Loading...
HomeMy WebLinkAboutPEC110067 SSCV Rezoning 013012 PEC packet TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 30, 2012 SUBJECT: A request for a recommendation to the Vail Town Council for a zone district boundary amendment, pursuant to Section 12-3-7, Amendment, Vail Town Code, to allow for a rezoning from Ski Base/Recreation District to Ski Base/Recreation 2 District, located at 598 Vail Valley Drive/part of Tract B, Vail Village Filing 7, and setting forth details in regard thereto. (PEC110067) Applicant: Ski and Snowboard Club Vail, represented by Tom Braun Planner: Rachel Dimond I. SUMMARY The applicant, Ski and Snowboard Club Vail (SSCV), is requesting a zone district boundary amendment to rezone the SSCV property, located at 598 Vail Valley Drive, from Ski Base/Recreation District to Ski Base/Recreation 2 District. Based upon Staff’s review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented, the Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of approval of the request, subject to the findings noted in Section IX of this memorandum. II. DESCRIPTION OF REQUEST The purpose of this request is to rezone the Ski and Snowboard Club Vail (SSCV) facility from the Ski Base Recreation (SBR) District to the Ski Base Recreation 2 (SBR2) District. A vicinity map (Attachment A), a zone district amendment map (Attachment B), the applicant’s request (Attachment C), letters from neighbors (Attachment D) and the Golden Peak Operational Management Plan (Attachment E) are attached for review. Upon approval of a rezoning, the applicant will submit a development plan that includes details on site plan, height and all other development parameters. The Vail Town Code does not require development plans to be viewed concurrently with rezoning applications. If rezoned, all impacts of redevelopment of the site will be reviewed and addressed with the development plan, pursuant to 12-8E-17, Mitigation of Development Town of Vail Page 2 Impacts, Vail Town Code. Generally, development plans and rezoning requests are heard together for larger projects or when part of a larger development. III. BACKGROUND SSCV was founded in 1962 as a ski and snowboard youth development program. The existing SSCV structure was constructed in 1976 after the Planning and Environmental Commission approved a conditional use permit for a structure in the Agriculture and Open Space District. At the time, the PEC did not require any parking, stating that “additional parking in this location is not appropriate.” At the time, Ski Club Vail served 75 users. On March 24, 1986, the PEC granted a front setback variance to allow a drop off area that also encroached into the Vail Valley Drive street right-of-way. The proposal also included the addition of the second floor of the club facility. At the time, Ski Club Vail leased parking spaces from the Rams-Horn Condominium Association to alleviate the on-site parking shortage. In January, 1998, the Town of Vail, Vail Associates and Ski Club Vail drafted a memorandum of understanding (MOU) regarding parking management for the Golden Peak Ski Base area facilities. Under this MOU, the Town Manager agreed to discuss Ski Club Vail’s parking situation with the Town Council. At their October 13, 1998 hearing, the Vail Town Council directed Ski Club Vail personnel to submit an application to fix the parking and drop-off issues on site. In November 1999, the PEC approved a variance request for expanded parking and drop-off in the right-of-way in anticipation of an approved development plan. On December 13, 1999, the PEC recommended approval to the Vail Town Council for a rezoning of the property to the SBR District from the Agriculture and Open Space District. Contingent upon the rezoning, the PEC also approved a development plan and a conditional use permit for a “quasi-public club.” The proposed redevelopment scheme included a 24,000 square foot commercial building for use by SSCV that included encroachments onto the adjacent Vail Resorts property, with half of the building located on Vail Resorts property. The development plan added SSCV to the Golden Peak development site. Figure 1 shows the proposed site plan as part of the approved development plan. On February 15, 2000, the Vail Town Council adopted Ordinance No. 2, Series of 2000, which rezoned the subject property from the Agriculture and Open Space District to the Ski Base/ Recreation District. The SSCV building was legally nonconforming in this district, and did not have the ability to expand under its existing zoning. According to the Staff memorandum dated February 1, 2000, “due to the encroachment onto Vail Associates’ property, it is necessary to apply a consistent zoning among the parcels.” A rezoning was implemented in anticipation of a redevelopment that never occurred. Town of Vail Page 3 Figure 1: Ski Club Vail proposed site plan from 1999 SSCV now serves over 500 members in a variety of alpine racing, free-skiing, freestyle, Nordic and snowboarding programs. The Club is a 501(c)3 non-profit charitable organization. The club would like to redevelop the club facility, which is too small for current programming. According to the applicant’s request in Attachment C, “The need to expand and update these facilities is acute. Creating a club facility that will be commensurate with its training facilities on Vail Mountain is the driving factor behind this redevelopment proposal.” SSCV envisions a 16,000 square foot club facility with an entry/lobby area, a community room, lockers and other space for athletes in the Club’s various programs, administration and coach’s space, conditioning/training space and storage. Structured parking is planned in the lowest level of the building. In order to finance the project during this economic downturn, the club anticipates the inclusion of dwelling units on the site as part of any future development plan. The subject property was rezoned to the SBR District and had an approved development plan, as part of the larger Tract B development site. The language in the SBR District is very specific to the Golden Peak Lodge, and does not accommodate the stand alone development of the SSCV facility as a mixed use building. Upon initial discussion with the Town of Vail Staff regarding redevelopment scenarios, there were numerous options discussed regarding potential process routes SSCV could take to achieve a redevelopment scenario: Town of Vail Page 4 • Amend the SBR District to include mixed use club facility as a land use (still non- conforming minimum lot size) • Special Development District (underlying zone district dictates allowable land uses) • Create a new zone district (results in an additional ski base area zone district) • Rezone the property to an existing zone district (SBR2 District meets the applicant’s needs of the proposed redevelopment) After reviewing the issues related to each option, the Town Staff and the applicant agreed that rezoning to the SBR2 District would be the best option to peruse the redevelopment goals of the SSCV. IV. APPLICABLE PLANNING DOCUMENTS Staff believes that following provisions of the Vail Land Use Plan, the Vail Village Master Plan and the Vail Town Code are relevant to the review of this proposal: Vail Land Use Plan (in part) Chapter II - Land Use Plan Goals / Policies (in part) 1. General Growth/Development 1.1 Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident. 1.3 The quality of development should be maintained and upgraded whenever possible. 1.12 Vail should accommodate most of the additional growth in existing developed areas (infill areas). 2. Skier /Tourist Concerns 2.2 The ski area owner, the business community and the Town leaders should work together to improve facilities for day skiers. Chapter VI – Proposed Land Use (in part) SB Ski Base: Ski base areas are designated at the main mountain portals found within the Town. Uses and activities for these areas are intended to encourage a safe, convenient and aesthetically-pleasing transition between the ski mountain and surrounding land use categories. The range of uses and activities appropriate in the Ski Base (SB) land use category may include skier and resort services, ski lifts, ski trails, base facilities, public restrooms, ticket sales, clubs, public plazas, open spaces, parking and loading/delivery facilities, and residential, retail, and restaurant uses. Town of Vail Page 5 Vail Village Master Plan (in part) GOAL #1 ENCOURAGE HIGH QUALITY, REDEVELOPMENT WHILE PRESERVING UNIQUE ARCHITECTURAL SCALE OF THE VILLAGE IN ORDER TO SUSTAIN ITS SENSE OF COMMUNITY AND IDENTITY. Objective 1.2: Encourage the upgrading and redevelopment of residential and commercial facilities. Policy 1.2.1: Additional development may be allowed as identified by the Action Plan and as is consistent with the Vail Village Master Plan and Urban Design Guide Plan. Policy 1.4.2: The Town may grant flexibility in the interpretation and implementation of its regulations and design guidelines to help protect and maintain the existing character of Vail Village. GOAL #2 TO FOSTER A STRONG TOURIST INDUSTRY AND PROMOTE YEAR- AROUND ECONOMIC HEALTH AND VIABILITY FOR THE VILLAGE AND FOR THE COMMUNITY AS A WHOLE. Objective 2.1: Recognize the variety of land uses found in the 11 sub-areas throughout the Village and allow for development that is compatible with these established land use patterns. Objective 2.2: Recognize the importance of Vail Village as a mixed use center of activities for our guests, visitors and residents. Objective 2.3: Increase the number of residential units available for short term overnight accommodations. Policy 2.3.1: The development of short term accommodation units is strongly encouraged. Residential units that are developed above existing density levels are required to be designed or managed in a manner that makes them available for short term overnight rental. Objective 2.4: Encourage the development of a variety of new commercial activity where compatible with existing land uses. Policy 2.4.1: Commercial infill development consistent with established horizontal zoning regulations shall be encouraged to provide activity generators, accessible greenspaces, public plazas, and streetscape improvements to the pedestrian network throughout the Village. Objective 2.5: Encourage the continued upgrading, renovation and maintenance of existing lodging and commercial facilities to better serve the needs of our guests. Town of Vail Page 6 Policy 2.5.1: Recreation amenities, common areas, meeting facilities and other amenities shall be preserved and enhanced as a part of any redevelopment of lodging properties. LAND USE PLAN: There is a well-defined overall pattern of land use throughout the Village that establishes one of its more pleasant characteristics. The greatest variety and intensity of uses are found within the Village Core Area and along the pedestrian ways of East Meadow Drive. The mixed use character of these areas make significant contributions to the vitality of the pedestrian experience in the Village. Land uses surrounding these areas are predominantly residential with a mixture of lodging, condominium, and low density residential development. Other land use designations in the Village include heavy service, public facility/parking, and ski base/recreation. Ski Base/Recreation: Located at the base of Vail Mountain in the Golden Peak area and immediately adjacent to Vail Village, this designation is intended to provide for the facilities and services inherent to the operation of a ski area. Uses and activities for these areas are intended to encourage a safe, convenient, and aesthetically-pleasing transition between the ski mountain and surrounding land use categories. The range of uses and activities appropriate in the Ski Base/Recreation land use category may include skier and resort services, ski lifts, ski trails, base facilities, public restrooms, ticket sales, clubs, public plazas, outdoor cultural/art events and sports venue, open spaces, parking and loading/delivery facilities, and residential, retail, and restaurant uses. GOLDEN PEAK SKI BASE SUB-AREA (#10) The Golden Peak Ski Base Sub-Area has traditionally served as a recreational activity center throughout the year. The Golden Peak Ski Base facility provides one of four access portals to Vail Mountain during the winter months, and accommodates a number Town of Vail Page 7 of the Town's recreation programs during the summer. In 1983, Vail Associates received approval for the redevelopment of this facility and in 1988, completed the Children’s Ski Center. The further redevelopment of this area will serve to reinforce its role as a major ski base and recreational activity center for the entire community. Development or redevelopment of this sub-area will attract additional traffic and population into this area and may have significant impacts upon portions of Sub-Areas 6 and 7. Title 12, Zoning Regulations, Vail Town Code (in part) Chapter 12-1: Title, Purpose And Applicability 12-1-2: Purpose: A. General: These regulations are enacted for the purpose of promoting the health, safety, morals, and general welfare of the town, and to promote the coordinated and harmonious development of the town in a manner that will conserve and enhance its natural environment and its established character as a resort and residential community of high quality. B. Specific: These regulations are intended to achieve the following more specific purposes: 1. To provide for adequate light, air, sanitation, drainage, and public facilities. Town of Vail Page 8 2. To secure safety from fire, panic, flood, avalanche, accumulation of snow, and other dangerous conditions. 3. To promote safe and efficient pedestrian and vehicular traffic circulation and to lessen congestion in the streets. 4. To promote adequate and appropriately located off street parking and loading facilities. 5. To conserve and maintain established community qualities and economic values. 6. To encourage a harmonious, convenient, workable relationship among land uses, consistent with municipal development objectives. 7. To prevent excessive population densities and overcrowding of the land with structures. 8. To safeguard and enhance the appearance of the town. 9. To conserve and protect wildlife, streams, woods, hillsides, and other desirable natural features. 10. To assure adequate open space, recreation opportunities, and other amenities and facilities conducive to desired living quarters. 11. To otherwise provide for the growth of an orderly and viable community. Article 12-8D. Ski Base/Recreation (SBR) District 12-8D-1: Purpose: The ski base/recreation district is intended to provide for the base facilities necessary to operate the ski mountain and to allow multi-family residential dwellings as a secondary use if certain criteria are met. In addition, summer recreational uses and facilities are encouraged to achieve multiseasonal use of some of the facilities and provide for efficient use of the facilities. 