Loading...
HomeMy WebLinkAboutDRB120041 APPLICATION JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER The applicant must submit written joint property owner approval for applications affecting shared ownership properties such as duplex, condominium, and multi-tenant buildings. This form, or similar written correspondence, must be com- pleted by the adjoining duplex unit owner or the authorized agent of the home owner’s association in the case of a con- dominium or multi-tenant building. All completed forms must be submitted with the applicants completed application. I, (print name) ______________________________________________, a joint owner, or authority of the association, of property located at _______________________________________________________, provide this letter as written approval of the plans dated __________________________________________ which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address not- ed above. I understand that the proposed improvements include: _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ ________________________________________ ____________________________________________ (Signature) (Date) Additionally, please check the statement below which is most applicable to you: I understand that minor modifications may be made to the plans over the course of the review process to ensure compli- ance with the Town’s applicable codes and regulations. ______________ (Initial here) I understand that all modifications, minor or otherwise, which are made to the plans over the course of the review pro- cess, be brought to my attention by the applicant for additional approval before undergoing further review by the Town. ______________ (Initial here) Notes: Please specify the manufacturer’s name, the color name and number and attach a color chip. Building Materials Type of Material Color Roof . . Siding . . Other Wall Materials . . Fascia . . Soffits . . Windows . . Window Trim . . Doors . . Door Trim . . Hand or Deck Rails . . Flues . . Flashing . . Chimneys . . Trash Enclosures . . Greenhouses . . Retaining Walls . . Exterior Lighting . . Other . . PROPOSED LANDSCAPING Minimum Requirements for Landscaping: Deciduous Trees – 2” Caliper Coniferous Trees – 6’ in height Shrubs – 5 Gal. Please specify other landscape features (i.e. retaining walls, fences, swimming pools, etc.) __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ Botanical Name Common Name Quantity Size PROPOSED TREES . AND SHRUBS . . . . . . . EXISTING TREES . TO BE REMOVED . . . . Type Square Footage GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL + Font Size - XFINITY Connect mha54@comcast.ne RE: Lopez Residence Utility Approval & Verification From : Richard J Sisneros <richard.sisneros@xcelenergy.com> Subject : RE: Lopez Residence Utility Approval & Verification To : Michael A. Hazard AIA <mha54@comcast.net> Cc : Ronnie J Bureta <ronnie.j.bureta@xcelenergy.com> Mon, Feb 27, 2012 09:35 PM Hi Michael, From our phone conversation on the address in question, you are clear to proceed. Xcel Energy High Pressure Gas does not have facilities north of I-70. Operations will respond to your email request as soon as they see it. I forwarded the email this morning as I am on temporary assignment in Denver. Feel free to call any time there may be questions. Thanks, Rich Richard J. Sisneros Xcel Energy | Responsible By Nature Foreman, High Pressure Gas, Silverthorne District Summit County Operations Center 200 W 6th Street, Silverthorne, CO 80498-1819 O: 970-262-4076 C: 970-371-9677 F: 970-468-1401 E:richard.sisneros@xcelenergy.com ________________________________________________ XCELENERGY.COM Please consider the environment before printing this email This email is covered by the Electronic Communications Privacy Act, 18 USC Sections 2510-2521. This email, and any attachments, may contain confidential, private and/or privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient (or authorized to receive for the recipient), please contact the sender by reply mail and delete all copies of this message and any attachments From: Michael A. Hazard AIA [mailto:mha54@comcast.net] Sent: Monday, February 27, 2012 9:45 AM To: samuel tooley; Sisneros, Richard J; jvroom@holycross.com; Bogert, Kathryn Kit; rforsyth@erwsd.org; tony hildreth; daniel roussin Cc: Ivan Lopez; Claes Holm Subject: Lopez Residence Utility Approval & Verification Good Morning, Please find attached a copy of the Town of Vail Forms and associated drawings for a proposed 200 S.F. second floor bedroom extension to an existing Eiger Chalet townhouse in Vail. Please be so kind as to review the material and affix your approvals to the appropriate form. Should you have any questions please feel free to contact me at 970.376.0066. If there is any possibility to complete your review, today (February 27th) it would allow us to meet the Towns submittal deadline for the March Design Review Meeting. Many thanks! Michael A. Hazard AIA Principal Michael Hazard Associates Architecture Planning Interiors P.O. Box 1068 Page 1of 2XFINITY Connect 2/27/2012http://sz0013.ev.mail.comcast.net/zimbra/h/printmessage?id=725600&tz=America/Los_A... UTILI’~ APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, end also to verify service availability and location for new construotion and should be used In conjunction with preparing your utility plan and schedul- ing Installations. A site plan, Including grading plan, floor plan, and etevations, shall be submitted to the follovAng utilities for approval and vertfloation. