HomeMy WebLinkAboutB11-0515NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MA I OR' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B11 -0515 Job Address: 1722 GENEVA DR VAIL Location......: Parcel No....: 210312312035 OWNER ARRIGONI, BALZ & CHRISTINA 12/30/2011 PO BOX 3125 VAIL CO 81657 APPLICANT ARRIGONI, BALZ & CHRISTINA 12/30/2011 PO BOX 3125 VAIL CO 81657 CONTRACTOR SUNDANCE PLUMBING AND HEATIN 12/30/2011 Phone: 970 - 748 -8977 KEN NETZBAND PO BOX 3684 AVON CO 81620 License: 0000003161 Description: INSTALL TWO SOLAR THERMAL PANELS ON ROOF FOR DOMESTIC HOT WATER. Occupancy: Type Construction: Project #: Applied.....: Issued... PRJ09 -0584 12/30/2011 01/12/2012 Valuation: $12,400.00 .....,..,..> .............. ........... «........,,.,....... ,.... ».. »..,. >..,,.. FEE SUMMARY ................,,.....,...............,...,. ........,....................,, Building Permit ------ - - - - -> $223.25 Bldg Plan Check ----- - - - - -> $145.11 Use Tax Fee------------------ - - - - -> $48.00 Electrical Permit ---- - - - - -> $0.00 Elec Plan Check ------ - - - - -> $0.00 Restuarant Plan Review--- - - - - -> $0.00 Mechanical Permit - - - - - -> $0.00 Mech Plan Check ---- - - - - -> $0.00 Additional Fees--------------- - - - - -> $131.64 Plumbing Permit --- - - - - -> $0.00 Plmb Plan Check ---- - - - - -> $0.00 Recreation Fee--------------- - - - - -> $0.00 Investigation------------------ - - - - -> $0.00 Will Call ------------------------------ > $5.00 TOTAL PERMIT FEES -- ----------- > $553.00 Payments -- ---------------------------- > $553.00 BALANCE DUE------------------ - - - - -> $0.00 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. ......... ._.:.. _ — Signature of caner or Cont for Print Name combination permit_012811 ate m CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B11 -0515 Address: 1722 GENEVA DR VAIL Owner: ARRIGONI, BALZ & CHRISTINA Location: Cond: CON0012400 The applicant shall paint the solar energy device framing, brackets and associated equipment black or a color that matches adjacent building surfaces. Cond: CON0012401 The applicant shall install the solar energy device to project no further from the roof plane than the minimum distance necessary to acheive up to a 50 degree orientation. The applicant shall install the solar energy device to project no more than 8 feet above the roof plane to which the device is attached. combination permit_012811 TvWNVF VAIL i REQUIRED INSPECTIONS AND STATUSES Permit #: B11 -0515 Address: 1722 GENEVA DR VAIL Owner: ARRIGONI, BALZ & CHRISTINA Location: Item: 00200 MECH -Rough Item: 00260 PLMB -Misc. Item. 00290 PLMB -Final Item: 00542 PLAN -FINAL Item: 00090 BLDG -Final combination permit_012811 TOWN OF VAIL, COLORADO Statement Statement Number: R120000023 Amount: $553.00 01/12/201211:10 AM Payment Method: Check Init: LC Notation: #5570 / SUNDANCE PLUMBING AND HEATING ----------------------------------------------------------------------------- Permit No: Bll -0515 Type: COMBINATION BLDG PERMIT Parcel No: 2103 -123- 1203 -5 Site Address: 1722 GENEVA DR VAIL Location: Total Fees: $553.00 This Payment: $553.00 Total ALL Pmts: $553.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- BP - - - - -- 00100003111100 ------------------------ - - - - -- BUILDING PERMIT FEES ------ - - - - -- 354.89 PF 00100003112300 PLAN CHECK FEES 145.11 UT 11000003106000 USE TAX 496 48.00 WC 00100003112800 WILL CALL INSPECTION FEE 5.00 0 75 Department of Community Development South Frontage Road TOWN OF VAIP Vail, CO 81657 Tel: 970 -479 -2128 www.vailgov.com Development Review Coordinator X K SOLAR THERMAUPHOTOVOLTAIC PERMIT APPLICATION (Separate applications are required for a new electrical panel or any roof alteration) Project Street Address: CF�s! t V (Number) (Street) (Suite #) Building /Complex Name: Lq RR I ow 'RE$ Contractor Information