HomeMy WebLinkAboutB12-0082�ov�� a� v�«.
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970-479-2128
. ' �= `_ _.- www.vailgov.com
=`'�` CJevelopment Review Coordinator
TRANSMITT/�L FORM
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be perFormed until the revisions are approved 8� the permit is re-issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention: bQ Revisions
( ) Response to Correction Letter
% � g o� attached copy of correction letter
(y4Deferred Submittal
( ) Other
Project Street Address:
�S� L?�vtr �a...•� G t'c�
(Number) (Street)
BuildinglComplex Name:
Contractor Information
(Suite #)
Description / List of Changes:
Business Name: r s�� �d AC '� � �es�.Lc.ncL
��j�v. �o�wG C�(�o�rKJ
Business Address: !� /1�ync �►..�.�. �.
City ��ew State: �� Zip: _�
Contact Name: �VL ���
Contact Phone: _ _ 9 %d. �/ '� / , /G ��y � (use additional sheet if necessary)
Contact E-Mail: ����v_����,6�, � fa(S �,,,,�,�
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, Intemational Building and Residential Codes and other
ordinances of the T a� thereto.
X_ ,� ,�
Owner/Owner's Representative Signature (Required)
Applicant Information
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building:
Plumbing:
Electrical:
$
$ Co 7, ODI�
-T
Mechanical: $ oi3 ��Q
Total: $ �
i
Applicant Name: _,�V£ ��,r,� � Date R�� e� �� ���
, ;��
9�7b. �
Applicant Phone: �17/. LGS� ' � i t J�� 0 6 Za,�
Applicant E-Mail: _,i�.-���yc�2�..,�,(f.cay,� ; i � ; j
r,
For Office Use Only: T To`/�/A 1 O C, f��
rvlV � Y
Fee Paid:
Received From: � �r �( ��'�
Cash Check # _ V
CC: Visa / MC Last 4 CC ,# exp. date:
n�th #
�
� ���.
� ��
�' � �iil ' Yf��
SKYL�NE MECHAN�CAL, �NC_
P.O. Box 1258, 134 Airpark Dr. Unit 2-A
Gypsum, Co. 81637
970-524-6809 Fax 970-524-6810
www.skvlinemechanical.com
387 Beaver Dam Circ% Eqruipment Submitta/ 6-� �-�2
FC-1
FC-2
FC-3
FC-4
FC-5
H P-1-2
EF-1
EF-2
� EF-3
E F-4
Remote
GB-24
�
�
�
Job Name:
Reference:
System No.:
�// c
�.
GENERAL FEATURES
• R410A or R22 refrigerant-compatible
• Lightweight, low-profile compact design
• Customizable wide airflow pattern enables better air
distribution—d'uection of each vane can be adjusted to fit
room layout through Deluxe MA or ME controllers
• Auto wave airflow in heating mode—unit independently
cycles through horizontal and vertical positions for more
even heat distribution
• Four-speed fan settings and auto fan speed adjustrnent mode
• Comer-pocket design for simplified installation
• Built-in condensate lift mechanism; lifts to 33-1/2 in.
• Outside air capability
• Multiple sizes up to 36,000 Btu/h
• i-see sensor option uses infrared rays to search for hot
and cold spots
SPECIFICATIONS
Capacity`
Cooling .........................................................36,000 Btu/h
Heating .........................................................40,000 Btu/h
Power
Power Source ...........................208 / 230V, 1-phase, 60Hz
Power Consumption
Cooling ......................................................0.16 kW
Heating......................................................0.15 kW
Current
Cooling...................................................................1.07 A
Heating...................................................................1.00 A
Minimum Circuit Ampaciry (MCA) ............................1.34 A
Maximum Overcurrent Protection (MOCP) Fuse............15 A
External Finish...Grille (White; Munsell No. 6.4Y 8.9 / 0.4)
External Dimensions
Inches ................................11-3/4 h x 33-1/8 w x 33-1/8 d
mm ..............................................298hx840wx840d
Location:
Schedule No.
Date:
Grille (PLP-40BAU):
Inches ...............................1-3/8 h x 37-7/16 w x 37-7/16 d
mm ..................................................35hx950wx950d
Net Weight
Unit .............................................................60 Ibs. / 27 kg
Grille ...........................................................13 Ibs. / 6 kg
Coil Type ........................................................Cross Fin
(Aluminum Plate Fin and Copper Tube)
Fan
Type x Quantity ..............................................Turbo Fan x 1
Airflow Rate
(Low - Mid 1- Mid 2- High)..........777 - 883 - 989 -1059 cfm
Motor
Type.........................................................DC Motor
Output.........................................................0.120 kW
Standard Air Filter .................Polypropylene Honeycomb
Refrigerant Piping Dimensions
R410A
Liquid (High Pressure) ....................3/8" / 9.52 mm Flare
Gas (Low Pressure) .....................5/8" / 15.88 mm Flare
R22
Liquid (High Pressure) ....................3/8" / 9.52 mm Flare
Gas (Low Pressure) .....................3/4" / 19.05 mm Flare
Drainpipe Dimension
Sound Pressure Level
(Low - Mid 1- Mid 2- High).
................O.D. 1-1/4" / 32 mm
.......35 - 38 - 41 - 43 d8(A)
Options
pAir Outlet Shutter Plate (2 pieces)............PAC-SH5ISP-E
p High-Efficiency Filter (MERV 10) ..............PAC-SH59KF-E
p Multi-function Casement .........................PAC-SH53TM-E
p i-see Sensor Corner Panel .......................PAC-SAIME-E
p Wireless Signal Receiver ...........................PAR-SA9FA-E
' Cooling / Heatlng capacity indicated at the maximum value at operation under
the following condiGons:
Cooling: Indaor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F (35°C) DB
Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB ! 43°F (6°C) WB
Note: Ventilation air: Providing sufficient ventilation air is an important part of
every building design. ASHRAE Standard 62 provides the minimum ventilation
air requirement. Also, check local codes.
�
Ventilation rt
intake hole�
`O o
� `°
�b �'
Branch duct hoM
� -
rn
�i
O r`�
N �
lh
N U O
Suspension bdt
M70 or W3�@
Suspensio� Dolt
����
noie
'16 860-970 25/32 to 1-25/
,o
oolt pitch
� '� n
� ^
For MA-Remote controiler
terminel block (�5)
IIndoor unit/Outdoor unk
conneclirg tertninal bbck (TBS)
� m
mF
�°j = o
� d+ o
� Q
a� �w�e
gdlle
��
�
19-11/1615a
N � Air outlet hd
� Comer pocket 37-3/8 9:
IrWoor unit
• a o
li
Grille
Min.941/2(2400)
from 1ba
Min.19-11/16(500) ��
Entire
PB^P��Y
c
u
�
$
�
.�
�
N
�
Branch
duct hole
Unit : inch(mm)
Detail connecting of branch duct
Detail drawing of ventilation air intake hole
Burn,g Frole
Dreinpipe /Connected tl�e ettached 1
connected to VP-25 ;Ib�uble pipe a socket. /
, �e�1 �
��
lilt rt�echanism
�nd Drein emer�,
age hole
Auto vana
(Air outbl)
�
Vane motor
Keep 25/64(10) to 79/32(15)
belween unit ceiling
and ceiling siab.
Burting hde p8ch
Cut out hde
� Ceiling
In case of standard 9dlle In case of wireless siqnal receiver
� Emeryency operation switch<Cooling>
Emerp�nty operetion
swkch<HSanng>
Receiver ���
Operation lamp DEFROST/STAND BY lamp
Note:
1. As for drainpipe, please use O.D. 7-1/4(32) PVC TUBE.
Drain lift mechanlsm is included.
2. As for suspension bolt, please use Mt0 or 3/8. (Procured at local site)
3. Electrical box may be removed for the service purpose.
Make sure to slack the electrical wire linle bh for controUpower wires cannection.
4. The height ot the indoor unit is able to 6e adjusted with Me grille att�hed.
5. For the instaliation of the optlonal high effkiency filter or optlonal muld-functional
casement.
1 Add 5-5/16'(135mm) to the dimensions marked with an' on the fpures.
2 The optional high eKciency filter becomes optional multi-functional casement
and concomitant use.
6. When installing Me branch ducts, be sure b Msulate adequately.
Othenvise condensation end dripping may occur.
As for necessary installation / service space, please refer to the bottom, bft figure.
