Loading...
HomeMy WebLinkAboutD12-0001 TOWN QF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES DEMO. OF PART'/ALL BLDG. Permit # D12-0001 Project# ?? Job Address: 292 W MEADOW DR VAIL Status . . . : ISSUED Location.......: VAIL PUBLIC LIBRARY Applied .. . : 03/OS/2012 Parcel No....: 210106407005 Issued . . . : 03/16/2012 Expires.....: 09/12/2012 OWNER TOWN OF VAIL 03/05/2012 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 CONTRACTOR EVANS CHAFFEE CONSTRUCTION G 03/05/2012 Phone: 970-845-0466 MICHELLE EVANS PO BOX 8266 AVON CO 81620 License: C000003077 APPLICANT TOWN OF VAIL 03/05/2012 C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 Desciption: DEMO PERMIT FOR THE REMODEL/ADDITION,ADDING A NEW ELEVATOR, ENCLOSED STAIRS AND EXPANDED STAFF AND COMMUNITY ROOM. Occupancy: Type Construction: Valuation: $31,000.00 Revision Valuation: ?? Total Sq Ft Added: 0 r*+s*****»*rr**r**********r++****+**s*a*****r*****r+***«*****+*+*�r* FEE SUMMARY ****r**�**sst*****s****��*r�:***►s************s*******t*** Building------> $451.85 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $750.55 Plan Check---> $293.7o Recreation Fee--------------> $0.oo Additional Fees----------> ($750.55) Investigation-> $o.oo TOTAL FEES-------------> $750.55 Total Permit Fee---------> $o.o0 Will Call-----> $5.oo Payments-------------------> $0.00 BALANCE DUE---------> $0.00 *�r*«�*►**�*�a**.*�*+*�***r*t******+sss»****�***t***t+rs*********ss*ra*s**s��+rr*s�*�*********�s���ss*s*t***r**►t**s���:s******r*ts*tt******* Approvals: Item: 05100 BUILDING DEPARTMENT 03/12/2012 Martin Action: AP Item: 05400 PLANNING DEPARTMENT 03/12/2012 bgibson Action: AP Item: 05600 FIRE DEPARTMENT 03/15/2012 mvaughan Action: AP see conditions. Item: 05500 PUBLIC WORKS �3/13/2012 ls Action: AP **�.:.�..**..,+.*.*.�»:*�.,,*******.+*»*��+.�.....+.*+*.***........*..�»**:*.*++...�»»**........*........�.►..����.�...*:*****++.*.«.*...►... See the Conditions section of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS W ADVAII��B EL� ONE AT 4 - 149 OR ' R OFFICE FROM 8:00 AM 4 PM. i SIGNATURE OF OWNER OR C T OR FOR HIMSELF AND OWNEF ******************************************************************************************************** CONDITIONS OF APPROVAL Permit#: D12-0001 as of 03-16-2012 Status: ISSUED ******************************************************************************************************** Permit Type: DEMO. OF PART/ALL BLDG. Applied: 03/OS/2012 Applicant: TOWN OF VAIL Issued: 03/16/2012 To Expire: 09/12/2012 Job Address: 292 W MEADOW DR VAIL Location: VAIL PUBLIC LIBRARY Parcel No: 210106407005 Description: DEMO PERMIT FOR THE REMODEL/ADDITION,ADDING A NEW ELEVATOR, ENCLOSED STAIRS AND EXPANDED STAFF AND COMMUNITY ROOM. ***********************************************Conditions:************************************************ Cond: 38 (BLDG.): THIS PERMIT IS GOOD FOR ASBESTOS ABATEMENT ONLY. AN ASBESTOS ABATEMENT CERTIFICATE SHOWING THE AREA FREE FROM ASBESTOS IS REQUIRED PRIOR TO ANY FURTHER WORK OCCURING ON THIS SITE. IF FURTHER QUESTIONS ARISE, CONTACT THE VAIL FIRE DEPARTMENT AT 479-2252. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TU CHECK FOR CODE COMPLIANCE. Cond: CON0012451 If a building permit is not obtained and diligently pursued,the applicant shall restore all disturbed site areas to their previous landscaped condition and shall restore all exterior building demolition to its previous built condition within 180 days of the issuance of this perm it. Cond: CON0012459 Regarding fire alarm and sprinkler systems. Contractor shall provide impairment plan to fire department. Plan shall be approved by fire priar to commencing demolition. .:'( � ��- Department of Community Development 75 South Frontage Road TDWN OF VA(L�Y: va�i, co s�s5� Tel: 970-479-2128 www.vailgov.com Development Review Coordinator ��Mo�,RM�r � �;�(� BUILDING PERMIT APPLICATION (Separate applications are required for alarm &sprinkler) Project Street Address: Project#: �/����-o�3a _ _�� �,�2�T �l��v �U� (Number) (Street) (Suite#) DRB#: ej� � �S9s3�,�.J a oo�g U���Gj u�di>/J Building Permit#. 