Business Name: _� __ U AIo4o C F !,1 n BC; Business Address: F)D e �l 3 (o g L)' City Pr V O t � State: _W Zip: g ► &ao Contact Name: K1-C� Q Contact Phone: ) / 7 -D a g Project #: UN 109— D58 y DRB #: OR-R) ) QQ(o.,?, Lot #: Block # Subdivision: Work Class: New ( ) Addition ( ) Alteration ( ')( ) Type of Building: Single - Family ( g) Duplex Commercial ( ) Other( ) Contact E -Mail: 5_ph (c)_- VG , np Work Type: ) Multi - Family ( ) Interior ( ) Exterior ( Both ( ) X c- A/e)x r /P' GE Solar Type: Owner /Owner's Representative Signature (Required) Photovoltaic ( ) Solar Thermal (V Applicant Information Applicant Name: cf ALZ ARRI. GoN i Applicant Phone: Applicant E -Mail: Project Information Owner Name: Parcel #: 2 I O. j I a --� l a O,�; C_� Value of all work being performed: $ p (For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit www.eaglecounty.us/patie) (value based on IBC Section 109.3 & IRC Section 108.3) Detailed Scope and Location of Work: �-U� j R t �} �� ) Pf}}dl =t_ .J*)6MF5rJ C �4or War &, -- So r."r2 SySiCtn (use additional sheet if necessary) For Office Use Only: Fee Paid: Received From: Cash Check # CC: Visa / MC Last 4 CC # exp date: Auth # Date Received DEC 29, 20110, TOWN OF VAIL BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: Project M A Z3� Q! e, `, O,_ (Number) (Street) (Suite #) DRB #: ` Building /Complex Name: ` °Ag� e�P Building Permit #: Lot #- Block # Subdivision: Contractor Information ..............__. -- Business Name: s, s�....�, �t b �� Work Class: New ( ) Addition (�) Alteration ( ) Business Address: i�bp Type of Building: City State: C_& Single - Family (v�' Duplex( ) Multi-Family( ) Commercial ( ) Other( ) Contact Name: .� Work Type: Interior ( ) Exterior( ) Both Contact Phone: Contact E -Mail: �, his Valuation of Work Included Plans Included Work Contractor Registration Number: \C>\ Electrical ( )Yes (-")No ( )Yes (r)No X Mechanical ( )Yes ( ./)No ( )Yes (,/)No Owner /Owner's Repres �natureired) Plumbing (-**")Yes ( )No ( )Yes (/)No Building ( )Yes (v—)No ( )Yes (e�No Project Information Owner Name: 2.., _ � Parcel #: Value of all work being performed: $ I. 'z,` koo. cvt-, (For Parcel #, contact Eagle County Assessors Office at (970- 328 -8640 or visit (value based on IBC Section 109.3 & IRC Section 108.3) www.eaglecounty.us /patie) Electrical Square Footage I Detailed Scope and Location of Work: 1-44 I (use additional sheet if necessary) For Office Use Only: Date Received: E C IE 0 V E Fee Paid: D Received From: DEC 2 9 2011 Cash Check # CC: visa / MC Last 4 CC # exp date: Auth # TOWN OF VAIL 01 -Jan -1 I KR M CONSULTANTS, INC. (970) 949 -9391 P.D. Box 4572 FAX 949-1577 Vail, Colorado B1 658 RECORD TO: Ken Netzeband Sundance Plumbing and Heating P.O. Box 3684 Avon, CO 81620 DATE. 9/23/2009 JOB NUMBER: 0909 -15 PROJECT: Arrigoni Solar Panels ❑ RFI ❑ MEETING NOTES ❑ RESPONSE ❑ CLARIFICATION /CHANGE I have reviewed the specifications and installation instructions for the Vitosol 100 solar panels which are installed on the roof of the Arrigoni residence at 1722 Geneva Drive in Vail, Colorado. There are two panels located on the south - facing pitch of the roof over the master bedroom. The panels are 3' -9" x T -10" in dimension, and weigh 132 pounds each (4.5 pounds per square foot). I have reviewed the architectural drawings for the residence and the panel drawings that were prepared by the Swiss company that prefabricated the building components. I have not been able to locate any actual structural drawings for the building. The available information indicates that the roof structure consists of timber beams and purlins supporting timber decking. Based on the information at hand, it is my opinion that the roof structure is structurally capable of supporting the weight of the solar panels. Although I did not personally observe the installation