HomeMy WebLinkAboutB09-0130NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MWW*VK'
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD /ALT COMM BUILD PERMT Permit #: B09 -0130
Project #: ftE01 -6 011
Job Address: 244 WALL ST VAIL
Location......: UNIT M -1
Parcel No....: 210108251012
OWNER VAIL CORP 06/01/2009
PO BOX 7
VAIL
CO 81658
CONTRACTOR BUCHANAN YONUSHEWSKI GROUP 06/25/2009 Phone: 303 - 861 -4600
500 E 8TH AVE
DENVER
CO 80203
License: 127 -B
APPLICANT MCBOYD BUILDERS INC 06/01/2009 Phone: 328 -5789
PO BOX 238
EAGLE
CO 81631
License: 776 -B
Description:
ADDITION AND REMODEL TO CONVERT TICKET /SKI SCHOOL OFFICES
TO RETAIL
Occupancy: M
Type Construction:VA
Status .. :
ISSUED
Applied ..:
06/01/2009
Issued ...:
06/25/2009
Expires ...:
12/22/2009
Valuation: $467,900.00
Total Sq Ft Added: 0
xwxxwxxxxxwwwwx. wxxxxwxxx.. w, x. wxwxxxxxxxxw. wwwwxxxxxxxxxx ,...w . wwwwwxxxx.,,x.,.w FEE SUMMARY xxxxxx,..w..wwwww.xxx , x , x , xwwwxwwwwxxxxx..xwwww
Building Permit Fee - ->
$3,054.55
Will Cal Fee - - -- - - - - ->
$4.00
Total Calculated Fees--- —>
$14,202.01
Plan Check----- —>
$1,985.46
Use Tax Fee------- - - - - ->
$9,158.00
Additional Fees -- ------ --- - - - - ->
$72,425.32
Add'I Plan Check Hours-
$0.00
Restuarant Plan Review - ->
$0.00
TOTAL PERMIT FEES---- -- - - ->
$86,627.33
Investigation- - - - - -- ->
$0.00
Recreation Fee ---- --- - ---- >
$0.00
Payments-- - - - - -- - - - - ->
$86,627.33
wwwwwxwxfxrxxxxw* wwwwwwwxxxxx*xx ww wwwxxxxxwxxxxxwwwwwwwwwwxxxxxxxxxxwwwwwwwxxwxxxxx:
Total Calculated Fees - - - - ->
xxwwwwwwwwxxxxxxxxxxwwwxxxxxxxxxxxewwww,.
$14,202.01
BALANCE DUE — ->
wwxxxxxx: xxxxwwwwwwwwwxwxxxxxxxwwwwwwx
$0.00
+xwwxxxxxxxxxxxwwwww
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
nature of O or Contra ctor Date
) o.4 -4 JV g1,•Ns
Print Name
bid— alt — construction _permit 041908
rxxmxxx» xxrwwtwxxw» xt: rrxxxxw» wxwwwxxxxx» xxrwrxwwww» wx» xww» w» wwxw» xxxx» wxxwxrxxrr» xxxx» xx:: rrrwrtwwrwrwwxxwxw»» wxxwwwxxmxxx» xxxx »wwwx »wxww »xxxx »trwtxwwxwt »rt
APPROVALS
Permit #: B09 -0130 as of 06 -25 -2009 Status: ISSUED
xxmxwxx»x xxw»» ww» rwrx» rxxr»» rrwxxm» rwxwxwrrxr»:: xrrxrrrr» rrrxxrwrww» wwww» w» mwwww» wwwwwxxxxx» mr» wx::» xx» rxrrxr» rrxxwrrxrr »wrxx »rrrxmtrr »xr » »xrxx »xx
Item: 05100 BUILDING DEPARTMENT
06/18/2009 CG Action: AP
Item: 05400 PLANNING DEPARTMENT
06/11/2009 bgibson Action: AP plans routed to D -3
Item: 05600 FIRE DEPARTMENT
06/23/2009 drhoades Action: AP See conditions.
Knox box location to be approved by Vail Fire prior to
installation (if affected by this project).
Class A roofing material only to be used.