10�— D�� � Building/Complex Name:_ �.,gL� Contractor Information v� Lot#: /',/ Block#L Subdivision: � �i�s G�f��=� G����r� � �� � _ _ _---_ -- ___ __ ___ __ _ _ Business Name: Work Class: New( ) Addition(x ) Alteration(x) I Business Address:�� � ��� � _ � City �V� State:�Zip:� Type of Building: ���I r r� ����� Single-Family( ) Duplex( ) Multi-Family( ) Contact Name: wa � � �X � �,�(�u1'�A�� Commercial Other Contact Phone: ��� ' `�� ' �"��-J ��r���.�I��,�����yy� � Work Type: Interior(�) Exterior( ) Both( ) Contact E-Mail: � p �GV �i�i�ilqTrt�r/� Valuation of X Work Included Plans Included Work Owner/Owner's Representative Signature(Required) Electrical (�Yes ( )No (X)Yes ( )No �_ Applicantlnformation Mechanical (�)Yes ( )No (X)Yes ( )No Applicant Name: �,� `� Plumbing (�()Yes ( )No (�)Yes ( )No� Applicant Phone: a `� �[f' ��� Building (j�)Yes ( )No ()C)Yes ( )No 2 � Applicant E-Mail:'�rVl 4�4✓�KJ(1p����s . (�� Value of all work being performed: $ �� � (value based on IBC Section 109.3&IRC Section 108.3� � Project Informatio���� � V�� Electrical Square Footage Owner Name: Parcel#: ����������� (For Parcel#,contact Eagle County Assessors Office at(970328-8640 or visit www.eaglecounty.uslpatie) -�"'s---.._:��_^—_---_���. _. - — — _. ' Detailed Scope and Location of Wor4c: -�\E�D✓f?-Ti p,J E P�.lY101�t— i{�ise additional sheet if necessary) For Office Use Only: Date Received: � � � n �17 � Fee Paid: �A lV�,� D �� ��� Received From: �� Cash Check # MAR ��2012 CC: Visa / MC Last 4 CC # exp date: �- Autn # TOW N OF' �/AI L 01-Jan-1 I State of Colorado Asbestos Testing &Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Pfease contact the State directly for their requirements at the contact info listed below. When is asbestos testinq required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips& Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of a�age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailgov.com www.cdphe.state.co.us O1-Jan-I] � �a-000� David Rhoades From: Lori Ann Barnes Sent: Wednesday, March 07, 2012 2:42 PM To: 'Pamela Hopkins'; Greg Hall Cc: David Rhoades Subject: RE:VPL mold issues Response from AG Wassenaar rep re: mold issues: While I was at the library, I looked at the book drop closet area, and the wood framing in the wall cavity adjacent to the window in the front hallway (where drywall had been removed). Since these areas are impacted by a window leak, and not the "flood", they won't be addressed in my report. Regardless, the conditions in these two areas would not have a significant impact on indoor air quality within the building. Opening the main doors will entrain more mold spores into the building (from the normal outside air) than would be generated by any mold growth on these building materials inside. The drywall in the book drop closet area is primarily water stained, and not visibly impacted by mold growth on the interior surface. There may be some mold growth on the back side of the drywall, but the total area of impacted drywall is less than 10 square feet, and the drywall should not need special handling/treatment during demolition activities. The wood framing in the wall cavity adjacent to the window appears to be impacted by a limited amount of"wood rot". The mold that causes this wood rot is a normal part of our environment, and is present to a much greater extent in the forested areas surrounding the library. The area of framing impacted by this fungus in the library is less than 1 square foot, and the wood should not need special handling/treatment during demolition activities. As an aside, there is no such thing as "harmful" or"non-harmful"mold... mold has the potential to cause an allergy response (like hay-fever/seasonal allergies) in individuals who are allergic to mold. Your subcontractor should be fine, but if the contractor has a worker who is sensitive to dust(or has a known allergy to mold), they can utilize a dust mask during demolition to minimize their exposure to any airborne dust/mold spores. Because there are mold spores in all settled dust, and on all surfaces, elevated levels of mold spores are generated by demolition activities in general—regardless of whether the material has ever