12-8D-2: Permitted Uses: A. Within Main Lodge: The following uses shall be permitted within the main base lodge building in the ski base/recreation district: Basket rental. Injury prevention and rehabilitation facilities for owners' use. Lift ticket sales. Meeting rooms for owner use and community oriented organizations. Restaurant/bar/snack bar/candy sales. Ski lockers/employee locker rooms. Ski repair, rental, sales and accessories. Ski school and ski patrol facilities. Special community events. Summer seasonal recreational, cultural and educational programs and offices. Tennis pro shop. B. Retail And Meeting Room Space Limitation: a. Retail sales space in the first two (2) floors shall be limited to a maximum of fifteen percent (15%) of the nonresidential gross square footage of the main base lodge building. Under this section "retail" shall be defined as tennis pro shop, candy sales, ski repair/rental sales, accessories and clothing, basket rental, ski lockers and storage for the public. Town of Vail Page 9 b. Meeting rooms shall be limited to a maximum of ten percent (10%) of the nonresidential gross square footage of the main building. C. Dwelling Units: Multi-family dwelling units within the main base lodge building if the following requirements are met: 1. The dwelling units shall be a secondary use within the main base lodge building if they meet the following criteria: a. No residential use on ground level. b. Visual impacts such as surface parking for the dwelling units shall be minimized by providing at least forty percent (40%) of the required parking within the main base lodge building or in an attached parking structure. c. The maximum gross residential floor area (GRFA) devoted to dwelling units shall not exceed thirty percent (30%) of the total gross square footage of the main base lodge building. 2. Before acting on multi-family dwelling units, the planning and environmental commission shall consider the following factors in regard thereto: a. Relationship and impacts of the use on development objectives of the town. b. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks, and recreational facilities, and other public facilities and public facilities needs. c. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking area. d. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. 3. The planning and environmental commission shall make the findings set forth in subsection 12-16-6B of this title before permitting multi-family units within the main base lodge building. D. Children's Ski School Building: Permitted uses within the children's ski school building: Children's ski school services and programs. Community events and programs. Summer recreational, cultural and educational programs. Year round childcare and children's ski school and appurtenant recreational facilities and programs. E. Outside Of Lodge: The following uses shall be permitted outside the main base lodge and children's ski school buildings as shown on the approved development plan zoned ski base/recreation district: Bus and skier drop off. Food and beverage service. Indoor and outdoor ski storage. Mountain storage buildings. Private unstructured parking. Public parks, tennis and volleyball courts, and playing fields, playgrounds. Ski racing facilities. Town of Vail Page 10 Ski school activities. Ski trails, slopes and lifts. Snowmaking facilities. Special community events. Water treatment and storage facilities buildings. F. Employee Housing Units: Employee housing units, as further regulated by chapter 13 of this title. 12-8D-3: CONDITIONAL USES: The following conditional uses shall be permitted in the ski base/recreation district, subject to the issuance of a conditional use permit in accordance with the provisions of chapter 16 of this title: Addition or expansion of storage buildings for mountain equipment. Additions or expansions of public or private parking structures or spaces. Bed and breakfasts, as further regulated by section 12-14-18 of this title. Child daycare center. Communications antennas and appurtenant equipment. Food and beverage cart vending. Public, private or quasi-public clubs. Recreation room/minor arcade. Redevelopment of public parks, playgrounds. Redevelopment of ski lifts and tows. Redevelopment of ski racing facilities. Redevelopment of water storage extraction and treatment facilities. Seasonal structures to accommodate athletic, cultural, or educational activities. Summer outdoor storage for mountain equipment. Summer seasonal community offices and programs. 12-8D-4: ACCESSORY USES: The following accessory uses shall be permitted in the ski base/recreation district: Accessory uses customarily incidental to permitted and conditional uses and necessary for the operation thereof. Home occupations, subject to the issuance of a home occupation permit in accordance with the provisions of section 12-14-12 of this title. 12-8D-5: LOCATION OF BUSINESS ACTIVITY: All offices and retail sales conducted in the ski base/recreation district shall be operated and conducted entirely within a building except for approved special events and food and beverage vending. 12-8D-6: DEVELOPMENT PLAN REQUIRED: A. Compatibility With Intent: To ensure the unified development, the protection of the natural environment, the compatibility with the surrounding area and to assure that development in the ski base/recreation district will meet the intent of the zone district, a development plan shall be required. Town of Vail Page 11 B. Plan Process And Procedures: The proposed development plan shall be in accordance with section 12-8D-7 of this article and shall be submitted by the developer to the administrator, who shall refer it to the planning and environmental commission, which shall consider the plan at a regularly scheduled meeting. A report of the planning and environmental commission stating its findings and recommendations shall be transmitted to the town council for approval in accordance with the applicable provisions of section 12-16-6 of this title. C. Plan As Guide: The approved development plan shall be used as the principal guide for all development within the ski base/recreation district. D. Amendment Process: Amendments to the approved development plan will be considered in accordance with the provisions of section 12-9A-10 of this title. E. DRB Approval Required: The development plan and any subsequent amendments thereto shall require the approval of the design review board in accordance with the applicable provisions of chapter 11 of this title prior to the commencement of site preparation. 12-8D-7: DEVELOPMENT PLAN CONTENTS: The administrator shall establish the submittal requirements for a development plan application. A complete list of the submittal requirements shall be maintained by the administrator and filed in the department of community development. Certain submittal requirements may be waived and/or modified by the administrator and/or the reviewing body if it is demonstrated by the applicant that the information and materials required are not relevant to the proposed development or applicable to the planning documents that comprise the Vail comprehensive plan. The administrator and/or the reviewing body may require the submission of additional plans, drawings, specifications, samples and other materials if deemed necessary to properly evaluate the proposal. 12-8D-8: DEVELOPMENT STANDARDS/CRITERIA FOR EVALUATION: The following criteria shall be used as the principal means for evaluating a proposed development plan. It shall be the burden of the applicant to demonstrate that the proposed development plan complies with all applicable design criteria. A. Building design with respect to architecture, character, scale, massing and orientation is compatible with the site, adjacent properties and the surrounding neighborhood. B. Buildings, improvements, uses and activities are designed and located to produce a functional development plan responsive to the site, the surrounding neighborhood and uses, and the community as a whole. C. Open space and landscaping are both functional and aesthetic, are designed to preserve and enhance the natural features of the site, maximize opportunities for access and use by the public, provide adequate buffering between the proposed uses and surrounding properties, and, when possible, are integrated with existing open space and recreation areas. Town of Vail Page 12 D. A pedestrian and vehicular circulation system is designed to provide safe, efficient and aesthetically pleasing circulation to the site and throughout the development. E. Environmental impacts resulting from the proposal have been identified in the project's environmental impact report, if not waived, and all necessary mitigating measures are implemented as a part of the proposed development plan. F. Compliance with the Vail comprehensive plan and other applicable plans. 12-8D-9: LOT AREA: The minimum lot or site area shall be forty (40) acres of site area, at least one acre of which shall be buildable area. 12-8D-10: SETBACKS: In the ski base/recreation district, front, side, rear and stream setbacks shall be as indicated on the approved development plan. 12-8D-11: HEIGHT: Up to sixty percent (60%) of the building (building coverage area) may be built to a height of thirty five feet (35'), or less. No more than forty percent (40%) of the building (building coverage area) may be higher than thirty five feet (35'), but not higher than forty feet (40'). Towers, spires, cupolas, chimneys, flagpoles, and similar architectural features not usable as gross residential floor area may extend above the height limit a distance of not more than twenty five percent (25%) of the height limit nor more than fifteen feet (15'). 12-8D-12: DENSITY CONTROL: Total density shall not exceed one dwelling unit per eight (8) acres of site area. A dwelling unit in a multiple-family building may include one attached accommodation unit no larger than one-third (1/3) of the total floor area of the dwelling 12-8D-13: SITE COVERAGE: Site coverage shall be as shown on the approved development plan. 12-8D-14: LANDSCAPING AND SITE DEVELOPMENT: Landscaping requirements shall be as shown on the approved development plan. All areas within the area(s) of disturbance in the landscape plan not occupied by building, ground level decks or patios, or parking shall be landscaped. 12-8D-15: PARKING PLAN AND PROGRAM: Parking plan and management program shall be as shown on and described in the approved development plan. ARTICLE 12-8E. SKI BASE/RECREATION 2 (SBR2) DISTRICT 12-8E-1: PURPOSE: The ski base/recreation 2 district is intended to provide sites for facilities, activities and uses necessary for and appurtenant to the operation of a ski mountain. A variety of other facilities, uses and activities, including, but not limited to, residential, public and semipublic uses and special community events typically associated with a vibrant resort community are also permitted within the zone district. The ski base/recreation 2 district is intended to ensure adequate light, air, open space Town of Vail Page 13 and other amenities appropriate to permitted and conditional uses throughout the zone district. In order to achieve this objective and to ensure compatibility with adjacent land uses, all permitted uses, development and activity within the zone district shall be subject to approval of a comprehensive development plan in accordance with the provisions of this article. Furthermore, due to the likelihood of this district being located at the base of Vail Mountain, and upon some of the most critical and important lands to the future success and resort character of the town, development within this district shall be evaluated based upon its ability to meet the specific purposes of this title and to provide "compelling public benefits which further the public interests" that go beyond any economic benefits to the landowner. 12-8E-2: PERMITTED USES: The following uses shall be permitted within the ski base/recreation 2 district: Eating and drinking establishments including the following: Bakeries and delicatessens with food service, restricted to preparation of products specifically for sale on the premises. Cocktail lounges and bars. Coffee shop. Fountains and sandwich shops. Restaurants. Employee housing units, as further regulated by chapter 13 of this title. Lodges. Private or public off street loading facilities. Private or public off street vehicle parking structures. Public parks and outdoor recreation facilities. Residential uses including the following: Accommodation units. Multi-family residential dwelling units. Single-family residential dwelling units. Two-family residential dwelling units. Ski base oriented uses including the following: Commercial ski storage on the basement or garden level of a building. Retail stores and establishments. Ski lifts and tows. Ski patrol facilities. Ski racing facilities. Ski school facilities. Ski trails. Skier and guest services including, but not limited to, uses such as basket rental, lockers, ski repair, ski rental, lift ticket sales, public restrooms, information/activity desk. Snowmaking facilities. Special community events, including, but not limited to, ski races, festivals, concerts, and recreational, cultural and educational programs and associated improvements/facilities, subject to the issuance of a special events license. 12-8E-3: CONDITIONAL USES: The following conditional uses shall be permitted in the ski base/recreation 2 district, subject to the issuance of a conditional use permit in accordance with the provisions of Town of Vail Page 14 chapter 16 of this title: Brewpubs. Communications antennas and appurtenant equipment. Fractional fee units. Outdoor dining decks and patios. Private and public clubs. Public utility and public service uses. Additional uses determined to be similar to conditional or permitted uses described in this chapter, in accordance with the provisions of section 12-3-4 of this title. 12-8E-4: ACCESSORY USES: The following accessory uses shall be permitted in the ski base/recreation 2 district: Accessory uses customarily incidental to permitted and conditional uses and necessary for the operation thereof. Ski patrol offices. Ski school offices, sales, and activities. Skier and guest service employee offices, locker rooms, and meeting rooms. Swimming pools, patios or other recreation facilities customarily incidental to permitted uses. 12-8E-5: LOCATION OF BUSINESS ACTIVITY: A. Limitations; Exception: All offices, retail sales, and commercial ski storage conducted in the ski base/recreation 2 (SBR2) district shall be operated and conducted entirely within a building, except for approved special community events, outdoor display of goods, and outdoor restaurant seating. B. Outdoor Displays: The area to be used for outdoor display must be located directly in front of the establishment displaying the goods and entirely upon the establishment's own property. Sidewalks, building entrances and exits, driveways and streets shall not be obstructed by outdoor display. 