Models 1 2 A B C D
PLFY-P72NBMU�E Relrigeran1 pipe Rehiperant pipe ...e12.7
PLFY-P15NBMLLE ���e6.�5 Flvedconnectan���t/2
Flared connection
iJd"
PLFY-P1eNBMU-E RHrigeraM p�e Relrge2nt pipe e12.7 / 015.88
e6.35 /e9.52 Flared connection 12"' / 5/B" =�rz taY�s &5d32 2-2
Flaredconnection (compatible) l2ai� (zsel 1�) ('��)
114-/ 3�8"
(compatible)
PLFY-P24NBMU-E �f �M Fefngerantpipe...e75.88
PLFY-P30NBMU-E ^� �� Flared connection ...5l8
s9.52
PLFY-P36NBMU-E Flaredconnection ReMgerantpipe e15.88/m19.05
._ye- Flaredconnection 5/8" / 3N" >>-vi6 �t3/� -ni32 a-�re2
(compatlble) lze�) 125e1 le5) IT�)
YIbuW�N Ebe41e Ak CendltlonMp i RMrlqrtNion Sy�Ymt Wp1u NyWrM ISO
f001 cartifk�ibn Mn SeAw M00 a11M MMUtIM�I EW WrA Wq�nMtlon �60)
w.a on .'wi.. a a�r�ry w'r.ou.. r« m. w�� er Mrp.r.uon.na rr
ET� , ; ,� ����.��.
160 AWioAnUan 6y�4m
��STE� 3� Tw ISO f000 �wN� N a P� aW�aNr�tla� �Y�bm rM�INY b prMry YwrtN1N� u
Wp�YhA Ey tlr 180.160 MO7 urtlhs quYHy tirnMiM !uM m tM •tlaiP��
� Certlflcete Numbsr FM3356! awwpm.m, peaucuon, in.wwbn.ne nuuwy.w�e«• w. preauen ewe.e
r� wtlia+z.d qr�L
��$� � 1 �,V riwsiw �.ewe ur tonaroonxy a wnq.r.uon Sywna wor�o .eowne «w�nnn«xr
�'''�})��� m�^p�m.M H�Mm .uwva iso t/oo� artlne�neM1
9,�1�•�: U r A 5 iM 1801�000 MM M� M OI tMG/M �OV�nq b MlrkOnm�MY prOlKtlOn tN C1'tlN
�n«�.n�.i s,.�a,e o,,.��.a� �so�.
CanHle�b Numbar ECf7J1t27
C SD - PLFY-P36NBMU-E - t- 201104 m MITSUBISHI ELECTRIC / HVAC 2011
MiTSUBisHi
ELECTRIC
HVAC Advanced Products Division
Mitsubishi ElecUic 8 Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toll Free: 800-433-4822 (#4)
www.mehvac.com
Speciflcations are subject to change wkhout notice.
�
�
i �:
Job Name:
Reference:
System No.:
,;
��
�. .�
, .. �= .
,, ,.�'���° .
,,
GENERAL FEATURES
• R410A refrigerant
• 9-7/8" (250mm) high for low ceiling heights
• Eleven sizes from 6,000 to 54,000 Btu/h
• Ducted fan coil supporting multiple configurations for
flexible installation
• Five static pressure settings from 0.14"WG up to
0.60"WG
• Choice of fan speed settings
• Built-in condensate lift; lifts to 27-9/16" (700mm)
• Auto fan mode
• Quiet opera6on from 26 to 45 d6(A)
SPECIFICATIONS
Capacity*
Cooling...................................
Heating...................................
.............8,000 Btu/h
.............9,000 Btu/h
Power
Power Source ............................208 / 230V, 1-phase, 60Hz
Power Consumption
Cooling.............................................................0.06 kW
Heating.............................................................0.04 kW
Current
Cooling........................................................................0.56 A
Heating........................................................................0.45 A
Minimum CircuitAmpacity (MCA) at 0.60"WG ..................1.05 A
Maximum Overcurrent Protection (MOCP) Fuse .................15 A
External Finish .................................Galvanized-steel Sheet
External Dimensions
Inches ...............................9-7/8 H x 27-9/16 W x 28-7/8 D
mm ..............................................250 H x 700 W x 732 D
Location:
Schedule No.
Date:
Net Weight
Unit ...........................................................51 Ibs. / 23 kg
CoilType .................................................................Cross Fin
(Aluminum Plate Fin and Copper Tube)
Fan
Type x Quantity ...........................................Sirocco Fan x 1
Airflow Rate (Low-Mid-High) ........................212 - 265 - 300 CFM
External Static Pressure.....0.14 - 0.20 - 0.28 - 0.40 - 0.60"WG
(External static pressure is factory set to 0.20"WG)
Motor
Type ...............................................DC Brushless Motor
Output ...........................................................0.085 kW
Air Filter ....................................Polypropylene Honeycomb
Refrigerant Piping Dimensions
Liquid (High Pressure) ..................1/4" / 6.35 mm (Brazed)
Gas (Low Pressure) ....................1/2" / 12.7 mm (Brazed)
Drafnpipe Dimension ..............................O.D.1-1/4"/32 mm
Sound Pressure Levels
Low-Mid-High ...................................26 - 28 - 29 dB(A)
OPTIONS
a External Heater Adapter ...............CN24RELAY-KIT-CM3
a Filter Box (Includes 2" MERV 13 filter) ...............FBM2-1
' Cooling / Heating capacity indicated at the maximum value at
operation under the following conditions:
Cooling: Indoor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F
(35°C) DB
Heating: Indoor 70°F (21°C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C)
WB
Note: Ventilation air: Providing sufficient ventilation air is an impor-
tant part ot every building design. ASHRAE Standard 62 provides
the minimum ventilation air requirement. Also, check local codes.
,�. `
�..A,..,. =`'
�
�
(A) Space required for service and maintenance.
(B) Provide an access door for maintenance at the bottom.
Note 1 Use M10 suspension bolts. (not supplied)
2 Provide an access door for maintenance at the bottom.
3 The dimensions in the table are those of the PEFY-P24, 27, 30, 36, 48, 54NMAU-E models, which have 2
fans. The PEFY-P06, 08, 12, 15, 18NMAU-E model have 1 fan.
4 To connect an intake duct, uninstall the air filter on the unit, and install a field supplied airfilter on the intake
duct on the intake side.
5 If using a ventilation air connection, air temperature must be at neutral conditions.
MYhubbl�l ENCtrk Alr Condllonl�p i fl�Mqntlon SytNnu Worb r.quNM I80
,�, � �. �. ,� a �. � ,,.�� o...� ��
w.a� ,.�.ay� i�..R.�n..m�m.w�a�ro.�+�.�,a..
1 , �,p ,� ����p ��
E .�.�.,�
(� � 7M I60 9000 wrN� b� pI�M wlho�lrilbn ayp�m rNMMp b qw11ry �rrnnlNs r
Cartifleate Num6ar FM9368! '�wn.a by en. iEO. KO f007 o.Nxw qw�ry wrmei.s b.a.a an tM •AUpn,
Nw1oV^M^L ModueUon.In�Wblbn uM wxII1M' wMaa• ler preAUelt bultl �1
M �ulhorCW pML
�•�. ,.{.�
i"� .�$Q �'� WY� IMUOMM EMetrk Alr CqidllaNnp i R�MOMtlbn SM�1^� WerW �CWnO �nrlronmmhl
WU111 � �unspM�rntMNm�b�MWI501�001pNllt�tlOn.
� ��
en f»�.,C,...AS�., 71r �O 1�W0 prW 4� aN o/ sbnAWS WPN4q b�nvYOnm�nl�l p�olaaUOn ul !y 1M
«,•..•°x Y�brNtlonM EMertO Ory�nlyllon (150�.
CMMeata NumMr EC97J1417
C SD - PEFY-P08NMAU-E -1 - 201103
MITSUBISHI
ELECTRIC
HVAC Advanced Products Division
Mitsubishi Electric 8 Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toll Free: 800-433-4822 (#4)
www.mehvac.com
Specifications are subject to change without notice.
�
Job Name:
Location:
Drawing Reference: Schedule No.
No.:
�� �� �
� : �`
� ��
� �„��°._ �,
,�.;
GENERAL FEATURES
• R410A refrigerant
• 7-7/8" (200 mm) high for low ceiling heights
• Six sizes from 6,000 to 24,000 Btu/h
• Ducted fan coil supporting multiple configurations for
flexible installation
• Four external static pressure options from 0.02" WG
to 0.20" WG; factory set at 0.06" WG
• Choice of fan speed settings
• Built-in condensate lift; lifts to 21-11/16" (550 mm)
• Auto fan mode
• Quiet operation from 22 to 40 d6(A)
SPECIFICATIONS
Capacity*
Cooling
Heating
................................15,000 Btu/h
...............................17,000 Btu/h
Power
Power Source ...........................208 / 230V, 1-phase, 60Hz
Power Consumption
Cooling...........................................................0.07 kW
Heating...........................................................0.05 kW
Current
Cooling........................................................................0.55 A
Heating........................................................................0.45 A
Minimum Circuit Ampacity (MCA) ..............................0.69 A
Maximum Overcurrent Protection (MOCP) Fuse .............15 A
External Finish ................................Galvanized Steel Sheets
External Dimensions
Inches ....................................7-7/8 h x 39 w x 27-9/16 d
mm ..............................................200 h x 990 w x 700 d
Date:
Net Weight .......................................................541bs. /24 kg
Coil Type ...........................................................Cross Fin
(Aluminum Fin and Copper Tube)
Fan
Type x Quantity ...........................................Sirocco Fan x 3
Airflow Rate (Low - Mid - High) ...................282 - 335 - 388 cfm
Extema� Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG
Motor
Type.........................................................DC Motor
Output.........................................................0.096 kW
Air Filter ...................................Polypropylene Honeycomb
Refrigerant Piping Dimensions
Liquid (High Pressure) .................1/4" / 6.35 mm Brazed
Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed
Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm
Sound Pressure Levels
Low - Mid - High ..........................28 - 30 - 33 d6(A)
OPTIONS
o External Heater Adapter ...............CN24RELAY-KIT-CM3
o Filter Box (Includes 1" MERV 8 filter) .................FBL1-2
o Bottom Return Adapter Plate ...............................BRP-2
' Cooling / Heating capacity indicated at the maximum value at opera-
tion under the following conditions:
Cooling: Indoor 80°F (27°C) DB ! 67°F (19°C) WB, Outdoor 95°F
(35°C) DB
Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C)
WB
Note: Ventilation air: Providing sufficient ven6lation air is an important
part of every building design. ASHRAE Standard 62 provides the mini-
mum ventilation air requirement. Also, check local codes.