See the Conditions section of this Document for any that may apply.
bld_alt_construction _perm it_041908
CONDITIONS OF APPROVAL
Permit #: B09 -0130 as of 06 -25 -2009 Status: ISSUED
wx► wwwwxw» xx»» xxxxxxx►► wwww» wwxwxxw» xxwx» wwwxxww» ww» www» ww»» wwwxxwwwww» wwww» x» x» wwwwxx, rw» xxxxxxxx: x: xxwwwwx» xxxxxw» wxxwwwxw » »ww »wxwwx►wwwwww »»w »w » »xwww »»
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: CON0010810
SPECIAL INSPECTION REQUIRED PER IBC CH. 17
Cond: CON0010811
ALL EASEMENTS AND NO BUILD AREAS SHALL BE RECORDED PRIOR TO
ANY BUILDING FINAL OR TCO
Cond: CON0010824
Fire Sprinkler system required and shall comply with NFPA
13 (2002 ed) and VFES Standards.
Cond: CON0010825
Fire alarm system required and shall comply with NFPA 72
(2002 ed.) and VFES Standards.
bld _alt_construction_permit_041908
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R090000749 Amount: $72,425.3206/25 /200910:30 AM
Payment Method: Check Init: SAB
Notation: 475814 VAIL
RESORTS
-----------------------------------------------------------------------------
Permit No: B09 -0130 Type: ADD /ALT COMM BUILD PERMT
Parcel No: 2101 - 082 - 5101 -2
Site Address: 244 WALL ST VAIL
Location: UNIT M -1
Total Fees: $86,627.33
This Payment: $72,425.32 Total ALL Pmts: $86,627.33
Balance: $0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
FL 11000003113300, C HOUSING FEE IN LIEU 72,425.32
TOWN OF VAIL, COLORADO Statement
##***#####**#############**####*#*****######***########***### # # # * * * # # # # # # # * * * # # # # # # # * * * * * * ##
Statement Number: R090000748 Amount: $12,216.5506/25 /200910:04 AM
Payment Method: Check Init: SAB
Notation: 2233 BUCHANAN,
YONUSHEWSKI GROUP
-----------------------------------------------------------------------------
Permit No: B09 -0130 Type: ADD /ALT COMM BUILD PERMT
Parcel No: 2101 - 082 - 5101 -2
Site Address: 244 WALL ST VAIL
Location: UNIT M -1
Total Fees: $14,202.01
This Payment: $12,216.55 Total ALL Pmts: $14,202.01
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
BP 00100003111100 BUILDING PERMIT FEES 3,054.55
UT 11000003106000 USE TAX 4% 9,158.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number: R090000580 Amount: $1,985.46 06/01/200901:39 PM
Payment Method: Check Init: JLE
Notation: 1975 -WiTEIBB 1 C 1C.E D 1 G-61N
------------ ---------- ------ --------- ----------------------------------------
Permit No: B09 -0130 Type: ADD /ALT COMM BUILD PERMT
Parcel No: 2101 - 082 - 5101 -2
Site Address: 244 WALL ST VAIL
Location: UNIT M -1
Total Fees: $14,202.01
This Payment: $1,985.46 Total ALL Pmts: $1,985.46
Balance: $12,216.55
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------- - - - - -- ------------------------ - - - - -- ------ - - - - --
PF 00100003112300 PLAN CHECK FEES 1,985.46
BUILDING PERMIT APPLICATION
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
Project Street Address: �--
'Z+` WALL STR�LE' M
(Number) (Street) (Suite #)
Building /Complex Name: ONE PAIL- PL-mc-E
Contractor Information:
Company: McboYD BUiLU6RS, INC-
Office Use:
Project #:
fi z
r�
oq I
DRB #: ZO�
/��
W 5
�/
�J
Building Permit #:
;0,
1 —' -3O
V
Lot #: Block #5(- Subdivision: V60 V1
Company Address: Vo 15ox 23S 1, Detailed Description of Work: 4M (t4TEV4102 TiEk-Ar,1'
City:trAGl.1_r State: co Zip: IBIS
Contact Name: �> oTT FRi cKE
r
Contact Phone: 303 ,°t 1'j .Soo 1
Property Information
Parcel #: 21 0 1
(For parcel #, contact Eagle County Assessors Office at 970 - 328 -8640 or
visit www.eaglecouty.us/patie)
Tenant Name: VA I L, SP-OK-15
Owner Name: ONE VAIN PLACE ASSPCIATlo►)
Valuations (Labor & Material))
Building:
$ `31 5, O o 0
Plumbing:
$ -7, 4 o O
Electrical
$ 46 o o CD
Mechanical:
$ 39.,5,0-0
Total:
$ 4 6-1.-, O o
4�' >t1 � Ea9Si S�GE3,. NLy.r �SCT�tz.tott 1KRLl.S
(use additional sheet if necessary)
Work Class:
New( ) Addition( ) Remodel (A Repair( ) Other( )
Work Type
Interior ( ) Exterior( ) Both ('
Type of Building:
Single - Family ( ) Duplex ( ) Multi - Family ( )