12-8E-6: DEVELOPMENT PLAN: A. Development Plan Required: Prior to site preparation, building construction, or other improvements to land within the ski base/recreation 2 district, there shall be an approved development plan for said district or portion thereof. An approved development plan shall be the principal document in guiding the development, uses and activities of land within the zone district. A development plan shall be approved by the planning and environmental commission. Development standards including setbacks, site coverage, landscaping, density (GRFA) and parking shall be determined by the planning and environmental commission as part of the approved development plan. This determination is to be made based on the proposed development plan's compliance with the design criteria outlined in section 12-8E-9 of this article. B. Application: An application for approval of a development plan may be filed by any owner of property within the ski base/recreation 2 district or his/her agent or authorized representative. The application shall be made on a form provided by the department of community development and shall include a legal description of the property, a list of names and mailing addresses of all adjacent property owners and written consent of owners of all property to be included in the development plan, or Town of Vail Page 15 their agents or authorized representatives. The application shall be accompanied by submittal requirements outlined in subsection 12-8E-8A of this article and a development plan as outlined in subsection C of this section. C. Contents: The development plan shall be comprised of materials submitted in accordance with subsection 12-8E-8A of this article. The development plan shall contain all relevant material and information necessary to establish the parameters within which land in the district may be developed. The development plan may consist of, but not be limited to, the approved site plan, floor plans, building sections and elevations, vicinity plan, off street parking/loading plan, off site improvements plan, preliminary open space/landscape plan, densities and permitted, conditional and accessory uses. 12-8E-7: DEVELOPMENT REVIEW PROCEDURES: A. Preapplication Conference: Prior to submittal of a formal application for a development plan, the applicant shall hold a preapplication conference with the department of community development. The purpose of this meeting shall be to discuss the goals of the proposed development plan, the relationship of the proposal to applicable elements of the Vail comprehensive plan, and the review procedure that will be followed for the application. B. PEC Conducts Final Review: The final review of a proposed development plan shall be by the planning and environmental commission at either a regularly scheduled meeting or a special meeting. Prior to this meeting, and at the discretion of the administrator, a work session may be held with the applicant, staff and the planning and environmental commission to discuss the development plan. A report of the department of community development staff's findings and recommendations shall be presented at a public hearing before the planning and environmental commission. The planning and environmental commission shall review the development plan in accordance with the provisions of section 12-8E-9 of this article. 12-8E-8: SUBMITTAL REQUIREMENTS: A. Information And Materials Required: The administrator shall establish the submittal requirements for an approved development plan application. Certain submittal requirements may be waived or modified by the administrator or the planning and environmental commission if it is demonstrated by the applicant that the information and materials required are not relevant to the proposed development or applicable to the Vail comprehensive plan. A complete list of the submittal requirements shall be maintained by the administrator and filed in the department of community development. 12-8E-9: DESIGN CRITERIA: The following design criteria shall be used as the principal criteria in evaluating the merits of a proposed development plan. It shall be the burden of the applicant to prove by a preponderance of the evidence that the submittal material and the proposed development plan comply with each of the following standards, or demonstrate that one or more of them is not applicable, or that a practical solution consistent with the public interest has been achieved: Town of Vail Page 16 A. Compatibility: Design compatibility and sensitivity to the immediate environment, neighborhood and adjacent properties relative to architectural design, scale, bulk, building height, buffer zones, identity, character, visual integrity and orientation. B. Relationship: Uses, activity and density which provide a compatible, efficient and workable relationship with surrounding uses and activity. C. Parking And Loading: Compliance with parking and loading requirements as outlined in chapter 10 of this title. D. Comprehensive Plan: Conformity with the Vail comprehensive plan, town policies and urban design plans. E. Natural And/Or Geologic Hazard: Identification and mitigation of natural and/or geologic hazards that affect the property on which the development plan is proposed. F. Design Features: Site plan, building design and location and open space provisions designed to produce a functional development responsive and sensitive to natural features, vegetation and overall aesthetic quality of the community. G. Traffic: A circulation system designed for both vehicles and pedestrians addressing on and off site traffic circulation. H. Landscaping: Functional and aesthetic landscaping and open space in order to optimize and preserve natural features, recreation, views and function. I. Workable Plan: Phasing plan or subdivision plan that will maintain a workable, functional and efficient relationship throughout the development of the development plan. J. Annexed Lands: Conformity with the terms of an annexation agreement and demonstration of a compelling public benefit which furthers the public interest. 12-8E-10: LOT AREA: The minimum lot or site area shall be ten thousand (10,000) square feet of buildable site area. 12-8E-11: SETBACKS: In the ski base/recreation 2 district, front, side and rear setbacks shall be as indicated on the approved development plan. 12-8E-12: HEIGHT: In the ski base/recreation 2 district buildings shall range in height from zero feet (0') to forty three feet (43') and be indicated on the approved development plan. All development shall comply with the building height guidelines found in the Vail village master plan conceptual building height plan. In no instance, however, shall the maximum building height exceed forty three feet (43'). 12-8E-13: DENSITY CONTROL (DWELLING UNITS PER ACRE/GRFA): Total density shall not exceed eight (8) dwelling units per acre of buildable site area. The total Town of Vail Page 17 allowable gross residential floor area (GRFA) shall be as indicated on the approved development plan. 12-8E-14: SITE COVERAGE: In the ski base/recreation 2 district, site coverage shall be as indicated on the approved development plan. 12-8E-15: LANDSCAPING AND SITE DEVELOPMENT: In the ski base/recreation 2 district, landscaping requirements shall be as indicated on the approved development plan. 12-8E-16: PARKING/LOADING PLAN AND PROGRAM: Off street parking and loading shall be provided in accordance with chapter 10 of this title. At least ninety five percent (95%) of the required parking shall be located within the main building or buildings, and as approved by the planning and environmental commission in review of the development plan. The off street parking and loading plan shall be indicated on and described in the approved development plan. 12-8E-17: MITIGATION OF DEVELOPMENT IMPACTS: Property owners/developers shall also be responsible for mitigating direct impacts of their development on public infrastructure and in all cases mitigation shall bear a reasonable relation to the development impacts. Impacts may be determined based on reports prepared by qualified consultants. The extent of mitigation and public amenity improvements shall be balanced with the goals of redevelopment and will be determined by the planning and environmental commission in review of development projects and conditional use permits. Substantial off site impacts may include, but are not limited to, the following: deed restricted employee housing, roadway improvements, pedestrian walkway improvements, loading/delivery, streetscape improvements, stream tract/bank improvements, public art improvements, parking, and similar improvements. The intent of this section is to only require mitigation for large scale redevelopment/development projects which produce substantial off site impacts. 12-8E-18: AMENDMENT PROCEDURES: A. Minor Amendments: 1. "Minor amendments" are modifications to building plans, site or landscape plans that do not alter the basic intent and character of the approved development plan, and are consistent with the design criteria of this article. Minor amendments may include, but not be limited to, variations of not more than five feet (5') to approved setbacks and/or building footprints; changes to landscape or site plans that do not adversely impact pedestrian or vehicular circulation throughout the development site; or changes to gross floor area of not more than five percent (5%) of the approved square footage of residential floor area or retail, office, common areas and other nonresidential floor area. 2. Minor amendments consistent with the design criteria outlined in section 12-8E-9 of this article may be approved by the department of community development. All minor amendments shall be indicated on a completely revised development plan. Approved changes shall be noted, signed, dated and filed by the department of community development. Town of Vail Page 18 3. Notification of a proposed minor amendment, and a report of staff action of said request, shall be provided to all property owners within or adjacent to the zone district that may be affected by the amendment. Affected properties shall be as determined by the department of community development. Notifications shall be postmarked no later than five (5) days following staff action on the amendment request and shall include a brief statement describing the amendment and the time and date of when the planning and environmental commission will be informed of the administrative action. In all cases the report to the planning and environmental commission shall be made within twenty (20) days from the date of the staff's decision on the requested amendment. 4. Appeals of staff decisions may be filed by adjacent property owners, owners of property within the zone district, the applicant, planning and environmental commission members or members of the town council as outlined in section 12-3-3 of this title. B. Major Amendments: 1. "Major amendments" are any proposal to change uses; increases to residential floor area greater than five percent (5%) of the approved square footage; increases to retail, office, or common floor area greater than five percent (5%) of the approved square footage; increases or decreases to the number of dwelling, accommodation, or fractional fee club units; any request to modify, enlarge or expand the boundary of an approved development plan and any amendment to the approved development plan that is not a minor amendment as determined by the administrator and defined in this article. 2. Requests for major amendments to an approved development plan shall be evaluated based upon the degree of deviation of the amendment from the basic intent and character of the approved development plan and reviewed in accordance with the procedures described in section 12-8E-7 of this article. All major amendments shall be indicated on a completely revised development plan. Approved changes shall be noted, signed, dated and filed by the department of community development. 3. Owners of all property requesting the amendment, or their agents or authorized representatives, shall sign the application. Notification of the proposed amendment shall be made to owners of all property adjacent to the property requesting the proposed amendment, owners of all property adjacent to the zone district, and owners of all property within the zone district that may be affected by the proposed amendment (as determined by the department of community development). Notification procedures shall be as outlined in subsection 12-3-6C of this title. 12-8E-19: TIME REQUIREMENTS: A. Start Of Construction; Completion: The developer must begin initial construction of the development plan within three (3) years from the time of its final approval, and continue diligently toward the completion of the project. If the development plan is to be developed in phases, the developer must begin construction of subsequent phases within one year of the completion of the previous phase. B. Approval Voided: If the developer does not begin and diligently work toward the completion of the development plan or any stage of the development plan within the time limits imposed by the preceding subsection, the approval of said development plan shall be void. The planning and environmental commission shall review the Town of Vail Page 19 development plan upon submittal of an application to reestablish the development plan following the procedures outlined in section 12-8E-7 of this article. V. SITE ANALYSIS Existing Zoning: Ski Base/Recreation District Proposed Zoning: Ski Base/Recreation 2 District Existing Land Use Designation: Ski Base Proposed Land Use Designation: Ski Base (no change) Mapped Geological Hazards: None Lot Area: Approximately 0.265 acres/ 11,543 square feet Development Standard Ski Base/Recreation District Ski Base/Recreation 2 District Minimum Lot Size 40 acres with 1 acre buildable area 10,000 square feet of buildable area Minimum Setbacks Per the approved development plan Per the approved development plan Maximum Height 60% max 35 feet 40% max 40 feet 43 feet and per the Vail Village Master Plan Maximum Dwelling units/acre 1 DU/ 8 acres 8 DU/ acre (2 DU on subject property) GRFA 30% of gross floor area in lodge Per the approved development plan Site coverage Per the approved development plan Per the approved development plan Minimum Landscaping Per the approved development plan, all disturbed areas without structure, parking or patios must be landscaped Per the approved development plan; 95% of required parking shall be within the building Required Parking Per parking and management plan In accordance with Chapter 12-10 Development Review Process PEC review of development plan PEC review of development plan VI. SURROUNDING LAND USES AND ZONING Existing Use Zone District Land Use Designation North: Mixed Use Residential Cluster Village Master Plan South: Recreational Ski Base/Recreation Ski Base West: Recreational Ski Base/Recreation Ski Base East: Recreational Ski Base/Recreation Ski Base Town of Vail Page 20 VII. ZONE DISTRICT BOUNDARY AMENDMENT CRITERIA Before acting on a zone district boundary amendment application, the Planning and Environmental Commission shall consider the following factors with respect to this proposal: 1. The extent to which the zone district amendment is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town. Staff believes a rezoning of the subject property to the SBR2 District is consistent with all applicable elements of the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and Section IV of this memorandum. The SBR2 District will allow for a coordinated and predictable development review process and will allow for the development vision anticipated by the Club. • Vail Land Use Plan: This zone district boundary amendment meets the goals and objectives of the Vail Land Use Plan, including: o Goal 1.1, which states that “Vail should continue to grow in a controlled environment, maintaining a balance between residential, commercial and recreational uses to serve both the visitor and the permanent resident.” • Vail Village Master Plan: The applicable goals, objectives and policies of the Vail Village Master Plan will be met by rezoning to SBR2 District, including: o Objective 1.2, which states that the Town should “encourage the upgrading and redevelopment of residential and commercial facilities.” o Objective 2.2, which calls for recognition of “the importance of Vail Village as a mixed use center of activities for our guests, visitors and residents.” o Objective 2.3, which states the Town should “increase the number of residential units available for short term overnight accommodations.” Should dwelling units be approved on the subject property as part of a development plan once SBR2 zoning is in place, these dwelling units will most likely not be occupied by full-time residents, and thus, could become available for short-term rental. Therefore, Staff believes the applicant’s proposal meets this review criterion. 