�
�
c�
`�
�
E
W
�
.�
N
O
m
�
.S
�
wn.�a.ni e�vfc ur cawawny a n.try...um sysrm. wor�u.�r.d iso
f007 unMCatlon una.r ErM� f000 ot tlw k�w�leml NriAvA OryrYatbn (IS0)
Eib � ��.�.����..��.�.�M�.�W
• . . / eentlitlonln9 Walpnwnt
�
q0 Authoriaatlen fy�bm
</STE� �^ TM ISO 9000 wrin h� P�nt MMw��tlon ry�bm nbqn0 b 9uYM omnlNt Y
CeAlflule Number F►W569 ���a Oy IM 150. ISO f00t e�MN�s OwHry wR.rNfN W W en iM'M�qn.
aw�m.m, w�uciwn, in.mrua� aw .�umry..rvk..• ar vroe�. s�m n
.� .w�ain.a vr�i
z ���`
� 4�I xw�w.ni eiacac u. cawino�i� a �Nny...na� sr.�. wo�x..ca+na «,���m
d
V m.�.o.i��.r+�.wew �so ��am �.nin�.ua,.
� UKAS
`y f�...� tH I50110W'wb� h� W ol NnUrd� �PWYIny b�mNa�x�riW pM�etlon Mt Cy IM
...T �a,.i s�.w.,a ory.mnno� Mc�.
CMMleab Numbw ECY7Ji227
C SD - PEFY-P15NMSU-E - 1- 201103 �O MITSUBISHI ELECTRIC / HVAC 2011
Unit : mm(in)
V
�
O � � �
� �
T�y v y
m C
a � � `� O
n K �
� mW 'm�
�.c� � y �a
� � .r'.. T
� � � m C � �
C � > .��. � N
Q�� L a N V
N
� �a �, ���
� � LL � L � �
��W E s
d ti �
m�a W$�t
�„w �e��
��m v�w�m
� m N
; V � Z � C C
N � � �
o � j 2 �
� o� CON`p "
�L..W. d}a} N r
� n U ��L�L � 7
V�i N N y W �ll d
�Y�taaS�
� N M �
m
O ��
Z
� MITSUBISHI
/\ ELECTRIC
HVAC Advanced Products Division
Mitsubishi ElecUic � Electronics USA, inc.
3400 Lawrenceviile Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toll Free: 800�33-4822 (#4)
www.mehvac.com
Speciflcations are subject to change without notice.
Job Name:
Drawinq Reference:
System No.:
_,,.,........-e,_ , ,:, �
..---.._"" �."` �
..-- ,�,�
• W,,,M, "°�' ���� . ���'
� � ....--*.�'""""..- � . ?'°
....--, ' ' ,,�_
�
GENERAL FEATURES
• R410A refrigerant
• 7-7/8" (200 mm) high for low ceiling heights
• Six sizes from 6,000 to 24,000 Btu/h
• Ducted fan coil supporting multiple configurations for
flexible installation
• Four external static pressure options from 0.02" WG
to 0.20" WG; factory set at 0.06" WG
• Choice of fan speed settings
• Built-in condensate lift; lifts to 21-11/16" (550 mm)
• Auto fan mode
• Quiet operation from 22 to 40 d6(A)
SPECIFICATIONS
Capacity*
Cool i ng . . . . . . . . . . . . . . . . . .
Heating ..... ........ ... ..
....................................6,000 Btu/h
....................................6,700 Btu/h
Power
Power Source ...........................208 / 230V, 1-phase, 60Hz
Power Consumption
Cooling ...........................................................0.05 kW
Heating...........................................................0.03 kW
Current
Cooling........................................................................0.41 A
Heating........................................................................0.31 A
Minimum Circuit Ampacity (MCA) ..............................0.52 A
Maximum Overcurrent Protection (MOCP) Fuse .............15 A
External Finish
External Dimensions
I nches . . .. ........ .. . ..
mm.....................
............Galvanized Steel Sheets
.........7-7/8 h x 31-1/8 w x 27-9/16 d
...................200 h x 790 w x 700 d
Location:
Schedule No.
Date:
Net Weight .......................................................42 Ibs. / 19 kg
Coil Type ...........................................................Cross Fin
(Aluminum Fin and Copper Tube)
Fan
Type x Quantity ...........................................Sirocco Fan x 2
Airflow Rate (Low - Mid - High) ...................176 - 212 - 247 cfm
Extemal Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG
Motor
Type.........................................................DC Motor
Output.........................................................0.096 kW
Air Filter ...................................Polypropylene Honeycomb
Refrigerant Piping Dimensions
Liquid (High Pressure) .................1/4" / 6.35 mm Brazed
Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed
Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm
Sound Pressure Levels
Low - Mid - High ..........................22 - 24 - 28 d6(A)
OPTIONS
o External Heater Adapter ...............CN24RELAY-KIT-CM3
o Filter Box (Includes 1" MERV 8 filter) .................FBL1-1
o Bottom Return Adapter Plate ...............................BRP-1
' Cooling / Heating capacity indicated at the maximum value at opera-
tion under the following conditions:
Cooling: Indoor 80°F (27°C) DB ! 67°F (19°C) WB, Outdoor 95°F
(35°C) DB
Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C)
WB
Note: PEFY-P06NMSU-E cannot be used with PUHY/PURY-P-TGMU
or PQHY/PQRY-P-TGMU units.
Note: Ventilation air: Providing sufficient ventilation air is an important
part of every building design. ASHRAE Standarcl 62 provides the mini-
mum ventilation air requirement. Also, check Iocal codes.
�
d
U
C
N
u
c
.£
�
U
._
N
U
n
h
m
.�
�
Wwbbhl ENttrk �Ir CaW111oNny L RMrIqN�tlon Er�4m� Works K4u4M 1!O
f007 wMflutlon uiMr E�rM� f000 d IM InbmNbnY Ar�EVA Or9�� (�1
OuW on � rMw ot WNIry wrrr�IN� lor tM P�� ol nMp�nHOn M W
• .Pp 1�/ coneltlonlnppulpm�nR
r
E 190 Autlwriralim Sy�bm
(�STEp �• TM 150 9000 wrin b� P�nt a1tlarmtlon ayM�m nl�tlrq b V�KY omnWa u
Certlflnle Number FM33588 �w ���O. ISO f007 cvtllNS outliry .rrriWS W�W on IM •MNyn,
� �, w�+w�, x,.�.irm� .na w,u�w..,aws• ro. w��+• ww n
umwuee a.nc
��� � MltruEtrhl Ehcble Ak CmEltlml •
n0 IIMr19KMion BY�� Worlu �eWrN �nrkanmenal
8 m�napMnwN �Y� YanOW ISO i�Wl urtllle�tlon.
y� � UlAS TrISO/�WO�wNtb�sNO1tW�MrO��PWYMOb�pol�clbnwtMlM
."m Y�Ym�llontl 6tarMVtl Orqntratlon (150�
Grtlfkab NumGr EC97Jt227
C SD - PEFY-P06NMSU-E -1 - 201103 � MITSUBISHI ELECTRIC / HVAC 2011
� �
o� am
� � h :a
;$g ��
h � W N .-
� 0 � y � �
�CN ,.W, � T
� � Z N N � 7
ap C
m
�F� >� vl
q E� ta uv
c
a �m�m
8� LL V t� m
N� a E o m�
� ° ° W E �=
n �
'n� mw�m
�jma
3$� Z�cc
mZ'v �'�mc
� ° � t Z � �
O O� C O N O.-.
�Lmaa r
ma�yyy �
ta.IL�'c
� $r Rww ��
�x�-taa5...
.= c�i ri v
0 ^�
Z S�bl
Unit : mm(in)
MITSUBISHI
ELECTRIC
HVAC Advanced Products Division
Mitsubishi Electric 8 Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Faz: 800-889-9904
Toll Free: 800-433-4822 (#4)
www.mehvac.com
Specifications are subject to change without notice.