Commercial Other ( )
Does a Fire Alarm Exist? Yes ( )
Monitored Alarm? Yes ( )
Does a Sprinkler System Exist? Yes ( )
# & Type of Existing Fireplaces: Gas Appliances
Gas Log Wood /Pellet Wood Burning
No
No ('�Q
No
# & Type of Proposed Fireplaces: Gas Appliances _
Gas Log Wood /Pellet Wood Burning
Date Rec : (Z IE 0 W
'JUN 011009
5/21/2009
_ Town of Vail JUN 01 100
OFFICE COPY
Vail Fire Departm nt "j'pWN OF VpYL
Asbestos Testing & Abatemen
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu-
lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements
at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two - Family Dwellings: 30 square feet
All Others: 160 square feet
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State - certified and Vail- registered abate-
ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the
Town of Vail before the building permit will be issued
Project Checklist
My project falls into the category checked below:
Will not disturb more than the threshold limits identified above.
•? �LoV + pcv Iry + T rl ! �avc?
Tested negative, or at 1% or below (2 copies of test results included _r E6-^ jT
F1Tested positive at more than 1 %, requires abatement (2 copies of test results included)
Tips & Facts:
Even recent construction projects may include asbestos - containing materials, so buildings of pny age require testing.
• The "1989 Ban" on asbestos - containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so- called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos - containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
David Rhoades, Fire Inspector
Vail Fire Department
75 S Frontage Rd
drhoades@vailgov.com
970 - 477 -3454
www.vailoov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303 - 692 -3158
asbestos@state.co.us
www.cdphe.state.co.us
5/21/2009
e�(,
2006 IECC
COMcheck Software Version 3.5.2
Mechanical Compliance Certificate
Town of Vail
[IFFMal:
Report Date: 05/18/09 ®��
Data filename: Z:\PROJECTS\2009 \090501 - Todd Arch - One Vail Place Phase 2 \vail sports.cck
Section 1: Project Information
Project Type: Addition
Project Title : Vail Sports
Construction Site:
244 Wall St
Vail, CO 81657
Owner /Agent:
Section 2: General Information
Building Location (for weather data): Vail, Colmdo
Climate Zone: 6b
Heating Degree Days (base 65 degrees F): 9248
Cooling Degree Days (base 50 degrees F): 1102
Section 3: Mechanical Systems List
4 HVAC System 1: Heating: Hydronic or Steam Coil, Hot Water / Single Zon
2 HVAC System 2: Heating: Unit Heater, Electric
Section 4: Requirements Checklist
Requirements Specific To: HVAC System 1 :
1. Balancing and pressure test connections on all hydronic terminal devices
Requirements Specific To: HVAC System 2:
None
ID
JUN O 12009
TOWN OF VAIL
Designer /Contractor:
Paul Todd
Todd Architecture
Denver, CO
Generic Requirements: Must be met by all systems to which the requirement is applicable:
0 1. Load calculations per 2001 ASHRAE Fundamentals
L] 2. Plant equipment and system capacity no greater than needed to meet loads
- Exception: Standby equipment automatically off when primary system is operating
- Exception: Multiple units controlled to sequence operation as a function of load
Lj 3. Minimum one temperature control device per system
4. Minimum one humidity control device per installed humidification /dehumidification system
5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7-day clock, 2-hour occupant override, l0 -hour backup
- Exception: Continuously operating zones
- Exception: 2 kW demand or less, submit calculations
Ll 6. Outside-air source for ventilation; system capable of reducing OSA to required minimum
U 7. R -5 supply and return air duct insulation In unconditioned spaces R-8 supply and return air duct insulation outside the building R -8
insulation between ducts and the building exterior when ducts are part of a building assembly
Exception: Ducts located within equipment
Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F.