2. The extent to which the zone district amendment is suitable with the existing and potential land uses on the site and existing and potential surrounding land uses as set out in the town's adopted planning documents. The rezoning of the subject property to the SBR2 District will be in line with the recommendations for the designation of Ski Base in the Vail Land Use Plan, and the Vail Village Master Plan’s Golden Peak subarea #10. The Vail Land Use Plan Ski Base designation of the subject property states that “uses and activities for these areas are intended to encourage a safe, convenient and aesthetically-pleasing transition between the ski mountain and surrounding land use categories. The range of uses and activities appropriate in the Ski Base (SB) land use category may include skier and resort Town of Vail Page 21 services, …base facilities, public restrooms, … clubs, …parking and loading/delivery facilities, and residential...” This is directly in line with the SSVC rezoning request and their vision to redevelop with a mix of uses not achievable in the SBR District. Staff finds the proposed rezoning also meets the recommendations of the Vail Village Master Plan’s Golden Peak subarea #10, which states that “the further redevelopment of this area will serve to reinforce its role as a major ski base and recreational activity center for the entire community.” Therefore, Staff believes this proposal meets this review criterion. 3. The extent to which the zone district amendment presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives. Staff believes the rezoning of the subject property to the SBR2 District will allow for more harmonious, convenient and workable development of the subject property by providing a more harmonious and workable zone district. This is due to the broader nature of the SBR2 District versus the prescriptive and restrictive nature of the Ski Base Recreation District, which was established to facilitate the development of Golden Peak without any consideration of the SSCV property. Further, the proposed zone district is very similar in purpose to the existing zone district, as both purpose statements ultimately result in the shared outcome of ski base land uses and structures that interact with the adjacent ski mountain. There are many issues that need to be addressed with the development plan application that are not addressed through a rezoning application. In some cases, impacts of development must be mitigated, as outlined in Section 12-8E-17, Mitigation of Development Impacts. The impacts that will be addressed during the development plan review include deed restricted employee housing, roadway improvements, traffic mitigation, pedestrian walkway improvements, loading/delivery, streetscape improvement, parking, landscaping, public art, and similar issues. There is also a Golden Peak Operational Management Plan (see Attachment E) that will need to be updated to further address traffic impacts, parking, and loading and delivery. The Vail Town Code does not require development plans to be viewed concurrently with rezoning applications, and Staff believes these impacts will be adequately addressed with the development plan. Therefore, Staff believes the applicant’s proposal meets this review criterion. 4. The extent to which the zone district amendment provides for the growth of an orderly viable community and does not constitute spot zoning as the amendment serves the best interests of the community as a whole. Staff finds the proposed rezoning of the subject property to SBR2 District will help facilitate the redevelopment of an aging building that needs to be updated. This will provide for the growth of an orderly viable community, and does not constitute spot Town of Vail Page 22 zoning as the amendment serves the best interests of the community as a whole by facilitating the redevelopment of this aging property and complying with the Vail Comprehensive Plan. Land use decisions in various courts have determined that if the amendment serves the best interests of the community as a whole, the rezoning is not spot zoning. Further, the SBR2 District is only one parcel away from the subject property and the districts are compatible because of the similarities in their purpose statements. Therefore, Staff believes the proposal meets this review criterion. 5. The extent to which the zone district amendment results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features. Staff finds the proposed rezoning of the subject property to SBR2 from Ski Base Recreation will not adversely impact the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features, as the difference in allowable bulk and mass between the already development property and a potential redevelopment scenario is marginal, and the site is small enough and removed enough from the hillside that none of the above elements will be adversely impacted. Further, when specific details are provided in the development plan, these elements will be reviewed again during the development plan review. Therefore, Staff believes the proposal meets this review criterion. 6. The extent to which the zone district amendment is cons istent with the purpose statement of the proposed zone district. Staff finds the proposed rezoning of the subject property is consistent with the purpose statement of the proposed zone district. The purpose statement of the SBR2 District states: “the District is intended to provide sites for facilities, activities and uses necessary for and appurtenant to the operation of a ski mountain. A variety of other facilities, uses and activities, including, but not limited to, residential..and semipublic uses .. associated with a vibrant resort community are also permitted within the zone district.…Furthermore, due to the likelihood of this district being located at the base of Vail Mountain, and upon some of the most critical and important lands to the future success and resort character of the town, development within this district shall be evaluated based upon its ability to meet the specific purposes of this title and to provide "compelling public benefits which further the public interests" that go beyond any economic benefits to the landowner.” The SSCV facility rezoning and subsequent redevelopment furthers the purpose of the zone district by providing a semipublic use that works in conjunction with Vail Mountain Town of Vail Page 23 to provide world-class ski and snowboard development programs that provide a public benefit. The permitted residential land uses that are anticipated to finance the project are also consistent with the purpose statement’s inclusion of residential uses. Therefore, Staff believes the proposal meets this review criterion. 7. The extent to which the zone district amendment demonstrates how conditions have changed since the zoning designation of the subject property was adopted and is no longer appropriate. When the subject property was rezoned to the Ski Base Recreation District, it was rezoned to facilitate redevelopment of the subject property with encroachments onto the adjacent Vail Mountain property. In order to allow the development site to encompass all of Tract B, including Golden Peak, a consistent zoning needed to apply to the entire development site that shared one development plan. The current strategy of SSCV is to redevelop within the confines of their own property, and with a separate development plan and development potential from Vail Mountain and Golden Peak. As a result, they are legally non-conforming in terms of lot size, and thus, have difficulty in redeveloping the property. The proposed rezoning allows for the development of dwelling units, which could be integral to financing, as was the case in most of the redevelopment projects that occurred during Vail’s “Billion Dollar Renewal.” Therefore, Staff believes the proposal meets this review criterion. 8. Such other factors and criteria as the commission and/or council deem applicable to the proposed rezoning. VIII. RECOMMENDATION The Community Development Department recommends the Planning and Environmental Commission forwards a recommendation of approval to the Vail Town Council for a zone district boundary amendment, pursuant to Section 12-3-7, Amendment, Vail Town Code, to allow for a rezoning from Ski Base/Recreation District to Ski Base/Recreation 2 District, located at 598 Vail Valley Drive/part of Tract B, Vail Village Filing 7, and setting forth details in regard thereto. This recommendation is based upon the review of the criteria outlined in Section VII of this memorandum and the evidence and testimony presented. Should the Planning and Environmental Commission choose to recommend approval of this request, the Community Development Department recommends the Commission passes the following motion: “The Planning and Environmental Commission forwards a recommendation of approval to the Vail Town Council for a zone district boundary amendment, pursuant to Section 12-3-7, Amendment, Vail Town Code, to allow for a rezoning from Ski Base/Recreation District to Ski Base/Recreation 2 District, located at Town of Vail Page 24 598 Vail Valley Drive/part of Tract B, Vail Village Filing 7, and setting forth details in regard thereto.” Should the Planning and Environmental Commission choose to recommend approval of this request, the Community Development Department recommends the Commission makes the following findings: “Based upon the review of the criteria outlined in Section VII of the Staff memorandum to the Planning and Environmental Commission dated January 30, 2012, and the evidence and testimony presented, the Planning and Environmental Commission finds: 1. That the amendments are consistent with the adopted goals, objectives and policies outlined in the Vail comprehensive plan and compatible with the development objectives of the town. 2. That the amendments are compatible with and suitable to adjacent uses and appropriate for the surrounding areas. 3. That the amendments promote the health, safety, morals, and general welfare of the town and promote the coordinated and harmonious development of the town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality.” IX. ATTACHMENTS A. Vicinity Map B. Proposed Zoning Map Amendment C. Applicant’s request D. Letters from neighbors E. Golden Peak Operational Management Plan Attachment A Attachment B     Opal Building · 225 Main Street · Suite G-002 · Edwards, Colorado · 81632 970-926-7575 · 970-926-7576 fax · www.braunassociates.com     December 27, 2011 Mr. Warren Campbell Department of Community Development Town of Vail 75 South Frontage Road Vail, CO 81632 RE: Proposed Re-zoning of SSCV Clubhouse Site Dear Warren: Attached you will find an application to re-zone the Ski and Snowboard Club Vail property from Ski Base/Recreation to Ski Base/Recreation 2. Material provided herein includes: 1. Written description of the request, 2. Diagrams graphically depicting the area to be re-zoned 3. Application form 4. Filing fee I think you will find the material submitted to be very consistent with what we have discussed over the past few weeks. Thank you for your time and efforts to date. Please do not hesitate to contact me with any questions you may have. I look forward to working with you on this exciting project. Regards, Thomas A. Braun CC: Aldo Radamus Phil Hoversten David Viele Glen Davis     SKI AND SNOWBOARD CLUB VAIL Re-zoning Request, December 27, 2011 The purpose of this report is to provide background information and rationale for the proposed re-zoning of the Ski and Snowboard Club Vail (the Club, or SSCV) property located within the Golden Peak neighborhood of Vail. This request is to re-zone the subject property from Ski Base/Recreation to Ski Base/Recreation 2. The purpose of the re-zoning is to establish zoning on the property that could facilitate the redevelopment of existing Club facilities. The following information is provided below: • a brief summary of SSCV, a description of existing club facilities and goals for and need for upgrading Club facilities, • an assessment of re-zoning alternatives and the rationale for the proposed re-zoning, and • a statement regarding how the proposed re-zoning is consistent with applicable review criteria. This application is submitted by and on behalf of Ski and Snowboard Club Vail. Due to the projects proximity to Vail Mountain the Club will be coordinating with Vail Resorts (and with other neighbors) on any future redevelopment plans for their property. However, this project is not a Vail Resorts or Vail Resorts Development Company project. Ski and Snowboard Club Vail Founded in 1962, the mission of the Club is to provide youth the opportunity for character growth and excellence through athletics. The Club is widely recognized as one of the premier ski and snowboard clubs in the Country and is highly respected throughout the Valley as a leader in youth development. Ski and Snowboard Club Vail serves over 500 members in a variety of alpine racing, free-skiing, freestyle, Nordic and snowboarding programs. The Club is a 501(c)3 non-profit charitable organization. Originally a small club dedicated to ski racing, SSCV has evolved into one of our community’s largest organizations dedicated to serving our youth. In doing so the influence of the Club has grown to cover a wide range of topics, all making significant contributions to our community. The Kids The Club has had amazing success in developing snow-sport athletes who have gone on to excel on an international stage. The most recognizable among these is of course Lindsey Vonn, but not to be overlooked are the achievements of Toby Dawson, Chris Del Bosco, Sarah Schleper and many others. Over the course of the past two years four athletes have been named to the U.S. Ski Team, notable among them are two local, “home grown” athletes born and raised here in Eagle County.         