of the panels, if they were installed according to the instructions provided, it is also my opinion that the attachment of the mounting hardware to the roof structure is adequate. pp REG SIGNED: Kimberly R. McGhg4, PE V- ^NA REVIEWED: COPY TO: D C�C�I��M(� D DEC 2 9 2011 TOWN OF VAII ARlZlGoN( ROOF SOUTH LOCATfON OP (2) SOLAZ PANSLS) VITD SOL 100 MODEL S2.5 EXISTING AND NEW GRADE BELOW RIDGE = 80ci,5 OVER - FRAMED DEGORATIVE CHIMNEY L O 0 ry � N 0 � u = IL O O �V � N O � GENERAL NOTES: - -ROOF SLOPES 5� 12 AND LESS A� METAL - GUTTERS A-RE 5" HALF - ROUND, COPPER W/ HEAT TAPE. - DOWNSPOUTS A-RE 4" ROUND, COPPER W/ HEAT TAPE - VENT TERMINATIONS ARE GOPPEF AT ALL NON -METAL ROOFS. VEN TERMINATIONS AT METAL ROOFS A-RE GOMPATIBLE METAL. - COPPER GAPS ON EXPOSED END OF OUTLOOKERS, SHOULDE=R BEAMS, AND RIDGE BEAMS, TYPICAL. 3' -O„ TOP OF RIDGE = 8120' -10 ," N Z N FKA r+ Product Wormation Vitosol 100 Models s2.5, w2.5 The benefits at a glance: ■ High performance at an attractive price ■ Optimized collection of solar energy thanks to highly efficient Sol- titanium coating. • Collector surface area: 27 ft2/2.5 m2 for horizontal or vertical installation. • High efficiency through selectively coated absorber, integrated piping and extremely effective thermal insulation. ■ Flexible connection pipes facilitate short installation times. Up to ten collectors can be quickly installed in series using a convenient plug -in system. ■ Durable, corrosion resistant construction using materials such as powder coated aluminum, copper and stainless steel, as well as 4 mm special low -iron solar glass and non - degrading thermal insulation. ■ Universal application: on flat and sloped roofs, on top of roof coverings, or for freestanding installations. ■ Quality tested at SPF Institut, Rapperswil, Switzerland. Meets the requirements of the German "Blue Angel" certificate of environmental excellence. Construction and function The main component of the Vitosol 100 is the Sol- titanium coated copper absorber. It ensures high absorption of solar radiation and low emission of thermal radiation. A meander - shaped copper pipe, through which the heat transfer medium flows, is permanently embedded into the absorber. The heat transfer medium channels the absorber heat through the copper pipe. The absorber is encased in a highly insulated collector housing, which minimizes collector heat losses. The high quality thermal insulation provides temperature stability and is free from gas emissions. The cover consists of a solar glass panel with a very low iron content, thereby reducing reflection losses. The solar glass is 4 mm thick, making it very resistant to weather influences. The glass is set into the collector frame with a continuous A Continuous profiled seal (vulcanized) E Melamine resin foam e Solar glass cover, 0.16 " /4 mm thick F Mineral fiber insulation C Meander - shaped copper pipe G Aluminum frame sections D Copper absorber H Aluminum -zinc base panel profiled seal, preventing water from penetrating into the collector. This ensures a long and reliable service life for all internal components. The collector housing consists of a powder- coated aluminum frame (recycled aluminum), into which the solar glass is permanently sealed. Up to ten collectors can be joined quickly and easily to form a single collector array. For this, the standard equipment includes flexible connection pipes, sealed with O -rings (see picture below). A connection kit with clamping ring fittings enables the collector array to be quickly connected to the pipes of the solar circuit. The collector temperature sensor is installed in the solar circuit flow using a sensor well set. MEMO N N (o LO Co N LO %4-1/ O N N O LO OD N LO Technical Data Technical Data Model s2.5 w2.5 Total surface area ft.2 / m2 29.2/2.71 29.2 / 2.71 Absorber surface area ft.2 / m2 27.0/2.50 27.0/2.50 Aperture ft.2 / m2 27.0/2.50 27.0/2.50 Dimensions t Width inches 45 94 mm 1 138 ♦2385 Height inches 94 45 mm 2385 1138 Depth inches 4 4 mm 102 102 Optical efficiency *2 % 84 84 Heat loss coefficient Ut W/(m2 • K) 3.36 3.36 U2 W /(m2 • K2) 0.013 0.013 Thermal capacity QM2 • K) 6.4 6.4 Weight lb / kg 132/60 132/60 Fluid capacity USG 0.6 0.8 (heat transfer medium) Itr 2.2 3.0 Maximum working pressure" psig 87 87 bar 6 6 Maximum stagnation temperature `4 OF / °C 412/211 412/211 Connection inches 3/. 