Project Title: Vail Sports Report date: 05 /18/09
Data filename: Z:WROJECTS\2009 \090501 - Todd Arch - One Vail Place Phase 2 \vail sports.cck Page 1 of 2
- Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2
inches w.g. pressure classification
8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
9. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181 B tapes and mastics
F1 10. Hot water pipe insulation: 1 in. for pipes —1.5 in. and 2 in. for pipes >1.5 in. Chilled watedrefrigerantlbrine pipe insulation: 1 in. for
pipes < =1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes < =1.5 in. and 3 in. for pipes >1.5 in.
- Exception: Piping within HVAC equipment
- Exception: Fluid temperatures between 55 and 105 degrees F
- Exception: Fluid not heated or cooled
- Exception: Runouts <4 ft in length
11. Operation and maintenance manual provided to building owner
12. Balancing devices provided in accordance with IMC 603.15
13. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
- Exception: Gravity dampers acceptable in buildings <3 stories
- Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfrn where dampers are
interlocked with fan
❑ 14. Stair and elevator shaft vents are equipped with motorized dampers
Cj 15.Three-pips systems not used
Section 5: Compliance Statement
Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC
requirements in COMcheck Version 3.52 and to comply with the mandatory requirements in the Requirements Checklist.
C HO S M eK04 S 0`266 L��� S - I P -Oct_
Name - Title Signature Date
Project Title: Vail Sports Report date: 05/18/09
Data filename: Z:\PROJECTS\2009\090501 - Todd Arch - One Vail Place Phase 2\vail sports.cck Page 2 of 2
4
SSE OWMA
SSI DALLAS
ESE DENVER
ESS PORTLAND
Town of ven
C FFICE COPY
JUN 0 1 2009
TOWN OF VAIL
Structural Calculations
for
Vail Sports
Vail, CO
ESE DENVER
Enagat Schneider Engineering, Inc.
3300bruwerSh d
Demur, UK* 80205
()201904 -1234
MN: 7201904 -56]1
dffjWkScMeia,PE,SE
St* t SYanles, PE
Wam6.INA PI, SE
MI E. Stases, PE, SE
24
Allowable Axial Loads For 3 -518" Stuns (lbs)
Wind Lbad =5 PSF
__. Wind Load =20 PSF �-
Wind Lond=15 PSF
1827
2741 4150
5641 2348 3332
5106
6754
9838
27 6252 8128
11554
1584 1
2459
4150 1
5641 2092 3162
' 2017 2800
4150
5641
2437
3332 5106 6754
9838
2754
3986 6252
8128
11554
6754
1 ;2017 2800 1
4150
5641
2437
3332 1
5106
6754
9838
2754
3986
6252
8128
11554
2041
.„ x.!2017
2800
4150
5641
2437
3332 1
5106
6754
9838
2754
3986
6252
8128
11554
1550 2852 5347 7441
2058 3334 5441 7044_
11967
11967
2729
3953
5342
2367
3236 1
4814
6355
9170
2689
3862
5881
7632
10749
9a
4725
2729
3953
5342
2367
3236
4814
6355
9170
2689
3862
5881
7632
10749
8818
1848
2729
3953
5342
2344
3236
4814
6355
9170
2689
1 3862
5881
1 7632
10749
2815 699 355
1904
2641
3734
4989
2283
3120
4481
5890
8370
2610
3716
5441
7044
9809
r: 113
1854
2641
3734
4989
2283
3120
4481
5890
8370
1 2610
3716
5441
7044
9809
24•;,
1589
2395
3734
4989
2041
3015
4481
5890
8370
1 2449
1 3716
5441
7044
9809
12'.°
!1780
2533
35.01
4596
2184
2983
4146
5380
7552
2516
1 3548
4983
6417
8818_
1
0�9 1616
2386
3501
4596
2040
2965
4146
5380
7552
2447
3548
4983
6417
8818
1328
2044
3296
4472
1734
2609
4141
5380
7552
2119
3309
4983
6417
8818
w
X12 a?