been impacted by a water loss/intrusion. During our visit, I communicated the findings from the window arealbook drop to the Town of Vail representative that was with us (John Gallegos). I don't know if he planned to address these areas prior to demolition/renovation of the facility. It may be worth contacting him to find out. From: Pamela Hopkins [mailto:phopkinsl7@gmail.com] Sent: Wednesday, March 07, 2012 2:15 PM To: Greg Hali; Lori Ann Barnes Cc: David Rhoades Subject: VPL mold issues Hello Greg and Lori, I spoke to David about the asbestos tests and then the air quality testing that was done and he would like a copy of the final report to be sent to him for inclusion in the VPL Demo Permit. Lori, did the person who was testing address the mold by the book drop?Will her air quality report include anything on that area? David wants to know if that mold is non- harmful before demolition. 1 Thanks for the help, Pam Pamela W. Hopkins, AIA, LEED AP Snowdon and Hopkins Architects, PC PO Box 3340 Vail, CO 81658 970.476.2201 970.376.6469 cell Pam .SnowdonHoqkins.com 2 �1a- o0o I Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Town Of Vail Site 6 — Library 292 W Meadow Dr, Vail, Colorado Asbestos Inspection Report — Page 1 of 2 March 1, 2011 John Gallegos Facilities Manager Town of Vail On February 26, 201 l, Quentin Danziger conducted an asbestos inspection of the suspect materials throughout the building. Asbestos was NOT found, as described below. Homogenous Description Number of % Asbestos Square Type/Friable? Area Sam les Feet O1 Texture 3 Non Detect 02 Sheetrock/JC 3 Non Detect 03 Floor Tile 3 Non Detect Under Carpet in Copy Room with 2 Mastics 04 Office Ceilin 3 Non Detect OS Bathroom 3 Non Detect Ceilin BACKGROUND: The Town of Vail requested an asbestos inspection of this building. Roofing materials were not seen, but inspection was limited due to snow. If suspect roofing material such as tar paper is found during remodel, contact Quentin at 970-390-0087. This inspection includes only suspect materials that are visible to the inspector. If other suspect materials become visible during demolition, they must be sampled before they are disturbed. Examples of suspect materials include but are not limited to: linoleum, floor tile, ceiling tile, mastic, sheetrock,joint compound, roofing materials, etc. There are over 3000 known asbestos containing materials. SAMPLING PLAN: Colorado State Requirements - For each homogenous area of less than 1000 square feet, a minimum of three samples must be collected in random areas. For each Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Town Of Vail Site 6 — Library 292 W Meadow Dr, Vail, Colorado Asbestos Inspection Report — Page 2 of 2 homogenous area of 1000— 5000 square feet, a minimum of five samples must be collected in random areas. Areas of 5001 square feet or greater require a minimum of 7 samples. These laws are defined by the EPA (AHERA) and Colorado State Regulation 8. Determination of homogenous sampling areas—Homogenous Areas are determined by type of suspect material, texture, color and location. Determination of random sampling areas—The samples were collected in a random manner. Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality consultants. We look forward to working with you in the future. Quentin Danziger, BS, CIE, ABI—Colorado Asbestos Inspector Certification# 12781 Indoor Environmental Services, Inc. Dba Q Consulting, Inc. 970-390-0087 QConsultingInc@yahoo.com EMSL Analytical, Inc. 7330 S.Alton Way Building 12 Suite A,Centennial,CO 80112 Phone: (303)740-5700 Fax: (303)741-1400 Email: cigny rla a nbl.