HomeMy WebLinkAboutAs-BuiltsALPINE
Alpine Engineering, Inc -
0259 Continental Court, #205
Breckenridge, CO 80424 ENGINEERING INC
P. 0. Box 4603
Frisco, Colorado 80443
PH: (970) 453 -6064 FAX: (970) 453 -6631
LETTER OF TRANSMITTAL:
�`D. P� J u����� 7-
To: � ��td" Date:
Job No:
G Job Title:
Attu: B l --
G.L1
We are sending the following items; attached under separate cover via
shop drawings reproductions originals specifications
copy of letter change order samples other
These are transmitted:
for approval as requested reviewed for your use
fnr rP.V1PW Anri rnmment
fnr vnur record
after loan to use other
Copies to:
Signed: '
NOTES:
1. PLACEMENT AND INSTALLATION OF ALL NEW, RESET, AND RELOCATED SIGNS SHALL
BE IN ACCORDANCE WITH S -614 -1 AND S- 614-2.
2- LANE MARKINGS SHALL BE EPDXY. WORD / SYMBOL MARKINGS SHALL BE
PREFORMED THERMOPLASTIC.
3. IN COOT REGION 3 ALL SIGN POSTS SHALL BE GALVANIZED TUBULAR STEEL.
4. THE CONTRACTOR SHALL CONTACT BRIAN KILLIAN (970 -248 -7293) AT LEAST
2 WEEKS PRIOR TO STRIPING. IF THE PERMITTEE'S CONTRACTOR FAILS TO REVIEW
THE SIGNING AND STRIPING WITH COOT, THE PERMITTEE WILL BE RESPONSIBLE FOR
ANY CORRECTIONS REQUIRED UPON FINAL INSPECTION OF THE ACCESS.
5. "FULL COMPLIANCE' TEMPORARY PAVEMENT MARKINGS SHALL BE APPLIED PER
CDOT SPECIFICATIONS AT THE END OF EACH CONSTRUCTION DAY. INTERIM MARKINGS
FOR CENTER LANE LINES CONSIST OF 4 °X4! SEGMENTS WITH 36' GAPS.
6. REMOVAL OF PAVEMENT MARKINGS ML15T BE BY GRINDING OR ANOTHER
ACCEPTABLE METHOD THAT IS APPROVED BY THE ACCESS MANAGER, DAN ROUSSIN
(UNLESS ASPHALT OVERLAY IS REQUIRED).
CURB AND GUTTER
TO REMAIN CINB AND GUTifR
ro REMAIN
REM p ro �""ON SOUTH FRONTAGE ROAD
TvPTDAL c SECTION A-A 0" R
gcRaN A -A R
LANDSCAPE MWAN
REFER TO SHEET 17 FOR TYPICAL
CONSTRUCTION CROSS SECTION A -A
3 �® 9 .
aL R-2&V
?.Cr CONCRETE g
PAN R/ W LIP - EXETNC CATCH r5
ILIY41 ED P.AVETt m
Lt-t
W
R_l%w
W)- END VAL
wM wTm+ xPE PLAZA HOTEL
+
+
MAD[ 666K V
GATEWAY BUILDING 1 �I
:a 1 VILLAGE INN PLAZA
Computer File Information Index of evlsions
Dreat;aa Date: 11/15/2004 IaiNals: DLL o ALPINE VAIL PLAZA HOTEL
HORIZONTAL CONTROL PLAN Project No.
Last Madi6aatloa Dote: 03/12/2007 InItlals: DLL Q 0259 CONTINENTAL COURT, #205 12100.0
BRECKENRIDGE, COLORADO 80424
Full Path: P: \Vail Plaza Hotel \dwg \COOT\ — P.O. BOX 4603 • FRISCO, COLORADO 80443 Designer: D.L. Leinweber Structure
Drawing His Name: VPH— RONTAGE O _ • 970 453 -6064 ' FAX 453 -6631 • Details,: D Leinweber Numbers
ACAD Ver. 2002 Scale: 1' =30' Units: English O - ENGINEERING INC Sheet Subset X1 Subset Sheets: X Sheet Number 8
NOTES:
1. PLACEMENT AND EXISTINGATION OF ALL NEW, RESET, AND RELOCATED SIGNS SHALL IL-
BE IN ACCORDANCE WITH S -614 -1 AND 5- 614 -2.
