Loading...
HomeMy WebLinkAboutF12-0005 HYDRAULICS EAST UNITHydraulic Summary Report Description: East Unit Job Number: BM0072 NodeFlow(gpm) Total Hose Streams 0.00 Safety MarginRequiredAvailable Node Hose FlowStaticResidualFlowTotal Demand (gpm)(psi)(psi)(gpm)(psi)(gpm)(psi)(psi)@@ 2384.67169.96214.7101200.0055.00085.000104.57 Design EngineerJob Number Total Water Required (Including Hose Allowance) 104.57 Maximum Pressure Unbalance In Loops 0.000 Additional Hose Supplies 0.00 Hose Allowance At Source Supplies 0.09gal97.68gal Residential 0.100gpm/ft² 100.00ft² 900.00ft² (Actual 472.24ft²) 4 Occupancy Area of Application Coverage Per SprinklerNumber Of Sprinklers Calculated Density Job Suffix AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area Volume capacity of Dry PipesVolume capacity of Wet Pipes 18.86 between nodes 23 and 8 Maximum Velocity Under Ground 10.58 between nodes 3 and 2 Maximum Velocity Above Ground 5.6 K-Factor 25.60 at 20.898 Most Demanding Sprinkler Data System East Vail, CO Job Site/Building 2985 Booth Creek Drive AHJ Reusswig Remodel Job State Certification/License NumberJob Name: Hudson DeWeeseBM0072 Contractor Contractor Number 21 Name of Contractor: Western States Fire Protection Address 1 7026 S. Tucson Way Address 2 Centennial, CO 80112 Contact NameContact Title PM Extension 110 Phone 303-792-0022 FAX E-mail Hudson.DeWeese@wsfp.us Web-Site Hudson DeWeese Address 3 Address 1 Address 2 Drawing Name ALL FLOORS System Flow Demand 104.57 Remote Area(s) Address 3 02/16/2012© M.E.P.CAD, Inc.Page 1AutoSPRINK® VR8 v8.1.11 9:45:22AM Device(gpm) Actual FlowMinimum Flow (gpm)(K) K-Factor (psi) Pressure Summary Of Outflowing Devices Report Description: East Unit Job Number: BM0072 Sprinkler40126.7625.605.622.832 Sprinkler40225.6125.605.620.917 Sprinkler40325.6025.605.620.898 Sprinkler40426.6025.605.622.562 Most Demanding Sprinkler Data © M.E.P.CAD, Inc.02/16/2012Page 2AutoSPRINK® VR8 v8.1.11 9:45:27AM Pipe TypeDiameterFlowVelocityFriction LossLengthPressure DownstreamElevationDischargeK-FactorPtPnFittingsEq. LengthSummary UpstreamTotal Length HWC Hydraulic Analysis Job Number: BM0072 Report Description: East Unit • • • • • Route 1 • • • • • Pf Pe Pv CM1.101025.608.630.1074260'-11¾0.104 40323'-725.605.620.898Sprinkler0.102 923'-4¼21.1040'-11¾ 150 Pf Pe Pv CM1.59804.640.740.00074310'-00.019 923'-4¼21.104T(8'-0)16'-0 623'-4¼21.124T(8'-0)26'-0 150 Pf Pe Pv CM1.598030.254.840.02384312'-4¾0.510 623'-4¼25.6121.124Flow (q) from Route 29'-01.199 40120'-722.832E(9'-0)21'-4¾ 150 Pf Pe Pv CM1.598057.019.120.07699740'-106.378 40120'-726.765.622.832Sprinkler,42'-03.414 712'-8½32.6243T(8'-0), 2E(9'-0)82'-10 150 Pf Pe Pv CM2.950057.012.680.0038890'-00.051 712'-8½32.62413'-0 258'-532.675E(13'-0)13'-0 150 Pf Pe Pv CM1.598057.019.120.0769976'-0½1.081 258'-532.6758'-0 268'-533.756T(8'-0)14'-0½ 150 Pf Pe Pv CM1.598016.482.640.0077543'-11½0.155 268'-533.75616'-0 278'-533.911T(8'-0), C(8'-0)19'-11½ 150 Pf Pe Pv CM1.598064.0410.240.0954829'-31.743 278'-547.5633.911Flow (q) from Route 39'-04.010 28-0'-1039.664E(9'-0), Z18'-3 150 Pf Pe Pv CM2.950064.043.010.0048230'-00.019 28-0'-1039.6644'-0 4-0'-1039.683EE(4'-0), Z4'-0 150 Pf Pe Pv CM1.598064.0410.240.09548211'-10¼1.992 4-0'-1039.6839'-0 2-0'-1041.674E(9'-0)20'-10¼ 150 Pf Pe Pv CM2.0090104.5710.580.0775824'-60.350 2-0'-1040.5341.674Flow (q) from Route 4 3-0'-1042.024LtE4'-6 150 Pf Pe Pv FR2.0090104.5710.580.07758212'-7¾17.199 3-0'-1042.0248'-63.102 5-7'-11¾62.3253Tr(1'-0), sCV, E(3'-6), BFP(-12.560), 2cplg(1'-0), PRV(-3.000) 21'-1¾ 