Job Name:
Location:
Drawing Reference: Schedule No.
System No.:
GENERAL FEATURES
• R410A refrigerant
• 7-7/8" (200 mm) high for low ceiling heights
• Six sizes from 6,000 to 24,000 Btu/h
• Ducted fan coil supporting multiple configurations for
flexible installation
• Four external static pressure options from 0.02" WG
to 0.20" WG; factory set at 0.06" WG
• Choice of fan speed settings
• Built-in condensate lift; lifts to 21-11/16" (550 mm)
• Auto fan mode
• Quiet operation from 22 to 40 d6(A}
SPECIFICATIONS
Capacity'`
Cooling ..........................................................12,000 Btu/h
Heating ..........................................................13,500 Btu/h
Power
Power Source ...........................208 ! 230V, 1-phase, 60Hz
Power Consumption
Cooling...........................................................0.07 kW
Heating...........................................................0.05 kW
Current
Cooling........................................................................0.53 A
Heating........................................................................0.43 A
Minimum Circuit Ampaciry (MCA) ..............................0.67 A
Maximum Overcurrent Protection (MOCP) Fuse .............15 A
External Finish ................................Galvanized Steel Sheets
External Dimensions
Inches ................................7-7/8 h x 31-1/8 w x 27-9/16 d
mm ..............................................200hx790wx700d
`
Date:
Net Weight .......................................................46 Ibs. / 20 kg
Coil Type ...........................................................Cross Fin
(Aluminum Fin and Copper Tube)
Fan
Type x Quantity ...........................................Sirocco Fan x 2
Airflow Rate (Low - Mid - High) ...................211 - 282 - 370 cfm
Extemal Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG
Motor
Type.........................................................DC Motor
Output .........................................................0.096 kW
Air Filter ...................................Polypropylene Honeycomb
Refrigerant Piping Dimensions
Liquid (High Pressure) .................1/4" / 6.35 mm Brazed
Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed
Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm
Sound Pressure Levels
Low - Mid - High ..........................23 - 28 - 35 dB(A)
OPTIONS
a External Heater Adapter ...............CN24RELAY-KIT-CM3
e Filter Box (Includes 1" MERV 8 filter) .................FBL1-1
o Bottom Return Adapter Plate ...............................BRP-1
` Cooling / Heating capacity indicated at the mauimum value at opera-
tion under the following conditions:
Cooling: Indoor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F
(35°C) DB
Heating: Indoor 70°F (21 °C) OB, Outdoor 47°F (8°C) DB / 43°F (6°C)
WB
Note: Ventila6on air: Providing sufficient ventilation air is an important
part of every building design. ASHRAE Standard 62 provides the mini-
mum ventilation air requirement. Also, check local codes.
m
u
C
m
c
E
m
t�
.�
O
w
N
a
�
.�
�
�
��„�N.���.�,,�.W�,.�..a�
,�, ���.���.�.�.,����,
E*� � w..ao�.r.�n..ma�.�nrw�.m.,ro.u�.pod�..r�amny.mwn.�ew
• � �/ eondtlonlnppulpnwnt
Y
q0 Autlqriralien $yWm
��Ep E TM ISO 9000 wrin b� P�m rMOrR�tlon �Y�mm �1a11o0 a 9uYb omnlM� as
� Certiflnte Numbar FM33588 ��a ���• ��1 ertlMa y�Wlry warw�llw NwA m IM •YSlyn.
aw.apm.n�, v��wn. x�.�rano� .ne .u.m.ry..�..• ar yroe�. e�m N
�n �unwnzea punc
"�� �' W MIUUMShI EMCIrk iUr ConMtloniep i RNAqr�llon Sy�bm� Works �caulntl �nrMOnm.nhl
� � nu�nwn� �Yabm WIiArY 180 1�007 qrlllle�tlon.
W
��f ��,.�.C..�.� S Tw ISO 11000 wrb� b� aNW �nGrM WWYIn' lo �nvYwm�nW praMGlon M M tlr
._° �.na,r e�.wb ay.nn.non pwF
C�rtllfeaU NumWr EC97J1Yl7
C SD - PEFY-P12NMSU-E - 1- 201103 0 MITSUBISHI ELECTRIC / HVAC 2011
Unit : mm(i�)
tc
. U s
O � T
� °av
q � �N
�B d r e
am
0
a� r �
N�
`m W = N
m U� C y l0
� C � w « T
l6
m Z c� ui > °a
B C � > w � N
� E � L v d v
a �m m
��� 8°t� m
7 O W E d N�
m�a u'8�i�
�,�s` �e�
ay v�w� �o
3�8 Z�my
���
o(,1m` ��pZy�
y N� C O N
°�t maa a°,�
� a U � } } V1 ?
m m N N lL �L �
N m t �p W W m
� Y F t d d 5«
� c�i vi v
a (�
Z ci�l
� MITSUBISHI
/� ELECTRIC
HVAC Advanced Products Division
Mitsubishi ElecUic � Electronics USA, Inc.
3400 Lawrenceviile Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toli Free: 800-433-4822 (#4)
www.mehvac.com
Specifications am subject to change without notice.
Job Name:
� Drawing Reference:
System No.:
�
OUTDOOR VRF SYSTEM FEATURES
• Single-phase outdoor unit with variable
refrigerant flow zoning (VRF) technology
• Inverter-driven (variable speed) compressor
• Total refrigerant piping length of 394' (120 m)
• Uses CITY MULTI indoor units and Controls
Network
• External finish: Precoated Galvanized-steel
Sheets
• Operating Outdoor Temperature Range
Cooling: 23°F — 115°F (-5° � +46°C) DB*
Heating: 0°F � +60°F (-18° — +15°C) WB
' If PKFY-PO6/08 indoor units are connected, then range is
50°F - 115°F (10°C - 46°C).
Location:
Schedule No.
Date:
,;���(�l�;l,j��i�i��, �. �
IIII II ) INfI l�
It1t il� ili�lil I�� I 1 r ^
�1fIIN{ilGt << �� � �
fUl/lt�l���fi�+;n' � ,
�unlweu)
�'t11��11��'���wi' I ��
.i.�n�i u�u �iri iiiij in i i
�.�,;,,,:„��;,�„� , �� �
.�„i��E1��;=,u"b1 �
��' I�;��l, �""� � , �
I`I Itl t�'f�'�INN! �
�Illllll�i� jltl ��I�3� 1
ii�u n; n rii i ut� �.
��'�i�t�'� ""�p�ini+6L� �
, �,�,;,�'�,�,�,;�,� ;.,
,� ,,
� �;; ��!, i, �'t ,"
.�-
I ER R
�
` �
. ..�.
OPTIONAL PARTS
❑ Branch Joint (T-Branch) ..............................CMY Y62-G-E
❑ Header - Four-Branch ..................................CMY-Y64-G-E
❑ Header - Eight-Branch ...................................CMY-Y68-G-E
❑ Air Outlet Guide (One Piece)"* ....................PAGSG59SGE
❑ Wind Baftle (One Piece)"" ....................................WB-PA2
❑ Drdin Pan ................................................PAC-SG64DP-E
❑ Drain Sodcet .. ..........................................PAC-SG61 DS-E
" PUMY requires two ouUet guides or wind baifles tor installation.
Specificationa Model Name
Unit Type PUMY-P36NHMU
Nominal Cooling Capaclty BtuTh 36,000
Nominal Heating Capacity Btu/h 40,000
Extemal Dimensions (H x W x D) In. / mm 53-3/16 x 37-7/16 x 13 (+1-3/16) / 1,350 h x 950 w x 330 (+30)
Net Weight Lbs. / kg 287 / 130
Electrical Power Requirements Voltage, Phase, Hertr 208 / 230V, 1-phase, 60Hz
Cooling Power Input kW 3.22
Heating Power Input kW 2.93
Cooli�g Current (208I230V) A 14.2 / 157
Heating Current (208/230V) A 12.9 / 14.2
Minimum Circuit Ampacity (MCA) A 26
Recommended Fuse/Breaker Size A 30
Maximum Fuse Size A 40
Liquid (High Pressure) 3/8 / 9.52
Piping Diameter (Brazed) (In. / mm) Gas (Low Pressure) 5/8 (15.88
Total Capacity 50 to 130% of Outdoor Unit Capacity
Indoor Unit
Model / Quantity PO6 to P36 / 1 to 6
Sound Pressure Levels dB(A) 49/51
Fan
Type x Quantity Propeller Fan x 2
Airflow Rate CFM 3,530
Direct<Irive Inverter Motor Output kW 0.086
Compressor Operating Range 33°/a to 100%
Compressor Type x Quantity Inverter-driven Scroll Hermetic x 1
Compressor Motor Output kW 2.4
Refrigerant R410A
Lubricant FVSOS
High-pressure Protection Device 601 psi / 4.15 MPa
Compressor / Fan Protection Device Overheat Protection /Thermal Stivitch
Inverter Protection Device Overheat / Overcurrent Protection
Blue Fin Anti-corcosion Protection: Cellulose- and polyurethane-resin coating treatment applied to condenser coil that protects it from air contaminants;
t1 um thick; Salt Spray Test Method - no unusual rust development to 240 hours.