L'I
LLJ
2. LANE MARKINGS SHALL BE EPDXY. WORD / SYMBOL MARKINGS SHALL BE 2
Kr
PREFORMED THERMOPLASTIC. Ln
SKIPPED STRIPING (4" WIDE X 4' LENGTH)
3. IN CDOT REGION 3 ALL SIGN POSTS SHALL BE GALVANIZED TUBULAR STEEL. W
(Wjt
4. THE CONTRACTOR SHALL CONTACT BRIAN KILLIAN (970- 248 -7293) AT LEAST
SOLID STRIPING (4" WIDE)
PRIOR WEEKS PRIOR TO STRIPING. IF THE PERMITTEE'S CONTRACTOR FAILS TO REVIEW W
THE SIGNING AND STRIPING WITH CDOT, THE PERMITTEE WILL BE RESPONSIBLE FOR Z
ANY CORRECTIONS REQUIRED UPON FINAL INSPECTION OF THE ACCESS. J
"FULL COMPLIANCE' TEMPORARY PAVEMENT MARKINGS SHALL BE APPLIED PER U
NOTE: POSTED SPEED LIMIT IS 25MPH IN BOTH DIRECTIONS
COOT SPECIFICATIONS AT THE END OF EACH CONSTRUCTION DAY. INTERIM MARKINGS F
NO SPEED LIMIT SIGNS EXIST WITHIN PROJECT LIMITS.
FOR CENTER LANE LINES CONSIST OF 4"X4' SEGMENTS WITH 36' GAPS.
WB IIE
�' {°woE
6. REMOVAL OF PAVEMENT MARKINGS MUST BF BY GRINDING OR ANOTHER
ACCEPTABLE METHOD THAT IS APPROVED BY THE ACCESS MANAGER, DAN ROUSSIN
DOUBLE
(UNLESS ASPHALT OVERLAY IS REQUIRED).
CENTFANES
1E1101Y, CIpB AND DIITIER
-
{" WOE AND cuT1EB m MiLaN EDGE LINE
10
m NLDAVN VHTF
j
.,.. _ ::. _.:. ... .,: UUA 4 WIDE
LINE
.,...:.:. ,. ._ - :. -.._ , :- ........ .MINE _
DIM. VARIES
< N
_
^V �
UIE lNE
MtIIE, 4' WIDE
LANE LINE
NHTE {° MDE
MDE
4108 AND
_ EamNCANaN _.— � --
- LANE U.
--
- N VHTE, {° MDE
a1A4NWZIN0 UNE
— -
11"71 r MDE
END VAL r
PLAZA 007EL
-
tl It
I HEATEfl LQAD.MG i51Ok — —
w
w w / 1
// I r
I
1 r a
k
GATEWAY BUILDING I_
i
VILLAGE INN PLAZA
Computer File Information
n
ex o ewslons
�►LPINE VAIL PLAZA HOTEL
— 0259 CONTINENTAL COURT, #205
BRECKENRIDGE, COLORADO 80424
= P.O. BOX 4603 • FRISCO, COLORADO 80443
= =_ 970 453 -6064 FAX 453 -6631 •
ENGINEERING INC
STRIPING PLAN
Project No.
Creation Date: 11/15/2004 Initials: DLL
0
Last Modification Date: 03/12/2007 Initials: DLL
0
12100.0
Full Path: P: \Vail Plaza Hotel \dwg \CDOT\
Q
Designer. D.L. Leinweber
Structure
Drawing File Nome: VPH— FRONTAGE
Detauer: D.L. Leinweber
Numbers
ACAD Ver. 2002 Scale: i " =3D' Units: English
Sheet Subset XI
Subset S:,eeta: x
Sheet Number
10
Ld
Ld
Cn
LLI
Ld
to
Ld
Z
EDGE LDIE
VARTE,
IV WIDE I DIM. VARIES
LANE U
1� ME
A
EDGE LIIIE
wtITE
4' NOE
E
LANE LINE
E009 LINE
Ykm
VA Of
_[WHITIE
LANE UNE
WM V WIDE
ODUBIE
NES rEUOw, 4 WDE
EDGE LINE
7_ LANE E
V"TE, 4' WIDE $
LINE
1E
7�
PART 0
CROSSROADS (2) TRACT C
BUILDING
OVERRAN
CROSSROADS OF VAIL
A CONDOMINIUM (1)
Computer File information Index of Revisions VAIL PLAZA HOTEL
Creation Date 11/15/2004 Initials: DLL ALPINE STRIPING PLAN Project No.
Last M.dif—tl- Date: 03/12/2007 Wtid.: DLL 0259 CONTINENTAL COURT, #205 12100.0
F.11 Path: P:\Vil Plaza HoteI\dwg\CD0T\ BRECKENRIDGE, COLORADO 80424
P.O. BOX 4603 • FRISCO, COLORADO 80443 Designer. D L. L.i—b-
Stmcture
Drawing File Name: VPH—FRDNTAGE
970 453-6064 - FAX 453-6631 • Detail— D DL. Lein—b- N-1,...
ACAD Ver. 2002 Scale: 1*=30' Units, English ENGINEERING INC Sheet Subset: XI Subset Sheet.; X Sheet Number