1551
2267
3261
4204
1942
2799
3821
4881
6793
2341
3356
4555
5787
7916
`!23 4 "'
1378
1 2060
3165
4197
1757
2584
3821
4881
6793
2141
3238
4555
5787_
7916
•
1080
1706
2807
3786
1439
2213
3541
4698
6793
1794
2843
4413
5787
7916
1122
1672
2542
3295
1426
2093
3116
3999
5490
1769
2631
3802
4708
6396
si4
949
1466
2336
3066
1242
1878
2907
3769
5490
1563
2400
3589
4681
6396
656
1120
1990
2680
929,;:
1516
2554
3377
5037
1215
2010
3210
4272
6257
x� e,
.12 4
789
1209
1891
2453
1022
1536
2347
3010
4362
1286
1 1951
2894
3732
5213
,giO'O'gt
3164
625
1015'
1701
2244
,8481
1335
2154
2797
4114
1091
1736
2686
3510
5095
7349
,00t:
1, 1382„
..
1829
2439
3699
765
1375,
2337
3136
4661
__. Wind Load =20 PSF �-
Wind Lond=15 PSF
1827
2741 4150
5641 2348 3332
5106
6754
9838
27 6252 8128
11554
1584 1
2459
4150 1
5641 2092 3162
5106
6754_
9838
2503 3986_ 6252 8128
11554
1139
1942
3700
5322 1622 2634
4930
6754
.9838
2015 3467 6252 8128
11554
1537
2371 1
3953
5342 2015 3033
4814
6355
9170
2422 3839 7632
10749
1256
2041
1 3629
5129 1717 2694
4735
6355
9170
_5881
2110 3486 5881. 7632
10749
1243
1456
1985
1 3027
3399
4414 1187 2089
4729 1672 2592
Aitt
4364
5763
5890
9020
8370
1550 2852 5347 7441
2058 3334 5441 7044_
10749
9809
937
1624
3030
4294 1347 2218
3984
5491
8370
1711 2940 5101 6996
9809
;;406
999
2391
3545 aJ42,: 1567
3324
4725
7471
2250
4383 6200
9460
902
1609
2854
3958 1342 2156
3688
5003
7523
1697 2828_
4667 6339
8818
645
1234
593
1263
885
2473
1895.
3518 00: 1765
2770 1055
3277 fi040 1750
3298
2631:
3065
4554
3559
1331 2411 4243 5870
8746
7820
3789
_4180
_6994
6092
6328
L,1,021 1697 -1 3521 5070
1 1358 1 2349 3922 5333
2361
1982
2815 699 355
2697
3740
5811
... 985. 1926 3503 4872
121D. 2794 4094
88 ;1532. 2745 3769
2352 3344
2631
909. 2678
2292.
_7876
7343
$
211 G,
'L2bi' 1070,,2122
_
2b41 ,-
2996.
4937
4475
4001
3205
3190
6439
5673
5180
4350
5
2896
2.50
4130
.86 2,
r: 113
r 3 X 6A C' end Load -25 PSF
STUD
2194
4
5630
1850
NelgFli
Spac�n�„
^ �`1
9838 2253
3733
tt1}a
�rn15
74';
1000
1782
1g,.
5126
1584 2459 4150
5641 2092 3162.
5106 6754 9838. 2503 3986 6252 8128 11554
6630
i6 7,i'
1281
2109
.3871
5526
1773
2804
5106
6754
9838 1 2173 1
3643
6252 1
8128 111554
9257 1157
x i9ANQ4
4`
,737
1474
3217
4750
1195
2153
4430
6250
9838 1570 1
2965
5787
8089 j
11554
�5 x"If2
10149
1256
2041
3629
5129
1717
2694
4735
6355
9170 2110
3486
5881
7632
10749
661
475
'916
1642
3218
4641
1355
2282
4309
5994
9170 1729
3054
5563
7632
10749
3903
1053
'319
941. 1
2495
3787
';719.
1554
3559
5124
8258 ` L66L
2287
4746
6779
10479
4496 7199 :922
3477 5991
1 4153 6522 ,10D2.
3562 5824
2561 4848: -
3350 5352
6' 4678
',12, ,
937
1624
3030
4294
1347
2218
3984
5491
8370 1711
2940
5101
6996
9809
10 ,
r: 113
:575
1196
2592
3780
960
1772
3532
4966
7757 1297
2468
4609
6451
9751
24•;,
3281
460
1839
2901
1003
2754-
4065
6689 „5'8
:1651-
3761
5511
8659
12'.°
1'645
1234
2473
3518
7004
1765
3298
4554
6994 1331
2411
4243_
5870
8746
`.,16`''
,794:!'.
2028
3004
_ 606
1305
2840
4029
6375 ,:'s8 '
1921
1 3747
5320
Bill.