`�
`...
��
��
���
#
�
a
0
�
�
0
s��
$
a
�
� ��
a a�
� ���
����
� ���
� ��
���
� �� � �
� ���� � ��
��•� a�
$ � ,
LL � 3�B LL Ati
M
i
� E ��
w � �
a 3gp , �
w � � %'� � �:
ffi
U � "
� ��� '`
W�
`� o � . � S
.= o # ��
� � �
� �+ m 'cn �
U O � � �
� ��� � �
w
� ��W� � �
� �
Mnsu0lsM lYetrk Alr CaMItloNrq i Mlrlqn�tlm fysWw� WorYS KQukM ISO
900/ prtHk�Uen uM�r BwM� f000 0l iM Y�brtYtlonY 3W�AW Or9Nli�lbn (150)
� e..sa an .�•rv a w.�r••.�.�. �a me v�� a nnyw.non .ne r�
• . o � ea�anromna �whw��
I50 AWwrinlbn 8yaMn
�� �; m. ao coao ..rw. r. pam wua'mue� .rw� r.��ro m q�ruy ..�r.nio..
� .eqwn.a ey m• iso. iso soo� �.nm.a w�nv.r,.m.. e.a.e e� uw'«.ie^,
CMMCate NumDer FM3J568 ye��op��4 p���, kyWl�tlon mE au:lYar awvkw' la yrodueb OWk M
�n �uthorizW p4n1.
�� �.{�
y�� ],SQ `�y W YlbuWtM ENe41e �k GaWlibnln9 � R�MqM�bn SYN,N WMka �CW�rM MvFOnnMnW
j ��1� � � mnry.n.nt synwn w�e.ra Ifo 7�ooi enune.um.
.�� � Us�C�A 5 1M ISO 7�000 Mrlw b a wl of �bndrt0� WP�Y��O b�nNmmMnW poNetlon M py iM
.. . �nrw�.i swb.a aw�wuo� �so�
GrtMOat� NumWr EC97J7�7
C SD - PUMY-P36NHMU - 1- 201007 � MITSUBISHI ELECTRIC / HVAC 2010
mm(in)
� nn�TSUB�sH�
/� ELECTRIC
HVAC Advanced Products Division
Mitsubishi Electric & Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fau: 800-889-9904
Toll Free: 800-433-4822 (#4)
www.mehvac.com
Specifications are subject to change without notice.
�
�
�
�i i o��.ss-os
IEF-1 I
�
� E7 �/ � i sp e��� IIII I', , l% y
Specification Submittal Data / Panasonic Ventilation Fan
Deseription
Ventilating fan shall be Low Noise ceiling mount
type rated for continuous operation. Fan shall
be ENERGY STAR rated and certified by the
Home Ventilating Institute (HVI). Evaluated by the
Underwriters Laboratories and conform to both
UL and cUL standards.
Motor/Blower.
• Four-pole totaliy encbsed condenser motor
rated for continuous use.
• Power Rating shall be 120 volts and 60 Hz.
• Fan shail be UL and cUL listed for tub/shower
enclosure when used with a GFCI branch circuit
wiring.
• Motor equipped with thermal�utoff fuse.
• Removable with permanently lubricated plug-in
motor.
Housing:
• Rust proof paint, gaNanized steei body.
• Detachable dual 4' or 6' diameter duct adaptor.
• Buift in backdraft damper.
• 6cpandable extension bracket up to 24".
• Double hanger bar system allowing for ideal
positioning.
Grille:
• Attractive design using PP material.
• Attaches directly to housing with torsion springs.
Warranty:
• ALL Parts: For period of 3 years from the date
of the original purchase.
Arehksetunl Speeifiwtions:
Ventilating fan shall be of the ceiling mount,
ENERGY STAR rated type, with no less than 80
CFM and no more than less than <0.3 sone as
certified by the Home Ventilating Institute (HVI) at
0.1 static pressure i� inches water gauge (w.g.)
with no less than 62 CFM and no more than
0.4 sone as certified by FM at 0.25 w.g. Power
Consumption shall be no greater than14.7 watts
at 0.1 w.g. and 14.5 watts at 0.25 w.g ENERGY
STAR rated with efficiency of no less than 5.8
CFM/watt at 0.1 w.g and 4.5 CFM/watt at 0.25
w.g. The motor shall be totaly enclosed, four
pole condenser type engineered to operate
continuousiy. Power rating shall be 120v/60Hz.
Included is a detachable dual 4" or 6' diameter
duct adaptor. Duct diameter shall be no less
than 4". Fan shali be U� and cUL listed for tub/
shower enclosure when used with GFCI branch
circuit wiring. Fan shall be ASHRAE 622, LEED,
ENERGY STAR IAP, EarthCraft, Cal'rfornia Tftle-24,
and WA Ventilation Code compliant. ,_
Specifications: WhisperCelling FV-08VQ5 4� � 6� �`�
(standar�
Static Pressure in i�ches w.g. 0.1 025
Air Volume (CFM) 80 62
Noise (sones) <0.3 0.4
Ventilatlon Fan power Consumption (watts) 14.7 14.5
CI18f8C�Q�iSUC8
E�ergy Eificiency (CFM/Watt) 5.8 4.5
(HVI tested data for
0.1' S.P.) Speed (RPM) 829 1089
Current (amps) 0.12 0.12
Power Rating (V/Hz) 12W60
ENERGY STAR rated YES
As of date 4/11
For complete Installation Instructions visit www.panasonic.com/building
Q o.eo
;
�
:= o.so
�
§
0
a` 0.40
�
w
N
�.�
020
o.io
o.00
o zo �o eo
_• �:���
,2 4" or 6" duct
����o
'D�f�s''2• ��.
�; 5 e
1'� /
, ,o ��
�?�9• ��9 \
�02 �
3.
�h� .
FV-08VQ5
Model Ouantity Comments Project:
Location:
Architect:
Engineer:
Contractor:
Submitted by:
Date:
Panawnie Homs and Environmsnt Company
Division of Panasonic Corporation of North America
One Panasonic Way
Secaucus, NJ 07094
www.panason ic. co m/bu i Id i ng
�� c � L u s �
4" Duct
�-OQ�/
- • 20 Feat
—.—.10 F�at
- • 60 Feet
— 80 Feet
- • 100 Fee
� 6" Duct
to ioo
Airflow(cFM)
E F-2-3-4
� E��i i sp e���� i I%� r r�
Specification Submittal Data / Panasonic Ventilation Fan
Dsscriptlon
Ventilating fan shall be Low Noise ceiling mount
type rated for continuous operation. Fan shail
be ENERGY STAR rated and certified by the
Home Ventilating Institute (HVI). Evaluated by the
Underwriters Laboratories and conform to both UL
and cUL standards.
Motor/Blower.
• Four-pole totally enclosed condenser motor
rated for continuous use.
• Power Rating shall be 120 voits and 60 Hz.
• Fan shail be UL and cUL listed for tub/shower
enclosure when used with a GFCI branch circuit
wiring.
• Motor equipped with thermal-cutoff fuse.
• Removable with pertnanently lubricated plug-in
motor.
Housing:
• Rust proof paint, galvanized steel body.
• Detachabie dual 4' or 6' diameter duct adaptor.
• Built in backdraft damper.
• Expandable extension bracket up to 24".
• Double hanger bar system allowing for ideal
positioning.
Griile:
• Attractive design using PP material.
• Attaches directly to housing with torsion springs.
Warranty:
• ALL Parts: For period of 3 years from the date of
the originai purchase.
ArchR�ctural Specifleatlons:
Ventilating fan shall be of the ceiling mount,
ENERGY STAR rated type, with no less than 110
CFM and no more than less than <0.3 sone as
certified by the Home Ventilating Institute (HVI) at
0.1 static pressure in inches water gauge (w.g.)
and with no less than 91 CFM and no more than
0.5 sone as certified by HVI at 0.25 w.g. Power
Consumption shall be no greater than 21.1
watts at 0.1 w.g. and 20.7 watts at 0.25 w.g.
ENERGY STAR rated with efficiency of no less
than 5.3 CFM/watt at 0.1 w.g. and 4.5 CFM/watt
at 0.25 w.g. The motor shall be totally enclosed,
four pole condenser type engineered to operate
continuousty. Power rating shall be 120v/60Hz.
Included is a detachable dual 4` or 6" diameter
duct adaptor. Duct diameter shail be no less
than 4". Fan shall be UL and cUL listed for tub/
shower enclosure when used with GFCI branch
circuit wiring. Fan shall be ASHRAE 622, LEED,
ENERGY STAR IAP, EarthCraft, Califomia Tftle-24,
and WA Ventilation Code compliant.