��7 A�' Quentin Danzi er g Customer ID: INES78 Q Consulting, Inc. cUStomer Po: PO Box 997 Recei�ed: 03/01/11 9:00 AM Vail, CO 81658 EMSL Order: 221100660 Fax Phone: (970)390-0087 EMSL Proj: Town of Vail Project: TOV-Vail Library Analysis Date: 3/1/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Asbestos Sample Description Appearance °/a Fibrous % Non-Fibrous % Type 01-01 Te�dure White/Yellow 100% Non-fibrous(other) None Detected 221100660-0001 Non-Fibrous Heterogeneous 01-02 Texture White/Yellow 100% Non-fibrous(other) None Detected 221100660-0002 Non-Fibrous Heterogeneous 01-03 Texture White/Yellow 100% Non-fibrous(other) None Detected 221100660-0003 Non-Fi brous Heterogeneous 02-01-TeMure Sheetrock/JC White/Yellow 100% Non-fibrous(other) None Detected 221100660-0004 Non-Fibrous Heterogeneous 02-01-Joint Sheetrock/JC White 100% Non-fibrous(other) None Detected Compound Non-Fibrous 221100660-0004A Homogeneous 02-01-Drywall Sheetrock/JC Brown/White 10°/a Cellulose 85% Non-fibrous(other) None Detected 221100660-0004B Fibrous 5% Glass Heterogeneous 02-02-Texture Sheetrock/JC Brown/White 100% Non-fibrous(other) None Detected 2ziioosso-000s Non-Fibrous Heterogeneous Initial report from 03�01/2011 17:12:15 � - Analyst(s) Erin Orthun(9) Erin Orthun, Laboratory Manager Molly Walker(18) or other appro�ed signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced,except in full,without wntten approval by EMSL. E no responsibiliry for sample collection actitities or analytical method limitations. Interpretation and use of test results are the responsibility of the clienL This report must not be use client to claim product certification,approval,or endorsement by NVLAP,NIST or any agency of the federal go�,emment. Non-fiable organically bound materials presenl a problem i theretore EMSL recommends graumetric reduction prior to analysis. Samples receieed in good condition unless othenvise noted. Sam les anal zed b EMSL Anal tical,Inc.Centennial,CO NVLAP Lab Code 200828-0 Test RepoR PLNF7.23.0 Prin�d: 3/1/2011 5:25:15 PM � EMSL Analytical, Inc. 7330 S.Aiton Way Building 12 Suite A,Centennial,CO 80112 Phone: (303)740-5700 Fax: (303)741-1400 Email: SJenverlab(a�ernsl.com A�'� Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Recei�ed: 03/01/11 9:00 AM Vail, CO 81658 EMSL Order: 221100660 Fax Phone: (970)390-0087 EMSL Proj: Town of Vail Project: TOV-Vail Library Analysis Date: 3/1/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Asbestos Sample Description Appearance % Fibrous % Non-Fibrous °/, Type 02-02-Joint Sheetrock/JC White 100% Non-fibrous(other) None Detected Compound Non-Fibrous 221100660-0005A Homogeneous 02-02-Drywall Sheetrock/JC Brown/White 10% Cellulose 85°/a Non-fibrous(other) None Detected 221100660-00058 Fibrous 5% Glass Heterogeneous 02-03-Texture Sheetrock/JC Tan/White 100% Non-fibrous(other) None Detected zz>>oosso-000s Non-Fibrous Heterogeneous 02-03-Joint Sheetrock/JC White 100% Non-fibrous(other) None Detected Compound Non-Fibrous 221100660-0006A Homogeneous 02-03-Drywall Sheetrock/JC Brown/White 10% Cellulose 85°/a Non-fibrous(other) None Detected 22»oosso-000se Fibrous 5% Glass Heterogeneous 03-01-Tan Mastic Floor Tile Under Tan 100% Non-fibrous(other) None Detected 221f00660-0007 Carpet-Copy Non-Fibrous Room ��eneous Initial report from03�01/2011 17:12:15 Anayst(s) � ���.w� ', �, , Erin Orthun(9) Erin Orthun, Laboratory Manager Molly Walker(18) or other approved signatory EMSL maintains liability limited to cost of anatysis. This report relates only to the samples reported and may not be reproduced,except in full,without written approval by EMSL. E no responsibility for sample collection actiHties or analytical method limitalions. Interpretation and use of test results are the responsibility of the client. This report must not be use client to claim product certification,approval,or endorsement by NVLAP,NIST or any agency of the federal go�emment. Non-friable organically bound materials present a problem i therefore EMSL recommends gra�imetric reduction prior to analysis. Samples receieed in good condition unless othenvise noted. �� Sam les anal zed b EMSL Anal tical,Ina Centennial,CO NVLAP Lab Code 200828-0 Test Report PLIV�7.23.0 Prin�d: 3/1/2011 5:25:15 PM 2 EMSL Analytical, Inc. 7330 S.Alton Way Building 12 Suite A,Centennial,CO 80112 Phone: (303)740-570Q Fax: (303)741-1400 En�ail: cl�,nverla a}�n�l_com A�'� Quentin Danziger Customer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Recei�ed: 03/01/11 9:00 AM Vail, CO 81658 EMSL Order: 221100660 Fax Phone: (970)390-0087 EMSL Proj: Town of Vail Project: TOV-Vail Library Analysis Date: 3/1/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Asbestos