3/. mm 22 22 Requirements for installation surface and Roof construction with adequate load capacity for prevailing wind forces anchorage "' Dimensions rounded to the nearest Y4 inch. *2 Based on absorber surface area. '3 In sealed systems, operating pressure of at least 22 psig + 0.45 psig x static head (ft.) / 1.5 bar + 0.1 bar x static head (m) must be present in the collectors in cold condition. '4 The stagnation temperature is the temperature which applies to the hottest point of the collector at a global radiation intensity of 3412 Btu /h / 1000 W when no heat is conducted by the heat transfer medium. Model s2.5 M M 4 "/ 1 60m CR Model w2.5 M M O) Legend CR Collector return (inlet) CS Collector supply (outlet) 4 "/ 102 mm 2': " 60 mm CS CS 3 Installation on Sloped Roofs Installing the Mounting Frames Install the panel array level or slightly inclined (approximately %2 "/ 10 mm) towards the connection side to ensure complete venting. Always locate an air vent at the highest point in the piping. Lagg boft�_ Washer �— Mounting -� - — bracket Minimum 91 6.3 cm/ Silicone 2.5 in sealant Source: CANSIA 8 Attaching roof brackets on shingled roof 1.The roof brackets should be laid out as close as possible to the dimensions shown in the chart on page 9 for s2.5 collectors, and page 10 for w2.5 collectors. IMPORTANT The roof bracket must be securely attached to the roof joist of the structure. Only use stainless steel attachment screws. IMPORTANT The 1.2" / 30 mm screws provided with the mounting kit are insufficient length for most wood frame roofs and should not be used for mounting the roof brackets. The installer must provide stainless steel 3" / 80 mm (preferrably 4" / 100 mm) lag bolts or screws. o LO co LO N 2. Locate the roof joist by tapping along the roof to find its general location (stud finders do not work well through shingles and roof sheathing). Drill within Too close 3. Pry up the shingles and drill small pilot 0.2 "/5 mm of to edge holes to locate exact location of roof center joist. If necessary, check where pilot - - hole is coming through roof from inside of attic. 4. Drill pilot holes into center of joist as shown. Fill the pilot holes and coat the bottom of roof bracket with silicone sealant. 5. Attach bracket to roof joist using Correct Incorrect appropriate stainless steel lag bolts or Source: CANSIA screws (field supplied). Lag bolt should penetrate the roof joist at least 2'/2 64 mm. IMPORTANT The roof bracket must be securely attached to the roof joist of the structure. Only use stainless steel attachment screws. IMPORTANT The 1.2" / 30 mm screws provided with the mounting kit are insufficient length for most wood frame roofs and should not be used for mounting the roof brackets. The installer must provide stainless steel 3" / 80 mm (preferrably 4" / 100 mm) lag bolts or screws. o LO co LO N O LO N C" f'. Installation dimensions for ten s2.5 collector panels Dimensions for Model s2.5 collector Installation on Sloped Roofs 6. Re -apply shingles, if required, and ensure all roof penetrations are thoroughly sealed with silicone sealant. 