Specifications: WhisperCeiling FV-11 VQ5 4• or s° n��t
(Standar�
Static Pressure i� inches w.g. 0.1 0.25
Air Volume (CFM) 110 91
Noise (sones) <0.3 0.5
Ventilation Fan power Consumption (watts) 21.1 20.7
Characteristics
Energy Efficiency (CFM/Watt) 5.3 4.5
(HVI tested data for
0.1' S.P.) Speed (RPM) 950 1161
CuRent (amps) 0.18 0.17
Power Rating (VMz) 120/60
ENERGY STAR rated YES
As of date 4/11
For complete Installation Instructions visit www.panasonic.com/building
q� 0.60
a
r
� 0 70
�
a 0.80
u
a`
� o.so
w
N
0.10
0.90
o.zo
o.a
FV-11 VQ5
FV-11 VQ5
o.00 i�� --�-�- - ,- - i
0 t5 SO 75 100 125
Airllow(CPM)
Model Quantity Comments ProJect:
Location:
Architect:
Engineer:
Contractor.
Submitted by:
Date:
Panasonic Hom� and Environm�nt Compaoy
Diviaion of Panasonic Corporation of North America
One Panasonic Way
Secaucus. NJ 07094
www.panason i c.c o m/b u i I ding
�,c�Lus
�
'�io�sss-i�
4" Duct
FV-11V05
- • 20 FeM
._..._. �0 F�et
� • 60 Feet
—!0 Feet
- • ioo v..c
6" Duct
� Job Name:
Drawing Reference:
Svstem No.:
A��
a as
o ��� �
a�
���� � � F
.
top � �� �
� �� ��
�� O i
� � � ��: o�
:�,� o 0
,.., �
.�-�-I� .�.�..�
PAR-FL32MA PAR-FA32MA
(Signal receiving unit)
OVERVIEW OF CITY MULTI� CONTROLS
NETWORK (CMCI�
• Consists of TG-2000 integrated system software, AG-150/
GB-SOADA/GB-24�I'G24 centralized controllers, web
browsers, timers, remote controllers, and BMS interfaces.
� • TG-2000 integrated system software supports up to 40
AG-150/GB-SOADA centralized controllers (licensed for
PC sofiware features) for a maximum of 2,000 indoor
units from a single PC.
• AG-150 centralized controller operates up to 50 indoor
units with optional control via a field-supplied PC with
licensed software.
• GB-SOADA centralized controller operates up to 50
indoor units via a field-supplied PC with licensed
software.
• GB-24 central controller operates up to 24 indoor units
via a field-supplied PC with licensed sof�ware.
• TC-24 standalone centralized controller operates up to 24
indoor units via an integral touch screen interface.
• Remote controllers consist of Deluxe MA, Simple MA
Wireless MA, and ME.
• UO controllers consist of D1D0 (PAC-YG66DCA) and
AI (PAGYG63MCA) for third-party equipment control.
• LonWorks� and BACnet�' interfaces also available.
• Interlocking of LOSSNAY� ERV units for control via
the AG-150/GB-SOADA/GB-24/TG24 centralized
controllers.
Signal
receiving
unit
Non-polarized
2-wire
Wireiess •
remote �
controller
Location:
Schedule No.
Date:
PAR-FL32MA WIRELESS MA REMOTE CONTROLLER
SPECIFICATIONS
• Used in conjunction with PAR-FA32MA MA Remote
Controller Receiver.
• Maximum signal receiving distance is appmximately 22' (7m).
• Maximum signal receiving angle is approximately 45 to the
left and right of center.
• Install a minimum of 3' (1 m) away from a television or radio.
• Controls group operation for up to 16 indoor units in a
single group.
• Supports both Fahrenheit and Celsius.
• User Functions allows user to set:
- On/Off
- Set Temperature
- Operation Mode (Heat, Cool, Dry, Fan, Auto [R2-Series
only])
- Fan Speed setting
- Airflow direction (depending on indoor unit)
• Range of set temperature depends on the indoor unit:
Cool/Dry: 67°F to 87°F / 19°C to 30°C
Heat: 63°F to 83°F / 17°C to 28°C
Auto: 67°F to 83°F / 19°C to 28°C
• On/Off timer: One On/Off setting for one day.
• Function Lockout: Individually prohibits all functions of
each remote controller.
• Grouping: Can only be used in same group with
PAC-YTSICRA Simple MA Remote Controllers,
PAR-21MAA Deluxe MA Remote Controllers, and other
wireless receivers with up to two remote controllers per
group. Wireless remote controller cannot group indoor units
served by separate outdoor units.
• Dimensions: 2-1/4" W x 6-1/4" H x 3/4" D(58 x 159 x 19mm).
PAR-FA32MA WIRELESS MA REMOTE CONTROLLER
RECEIVER SPECIFICATIONS
• On/Off lamp to indicate unit operation and enor status.
• Enable heat and cool operation (at pre-set parameters) from
the receiver for when the remote is not operational.
• Wiring: Connects using two-wire, stranded, non-polar
control wire to TB-15 connection terminal on the indoor
unit. Requires crossover wiring for grouping across indoor
units.
• Dimensions: 2-3/4" W x 43/4" H x 7/8" D(70 x 120 x 23mm).
Non-
polarized
2-wire
Signal .
receiving �
unit
Wireless
remote �
controller
Non-
polarized
2-wire
Signal �
receiving
unit
Wireless
remote �
controller
�)
x���
� � �b
p j)�d p��
� ��= _ ° :�,
%� - ..:sE `�i��J
ON/OFF jF TEMC �
O � �
�
.-'
'-r
PAR-FL32MA
19f3/al
PAR-FA32MA
70[2-3/4] 22.5[�/e]
i0 ON/OFF
�
�
�
N
�
�
i�,ilfAt OCOOL N
0 0
.�.11RUe�N BKTnIc
Unit:mmjin.]
O O
HqtixfuBAl�� c F a��
l^iiEL <ARL C N_F t�;.
$IIMlAI1. Gt�1�EKQti f
OY�ITb��C(Ntt�.
1[432Nmtl�SBT:f/I�r_
�CSOIIf.Lt�t.lt4�LL (
f,! l�.
tLt4Ntl.'1 t n F+K9 if
Bt71LL<1_£�`,
iLtARymt Lii.279 E�n
2 e�-31lYt�c ( ti £ ��.
• W AN���.« Mhnin.
kbart w �����4+teNt:xl
plb�l�.pa'rx!IY
•Xnen N 1�ttx i r� N Wu 0c .Y
�rw�tbwey�mVe�la'a, �
IKti�
�Mw i�4i MM� ec4r a.
plor�:.a� MEtwE+tt�x'.�
t1hwYM�NMpn
•Irrrf:�.I�ry�.Mtw
q�r�xti�tw NiMwtl�
�st��nllr
•iodw�tl�'aMrtrW
ro.w �IrNIIaM1T�aw.•
��.p01G
�pIE0p111
0 �
Wtwblahl EMCtrk Alr CondltlonMp � R�IAyx�llo� 5y1tNn1 Worka �equlrW 180
fooi e.nme.non w,a.r s.nn fooa a m. mw�n�wi mnare aw+*•uo„ fiso)
E*/� � w..a�.�.w..awriM..rt.,:a.ro,m.woe�cu�or�.mwono�a�a.k
• . . / contlltlonin9 Mulpmn�.
Y
so.�m«mtl� s,.w�
57E� TM t50 9000 arW la � pWq rMOrlx�ibn W Wm M�tlnp m 9ua1M �rraniN� r
�pV�4lW h' �M ISO. I30 l001 qrtlM� WYIIY M�rtr�Hp WMG en tlN'Maipn.
Certiflcate Num6er FM33568 a�opm�n; ProAUetlon. M�blbUen �nE auvl�ry wrvlc�s' M pro0ueb Culk �t
�n �uthorfteE plmt
�, '�``� d�
t:� [$Q � � WUUWM EMetrk Alr ConNlbNnq � RNrly�ndon fYN�� W� KVW�� �^vlronm�nhl
` rr% F ��OM� �Y�Mn �UM�rd ISO 1�007 nrqllutlrn.
A \.�.1 J U N�5
d iM ISO 1�000 rris h� wt ol NanE�rd� �PPN�q ro�nvkonm�nfal Oro�� wt Gy IM
�'•...�^` �wmeeo�r awa..a o.yenr.non psoi.
c.rtnkau Numwr ece�dt�n
C SD - PAR-FL32MA and PAR-FA32MA - 1- 201008 � MITSUBISHI ELECTRIC / HVAC 2010
� MITSUBISHI
/_ ELECTRIC
HVAC Advanced Products Division
Mitsubishi Electric & Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toll free: 800�33-4822 (#4)
www.mehvac.com
Specifications are subject to change without notice.
�
�
Job Name:
Drawing Reference:
System No.:
�
�` ��,
� t . �o ,
�
GB-24 Centralized Controller
OVERVIEW OF CITY MULTI� CONTROLS
NETWORK (CMCN)
• Consists of TG-2000 integrated system softwaze, AG-150/
GB-SOADA/GB-24�I'G24 centralized controllers, web
browsecs, timers, remote controllers, and BMS interfaces.