Athletic achievements are an important goal, however the underlying purpose of the Club in serving our youth is to use athletics to instill the “3 C’s” of courage, character and commitment, to help kids development life lessons that will help them in the years to come. The Community The Club utilizes its staff and athletes to volunteer in a variety of community events throughout the year. Most notable among these is the Birds of Prey at Beaver Creek. Each year the Club provides on average 4,000 hours of volunteer help to this event. The presence of Club volunteers is also found at the Community Fund Rummage Sale, the Copper Triangle and other community events. The Academy In the fall of 2007 Ski and Snowboard Club Vail partnered with the Eagle County School District to establish the Vail Ski and Snowboard Academy. The Academy is a fully accredited and certified public school with the goal of providing its students with a rigorous academic curriculum while supporting a world class training and competition schedule. From 31 students in its first year, the Academy grown to 141 students in 2011. While most students are from Eagle County, this past year a total of 17 families re-located to Eagle County in order for there kids to attend the Academy. The economic impact of these new families is significant. Economic Impact The Club’s programs and visitors drawn to Vail are instrumental in generating significant economic activity for the community. Foremost among these is the early season training at Golden Peak. Snowmaking improvements made a few years ago have made Golden Peak a prime location for early season race training. This past year, for a five week period 20 ski clubs, 10 colleges and 20 national ski teams came to Vail to train. This resulted in the Club issuing approximately 7,600 tickets to visitors who on average spent a week in Vail. This resulting in literally millions of dollars spent on lodging, meals and shopping. By way of example, Manor Vail alone had 2,200 “group nights” during this period, at a time of year when the facility is typically very quiet. Throughout the winter the Club hosts a number of races and other events. This year 42 race days are planned and most of them are multi-day events. This year Vail will host a Junior Olympic event for 13 and 14 year olds that will involve 160 athletes, coaches and families over an eight day period. The economic impact of this and other events is quite considerable. Existing Club Facilities The Club currently operates from a building located at the base of Vail Mountain at Golden Peak that is approximately 6,000 square feet in size. This building was originally constructed in the         mid-70’s and a second floor was added in the mid-80’s. At that time the Club was serving just over 100 athletes. With a current membership of over 500 athletes the space constraints within the existing facility are severe and the building is certainly showing its age. The need to expand and update these facilities is acute. Creating a club facility that will be commensurate with its training facilities on Vail Mountain is the driving factor behind this redevelopment proposal. Goals of the Club Re-development The goal of the Club is to re-develop their building to provide the space and facilities necessary to serve its membership – be they five year olds in the Future Stars program or world class athletes competing in Olympic or World Cup events. Conceptual plans for the building envision approximately 16,000SF of Club space that would include an entry/lobby area, a community room, lockers and other space for athletes in the Club’s various programs, administration and coach’s space, conditioning/training space and storage. Structured parking is planned in the lowest level of the building. As a non-profit organization financing a building of this size is extremely challenging. The “economic engine” for the redevelopment would be two for-sale residential condominiums on the upper floors of the building. Additional information on existing club facilities, the need for the project and specifics on the proposed re-development would be provided as an element of the Development Plan to be provided in subsequent steps in the Town’s development review process. The Problem Statement – Existing Zoning The property is .265 acres in size and is currently zoned Ski Base/Recreation. This zone district was created in the early 80’s and was written with the specific intention of facilitating the re- development of the Golden Peak Base Lodge. The degree of specificity with which the zone district was written (in order to facilitate the base lodge redevelopment) is extreme. For example, allowable GRFA is based on a percentage of the square footage of the “base lodge”. As such GRFA ratio cannot reasonably be applied to the Club’s parcel (or any other parcel for that matter). Another complication is that the minimum lot size in the Ski Base/Recreation District is 40 acres, making the SSCV parcel a non-conforming lot. In summary, the Ski Base/Recreation zoning currently applied to the Club’s parcel does not provide a “workable process” for the review of redevelopment plans for the Club’s land.         The problem statement, or question is - what zoning and development review process is most appropriate for this project. Alternative Review Processes There would appear to be four possible zoning alternatives for how this project could be handled. The goals of this review process would be two-fold – to provide a process that would allow SSCV to propose a building consistent with its redevelopment goals and to provide the Town with the tools necessary to review the proposal. The following summarizes each of these. 1. Amend the Ski Base/Recreation Zone District In theory the “problematic” sections of the Ski Base/Recreation district could be amended such that the zone district could be used on other properties. However, given the specificity with which this zone district was written relative to the Golden Peak Base Lodge, any amendments would create other complications and could raise questions relative to the larger, +/-40 acre Ski Base/Recreation parcel. Amending this district is not considered a viable alternative. 2. SDD Overlay An SDD could provide a zoning process for the Club to propose their redevelopment plans and an SDD would also provide the town with the tools to review the proposal. However, an SDD is an overlay district and the underlying zone district would still come into play, i.e. the inherent complications with the Ski Base/Recreation District would remain a problem. An SDD is not considered a viable alternative. 3. Create a new zone district A new zone district could be drafted and applied to the SSCV property. However, drafting a new zone district is an extensive effort and begs the questions – how many different zone districts does the town really need and as an alternative is there an existing zone district that could “work”? 4. Re-zone with existing zone district In 2006 the Town established the Ski Base/Recreation 2 (SB/R2) district in order to facilitate the development of Vail’s Front Door. The underlying purpose of the Ski Base/Recreation 2 district is to “provide sites for facilities, activities and uses necessary for and appurtenant to the operation of a ski mountain”. A ski and snowboard club would certainly seem to be consistent with this purpose. Proposed Zoning Amendment         While the Ski Base/Recreation 2 district was created to facilitate the development of Vail’s Front Door, this zone district was not written with the same degree of specific attention to one building (Golden Peak Base Lodge) as was done with the Ski Base/Recreation District. As such, the land uses, development standards and review procedures outlined in SB/R2 could reasonably be applied to other properties. From a technical standpoint the permitted and conditional uses, allowable densities and other development standards would all “work” for the project envisioned by the Club. Any development approval is subject to the Town’s review and approval of a development plan so the town would have the tools necessary to ensure the project is consistent with Town goals. The SB/R 2 zone district is a viable alternative for the Club to use in pursuing their redevelopment plans and the zone district amendment is to apply SB/R2 to the SSCV property. The proposed amendment is in many ways a housekeeping item necessary to correct the complications created by the specificity with which the SB/R2 district was written. Consider the following comparisons: • Density (8 units per acre) is the same in both districts, • Most development standards are the same in both districts, • Allowable land uses (oriented toward ski mountain/base area uses) are very similar in both districts, and • The requirement for a Development Plan and the review processes are very similar in both districts.   Diagrams depicting the subject property are found on the following two pages.                         Criteria for Reviewing the Proposed Re-zoning Request In accordance with the Town Code, the following factors are to be considered by the PEC and Town Council with respect to the requested zone district amendment. (1) The extent to which the zone district amendment is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and The property has been zoned Ski Base/Recreation since 2000. This zone district was deemed to be consistent with “all applicable elements of the goals, objectives and policies of the Vail Comprehensive Plan” when the property was originally zoned SB/R and it is reasonable to assume that the SB/R zoning remains consistent with these goals, policies and objectives. As described in earlier sections of this report, rezoning to Ski Base/Recreation 2 will not significantly change the underlying purpose of the zone district, the allowable uses, density provisions, review processes or the majority of development standards. For these reasons it is reasonable to conclude the proposed zone district amendment is consistent with the Town’s comprehensive plan. The Vail Village Master Plan and the Vail Land Use Plan are the two most relevant master plan documents to consider relative to the proposed re-zoning. Each of these documents includes a wide array of goals, objectives and policies along with other elements to be considered in reviewing a re-zoning proposal. The following is a brief summary of these two plans: Vail Village Master Plan (adopted 1990, updated 2006 and 2009) The SSCV club facility is located just outside of the boundary of the Vail Village Plan boundary and as such is also located outside the Land Use Plan and other Illustrative Plans found in the document. For example, the subject property is located immediately outside the Ski Base Recreation land use category which reads: Ski Base/Recreation: Located at the base of Vail Mountain in the Golden Peak area and immediately adjacent to Vail Village, this designation is intended to provide for the facilities and services inherent to the operation of a ski area. Uses and activities for these areas are intended to encourage a safe, convenient, and aesthetically-pleasing transition between the ski mountain and surrounding land use categories. The range of uses and activities appropriate in the Ski Base/Recreation land use category may include skier and resort services, ski lifts, ski trails, base facilities, public restrooms, ticket sales, clubs, public plazas, outdoor cultural/art events and sports venue, open spaces, parking and loading/delivery facilities, and residential, retail, and restaurant uses. Given the subject property was zoned Ski Base/Recreation prior to the adoption of the VVMP, it is a reasonable assumption to consider this land use category relative to the proposed re-zoning.         A major element of the VVMP is the “Action Plan”. The Action Plan provides graphic and narrative descriptions of opportunities, constraints and other considerations relative to future land uses for ten unique “sub areas” throughout the Village area. These sub area concepts are intended to provide “advisory guidelines for future land use decisions to be used by the Planning and Environmental Commission and the Town Council. The Action Plan for the “Golden Peak Sub Area” does include the SSCV property. This element of the Plan states: The Golden Peak Ski Base Sub-Area has traditionally served as a recreational activity center throughout the year. The Golden Peak Ski Base facility provides one of four access portals to Vail Mountain during the winter months, and accommodates a number of the Town's recreation programs during the summer. In 1983, Vail Associates received approval for the redevelopment of this facility and in 1988, completed the Children’s Ski Center. The further redevelopment of this area will serve to reinforce its role as a major ski base and recreational activity center for the entire community. Development or redevelopment of this sub-area will attract additional traffic and population into this area and may have significant impacts upon portions of Sub-Areas 6 and 7. This element of the VVMP would clearly support the proposed zoning for the SSCV property. Vail Land Use Plan (adopted 1986, updated 2009) The most pertinent goal from this Plan is 1.3 – “the quality of development should be maintained and upgraded whenever possible”. The underlying purpose of this request is to establish a “workable” zoning and development review process that will allow the Club to propose the upgrading of existing facilities. The subject property is designated “SB Ski Base” on the Land Use Map. This category is described as: Ski base areas are designated at the main mountain portals found within the Town. Uses and activities for these areas are intended to encourage a safe, convenient and aesthetically pleasing transition between the ski mountain and surrounding land use categories. The range of uses and activities appropriate in the Ski Base (SB) land use category may include skier and resort services, ski lifts, ski trails, base facilities, public restrooms, ticket sales, clubs, public plazas, open spaces, parking and