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UT.ILITY COMPANIES. If yOU are unable to obtain comreents within that tireeframe please contact The Town of Vail. Subject Property Address: 1370 Sandstone Dr.Lot.__ Bleak___= Subdivision: Prlmary~ontact / O>vner Representative: Michael H_az_ard Phone: 970.949.4958 ,;...//.//~ __ /~//~ ~’ "Plans Dated: 02/24/12 Primar~ Contact/Owner Representative Signature Author z~ ed el nature Comments qWEST 970.468.6860(tal) 970.468.0672(fax) Contacts: Sareuel Tooley sareual.toolev(~owest,com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) )70.468.1401 (fax) :ontact: R{ch Slsneros richard,slsneros(~xcelenerev,cere HOLY CRO. SS ENERGY g70.g47,5471 (tel) 970.945.4081 (fax) 3onta~: .left Vrocm Ijvroom@holycross,cem KCEL Energy ~)70.262.4024 (tel) %ntacts: Kit Bogert Kathrvn.Boeert@xcelenerov.core EAGLE RIVER WATER & SAN 1TA- ~’XON DISTRICT ~70.477.S43S (tat) 970.477,5434 (fax) Contact: Roby Forsybh r~orsvth@erwsd,om COMCAST CABLE 970.619.0752 (tel) 970A6S-2672 (fax) Contact: Tony Hlldreth bmy,_hIld reth@cable.cerecast.core CDOT (Only In CDOT Right-of-way) 970,683.6284 (tel) Contact: Dan Roussln Daniel.roussln@dot,stata,ce,us .NOTES: 1. Utility locations must be obtained before digging, 2, A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way, Contact the Public Works Department for verification 970,479,21.98, 3,It ls the responsibility of the utility company and the applicant to resolve problems Identified above, 4-, The Primary ContacVOwner Representative is required to submit any revised drawings to the above agendes for re-approval & re-verification if the submitted plans are altered In any way after the authorized signature date, UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: ____________________________ Lot______ Block _____ Subdivision: ____________ Primary Contact / Owner Representative: ___________________________ Phone: _______________________ ______________________________________________________ Plans Dated: ________________________ Primary Contact/Owner Representative Signature NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. 03-Mar-10 Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Samuel Tooley samuel.tooley@qwest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisneros@xcelenergy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom jvroom@holycross.com 2/27/12 XCEL Energy 970.262.4024 (tel) 970.262.4038 (fax) Contacts: Kit Bogert Kathryn.Bogert@xcelenergy.com EAGLE RIVER WATER & SANITA- TION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee@erwsd.org COMCAST CABLE 970.619.0752 (tel) 970.468-2672 (fax) Contact: Tony Hildreth tony_hildreth@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us + Font Size - XFINITY Connect mha54@comcast.ne RE: Lopez Residence Utility Approval & Verification From : Daniel Roussin <Daniel.Roussin@DOT.STATE.CO.US> Subject : RE: Lopez Residence Utility Approval & Verification To : Michael A. Hazard AIA <mha54@comcast.net> Mon, Feb 27, 2012 04:54 PM There are no issues with CDOT. thanks Dan Roussin Colorado Department of Transportation Region 3 Permit Unit Manager 222 South 6th Street, Room 100 Grand Junction, CO 81501 970-683-6284 Office 970-683-6290 Fax   http://www.coloradodot.info/business/permits/accesspermits From: Michael A. Hazard AIA [mailto:mha54@comcast.net] Sent: Monday, February 27, 2012 9:45 AM To: samuel tooley; richard sisneros; jvroom@holycross.com; kathryn bogert; rforsyth@erwsd.org; tony hildreth; Roussin, Daniel Cc: Ivan Lopez; Claes Holm Subject: Lopez Residence Utility Approval & Verification Good Morning, Please find attached a copy of the Town of Vail Forms and associated drawings for a proposed 200 S.F. second floor bedroom extension to an existing Eiger Chalet townhouse in Vail. Please be so kind as to review the material and affix your approvals to the appropriate form. Should you have any questions please feel free to contact me at 970.376.0066. If there is any possibility to complete your review, today (February 27th) it would allow us to meet the Towns submittal deadline for the March Design Review Meeting. Many thanks! Michael A. Hazard AIA Principal Michael Hazard Associates Architecture Planning Interiors P.O. Box 1068 Vail, Colorado 81658 970.949.4958 P 970.376.0066 C mha@vail.net All information in this Communication, including attachments, is strictly confidential and intended solely for delivery to and authorized use by the addressee(s) identified above, and may contain privileged, confidential, proprietary and/or trade secret information entitled to protection and /or exempt from disclosure under applicable law. If you are not the intended recipient, please take notice that any use, distribution or copying of this Communication, and/or any action taken or omitted to be taken in reliance upon it, is authorized and may be unlawful. If you have received this Communication in error, please notify the sender and delete this Communication from your computer. Page 1of 2XFINITY Connect 2/27/2012http://sz0013.ev.mail.comcast.net/zimbra/h/printmessage?id=725300&tz=America/Los_A...