN POSTS SHALL BE GALVANIZED TUBULAR STEEL. W (Wjt 4. THE CONTRACTOR SHALL CONTACT BRIAN KILLIAN (970- 248 -7293) AT LEAST SOLID STRIPING (4" WIDE) PRIOR WEEKS PRIOR TO STRIPING. IF THE PERMITTEE'S CONTRACTOR FAILS TO REVIEW W THE SIGNING AND STRIPING WITH CDOT, THE PERMITTEE WILL BE RESPONSIBLE FOR Z ANY CORRECTIONS REQUIRED UPON FINAL INSPECTION OF THE ACCESS. J "FULL COMPLIANCE' TEMPORARY PAVEMENT MARKINGS SHALL BE APPLIED PER U NOTE: POSTED SPEED LIMIT IS 25MPH IN BOTH DIRECTIONS COOT SPECIFICATIONS AT THE END OF EACH CONSTRUCTION DAY. INTERIM MARKINGS F NO SPEED LIMIT SIGNS EXIST WITHIN PROJECT LIMITS. FOR CENTER LANE LINES CONSIST OF 4"X4' SEGMENTS WITH 36' GAPS. WB IIE �' {°woE 6. REMOVAL OF PAVEMENT MARKINGS MUST BF BY GRINDING OR ANOTHER ACCEPTABLE METHOD THAT IS APPROVED BY THE ACCESS MANAGER, DAN ROUSSIN DOUBLE (UNLESS ASPHALT OVERLAY IS REQUIRED). CENTFANES 1E1101Y, CIpB AND DIITIER - {" WOE AND cuT1EB m MiLaN EDGE LINE 10 m NLDAVN VHTF j .,.. _ ::. _.:. ... .,: UUA 4 WIDE LINE .,...:.:. ,. ._ - :. -.._ , :- ........ .MINE _ DIM. VARIES < N _ ^V � UIE lNE MtIIE, 4' WIDE LANE LINE NHTE {° MDE MDE 4108 AND _ EamNCANaN _.— � -- - LANE U. -- - N VHTE, {° MDE a1A4NWZIN0 UNE — - 11"71 r MDE END VAL r PLAZA 007EL - tl It I HEATEfl LQAD.MG i51Ok — — w w w / 1 // I r I 1 r a k GATEWAY BUILDING I_ i VILLAGE INN PLAZA Computer File Information n ex o ewslons �►LPINE VAIL PLAZA HOTEL — 0259 CONTINENTAL COURT, #205 BRECKENRIDGE, COLORADO 80424 = P.O. BOX 4603 • FRISCO, COLORADO 80443 = =_ 970 453 -6064 FAX 453 -6631 • ENGINEERING INC STRIPING PLAN Project No. Creation Date: 11/15/2004 Initials: DLL 0 Last Modification Date: 03/12/2007 Initials: DLL 0 12100.0 Full Path: P: \Vail Plaza Hotel \dwg \CDOT\ Q Designer. D.L. Leinweber Structure Drawing File Nome: VPH— FRONTAGE Detauer: D.L. Leinweber Numbers ACAD Ver. 2002 Scale: i " =3D' Units: English Sheet Subset XI Subset S:,eeta: x Sheet Number 10 Ld Ld Cn LLI Ld to Ld Z EDGE LDIE VARTE, IV WIDE I DIM. VARIES LANE U 1� ME A EDGE LIIIE wtITE 4' NOE E LANE LINE E009 LINE Ykm VA Of _[WHITIE LANE UNE WM V WIDE ODUBIE NES rEUOw, 4 WDE EDGE LINE 7_ LANE E V"TE, 4' WIDE $ LINE 1E 7� PART 0 CROSSROADS (2) TRACT C BUILDING OVERRAN CROSSROADS OF VAIL A CONDOMINIUM (1) Computer File information Index of Revisions VAIL PLAZA HOTEL Creation Date 11/15/2004 Initials: DLL ALPINE STRIPING PLAN Project No. Last M.dif—tl- Date: 03/12/2007 Wtid.: DLL 0259 CONTINENTAL COURT, #205 12100.0 F.11 Path: P:\Vil Plaza HoteI\dwg\CD0T\ BRECKENRIDGE, COLORADO 80424 P.O. BOX 4603 • FRISCO, COLORADO 80443 Designer. D L. L.i—b- Stmcture Drawing File Name: VPH—FRDNTAGE 970 453-6064 - FAX 453-6631 • Detail— D DL. Lein—b- N-1,... ACAD Ver. 2002 Scale: 1*=30' Units, English ENGINEERING INC Sheet Subset: XI Subset Sheet.; X Sheet Number