loading/delivery facilities, and residential, retail, and restaurant uses. The proposed re-zoning to Ski Base/Recreation 2 is consistent with this land use category. (2) The extent to which the zone district amendment is suitable with the existing and potential land uses on the site and existing and potential surrounding land uses as set out in the town's adopted planning documents; and         The proposed zoning is suitable for both the existing use of the subject property and the potential future use of the property, and both existing and future uses are compatible with surrounding land uses. This finding is clearly evident when considering the very minor changes in proposed zoning when compared to the properties existing zoning. Potential future uses are also consistent with the town’s adopted master plans. (3) The extent to which the zone district amendment presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and The existing Ski Base/Recreation zoning has been in place on the property for many years. Based on the fact that the Town zoned the property Ski Base/Recreation in 2000, one can reasonably assume the existing zoning was deemed to provide a “harmonious, convenient, workable relationship among land uses”. Given the fact that proposed zoning to Ski Base/Recreation 2 would result in very few material changes as compared to the existing zoning, it is concluded that the proposed re-zoning is consistent with this criteria. Purpose of district is to ensure compatibility and that compatibility is ensured by requirement of development plan review as requisite of any development. (4) The extent to which the zone district amendment provides for the growth of an orderly viable community and does not constitute spot zoning as the amendment serves the best interests of the community as a whole; and One of the stated purposes of the SB/R 2 district is “. . . to ensure compatibility with adjacent land uses, all permitted uses, development and activity within the zone district shall be subject to approval of a comprehensive development plan in accordance with the provisions of this article”. The requirement for all development within the SB/R 2 district to obtain approval of a development plan would inherently provide a system to ensure “orderly growth of our community”. “Spot zoning” is generally considered applying zoning to a single (often small-sized) property without consideration the community’s broader context. By the same token, courts have upheld re-zoning of single properties (regardless of size) if the re-zoning is consistent with a communities land use objectives and relevant community plans. Given the proposed re-zonings conformance with applicable community plans, this request would not be considered “spot zoning”. (5) The extent to which the zone district amendment results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features; and The proposed re-zoning would not result in an adverse impact on any of the considerations listed above.         (6) The extent to which the zone district amendment is consistent with the purpose statement of the proposed zone district; and The stated purpose of the Ski Base/Recreation 2 district is: The Ski Base/Recreation 2 district is intended to provide sites for facilities, activities and uses necessary for and appurtenant to the operation of a ski mountain. A variety of other facilities, uses and activities, including, but not limited to, residential, public and semipublic uses and special community events typically associated with a vibrant resort community are also permitted within the zone district. The ski base/recreation 2 district is intended to ensure adequate light, air, open space and other amenities appropriate to permitted and conditional uses throughout the zone district. In order to achieve this objective and to ensure compatibility with adjacent land uses, all permitted uses, development and activity within the zone district shall be subject to approval of a comprehensive development plan in accordance with the provisions of this article. Furthermore, due to the likelihood of this district being located at the base of Vail Mountain, and upon some of the most critical and important lands to the future success and resort character of the town, development within this district shall be evaluated based upon its ability to meet the specific purposes of this title and to provide "compelling public benefits which further the public interests" that go beyond any economic benefits to the landowner. (Ord. 29(2005) § 25: Ord. 4(2003) § 1) The existing and planned uses of the subject site are consistent with “uses and activities, including, but not limited to, residential, public and semipublic uses and special community events typically associated with a vibrant resort community” (7) The extent to which the zone district amendment demonstrates how conditions have changed since the zoning designation of the subject property was adopted and is no longer appropriate; and This is not necessarily a case where “conditions have changed” so much as it is a situation where the existing Ski Base/Recreation District was drafted in such a manner as to be exceedingly specific to the Golden Peak Base Lodge development. The degree of specificity is such that the SB/R district does not provide a “workable” zone district for the subject property. (8) Such other factors and criteria as the commission and/or council deem applicable to the proposed rezoning. To be determined by the Planning and Environmental Commission and/or Town Council.       1 Rachel Friede Dimond From:Shelley Bellm Sent:Tuesday, January 24, 2012 8:42 AM To:Rachel Friede Dimond Subject:FW: Ski Club Follow Up Flag:Follow up Flag Status:Flagged FYI… From: DeighanOne@aol.com [mailto:DeighanOne@aol.com] Sent: Tuesday, January 24, 2012 8:42 AM To: Shelley Bellm Subject: Ski Club I live full time in the Vail Golf Course neighborhood and I am in favor of this project. However, I would like to see some form of speed control measures implemented along Vail Valley Drive to slow the traffic down. It is a race course on the weekend and the police do not cite speeders. Thanks, Kevin Deighan Timberline Commercial Real Estate 1163 Cabin Circle Vail, CO 81657 970-476-3436 970-476-1986 Fax 213-347-6428 Los Angeles Phone www.timberlinere.com DRE#00983852 From: Carrie Walker [mailto:carrieswalker@gmail.com] Sent: Tuesday, January 24, 2012 9:02 PM To: Shelley Bellm Subject: SSCV Re-Zone To Whom it May Concern: As a resident of the Rams Horn Lodge and member of the VHA, I would like to ask some questions regarding the proposed re-zoning of the Ski and Snowboard Club Vail. No doubt, the club is an important asset to Vail mountain and the people to whom it serves. As an owner in Vail I am concerned by a few things..... 1. I have not yet seen any development plans proposed by the SSCV - Can that be provided before the vote on zoning assessment? 2. What parking measures has the SSCV taken to alleviate any parking issues that will result from its expansion? 3. To what degree is the zoning changing as it pertains to having residential and business use mixed? 4. What is the length of time for construction? 5. What is the parking consideration during construction? To date, no information has been circulated to neighbors in the area. Any information the development team has would be greatly appreciated in order to vote in a more educated manner on this issue. Regards, Carrie Walker January 24, 2012 Town of Vail Planning Commission 75 S. Frontage Road Vail, CO 81657 Dear Members of the Planning Commission The following is sent on behalf of the Rams-Horn Lodge Condominium Association in reference to the Ski and Snowboard Club Vail potential rezone and redevelopment of their current facilities. The facility is old and most likely in need of update. Prior to any approvals, however, we would like to see the plans and elevations for the proposed facility. Additionally, and perhaps of equal importance is a traffic impact study. As an Association, we have voiced our concerns on a number of occasions regarding the traffic, congestion, and safety of pedestrians on Vail Valley Drive. There also are issues regarding drop off, pick up and parking. Our concern at this point is that the potential re-development will lead to even greater issues of safety. As to whether the redevelopment including potential residential additions is within the realm of what is permitted in this area will most likely require significant discussions and meetings. We will participate in the public hearing process. We are also willing to be involved in a neighborhood study committee if that is found to be of any benefit to the Town of Vail. Sincerely John and Diane L. Milligan Association Managers and Owners Representatives Barbara Bruecker, Board President Vail Trails East Condominium Association bbruecker@aol.com 303-324-5223 January 25th, 2012 Town of Vail RE: Plan to redevelop the Ski and Snowboard Club and add the new Gondola, Dear Town of Vail, On behalf of the Board of the Vail Trails East Homeowners Association, I wish to express our concern for the redevelopment of the Ski and Snowboard Club. Specifically, the Vail Trails East Board is very concerned about the increase in the traffic in the area that this could bring. In addition, the traffic flow itself is of concern to the owners of the Vail Trails East Association. We ask that the Town engage in an impact study and rezoning meeting and include the neighboring condominium associations and if approved to carry out this project is a manner that minimizes the impact on the residence owners at Vail Trails East and other neighboring homeowners. Very truly yours, Barbara Bruecker Board President, Vail Trails East Homeowners Association Vail Homeowners Association Correspondence: RE - Ski Club Vail and Vail Village Gondola Issues TOV/PEC Hearing 01/30/2012 -----Original Message----- From: Morton, Bill (NYC-JMW) [mailto:Bill_Morton@jackmorton.com] Sent: Monday, January 23, 2012 10:45 AM To: Dwight Henninger Cc: Stan Zemler Subject: RE: Enforcement Dwight, Many thanks for your note, and apologies for my delay in responding. My wife and I have been traveling internationally since January 4 and just returned. I and all of my neighbors on Hanson Ranch Road, the row houses, etc., appreciate all of your efforts to address and hopefully resolve these traffic issues. Certainly we’re all aware of the issues during the “busiest” times, and more are ahead with Presidents’ weekend and Spring break. I believe the problems will continue until summonses are issued on a regular basis. There needs to be signage and perhaps even barriers preventing these vehicles from Hanson Ranch Road during these periods. Again, my thanks for your note and consideration in continuing to address and support the situation. …and a Happy New Year to you. Bill William Morton / Jack Morton Worldwide / + 1.212.401.7330 / mob: +1.917.864.2372 / http://www.jackmorton.com / blog at http://blog.jackmorton.com Follow us on: Twitter / Facebook / LinkedIn / YouTube / Flickr From: Dwight Henninger [mailto:DHenninger@vailgov.com] Sent: Friday, January 06, 2012 2:28 PM To: Morton, Bill (NYC-JMW) Cc: Stan Zemler Subject: Enforcement Bill Stan forwarded me you email, I’m the Police Chief here in Vail. I am aware of the problems on Hanson Ranch Road and I spent a half day out there last week working to keep the Shuttle vehicles and skier drop-off private vehicles from blocking the roadway. I have talked with the Shuttle service managers and hope the situation will improve in the coming weeks and months. Clearly last week is our busiest of the year and we had numerous issues all over town with parking and traffic. This made it impossible to have an officer, or CEO at every problem spot, but we are aware of the problems on Hanson Ranch road and will continue to do our best to enforce the rules in that area, while trying to balance the guest service component. Thanks for bring the concerns to us. Happy New Year! Dwight From: Morton, Bill (NYC-JMW) [mailto:Bill_Morton@jackmorton.com] Sent: Tuesday, January 03, 2012 12:06 PM To: Stan Zemler Cc: Andy Daly Subject: ENFORCEMENT Good morning, Stan. It was good to see you again at the Vail Village Homeowners Association Annual Meeting the other day. From my 21 years of being a Board member (now Emeritus,) I felt that this was truly one of the best. Kay and I have had a wonderful two weeks in Vail, and as I’m about to leave (yet returning again in February and March,) I thought I’d drop you a quick note around the subject of enforcement. The issue is the skier drop off and pick up on Hanson Ranch Road just past the Christiania. In short, between 8:30am and 10:30am and 2:30pm and 4pm every day, the traffic sometimes backs up beyond the Christiania. When this happens even the open lane gets blocked, and traffic doesn’t move. It’s obvious that the various hotels and “clubs” use that as their primary drop off and pick up. Is there some way to control that or find another location? While there has been a significant improvement in the trucks not using Hanson Ranch Road or unloading in the Village, it’s too bad that there’s not more enforcement of these trucks using the underground pickup and delivery. A stricter enforcement of this would enhance the functioning and ambiance of the Village. In any case, I drop you this note with continued appreciation for all that you and the Village leadership continue to provide to this very special community. Thanks, Bill William Morton / Jack Morton Worldwide / + 1.212.401.7330 / mob: +1.917.864.2372 / http://www.jackmorton.com / blog at http://blog.jackmorton.com Follow us on: Twitter / Facebook / LinkedIn / YouTube / Flickr Dwight Henninger Chief of Police Vail Police Department 970.479.2218 direct 970.479.2210 main 970.479.2216 fax dhenninger@vailgov.com vailgov.com twitter.com/vailgov ACHMENT14 1 00o GOLDENPEAKOPERATIONALMANAGEMENTPLAN I. INTRODUCTION VailAssociates, Inc. ( "VA ") hasfiledanapplicationtoamendtheApproved DevelopmentPlanfortheGoldenPeakBaseFacility. Theamendmentsinclude revisionstovehicularparkingonthesite, thedesignandfunctionofbothpublic skierandChildren'sCenterdropoff, aswellasalterationstoemployeeparking, lift capacity, andskibaseoperations Inthecourseofthesubmittal, VAhasmade certainrepresentationsregardingthephysicalsiteplanandtheoperationsofthe portal. TheTownofVailDepartmentofCommunityDevelopmenthasrequested elaboration. Thisplanexpandsuponandsupplementstheapplicationand, tothe extentitisinconsistentwiththeapplication, supplantsit. ThisGoldenPeakManagementPlanisintendedtoenhancetheexperiences ofgueststoVailandoftheresidentsoftheGoldenPeakneighborhoodinamanner consistentwiththegoalsandobjectivesoftheagreementbetweentheTownofVail TOV ") and' VailAssociatestomanagepeakperiodsinthisresortcommunity. In effect, themeasuresproposedinthisplanaremeansofmanagingorcontrollingthe demandsupontheGoldenPeakportalandtheimpactsuponitssurrounding infrastructure. TheconceptsandprinciplesoftheProgramToManagePeak PeriodsAgreement (the "Agreement ") betweenTOVandVAaretherefore incorporatedbyreferenceintothismanagementplan. 