• TG-2000 integrated system software supports up to 40
AG-150/GB-SOADA centralized controllers (licensed for
PC software features) for a maximum of 2,000 indoor
units from a single PC.
• AG-150 centralized controller operates up to 50 indoor
units with optional control via a field-supplied PC with
licensed software.
• GB-SOADA centralized controller operates up to 50
indoor units via a field-supplied PC with licensed
software.
• GB-24 central controller operates up to 24 indoor units
via a field-supplied PC with licensed software.
• TC-24 standalone centralized controller operates up to 24
indoor units via an integral touch screen interface.
• Remote controllers consist of Deluxe MA, Simple MA
Wireless MA, and ME.
• I/O controllers consist of DIDO (PAGYG66DCA) and
AI (PAC-YG63MCA) for third-party equipment control.
• LonWorks� and BACnet� interfaces also available.
• Interlocking of LOSSNAY°� ERV units for control via
the AG-150/GB-SOADA/GB-24/TG24 centralized
controllers.
GB-24 STANDARD PACKAGE
• GB-24 Centralized Controller
• PAC-SCSOKUA Power Supply
• SW-Mon: PC Monitoring
• SW-Sch: PC Scheduling
• SW-Email: Online Error Email
• SW-Maint: Online Maintenance Tool
Location:
Schedule No.
Date:
SOFTWARE FEATURES
• SW-Mon: Monitoring enables building manager to
customize and operate all indoor units from a network
PC's web browser for up to 24 units per GB-24.
• SW-Sch: PC Scheduling enables building manager to
customize daily, weekly and annual schedules from a
network PC's web browser from up to 24 indoor units
per GB-24. Schedules can be applied to a single indoor
unit, a group of indoor units or collectively (batch) to
all indoor units controlled by the GB-24.
• SW-Email: Online Error Email Distribution when an
enor occurs on the CITY MULTI system monitored by
the GB-24. The fault will be detected and a detailed
alert will be sent via email to the necessary personnel.
• SW-Maint: Online Maintenance Tool software performs
maintenance diagnostics via network PC and GB-24
Centralized Controller. Does not require CMS-MNG-E
converter/cable.
GB-24 CENTRALIZED CONTROLLER SPECIFICATIONS
• Manages up to 24 indoor units. Units can be controlled
individually, in a group or in a collecrive batch operation.
• Selectable setback mode with heating and cooling set
points.
• Controls On/Off, Operation mode selecrion (Cool,
Heat, Auto [R2-Series only], Dry, Fan, Setback),
temperature setting and air flow direction.
• Scheduling: Supports daily, weekly, annual schedules
through licensed operation via PC brower.
• RJ-45 IOBASE-T Ethernet port supports interconnection
directly to PC or to Local Area Network (LAN), PC
browser and TG-2000 software functions require
Mitsubishi Electric HVAC issued software licenses.
• Permits or prohibits remote controller functions such as
On/Off, Change Operation Mode and Set Temperature
adjustment.
• Requires manual addressing using dip switch to the
M-NET communication bus (default address is 000.)
• Wiring: requires power supply unit (PAGSCSOKUA).
• Dimensions: 5-1/8 H x 9-7/8 W x 1-1/2" D
• Extemal inputloutput signals can be used for batch
operations such as Start/Stop and Emergency Stop.
�
\�
•
GB-24 CENTRALIZED CONTROLLER DIMENSlON5
..
�
,
�
�
;
�
f
�
• �
�— �
'�e�
/
� 2� {97�d� I
.� __.._ . _ _ ___ �
e � �ao, �a
��'EB BRO�'�'SER PC REQUIREMENTS
� `''�
00
e
e
0
t��
Unit:mm[in.]
���
m ar� � / 3 � abwn
; � �
Item Requirements
CPti Pentium� 133MHz or faster IPentium 300MHz or more recommended
blemo � 64MB or more 128MB or more recommended)
Screen Resolution 1024 x 768 or hi her recommended
Compatible MicrosoR� Internet Explorer 6.0 or later (Note: Javao execution environment is required [Sun Microsysems� Java
Windows� p]u m Vet. 1.4.2 or later Check the Sun Micros stems Java Plu m vetsion in "Java" in the control anel
Browser �-� �• Y g-� P )•
Onboard LAN Port or LAN Card One connector IOBASE-T
Other Pointin device such as a mouse.
• 100 - 240VAC t10 %; 0.8A— 0.4A; SOHz/60Hz single-phase.
� • Fuse: 6.3A time delay type.
• Output voltage/current: M-NET: 23.0 — 32.OVDC; DC power supply: 24VDC f5% 0-7.SA.
• Dimensions: (H x W x D) 6-11/16 x 10-11/16 x 2-7/8".
• Weight: 3-1/81bs.
• Indoor installation in field-supplied control panel or surface mount attachment (sold separately).
PAC-SCSIKUA POWER SUPPLY DIMENSIONS
�`�
-��
C�
��.�.r.,
�'� �:��;°�, w�,
�,,,�:,,.:.�,�M° :�
:. +_ ��
^�" - :Y� c
�-.L:ii:.�� •;��' ['.i ��'
::;i�%f'�/!L1 �
=,':1.
�
� w �
� � �
� � �
� �
a c� ��
�
� M � �
r � �
. _ _ _ _ _ . _.
_.� .
� �� ' ,.`, .; iu'
`r.��.— � t•■■■t�.�_
TB2,TB3
NlpublMl Elsclrlt Air Can0ltbNnp i MMqNtllon SysMns Worka spiW�U q0
� 9ow unim.non u�w.r s.�.. a000 d n» ue.nreonr sr.w.ra ay.�a.uon Pso�
E� I e...a oo . r.a.. a w��r •.r.�u.. io. m. orod�uon a n��yv.non .na rr
• . . / eon�tlonln9 MN�P��
Y
ISO AuMwrizHlan Sy�bm
��E m TM ISO 8000 wrlw h a Wenl �u111qtraWn aY�� rN�tlnO b 9�nY wartantNa Y
ttIpWNM bY Ne ISO. ISO l001 pMM� W�IIty wrrY�qN NNA en IM'M��On.
Certiflcate Number FM33568 �,p„w„i, P,,,a„�,,,, �„��,,, .,,e.�auw �•' �« woa�d e�m N
.i wenorirae p.m.
� �>
i r $Q � � MMSUEkN ENCbIC Ak CandMbninp i NMIpMNIOn ByaWnt Wa/k� �CquleM �nrkonm�nW
I417U1 manp�nwrt qsbn aundvd ISO 110ot weXk�uon
TlS
�.�r.�. �RAS
��,.,- .�d ,. rn. roo u000..N.. r..« e�,�,�e.'a.ppymy eo «m.a.�.nr p.oa�ao� ..e nr u,.
eern.uon.i ltra.re aqentr+�an �soF
Grtflfuu NumMr EC97J1227
TB1
Unit: mm (in.)
� MITSUBISHI
/_ ELECTRIC
HVAC Advanced Products Division
Mitsubishi ElecUic b Electronics USA, Inc.
3400 Lawrenceville Suwanee Rd.
Suwanee, GA 30024
Tele: 678-376-2900 • Fax: 800-889-9904
Toll Free: 800�33-4822 (#4)
www.mehvac.com
C SD - GB-24 Base Package -1 - 201012 O MITSUBISHI ELECTRIC / HVAC 2010 SpecificaGons are subject to change without noUce.
�
� , "�;; _
r�
_.�,,
m.
4d �a
.
���
_ �
x.' � �� � �
�, >.
��
I * I
�
i
�--�^
N ___
zm
m �
-�i a -
O �
zw
_ T n `�
a
O
I� .,�H, n�, .�,,� ,� ,� ' I �I �
I�T ^' O
, I I � r.. —
�
I� . y
'� fi � �
� �
z ,; j � � , �
� � � � x
:!�-
�' — ,
_' __-- -
< _
� m p �I 1.? �,�±—�
II�II� �� Ap'__ — LJ—__—� .
� — G
.— —'.__T I.�I- . �.. y
I _ A � n
Y
O
i i� � F
T— __ __._.. � ..._ _
,�,i I � .. P.
�
I I li�i;' o ^ � )))) C
\ _
_� �' W' � ra �__ '" 1 E _ .- __ _. �,� ..- D
� i- I = � � � ,
� r - - - -
_
�
� £ �? N�n
�� � ^
'
�
A v . rn��-u ��i
_... _ _.. ���..m.. �
a _ _ -.. +:.a.:d .
s _�
�
y q � A � � �g'^.
s F ,- H y�
_ :,:
a � ....