885'''182,
213_
,3138 "`
5324
1086
2903
4387
7028
+12 a
2845
699.
„1355
2697
3740
5811 985
1926
3503
4872
7343
12
16
"w1
°1
:1541t'
`!23 4 "'
896 ;..2246:
3228
5210
148
3015
4337
6722
..4197;
24,1:
2367
3435:
5672
4001
5 :
3344
5180
4609
3650.
12 '`
�„ 761;
2292
3682
is r
s
e16
3164
1355
2194
3959
5630
1850
2891
5106
6754
9838 2253
3733
6252
8128
11554
1000
1782
3534
5126
1475
2469
4759
6630
9838 1863
3295
6143
8128
11554
-:367
1044
2771
4224
:`:803
1708
3968
5717
9257 1157
2499
5287
7543
11554
998
1738
3317
4758
1442
2381
4412
6113
9170 1821
3158
5674
7632
10149
606
1278
2843
_ 4197
1025
1904
3920
5542
8757 1378
2657
5139
7212
10749
661
475
2015.
3222
.: 295
1069
3060
4545
7569 601
-
1774
--
4201
—
6178
9781
1299
2697
3903
1053
1879
3640
5091
7905 1396
2581
4727
6582
9809_
_ 812
21.99, 3320 612
1371
3126
2244
2919
,2433
4496 7199 :922
3477 5991
1 4153 6522 ,10D2.
3562 5824
2561 4848: -
3350 5352
6' 4678
2042
1114
4167
3205
5961
4896
9182
7942
899
2134; 3126 1 7D1, 1
1632 949'
;483, ._„
1415
896
2038 3866
1484 3306
5451
8262
4832
7544
_..
3
2355
1$81. 3131
2584
_
3781
6323
4465 6869
3864 617'
4744
8
3281
• ESE OENVEO PROJECT
►��� Enagat Schneider Engineering, !ac.
SSEOMANA 3300LHiMBISIM! NBOVCf,Colufm 00205 PROJECT# BY
SSA DALLAS [720) 004-1234
ESEDENVER ►`` hx[7201904 -SSHr DATE PAGE
ESSPORRAND
�u k ✓�.: ' �? titer. �t` F:-� ^c j�f � r� �-" ;��- -: _ �C";l'..0
i
I
r
f
i
tw
� �, i fir f; �J ` �!' � l�' >� r ✓�Y • '�"'°;F ..��,
L 41—
1Pl
I f E f
t
a
t ; Z ,�??I
SSE 9MANA
bib-
SSI DALLAS
ESEDENVEP f `�
ESSPDRRAND
ESE VINVEO PROJECT_
Enagat Schneider Engineering, Inc.
3300brlmerShe; Denver,Colmoo 00`105 PROJECT
[120) 9041234
W[7201904-5618
DATE
PAGE
COMPANY PROJECT
1230E
,. e J i Vail Sports
Wood Y Y l o J1.wwb - - - -
NOrI ARE KR'. WOOD [*SIC;' i
May 16, 2009 10:39
Design Check Calculation Sheet
Sizer 6.0
LOADS:
- Ioa-- ?voe -- stribu =ion Pat -I vocation --' Magnitude Unit
l term Start End Start End
a1�CS a Tu 7 A ea
200.00 _ 5) *IlDs`
MAXIMUM REACTIONS (lbs) and BEARING LENGTHS
7'
Dead 344
i Live 344 349
total 349
Bearing: #2
IiLoad Comb #2 0.55
Lenath 0.55 .00
Cb 1.00
I
Lumber - other, W. Cedars, No.2, 2x6"
Roof joist spaced at 5.5" c /c: Self- weight of 1.44 plf included in loads;
Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help):
Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2005:
Crit =__ -or. Analysis Value Design Value Anal sis /Desi n
Shear fv = 56 Fv' = 155 fv /FV
Bending(-) fb = 1039 Fb' = 1046 fb /Fb' = O oc
Dead Defl'n 0.00 = <L/999 15.63
Live Defl'n 0.31 = L/286 0.50 = L /180 0 6�
Total Defl'r. 0.32 = L/282 0.50 = L /180
ADDITIONAL DATA:
FACTORS: F/E CD CM Ct CL CF Cfu Cr Cfrt C_. L2
E, 155 1.00 1.00 1.00 - - i.00 1.00 1.00 2
1.00 1.000 1.30C _ 00 15 1.00 1.00 - 2
Fb'+ 70G i.00 1.00 y l.OG 1.OG - -
Fcp' 425 - 1.OG 1.00 _ _ - = 1.00 1.00 _ 2
E' 1.0 million 1.00 1.00 1.00 1.00 2
Emin' 0.37 million 1.00 1.00 -
Shear LC #2 = L, V = 349, V design = 306 lbs
Bending( +): LC #2 = L, M = 655 lbs -ft
Deflection: LC #2 = L EI = 21e06 lb -in2
Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection.