7. Continue with mounting rail installation on page 11. Number 1 2 3 4 5 6 8 10 Dim. A mm 1 096 1 096 1096 1 096 1 096 1 096 1 096 1 096 inches 43 43 43 43 43 43 43 43 Dim. B mm — — 1 154 1 154 1 154 1 154 1 154 1 154 inches 451/2 45'/2 451/2 451/2 45'/2 451/2 Dim. C mm 39.5 69.0 79.5 80.0 85.5 91.0 102 113 inches 11/2 23/4 3 3 31/4 3'/2 4 4'h Dim. D'1 mm 1096 2192 3346 4500 5654 6808 9116 11424 inches 43 86'/4 1313/4 177 2221/2 268 359 4493/4 A A +A A +B +A A +B +B+ A +B +B +BA +B +B +B A +B +B A +B A +A +B +B +B +B +B +B +B +B +B +A +B +B +B +A Dim.E mm 1175 2330 3505 4660 5835 6990 9320 11650 inches 46'/4 913/4 138 183'/2 2293/4 275 367 458'/2 Dim. F mm 87.5 88 98.5 99 109.5 110 121 132 inches 3'/2 3'/2 4 4 41/4 4'/4 43/4 5 ' For static reasons, maintain the stated sequence. Maintain the dimensions A and B as far as possible. Roof brackets may also be offset if you need to locate roof joist. However, always maintain the overall dimension. .. 9 6 Installation on Sloped Roofs Installation dimensions for six w2.5 collector panels Dimensions for Model w2.5 collector 8. Follow steps 1 through 7 from the previous pages. Number 1 2 3 4 5 6 Dim. A mm 2100 2100 to 2175 2100 to 2175 2100 to 2175 2100 to 2175 2100 to 2175 inches 821/2 821/2 to 85'/2 821/2 to 85'/2 82'/2 to 85'/2 82'/2 to 85'/2 82'/2 to 85'/2 Dim. B mm 2100 max. 4650 max. 7050 max. 9450 max. 11850 max. 14250 inches 82'/2 183 277'/2 372 466'/2 561 Dim. C;1 mm 2422 4844 7266 9688 12110 14532 inches 951/4 1903/4 286 381'/2 4763/4 572 Dim. D mm 111 121 132 142 152 163 inches 4'/4 4 3/4 5 5'/2 5 6'/2 10 For static reasons, maintain the stated sequence. Maintain the dimensions A and B as far as possible. Roof brackets may also be offset if you need to locate roof joist. However, always maintain the overall dimension. . 1 . M. 0 00 N LO no o 0 n CO N Installing the mounting rails Installation on Sloped Roofs 1. Secure the joining elements Q into the mounting rails ©. 2. Secure the mounting rails to the roof bracket. The locking bolt © must be turned 90 °. Ensure the upper and lower mounting rails are square before tightening the locking bolts. Measure from opposite corners of the top and bottom rails to ensure that array is square. 3. Hook the mounting plates @ into lower mounting rails © according to the dimensions shown in the illustrations on pages 9 and 10. 11 If M 11 Installing the mounting rails o � r .0 r r` LO CO N W LO Installation on Sloped Roofs 1. Secure the joining elements (�) into the mounting rails ©. 2. Secure the mounting rails to the roof bracket. The locking bolt © must be turned 901. Ensure the upper and lower mounting rails are square before tightening the locking bolts. Measure from opposite corners of the top and bottom rails to ensure that array is square. 3. Hook the mounting plates @ into lower mounting rails © according to the dimensions shown in the illustrations on pages 9 and 10. 11 :i . M •* 7 LOCATION OF (2) SOLAR PANELS, VITOSOL 100 MODEL S2.5 (SEE "RECORD" DATED 9/23/09 FOR FURTHER INFO) �---- �- I------- �--- I--- I�----- - - - - -- - III - -�- -- I I I I I C I I � RIDGE I I I I I I I -- �I I� RIDGE elf ��� / \ II � I o \II Imo\ I I NORTH ROOF A► • -w g:7 : e: XD E_ I >0-: 0 O o LAM u V7 4 po c P n i I a U Z � V Zcoya c 0 �o � e 2 P O U o n o o i m � o m � u o - Y n u w UD a_ W � z a x o � w �E- 0 OTC Cn z a OW � z �0 designed by KRM drown by RSS checked by TDH issued PERMIT 11/01/11 REVISED 11/15/11 sheet s1 JOB #0909 -15 V7 4 po N D I � � c E rl v [ -.g -n) DEC 2 9 2011 TOWN OF VAIL 5-m- um L -r iE 01 -24 -2012 Inspection Request Reporting Page 7 4:17 Dm Vail_ Cn _ City of Requested Inspect Date: Wednesday, January 25, 2012 Site Address: 1722 GENEVA DR VAIL A/P /D Information Activity: B11 -0515 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: ARRIGONI, BALZ & CHRISTINA Contractor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Description: INSTALL TWO SOLAR THERMAL PANELS ON ROOF FOR DOMESTIC HOT WATER. Item: 542 PLAN -FINAL Requestor: SUNDANCE PLUMBING AND HEATING Comments: 977 -0298 Assigned To: BGIBSON Action: a