2 Arealitythatmustberecognizedinexaminingthecreationofinfrastructure andoperationalsystemsforGoldenPeakorVailatlargeisthatboththeski companyandthegreaterVailcommunityareengagedinthewinterandsummer resortbusiness. Forreasonsbeyondthecompletecontrolofthecommunitythe demandsforanduseofresortgoodsandserviceswillalwaysbesubjecttospecificor isolatedeventssuchastheChristmasholidayoraworldclasscompetitiveor culturalevent. EventssuchasthesewillbynecessitymeanthatVailwillexperience surgesorpeaksofvisitorusethatmaybemitigated, butwillnotbeentirely overcomeoreliminatedbyinvestmentinhardassets. Totheextentthatsuchhigh demandeventstaxthecapacityofoursystemsandourcollectivepatience, wemust alsoacknowledgethattheseevents, ifwellmanaged, arealsowhatgiveuslife, vitality, excitementandspecialappeal. Itistheeffortto "managewell" thatleadstothecreationofthisplan. Inits applicationVAhasproposedsignificantphysicalimprovementstotheGoldenPeak portal. Theseinclude: doublingtheskierdropoffzonecapacities; improvingdropoffflowandfunction; givinglocationalprimacytopublictransit; structuringandlandscapingprivateautoparking; improvingliftaccesstobalanceportaluseacrosstheVillage; and improvingbaselodgefacilitiesfortheguestandlocalalike. Arealitythatmustberecognizedinexaminingthecreationofinfrastructure andoperationalsystemsforGoldenPeakorVailatlargeisthatboththeski companyandthegreaterVailcommunityareengagedinthewinterandsummer resortbusiness. Forreasonsbeyondthecompletecontrolofthecommunitythe demandsforanduseofresortgoodsandserviceswillalwaysbesubjecttospecificor isolatedeventssuchastheChristmasholidayoraworldclasscompetitiveor culturalevent. EventssuchasthesewillbynecessitymeanthatVailwillexperience surgesorpeaksofvisitorusethatmaybemitigated, butwillnotbeentirely overcomeoreliminatedbyinvestmentinhardassets. Totheextentthatsuchhigh demandeventstaxthecapacityofoursystemsandourcollectivepatience, wemust alsoacknowledgethattheseevents, ifwellmanaged, arealsowhatgiveuslife, vitality, excitementandspecialappeal. Itistheeffortto "managewell" thatleadstothecreationofthisplan. Inits applicationVAhasproposedsignificantphysicalimprovementstotheGoldenPeak portal. Theseinclude: doublingtheskierdropoffzonecapacities; improvingdropoffflowandfunction; givinglocationalprimacytopublictransit; structuringandlandscapingprivateautoparking; improvingliftaccesstobalanceportaluseacrosstheVillage; and improvingbaselodgefacilitiesfortheguestandlocalalike. 3 s Thismajorinvestmentinhardassetssatisfiestothehighestdegreepossiblethe programmaticrequirementsoftheGoldenPeakproject'splanningprofessionals. Theproposedmanagementtechniqueswhichfollowaremeanttobeflexible guidelinesanddynamictoolswhichmaybealtered, revised, enhanced, oreven eliminatedovertimeasneedsrequireto "managewell ". And, whilethese techniquesaredescribedintermsofVAorTOVresponsibilities, itmustbenoted thatothers, thegreaterVailcommunityandeachandeveryGoldenPeakneighbor, mustlikewisecontribute, actresponsiblyandtreatothersequitablyinmanagingor mitigatingtheimpactsofuse, growthandcongestionduringpeakperiodswithin ourcommunity. Fortheirparts, pursuanttotheAgreement, bothVAandTOVhave immediateresponsibilitiestoundertakegrowthmanagementmeasures. SectionIII pages11 -16) oftheAgreementoutlinestheseimmediateresponsibilitiesunderTier IofthePlan. VA'sobligationsincludemeasureswhichmightmitigateimpactsat GoldenPeaksuchasprovidingbuspassestoappropriateemployeesforuseonthe TownofVailsystem, encouragingcarpooling, andpursuingParkandRidesitesfor employees. TOV'sobligations, setforthintheAgreement, includecontrollingpeak trafficandparkingissues, productivemanagementoftrafficcirculationandparking systems, creative allocationofthebus service, effectiveutilization oflaw enforcementpersonnel, andbetterdistributionofskierstodifferentbasearea facilities. 4 ForthesepurposesitispertinenttonotethatintheAgreement "Peak Periods" aredefinedas: ChristmasPeak: Thatperiod whichextendsbetweenDecember 26 and December31; and HighSeason: ThatperiodwhichincludesPresidents' Weekendandeach weekendbeginningthethirdweekendinFebruarythroughtheendof March. NonpeakPeriods" aredefinedas: ThoseperiodsfallingoutsideoftheChristmasPeakandHighSeasonand whichnormallyincludetheearlyskiseason, Thanksgiving, thepre - ChristmasPeriod, theJanuarytomid - Februaryperiod, andthelateski season. AnotherpertinentconceptintheManagedGrowthAgreementisthe benchmarkcapacityofthemountainwhichhasbeendefinedas19,900skiersatone time ("SAOT "). ThetheorybehindtheManagedGrowthAgreementisto implementtiersofmanagementtechniquestocontrolinfrastructuredemandsand operationsator belowthe19,900SAOTthreshold. Anadditionalfactorfor consideration isthedesigndaystandardforGoldenPeakplanningstudiesand infrastructureassessmentwhich is15,000SAOT, atypical skierdaycountforthe 5 currentChristmasPeak. ThephysicalinfrastructureofGoldenPeakisdesignedto accommodatetheportaldemandsofa15,000SAOTevent. TheAssessmentCommittee, describedinSectionVIoftheAreement, isthe entitychargedwithmonitoring, evaluating, andrefiningtheoperationsofthe communitymanagementplan. ForthepurposesofthisAgreement, theAssessment Committeeislikewisecha 3ility, butitisunderstoodthatfor thesepurposestheAssessmentCommitteemaydelegateitsreviewfunliontothe VailTransportationTaskForceorotherdesigneeandshallincluderepresentatives oftheaffectedGoldenPeakneighborhoodinthereviewprocess. Theprojectcomponentsorelementswhichmightbeconsideredfortiered managementtechniques atGoldenPeakinclude thefollowing: (a) Managed ParkingStructure; (b)PublicSkierandChildren'sCenterDrop -offAreas; (c) EmployeeParking; (d) MountainOperations; (e) LocalandCommunityPrograms, suchasDEVO; (flSkiClubVailActivities; (g) AdultandChildren'sSkiSchool; (h) Loading, DeliveryandTrashRemoval; (i) SnowManagement; (j) Ticketing; and (k) SpecialEvents. 11. MANAGEDPARKINGSTRUCTURE TheApprovedDevelopmentPlanof1984depicted130surfaceparking spaces, primarilylocatedonthenorthsideofTractFalongVailValleyDriveforall varietiesofusersofthisparticularportaland6interiorparkingspacesforthe residentialcondominiums. TheChildren'sCenterplanof1988required12spaces. 4 1 6 Takentogetherthesetotal 148spacesfordrop offandparking. Presentlythe surfacelotexistingatGolden Peakholdsapproximately 150automobilesorless dependingontheamountofsnowstorageonthelotandtheefficienciesofcar raddleCreek storage: Othese150spaces roughly18 -20are usedbyemployees; p Property-Owners reserveandutilize8spaces; 4spacesareusedforCrossCountry xnddro off; andapproximately118spacesareavailableforuseSki Vanpick =up_ P7 _. bytheskiing - publicforafee.. Par'Mgrequirements _forthe - Ski Base/RecreationDistrictareaddressedin Section18.39.230ofthe.uail.Ordinanceswhichreads: Off- streetparkingshallbeprovidedinaccordancewithChaptrer18.52 and /orasspecifiedontheApprovedDevelopmentPlan. "(emphasissupplied) itsandcontemplatesaparkingfunctionandThe languageofthissectionperm designuniquetothisdistrictanditsdevelopmentplan. Inresponsetothisunique environmenttheparkingstructureproposedinthisplanconsistsof148parking spaces including5handicappedorADAspaces) locatedatorbelowthestreetP elevationandlandscapedacrossthetoptoprovideanaestheticbenefittothe developmentandthesurroundingneighborhood.. Thefundamentalconceptofthe organizationandmanagementoftheseparkingspaces, theequivalentofaTierI managementtechnique, istocreateamanagedorreserved "righttopark" mechanismdesignedtocontroltheavailabilityanduseofthespacesandhencecut downonindiscriminatetraffic flowswhileprovidingforandpaying fortheaesthetic 7 benefitsofthelandscapedstructure.Themechanismformulatedtoprovidethis managedparkingproducttothepublicisanon - equitycluborassociationofupto 500memberswhowouldhavetherighttoparkinthisstructureforafee. Twotiers ofmembershipintheassociationarecontemplated. Thefirsttierwouldconsistof upto50memberswhowouldhavearighttoparkinanidentifiedreservedparking space. Thesecondtierofmemberswouldbeupto450peoplewhohavearightto parkinthestructurebaseduponamonitoredandcomputercontrolledreservations system. Itistheintentoftheapplicanttoinitiallyoffer50firsttierand200second Parkingmembershipswouldbesoldinthefalloftier membershipstothepublic. 1995contingentuponfinalapprovaloftheGoldenPeakBaseFacilityProjectbythe TownofVailandsufficient subscriptionstocommence constructionoftheparking structureinthespringof1996, butnolaterthanspringof1997. Intheeventthat thenecessary subscriptionsarenot forthcomingtocommence constructionin1997, VAIwillinitiatediscussionswiththeTownCouncilconcerningpaymentinlieuof parkingalternatives. Thefirsttiermemberwouldsecurearighttouseaparticularparkingspace onayear-roundbasis. Hence, theratiooffirsttiermemberstoparkingspaces reservedfortheirusewouldbe1to1. Thesecondtiermemberswouldhaveayear- roundrighttouseaparkingspace basedupon availabilityandpriorreservation, monitoredbyacomputerizedrotation systemtoinsureequitableandoptimizeduse. Theinitialofferingof secondtiermemberships wouldconstitutearatio of 8 approximately2 memberstoeveryparkingspace. Thesememberswouldcallthe parkingarkin managermorethan24 -hoursinadvancetoreservetheiruseofavailable spaces. Areservationlistfromamongthememberswouldbecompileddailyforthe managementofentryaccessbypersonnelstationedintheattendantboothatthe entrytothestructure. Accessintothestructurewouldbepermittedupon presentationofaphotoI.D. identifyingthebearerasamemberandaconfirmation ofareservedparkingspaceontheparkingavailabilitylist. Intheeventthatallparkingspacesarenotfullyreservedandutilizedbythe clubmembers, VA, asoperatorofthefacility, reservestherightatanytimeofthe yeartoutilizeunreservedspacesforotherguests, membersoftheskiingpublic, employeesorotherpersonswholikewisemustcallandreserveaspacelessthan24- hoursinadvance. Thisshort- noticeusebynon - memberswouldbepermittedonly onadailybasisbyreservation. However, thismanagedoperationalfeaturewould expandtheavailableusergroupsandincreasetheutilizationofthestructureinnon- able, unwanted traffic. Further, iftheutilityofpeakperiodswithoutaddingappreci thestructurecanbemaximizedbyofferingadditionalmembershipsforsale, VAwill dosoafterthefirstyearofoperationestablishestypicaloccupancies. III. SKIERDROPOFF SkierdropoffoccurspresentlyontheeastsideoftheexistingGoldenPeak structureandimmediatelyto thenorthoftheChildren's Center. Existing conditionsprovidefor21 head -inspacesadjacentto theChildren'sCenterand10 9 parallel, oractiveparkingspaces, inaloopdrop -offareaforthegeneralpublic, totaling31spacescurrentlydedicatedtoalldrop -offfunctions. Theproposedplan nearlydoublesthiscapacitybyprovidingfor30head -inspacesdedicatedto Children'sCenterdropoffand29spacesforgeneralskierdropoffnorthofthe proposedbuilding, totaling59spacesforskierdropoffatthisportal. A.) Ti= Managementmeasurestobeundertakeninasequentialfashion concurrentlywithredevelopmentinclude: 1. DuringtheChristmasPeakperiodandPresidents' WeekendVAwill stafftheGeneralSkierandChildren'sCenterdropoffzoneswith4to6 people, splitbetweenthedropoffzonesastrafficneedsdemand, duringpeak arrivalanddeparture hoursorapproximately from8:30to10a.m. and3 p.m. to4:30p.m. Thesetrafficmanagerswilldirecttraffic, assistand expeditetheloadingandunloadingofpassengersandequipment, encourage thetimelyandswiftdepartureofvehicles, andenforcerestrictionsagainst unauthorizedparkingbycallingfortheremovalortowingofoffending vehicles. 2. DuringtheHighSeasonperiodVAwillstafftheGeneralSkierand Children'sdropoffzoneswith2to4people, splitbetweenthezonesastraffic needsdemandduringpeakarrivalanddeparturehours. 3. Duringnon -peakperiodsandduringeveningornighthoursthedropoff zoneswouldbestaffedormanagedupon theoperationaldiscretion ofVAas 10 maybeneededtopreventcongestionorvehiclestackingintoVailValley Driveorthebuslane. Duringtheseperiodsandtimes, exceptforspecial events, VAwillpermitparkingbythegeneralpublicinthedrop -offzone surfacespacesconsistentwiththepracticeanduseofotherVAparkinglots suchasNorthDaylot. 4. Permanent, static, signage atthetopofBlueCow Chutewillbeinstalled byTOVindicatingthatthereisnopublicparkingatGoldenPeakandthat onlyChildren'sCenterandskierdropoffispermitted. 5. InSectionV (page25) oftheAgreementadditionalskierdropoffzones havebeenidentifiedas "pressingcurrenttransportationandcirculation needs ". VAwillthereforecooperatewiththeTOVinidentifyingadditional skierdropoffzoneselsewhereinthetownincludingFordPark, theMain ParkingStructure, Lionshead, andotherlocationswhichwillbeformalized andimprovedby theTownofVail. InitiallyTOVwilldevelopand implementaplanforgeneralskierdropontheupperdeckofthe TransportationCenterutilizing existingphysicalimprovements andfacilities. 6. UpontheconclusionofeachPeakPeriodandskiseasontheAssessment Committeeoritsdesignee, willspecificallyassessaccesstoandegressfrom themountainatGoldenPeak, togetherwithtrafficanddropoffimpacts associatedwiththeskier movementsandwillmake recommendationsfor 11 adjustments orimprovements totheTierI managementtechniques describedabove. B.) TierH . IntheeventthatsomeoralloftheTierImanagement techniquesabovehavebeenimplementedandtrafficcongestioninthedrop offzonesstillresultsinvehiclestackingintothestreetorbuslanestoa degreedetrimentaltotheordinaryoperationoftheinfrastructure, thenthe followingsuccessivemanagementeffortswillbeundertakenintheneat succeedingskiseason: 1. VAand /orTOVwillimplementadditionalTierItechniqueswhichhave notyetbeenemployedorwillenhancethoseTierItechniquesalreadyinuse accordingtotherecommendationsoftheAssessmentCommittee. 2. T pursuantursuanttoitsgeneralobligationsintheAgreementtoimplement pro- activemanagementeffortsincoordinationwithVAtocontroltraffic, will increaseutilizationoflawenforcementpersonnelduringpeakperiodsinthe managementoftrafficatGoldenPeak (SectionIII. A. 2. a., page13). 3. Basedupontheimpactsoftrafficcongestionandastransportationneeds demand, TOVwillimplementanelectronicsignageprogramwhichwould displaymessagesonthetownarterialsregardingtrafficconditionswithinthe townparkinggarages, dropoffzonetrafficstatusconditionsandliftmaze conditionsatthebaseportals. 12 IV: EMPLOYEEPARKING Presently18to20VAemployeesparkatGoldenPeakoftheapproximately 500employeeswhoarebasedthereinPeakPeriods. Another25to30spacesare seasonallyleasedby VAfromthirdparties foremployeeparking. Theremaining 90% ofGoldenPeakbasedemployeesparkinpubliclots, usepublictransit, oruse otherprivateparkingspots. A.) TierI . Thefollowingmanagementtechniqueswillbeimplemented sequentially upon redevelopment to mitigate employee transportation impactsandservetheneedsofthecommunity'semployees: 1. VA, togetherwithTOV, willenterintonegotiationswiththeColorado DepartmentofTransportationtosecure, ifpossible, anemployeeparkand rideinterceptlotonHighway6inEagle -Vail. ThislotwouldbeusedforVA andTOVemployeestoparktheirvehiclesinEagle -Vailandutilize establishedpublictransportationroutestocontinueontotheirjoblocations inVail. IntheeventtheCDOTsiteisnotavailableorunsuitable, othersites willbelocatedandsecuredforaparkandridelot. 2. Totheextentspaceavailabilityexistsduringnon -peakperiods, V. A. will permitmanagedemployeeparkingbyreservationintheparkingstructureat GoldenPeak. 