(D =dead L =live S =snow W =wind I= impact C= construction Lc= concentrated;
(All LC's are listed in the Analysis output)
Load combinations: ICC -IBC
DESIGN NOTES:
1. Please verify that the default deflection limits are appropriate for your application.
2. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1.
!
SE DE6'VEF PROJECT
En
agat Schneider Engineering, Inc.
SSEDMAHA ► _ 3300bfimofStfee: Hum, Colmoo 00205 PROJECT#
BY
SSA DAIIAS �� — [120)904 -1234
ESEDENVER ►
DATE
PA6E
lax [7201904.567P
LSSPORRANO
iZEiiVf d tl U'r i�ir.JUadj
f fir �1 I/i 1
r � N a� w.
, v
f
.y
i
✓ Ti
v
j��
fryl. � •��Y����i -1 `gyp v�"V � �e d
r
�. ' v � � i �
I�
E.��-�� - w�1
r
r -
r v
r
Z
v
ter
< :
%M1
e-,
,
t
t1
n
� I
ESE E E N V E R PROJECT
Enagat Schneider Engineeng, inc.
SSE OMAHA JIM- _ 3300 biner SOW Denver, Colorado 80205 PROJECT# BY _
SSI DALLAS `� [7201904-1234
ESEDENVER lax [720) 904-5678
DATE PASS
ESS PORILANG >;`
_... . _ .........
*144
SSEOMAHA
SSI OALLE
ESEHENVER i
ESSMRTLANO
ESE OENV R
Enagat Schneider Engineering, Inc.
3300 brimofS000l 0enw, Comma 80205
[7X1904 -1234
Eax [7201 904-567C,
a
PROJECT
PROJECT# BY
BATE
A.
i �It
I 1
r
PAGE
1
7
i
� 5
r T
E,
-- — ►Ni -, 5 c 5 Q ` 1p
K14-7V ol 9D
60, 471 57
1 -71$
f1S,SxL�-�
Dp ,
M
®per G5 I���►dL!isa ��r �' ` UJ�-
52
i
w` 1))<
► =.�1
l 1,
Enaga! Schneider Engineering, Inc.
SSA OMAHt 3399 iarimof Shp! befivoi. CoioWt 80205
SSI OCAS [7201904-1234
FS[PENvu, lax [7291904 -5610
ISS PORTLAND
1, r
7
r orzx,>
PROJECT
PRGd[Cl# BY
DATE PA61
JUN. 25, 2009 9:05AM VA RESORTS DEV, N0. 948 P. 2
VAILRESORTSa
EXTRAORDINARY RESORTS - EXCEPTIONAL FXPERIFMCF.S'"
June 25, 2009
To Whom It May Concern:
Vail Resorts is the property owner for Ono Vail Place 244 'Nall St. This letter is to inform
you that there has been a change in contractor for the project. from 1\4cBoyd Builders, JAC,
to B'Y'G. permit nuniber for the project is B09 -0130.
You can reach me, at (970) 754 -2545 if you have any questions.
JIW �-v
i1u Crocker
Conunereial property Manager
VRDC
Vail Reaorta Development Company - 970 7612635 • vrdc.com
Post Office Box 959, 137 Benchmark Road - Avon, Colorado 81620
%I
B09 -0130 : Entries for Item:90 - BLDG -Final 16:10 01/18/2013
Action
Comments
By
Date
Unique_
Key
CR
1. Provide accessible signage at dressing
Martin
09/24/2009
A000127
room
899
2. Create framing at hw pipe for heat in
bathrooms or insulate
3. Move toilet paper dispenser in bathrooms
per ANSI
4. Complete framing outside
AP
c9
10/20/2009
A000128
843
Total Rows: 2
Page 1