EXD: Item: Requestor: Comments: Assigned To: Action: Item: Requestor: Comments: Assigned To: Action: Item: Requestor: Comments: Assigned To: Action: Item: Requestor: Comments: Assigned To: Action: 90 BLDG -Final SUNDANCE PLUMBING AND HEATING 977 -0298 JMONDRAGON Time Exp: _ 200 MECH -Rough SUNDANCE PLUMBING AND HEATING 977 -0298 JMONDRAGON Time Exp: 260 PLMB -Misc. SUNDANCE PLUMBING AND HEATING 977 -0298 JMONDRAGON Time Exp: 290 PLMB -Final SUNDANCE PLUMBING AND HEATING 977 -0298 JMONDRAGON Time Exp: _ -vUj Inspection History Item: 200 MECH -Rough Item: 260 PLMB -Misc. REPT131 Requested Time: 08:00 AM Phone: 970 - 748 -8977 Entered By: JMONDRAGON K Requested Time: 01:00 PM Phone: 970 - 748 -8977 Entered By: JMONDRAGON K Requested Time: 10:45 AM Phone: 970 - 748 -8977 Entered By: JMONDRAGON K Requested Time: 11:15 AM Phone: 970 - 748 -8977 Entered By: JMONDRAGON K Requested Time: 11:45 AM Phone: 970 - 748 -8977 Entered By: JMONDRAGON K Run Id: 14046 01 -26 -2012 Inspection Request Reporting i Page 5 4:18 pm Vail, CO - City Of Requested Inspect Date: Friday Januarryy 27, 2012 Site Address: 1722 GtENEVADR VAIL A/P /D Information Activity: B11 -0515 Type: COMBO Sub Type: ASFR Status: FINAL Const Type: Occupancy: Use: Insp Area: Owner: ARRIGONI, BALZ & CHRISTINA Contractor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Description: INSTALL TWO SOLAR THERMAL PANELS ON ROOF FOR DOMESTIC HOT WATER. Rtion s 542 PLAN -FINAL Requested Time: 08:00 AM Phone: 977 -0298 BGIBSON Entered By: JMONDRAGON K T' Exp: ane s not Visible fr ow Z( Il t Z �G Item: 90 BLDG -Final Requested Time: 09:30 AM Requestor: Phone: Comments: 977 -0298 Assigned To: JMONDRAGON Entered By: JMONDRAGON K Action: Time Exp: Comment: Item: 200 MECH -Rough Requested Time: 09:00 AM Requestor: Phone: Assigned To: JMONDRAGON Entered By: JMONDRAGON K Action: Time Exp: Comment: Item: 260 PLMB -Misc. Requested Time: 10:30 AM Requestor: Phone: Comments: 977 -0298 Assigned To: JMONDRAGON Entered By: JMONDRAGON K Action: Time Exp: Comment: Item: 290 PLMB -Final Requested Time: 11:00 AM Requestor: Phone: Comments: 977 -0298 Assigned To: JMONDRAGON Entered By: JMONDRAGON K Action: Time Exp: Comment: Inspection History Item: 200 MECH -Rou h ** Approved ** 01/26/12g Inspector: sgremmer Comment: REPT131 Action: AP APPROVED Run Id: 14051 V OY �,e:��� CiJ S� 01 -24 -2012 Inspection Request Reporting Page 7 4:17 pm Vail, CO - City Of Requested Inspect Date: Wednesday Janua 25, 2012 Site Address: 1722 GENEVA DR VIL A /P /D Information Activity: B11 -0515 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupancy: Use: Insp Area: Owner: ARRIGONI, BALZ & CHRISTINA Contractor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Description: INSTALL TWO SOLAR THERMAL PANELS ON ROOF FOR DOMESTIC HOT WATER. iryspecuvn�s► - - -- r Item: 542 -FINAL Requested Time: 08:00 AM °stor: DANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 cents: 977 -0298 d To: BGIBSON Entered By: JMONDRAGON K stiQn: xp: Item: 90 BLDG -Final Requested Time: 01:00 PM Requestor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Comments: 977 -0298 Assigned To: JM RAGON Entered By: JMONDRAGON K Action: Time Exp: Item: 200 MECH -Rough Requested Time: 10:45 AM Requestor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Comments: 977 -0298 Assigned To: JM N GON Entered By: JMONDRAGON K Action: Time Exp: Item: 260 PLMB -Misc. Requested Time: 11:15 AM Requestor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Comments: 977 -029 Assigned To: J GON Entered By: JMONDRAGON K Action: Time Exp: Item: 290 PLMB -Final Requested Time: 11:45 AM Requestor: SUNDANCE PLUMBING AND HEATING Phone: 970 - 748 -8977 Comments: 977 -0298 Assigned To: J GON Entered By: JMONDRAGON K Action: Time Exp: MV1, Z �Z Inspection History Item: 200 MECH -Rough Item: 260 PLMB -Misc. REPT131 oa /olfja Run Id: 14046