Sample Description Appearance % Fibrous °/, Non-Fibrous % Type 03-01-Floor Tile Floor Tile Under White 100% Non-fibrous(other) None Detected zz�ioosso-000�a Carpet-Copy Non-Fibrous Room Homogeneous 03-01-Black Mastic Floor Tile Under Black 100% Non-fibrous(other) None Detected 221100660-0007B Carpet-Copy Non-Fibrous Room Homogeneous 03-02-Tan Mastic Floor Tile Under Tan 100°/a Non-fibrous(other) None Detected 221100660-0008 Carpet-Copy ►.bn-Fibrous Room ��eneous 03-02-Floor Tile Floor Tile Under White 100% Non-fibrous(other) None Detected 221100660-0008A Carpet-Copy Npn-Fibrous Room Homogeneous 03-02-Black Mastic Floor Tile Under Black 100% Non-fibrous(other) None Detected 221100660-0008B Carpet-Copy Non-Fibrous Room Homogeneous 03-03-Tan Mastic Floor Tile Under Tan 100% Non-fibrous(other) None Detected 221100660-0009 Carpet-Copy Non-Fibrous Room Homogeneous 03-03-Floor Tile Floor Tile Under White 100% Non-fibrous(other) None Detected 221100660-0009A Carpet-Copy ►.�n-Fibrous Room Homogeneous Initial report from Oy01/2011 17:12:15 � , - Anayst(s) , ; Erin Orthun(9) Erin Orthun, Laboratory Manager Molly Walker(18) or other appro�ed signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may nol be reproduced,except in full,without written approval by EMSL. E no responsibility for sample collection actiHties or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be use client to claim producl certification,approral,or endorsement by NVLAP,NIST or any agency of the federal goeemment. Non-fiable organically bound materials present a problem i therefore EMSI recommends graWmetric reduction prior to ana�ysis. Samples recei�,ed in good condition unless othenvise noted. Sam les anal zed b EMSL Anal tical,Ina Centennial,CO NVLAP Lab Code 200828-0 Test Report PLN�7.23.0 Prin4ed: 3/1/2011 5:25:15 PM 3 EMSL Analytical, Inc. 7330 S.Alton Way Building 12 Suite A,Centennial,CO 80112 Phone: (3Q3)740-5700 Pax: (303)741-1400 ErT�iC cleriy_�rlah��n�l_cc�m A�'� Quentin Danziger Customer ID: INES78 Q Consulting, Inc. custor„er Po: PO Box 997 Recei�ed: 03/01/11 9:00 AM Vail, CO 81658 EMSL Order: 221100660 Fax Phone: (970)390-0087 EMSL Proj: Town of Vail Project TOV-Vail Library Analysis Date: 3/1/2011 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Asbestos Sample Description Appearance °/, Fibrous % Non-Fibrous % Type 03-03-Black Mastic Floor Tile Under Black 100°/o Non-fibrous(other) None Detected 221100660-00098 Carpet-Copy Non-Fibrous Room Homogeneous 04-01 Office Ceiling White 80% Min.Wool 10% Non-fibrous(other) None Det�ted 22�iooeso-oo�o Fibrous 10% Perlite Heterogeneous 04-02 Office Ceiling White 80°/a Min.Wool 10% Non-fibrous(other) None Detected 221100660-0011 Fibrous 10% Perlite Heterogeneous 04-03 Office Ceiling White 80% Min.Wool 10% Non-fibrous(other) None Detected 22i�ooeso-oo�z Fibrous 10% Perlite Homogeneous 05-01 Bathroom Ceiling Brown/White 40% Cellulose 10% Non-fibrous(other) None Detected zz��oosso-oois Fibrous 40% Min.Wool 10% Perlite Heterogeneous 05-02 Bathroom Ceiling Brown/White 40% Cellulose 10% Non-fibrous(other) None Detected 221100660-0014 Fibrous 40% Min.Wool 10% Perlite Heterogeneous 05-03 Bathroom Ceiling Tan/White 40% Cellulose 10% Non-fibrous(other) None Detected 221100660-0015 Fibrous 40% Min.Wool 10% Perlite Heterogeneous Initial report from 03�01/2011 17:12:15 , Analyst(s) Erin Orthun(9) Erin Orthun, Laboratory Manager Molly Walker(18) or other appro�ed signatory EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported and may not be reproduced,except in full,without written approval by EMSL. E no responsibility for sample collection actiWties or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be use client to claim product certification,approval,or endorsement by NVLAP,NIST or any agency of the federal go�emment. Non-friable organically bound materials present a problem r therefore EMSL recommends graHmetric reduction prior to analysis. Samples receiued in good condition unless otherwise noted. Sam les anal zed b EMSL Anal tical,Inc.Centennial,CO NVLAP Lab Code 200828-0 Test Report PLM-7.23.0 Prin�d: 3/1/2011 5:25:15 PM THIS IS THE LAST PAGE OF THE REPORT. 4