150 Pf Pe Pv UG1.9850104.5710.840.08225814'-0¾1.238 5-7'-11¾62.3251'-0 8-7'-11¾63.563cplg(1'-0)15'-0¾ 150 Pf Pe Pv UG1.5050104.5718.860.31671517'-8½6.398 8-7'-11¾63.563Supply,2'-6 23-7'-11¾69.962S, E(2'-6)20'-2½ 150 104.57 0.00Hose Allowance At Source 23 • • • • • Route 2 • • • • • Pf Pe Pv CM1.101025.618.630.1075170'-11¾0.104 40223'-725.615.620.917Sprinkler0.102 623'-4¼21.1240'-11¾ 150 • • • • • Route 3 • • • • • Pf Pe Pv CM1.598047.567.610.05505953'-85.983 40420'-726.605.622.562Sprinkler,55'-04.841 229'-533.3853E(9'-0), 2EE(2'-0), 3T(8'-0), Z108'-8 150 Pf Pe Pv CM2.950047.562.230.0027810'-00.036 229'-533.38513'-0 299'-533.421E(13'-0)13'-0 150 Pf Pe Pv CM1.598047.567.610.0550591'-00.055 299'-533.4210.434 278'-533.9111'-0 150 • • • • • Route 4 • • • • • Pf Pe Pv CM2.950040.531.900.0020690'-00.008 24-0'-1040.2354'-0 1-0'-1040.244EE(4'-0)4'-0 150 Pf Pe Pv CM1.598040.536.480.04095217'-11¼1.431 1-0'-1040.24417'-0 2-0'-1041.674E(9'-0), T(8'-0)34'-11¼ 150 • • • • • Route 5 • • • • • Pf Pe Pv CM1.598020.963.350.01209212'-4¾0.259 923'-4¼21.1049'-01.199 40420'-722.562E(9'-0)21'-4¾ 150 © M.E.P.CAD, Inc.02/16/2012Page 3AutoSPRINK® VR8 v8.1.11 9:45:34AM Pipe TypeDiameterFlowVelocityFriction LossLengthPressure DownstreamElevationDischargeK-FactorPtPnFittingsEq. LengthSummary UpstreamTotal Length HWC Hydraulic Analysis Job Number: BM0072 Report Description: East Unit • • • • • Route 6 • • • • • Pf Pe Pv CM1.598040.536.480.04095234'-3½2.469 268'-533.75626'-04.010 24-0'-1040.235T(8'-0), 2E(9'-0)60'-3½ 150 1.51 Pipe Type Legend AOArm-Over BLBranch Line CMCross Main DNDrain DRDrop DYDynamic FMFeed Main FRFeed Riser MSMiscellaneous OROutrigger RNRiser Nipple SPSprig STStand Pipe UGUnderground Units Legend DiameterInch ElevationFoot Flowgpm Dischargegpm Velocityfps Pressurepsi LengthFoot Friction Losspsi/Foot HWCHazen-Williams Constant PtTotal pressure at a point in a pipe PnNormal pressure at a point in a pipe PfPressure loss due to friction between points PePressure due to elevation difference between indicated points PvVelocity pressure at a point in a pipe Fittings Legend ALVAlarm Valve AngVAngle Valve bBushing BalVBall Valve BFPBackflow Preventer BVButterfly Valve CCross Flow Turn 90° cplgCoupling CrCross Run CVCheck Valve DelVDeluge Valve DPVDry Pipe Valve E90° Elbow EE45° Elbow Ee111¼° Elbow Ee222½° Elbow fFlow Device fdFlex Drop FDCFire Department Connection fE90° FireLock(TM) Elbow fEE45° FireLock(TM) Elbow flgFlange FNFloating Node fTFireLock(TM) Tee gGauge GloVGlobe Valve GVGate Valve HoHose HoseHose HVHose Valve HydHydrant LtELong Turn Elbow mecTMechanical Tee NozNozzle P1Pump In P2Pump Out PIVPost Indicating Valve POPipe Outlet PRVPressure Reducing Valve PrVPressure Relief Valve redReducer/Adapter SSupply sCVSwing Check Valve SprSprinkler StStrainer TTee Flow Turn 90° TrTee Run UUnion WirFWirsbo WMVWater Meter Valve ZCap 4.87 150 1.33 140 1.16 130 0.713 100 Equivalent Pipe Lengths of Valves and Fittings (C=120 only) Actual Inside Diameter Schedule 40 Steel Pipe Inside Diameter= Factor C Value Multiplier Value Of C Multiplying Factor © M.E.P.CAD, Inc.02/16/2012Page 4AutoSPRINK® VR8 v8.1.11 9:45:34AM Hydraulic Graph Report Description: East Unit Job Number: BM0072 System Demand (Including Hose Allowance at Source) System Demand 55.000 @ 1200.00 Residual: Pressure 85.000 Static: Pressure Supply at Node 23 Hydraulic Graph Supply at Node 23 69.962 @ 104.57 69.962 @ 104.57 Available Pressure at Time of Test 84.671 @ 104.57 © M.E.P.CAD, Inc.02/16/2012Page 5AutoSPRINK® VR8 v8.1.11 9:45:39AM