13 3. DuringPeakPeriodsVAemployeeswillcarpooltothesoccerfieldlot pursuanttotheHolidayTrafficandParkingPlanasmanagedandoperated byTOVor alternativelyasmanagedbyVA. 4. DuringtheChristmaspeakperiodand, infact, extendingbeyonditfrom December24untilJanuary1inanygivenyear, VAwillimplementits HolidayTrafficandParkingPlan. DuringthisperiodVAwillprovidefree busticketsfortheAvon/BeaverCreekbussystemtoallGoldenPeakbased staff. ParkinginVAlotssuchasWestDayLotandNorthDayLot, willbe availableforfreetoemployeeswhocarpool. Employeesnotcarpoolingwill bechargedafee. 5. VAwilladdtheHolyCrossLottoitsparkinginventoryforpeak - period employeecarpooling. 6. Asnecessary, VAwillassignemployeescarpoolinglocationsinparticular lotsamongtheWestDay, NorthDayandHolyCrosspropertiesandmanage entryaccessintotheseproperties. 7. VAwilllease20parkingspacesfromathirdpartyor, alternatively, purchase20 "blue" parkingpassesfromtheTOVforparkinginthetown structures. 8. UpontheconclusionofeachPeakPeriodandtheskiseason, the AssessmentCommitteeor itsdesigneewillmonitor theTierItechniques 14 describedabove, assesstheoperationalresults, andmakerecommendations foralterationsorenhancementstotheplan. B.) TierII . IntheeventthatsomeoralloftheTierImanagement techniqueshavebeenimplementedandemployeeparkingandtransitisstilla concern, additionalmethodsofemployeetransitandparkingwillbe undertakenattherecommendationoftheAssessmentCommitteeorits designee. V. MOUNTAINOPERATIONS A.) TierI. Managementmeasurestobeundertakenduringpeakperiodsin asequentialfashionconcurrentlywithredevelopmentinclude: 1. VAwillextenditsperiodsofmountainoperationslaterintotheday (e.g. until4.00p.m.) tospreadoutthedeparturetimesofskiersfromthe mountain. 2.. EmployeepasseswillberestrictedduringtheChristmasPeakand Presidents' weekend. 3. Improvementstothefoodandbeverageofferingatthebasefacility restaurant, includingapresskianddinnerofferings, willbedesignedto attracttheskiingpublicandstaggerthepublic'sdeparturefromtheportal . 4. VAwillcooperateandcoordinatewithTOVandtheColorado DepartmentofTransportationregardingtheinstallationofsignageatbase facilities, includingGoldenPeak, advisingdepartingskiers ofroadconditions 15 and, ifconditionsareadverse, invitingoradvisingdepartingskierstostay laterinthevillageanddrawouttheirdeparturetimes. 5. UpontheconclusionofeachPeakPeriodandtheskiseasonthe AssessmentCommitteeoritsdesigneewillassessmountainoperationimpacts andmakerecommendationsforadjustmentsorimprovementstotheTierI managementtechniquesdescribedabove. g,) TierII . IntheeventthatsomeoralloftheTierImanagement techniqueshavebeenimplementedandcongestionstillexistsintheportal duringpeakperiods, thenthefollowingsuccessivemanagementeffortswill beundertakeninthenextsucceedingskiseasonorPeakPeriod: 1. VAand /orTOVwillimplementadditionalTierImeasureswhichhave notyetbeenemployedorwillenhancethoseTierItechniquesalreadyinuse accordingtotherecommendationsoftheAssessmentCommitteeorits designee. 2. VAwillcontinuetotakeoperationalmeasurestobalancethe functionalityanduseofitsportals, aswellason- mountaincirculation. VI. DEVO/LOCALANDCOMMUNITYPROGRAMS DEVO" isanabbreviationfor theVailDevelopmentTeam, aChildren'sSki SchoolProgramconsistingof300childrenwhichoffersspecializedskischoolclasses tothechildrenoflocals andfrontrangeskiers. Thehighconcentration oflocals 16 participating intheprogramresults inan inordinatelyhighdropoffimpactonnon- peakSaturdayswhichmimicspeakconditionsthroughouttheseason. A, TierI . Measurestobesequentially undertakenconcurrentlywith redevelopmentinclude: 1. TheDEVOprogramdoesnotrunduringtheChristmasPeakorover Presidents' Weekend. Theprogramwillcontinuetobelimitedinthis fashion. 2. ArrivalsfortheDEVOprogramwillbestaggeredinadvanceofthe typicalski schoolormountainopening times. DEVOarrivalwillbe scheduledfor8:30a.m., one -halfhourpriorto liftopening. Pickupwill likewisebescheduledearlierthanregularmountainclosure. 3. DropoffforDEVOwillbeformalizedandmanagedbyDEVOinstructors intheGoldenPeakskierdropoffzonestopreventstackingintothestreets. 4. VAwillinvestigatesplittingtheDEVOprogramfurtherandbasingsome portionoftheprograminLionsheadorstagingitatotherdropoffzones. Forexample, moving theFreestyleProgram, approximately 15% ofthe DEVOskiers, toanotherdropoffzonesuchastheTOVstructurewillbe exploredandimplementedifalternate dropoffsarecreated. StagingDEVO outoftheLionsheadTeenCenterwillalsobeexploredwithTOV, including thecreationofshort -term, 30minute, drop -offandpick -upparkingspacesin theLionsheadParking Structure. 17 5. DEVOraceeventswillbemovedinwholeorinparttootherlocalcourses. 6. UpontheconclusionofeachskiseasontheAssessmentCommitteeorits designeewillassesstheimpactscausedbytheDEVOprogramandmake recommendationsforadjustment orimprovementtotheTierItechniques describedabove. B.) TierII . IntheeventthatsomeoralloftheTierItechniqueshavebeen implementedandDEVOstilladverselyimpactsportalcongestionthenthe followingsuccessivemanagementeffortswillbeundertakenintheneatski seasonorPeakPeriod: 1. DEVOwillberelocatedinpartorinwholetootherportals, including down - valleyportalsaccessingBeaverCreekMountain. 2. DEVOandothersuchlocalprogramswillbeterminated. VII. SKICLUBVAIL SkiClubVailisaprivate, non - profitskiclubwhichisnotowned, operated, ormanagedbyVA. VA, however, provideson- mountainaccessfortrainingand racingeventsforSkiClubVail. SkiClubVailtrainingaccountsforapproximately 60,000gatestartsperyearandSkiClubVailracingactivitiesaccountforan additional15,000gatestartsperyear. Generallyracingactivity, includingSkiClub Vail, runsfrom8:30a.m. until4:30p.m. andfrequentlyoccurssevendaysperweek duringtheskiseason. 18 ' A.) TierI . Managementmeasurestobetakenconcurrentlywith redevelopmentinclude: 1. SkiClubVailprogramswillbecoordinatedwithotherspecialevents, as wasdoneduringthe1994/1995season, topreventovercrowdingofgroupsin theportalatanyonetime. 2. StarttimesforSkiClubVailduringpeakperiodsandhighseasonwillbe coordinatedsothatSkiClubVailarrivaltimeswilloccurbeforethe9a.m. peakhourrushandwillbeterminatedlaterintheafternoontospreadthe departurefromtheskimountain. 3. VAwillallowandencourageSkiClubVailuserstoarriveanddepart usingtheGeneralSkierDrop -offZone. 4. Upontheconclusionoftheskiseason, theAssessmentCommitteeorits designeewillmonitortheTierItechniquesdescribedabove, assessthe impactofSkiClubVailontheuseandefficienciesoftheportalandmake recommendationsforalterationsorenhancementstotheplan. B.) TierH . IntheeventthatsomeoralloftheTierImeasureshavebeen implementedandSkiClubVailstillposeslogisticalproblemsforthe optimizeduseoftheportal, therecommendationsoftheAssessment Committeeoritsdesigneewillbeimplemented. 1. SkiClubVailwillbeterminatedinwholeorinpartinitsuseofthe GoldenPeakracecourses andbasefacility. J 19 VIII. ADULTANDCHILDREN'SSKISCHOOLS TheGoldenPeakportalissomewhatuniqueinthatitsupportsafull children's ski school, including nursery, as well astheadult ski school. Approximately37,000skischoolstudentsperseason, oranaverage264perday, are servicedatthisportal.. Thesizeandscopeofskischoolactivitiesintheportalare naturallyconstrainedbythesize ofthebaseareafacilities. TheChildren'sSki Schoolinparticularisfunctionallylimitedbythebuildingsizeandtheskiyard availableforintroductorychildren'sclasses. A.) TierI . Managementmeasurestobeundertakeninasequentialfashion concurrentlywithredevelopmentinclude: j 1. Skischoolclasseswillbecoordinatedwithmorningarrivalsofother specialusergroupssothatskischoolclasseswillsequentiallyfollowthe arrivaltimesofothergroupsandactivitiesandspreadoutportalarrivals. 2. VAwillemphasizea "onestopshop" oflessonsandequipment, including overnightstorage, whichwillreducetheneedforarrivalbyprivate automobileaswellasreducedwelltimesofautomobileswhichdoarrivefor dropoff. 3. VAwillpromoteinitsmarketingmaterialstheconvenienceofpublic transitwhichservicesthearea. 4. VA will explore the implementation oftelephone orelectronic preregistrationinskischool, including theChildren'sSkiSchool, inaneffort 20 tocutdownthedwelltimesofautomobilesdroppingskiersoffforskischool registration. 5. UpontheconclusionofeachPeakPeriodandtheskiseason, the AssessmentCommitteeoritsdesigneewillassesscongestionintheportal relatedtoskischoolactivitiesandmakerecommendationsforadjustmentsor improvementstotheTierImanagementtechniquesdiscussedabove. B.) TierH . IntheeventthatsomeoralloftheTierImanagement techniqueshavebeenimplementedandcongestionassociatedwiththeski schoolsstillresultsincrowdingintheportalthenthefollowingadditional managementstepswillbesequentiallyimplemented: 1. Therecommendationsforimprovementsoradjustmentsmadebythe AssessmentCommitteeoritsdesigneewillbeinstitutedinthefollowing seasonorPeakPeriod. 2. VAwillmakeimprovementstoitsLionsheadSkiSchoolfacilitiesuponthe redevelopmentofthatportaltakingpressureoffoftheGoldenPeakportal. IX. LOADING, DELIVERYANDTRASHREMOVAL TheGoldenPeakBaseFacilityrequiresthedeliveryoffoodandliquorforits restaurantoperationsandtrashandrecyclingpick -upforallfunctionslocatedat GoldenPeak. Currently, foodandliquordeliverytakesplacedailybetween6:00 a.m. and7:00a.m. andagainbetween5:00p.m. and6:00p.m. Themajorityof 21 foodandliquordeliveriesarefirstsortedoutattheGondolaBuildinginLionshead, thendeliveredtoGoldenPeakbyVAemployees. Currently, thereisnoformalloadingdockatGoldenPeakwhichresultsin theneedfortwo (2) dailyfoodandliquordeliverytrips. Inaddition, thereisatrash compactoratGoldenPeakcurrentlywhichresultsintheneedfordailytrash collectionat7:00a.m.. Recyclingpick -upisdonebyVAandoccursasneeded concurrentlywithfoodandliquordrop -off. Itisestimatedthatcurrentdelivery timeswillremainthesametoavoidinterferencewithskiertraffic, thoughthe additionofaformalloadingareaandstoragemayreducethenumberofdaily deliverytripsbyVAfromtwo (2) toone (1). Theadditionofatrashcompactorat GoldenPeakshouldreducethefrequencyofdailytripsrequiredfortrashpick -up. A.) TierI . Measurestobeundertakenconcurrentlywithredevelopment include: 1. Deliverytimeswillbemanagedsothatnodeliveryortrashpick -upwill occurduringthehoursof8:30a.m. to10:30a.m. and3:00p.m. to5:00p.m. 2. TheAssessmentCommitteewillreviewandassesstruckdeliveriesand serviceattheconclusionofeachskiseasonandmakerecommendationsfor alterationsorimprovementsasnecessary. B.) TierH . Intheeventthatsomeoralloftheabovemeasureshavebeen implementedandifloading, deliveryand /ortrashremovalresultsin 22 operationalinefficienciesintheportalthenthefollowingmanagement techniqueswillbeimplementedintheneatsucceedingskiseason: 1. TherecommendationsoftheAssessmentCommitteewillbeimplemented. 2. VAwillendeavortodeliverlargerloadsdirectlytoGoldenPeakandstore additionalfoodandbeverageonsitethusreducingthenumberoftripsor willarrangenightdeliverytoavoidtrafficcongestion. X. SNOWMANAGEMENT SnowmanagementatGoldenPeakwillbeconductedinamannersimilarto thatinotherVAportals. Snowstoragezoneshavebeendepictedupontherevised snowstoragemappreparedandsubmittedwiththeApplication. A.) TierI . Thefollowingmanagementeffortswillbeundertakenwith respecttosnowstorageandmanagementduringtheskiseason, including peakandhighseasonperiods. 1. VAwillbycontractwiththirdpartiesorthroughitsownforcesplowall areasofvehicularcirculationasdepictedontheSnowManagementPlanby 6a.m. everymorninguponasnowfallof4ormoreinches. 2. VA, throughitsownforces, willremovesnowfromsidewalksandplaza areasdepictedupontheSnowManagementPlanbymeansofabobcat, an ATVand /orbyhandbetweenthehoursof7and8:30onallmornings followingasnowfallof4inchesormore. 23 3. VAwillstoresnowintemporarysnowstorageareaswithinthedropoff zonesandwithintwotosevendaysofa4snowfallwilluseloadersand truckstoremovethesnowstoredthereandtransportitfromthesite. Impactsontrafficcongestionwilldeterminethespeedandfrequencyof removalofsnowfromthetemporarysnowstorageareas. VAwillremove snowimmediatelyifsnowstorageresultsincongestioninthedrop -offzones causingautostackingintothestreet. 4. AttheendofeachPeakPeriodandtheskiseasontheAssessment Committeeoritsdesigneewillreviewsnowremovalperformanceduringthe seasonand, asnecessary, makerecommendationsforadjustmentsor improvementstotheTierItechniquesdescribedabove. B.) TierII . IntheeventthatsomeoralloftheTierItechniquesdesignedto managesnowhavenoteffectivelyclearedthesnowfromthedropoffzonesor otherpublicareasand /orhaveimpactedcirculationonthepublicstreets, thenVAwill implement recommendationsmade by theAssessment Committeeoritsdesignee. XI. SPECIALEVENTSANDSKIRACING GoldenPeakisthesiteofmanyskiracesandspecialeventsduringthecourse ofaskiseason. Typicallytheracingseasonbeginsinmid- Decemberandruns throughearlyApril. Trainingforskiracingcanbebrokendown asfollows: Ski ClubVailgenerates60,000gatestartsperyear; highschool programsadd7,500 24 . gatestartsperyear; andcorporate /clubtrainingeventsadd7,500morestartsper year. Actualracingstartsforthesethreeusergroupsareapproximately15,000gate startsperyearforSkiClubVail, withanadditional2,000startsperyearforlocal highschoolprograms, and10,000startsperyearforcorporateandclubracing. Thesetotalroughly102,000gatestartsperyearandaverage4.5skiracingevents perweek. Dailyactivityforskiracingtypicallycommencesat8:30a.m. and continuesuntil4:30p.m. Oftheseraceeventstwoorthreemajortelevisedevents occureachyear, notallofwhichareheadquarteredoutoftheGoldenPeakcourse. TheseincludetheProTour, FISWorldCupandNorthAmericanTrophySeries races. In1999theWorldChampionshipswillbeheldatVailandopening ceremoniesarescheduledforGoldenPeak. Racestartsanddemandfortraining spacehavebeengrowingsteadilyforthepastdecade. SpecialEvents.whichoccuratGoldenPeak, inadditiontotheroutineracing programs, includevarioussnowboardingeventswhichdrawtypically100to250 people, theU.S. ProTour.whichdrawsabout500people, andHotWinterNights eventswhichdraw500to1000peopletypicallyinFebruaryandMarchandupto 3000peopleduringtheChristmasholiday. A.) TierI . ManagementtechniquesalreadyutilizedandinplaceatGolden Peakorwhichwillbeimplementwithredevelopmentinclude: 1.0 25 1. Snowboardingeventstypicallyheldinnon -peakperiodsareusuallysmall withminimalimpactonportalarrivalsoruse. Arrivalsandstagingofevent participantswillbemanagedwithVApersonnelonan "asneeded" basis. 2. HotWinterNightseventsareheldduringoffhoursanddonotinterfere withotherportalarrivalsordemandsoninfrastructure. Thesewillbe managedwithVApersonnelonan "asneeded" basis. 3. Majorevents, such as televisedFIS racing events, theWorld Championships, majorbicycleraceevents, andsummerfireworkswillbe managedthroughthestandardspecialeventpermittingprocessoftheTOV. 4. AttheendofeachPeakPeriodandskiseasontheAssessmentCommittee oritsdesigneewillreviewandmakerecommendationsconcerningSpecial iEventsandracingactivitiesatGoldenPeakandtheirimpactsontheportal andcongestioninthesurroundinginfrastructure. B.) TierU . IntheeventsomeoralloftheTierItechniqueshavebeen implementedandcongestionhasstillresultedattheportalwhichadversely effectstrafficorsurroundingtowninfrastructurethenVAwillimplementthe recommendationsoftheAssessmentCommitteeoritsdesigneeinthe followingskiseasonorPeakPeriod. Inadditionthefollowingsuccessive managementtechniqueswillbeimplemented: 1. Specialeventswillbemovedinpartfromthisportaltodownvalley locations.