A'i n..in�i��ou.�.nan..e
- _ I'�I�'� l _
�
ni ro -o i, �i `c 'ti
O� U A W N—
b
� ..�- �% �.% :.i .n � C
r'"� .'9 7� 7 'F A
C C C C C C �
zzzzzz 'b
c��edo v�
^n -� -n -n -n -n
CO0000 �
v�����
C�CCCG [17
c�i�>���� �
C— �--� N N C
U'z t/i Vi O� O� r..y �
ln � cn�tn �O �D
� � � � � �
`r'; W 'r1 'i'1 'i'1 'i'1 '
i�i �� n C�i n i� 7
0
0
.n ,
_ . i f.
I '�� c
�
; mwoH,, a, _,,,,�.
i
�
�— . -- — � �
— � ' - ,PW , a��, � � x �
~ � ~ _ - � '
A ' I'� J — � i H
_" � __ — - ',. IA Z
� _ -�_�� LJI O
� A �
I
I�
k �. .
Om
��
m D
z A
oN
z�
-�
�
O
r
! �i
z�
��
z x
'
� m
x3
za
n ,.
� �' R =
o� ��
� x^
o '
L
� �
D
�� O
I D
z
i -�
_ _ N
O
z
, � �
_ �� z
r
� {
A
� �
_
�
F;� �
z
��� _..
��
rn �
��
n�
Y �
� �
�z
dn
z
�
W
�
v
�
C�1
�
G
t17
�
d
a
�
�
�
r"
m
�
C�
-'
��
a
- �
� _ I � _ �Ti
� o iA
+� f^� � � �.. - x W
f � �
�y Q i _______ �"D.
_h�` R I J�_�_�_...-.
V � LD
" � I G 'C _- p 5
I � i G4 pm
— I
�
�_____
i r--- ,
i,
i
�;
i
_- AaW�o�:;� R�,
_ �„ME��� ��,s � I
r„M �o <n <
�. p �
a.e x I
- <
_ ;� , " �
_ �, I
_ ,� �, �
__ ,� ., o
= av OI
= nATHE0.NtKTni '�.
- oEMAno�
-
o, � .
;,
�
� I
A ',
'
i
. . . .. ... ��i
�
__ . .. .._.. .
_ � . .
_J _
,,
i, "
� --
�
':3
ti �
— -�'' O
A
'� F
_3 �
° y n
raN�°r:>�„ R
�n.,.«.,� , Z
� ,„E � .,.�,� Y
° a:R �
= Z
— - a n.«ue .� � -f
= M � �
-- ' �
- „� o
oEM �, �
� i
K
�.a N '
' I
_ I
i�--- _
i,'
-
� -
�
p I" ,
E I ,
F
7
z_� -
_ � � <
-�� +. y ^
'i O
K
� F
_ >' �
- x .,
I y ��i � ,. � , � � � �
i ii � o
I � ---�� �� ��
----- --- ----- --� � � ,^�n
�� --- ��' �; �
> -��� � 3
^:I� �_� p
� o ti� — � �
' �-� i��� �,-o �__ _ o
— - -�
��: �.5�,,,; .. _ ' _ A
_ ..�''�—_ _._ . _ n
� - �
' — �
_ _ A
. .... - --__ Q
- r
- �
_ . ,. - - - - � - ,u.��.,� - _
�!,,: �
_ . ..___ . ------+ ��
� -- � . � ---: ---T � � � . - -- 3
i -
� �s- ' --------- - �----- ----- --- �
' i °z � � '- �d
� ___________.._ ___-
I _ ��� ____ `� __��� -
� _
i i $ �_
-
� s
� -
� �-- -
, -- --- - -- �- , - r�n
- __- --- = J.
--- - 7C
-- - ' ._ w - �
- PWR --- a
-_ _ A__;�
—�..SYSPMP �n - W
�
_ O
- z a �
,., - - - X
- -- ---
_ .. ,_o
- - ---- --
- - _ _ - - - �, -'
- z
-----------,� :.,::., -�., �
� � r ---- ---� t�. -'�< n
, _� �
I � O
I�y� �fG� I I r-__- -__ � � A �'�"�
wl � y I I O
' R T 3I ryy ` p I � _ , � Ib
� _ N+ I$�� O� � .. .�`lx.-_'..:.pi �I j � ''92 I I _ _--_�� — �
_ . ..
.. � n i ... I ' { I I .
m < < ... . � � --� i � �
r o : :� : ....;. � ,
o _ w
I� �H i
� - � -- _ a '�--- � �
� F � $ r ^ b � �� ' < � a - -----� �
A z A � � V' pp . n � r J .
_ L
� � n I U I� � . L- [�i
� � � �
r I � �
Q
�
n
� �
cn R`
� �
D t�
� D
��y^z
V 4J
z
�
�
�
RadiantWorks Professional Mechanical Summary Report si5izo�2
Project Information Contact Information
Project Number Designed By G PECK
Project Quote Company Name GT SANDERS
Project Name 387 BEAVER DAM CIRCLE Phone Number
Designed For
Project Assumptions
Outdoor Temp -21 °F
Elevation 8150 ft
Wind Speed 10 mph
Job Type Residential
VAIL , CO (Colorado)
Pump Specs
Zo�e Name Flow Head Delta T Supply Fluid Temp
Zone 1 0.4 0.2 20 140
Zone 2 2.4 1.1 20 140
Zone 3 1.8 1.4 20 140
Zone 4 1.8 2.3 20 140
Zone 5 12 1.1 20 140
Zone 6 1.8 1.4 20 140
Zone 7 1.2 2.2 20 140
Zone 8 1.9 2.6 20 140
Heated Area Descriptions
� Application Construction Heated Area Product Totals
Zone 1<> Room List (STORAGE /CONDITIONED CRAWLER)
Radiant Heating ThinSlab 313 ftZ (2) 200' Lengths of 1/2"
RadiantPEX+
Zone 2<> Room List (FAMILY ROOM, STAIR 1/ OFFICE / BATH, BEDROOM / BATH #1, BEDROOM / BATH #2)
Radiant Heating ThinSlab 1116 ft2 (6) 200' Lengths of 1/2"
RadiantPEX+
�
Zone 3<> Room List (LAUNDRY / HALLWAY, KITCHEN, DINING RM / ENTRY / STAIRS)
Radiant Heating ThinSlab
Zone 4<> Room List (LIVING ROOM)
Zone 5 <> Room List (GARAGE)
Radiant Heating
Radiant Heating
Zone 6<> Room List (MASTER BATH / CLOSETS / STAIR #2)
Radiant Heating
Zone 7<> Room List (MASTER BEDROOM / STAIR #1)
Radiant Heating
Zone 8<> Room List (GUEST SUITE / STAIR, GUEST BATH)
Radiant Heating
ThinSlab
ThinSlab
ThinSlab
ThinSlab
ThinSlab
746 ft2
424 ftz
538 ft2
613 ft'
324 ft'
502 ft2
(4) 200' Lengths of 1/2"
RadiantPEX+
(3) 200' Lengths of 1/2"
RadiantPEX+
(3) 200' Lengths of 1/2"
RadiantPEX+
(4) 200' Lengths of 1/2"
RadiantPEX+
(2) 200' Lengths of 1/2"
RadiantPEX+
(3) 200' Lengths of 1/2"
RadiantPEX+
387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 1 of 3
RadiantWorks Professional Mechanical Summary Report 6/5/2012
Heating Load Summary
Tube Back/Edge Total Total Supp.
Spacing Intensity Losses Required Provided Needed
Zone1 3009 27036
STORAGE /CONDITIONED CRAWLER 12 9.61 2.69 3009 27036
Zone 2 21885 41353
FAMILY ROOM 12 18.7 1.42 6302 12306
STAIR 1/ OFFICE / BATH 12 21.05 1.56 6546 11940
BEDROOM / BATH #1 12 17.17 1.38 4172 8881
BEDROOM / BATH #2 12 21.62 1.59 4865 8226
Zone 3 16484 35802
LAUNDRY / HALLWAY 12 26.63 1.85 3861 11420
KITCHEN 12 13.83 1.26 3623 10068
DINING RM / ENTRY / STAIRS 12 26.55 2.10 9000 14314
Zone 4 16880 16847
LIVING ROOM 12 39.81 2.30 16880 16847 YES
Zone 5 10687 44776
GARAGE 12 19.86 1.74 10687 44776
Zone 6 16502 22344
MASTER BATH / CLOSETS / STAIR #2 12 26.92 1.85 16502 22344
Zone 7 10721 12538
MASTER BEDROOM / STAIR #1 12 33.09 2.60 10721 12538
Zone 8 17854 21031
GUEST SUITE / STAIR 12 36.53 2.68 16437 17155
GUEST BATH 12 27.25 1.63 1417 3876
Project Summary
Total Flow: 12.3 GPM
Total System Head: 2.6 ft
Boiler Load: 122982 BTU/h
Total System Volume: 52 Gallons
Total Heated Area: 4576 ftz
Please verify all project information for accuracy.
387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 2 of 3
•
RadiantWorks Professional Mechanical Summary Report 6/5/2012
Signature:
Date:
387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 3 of 3
�
����
NEAT/NQ BO/LER
� �_.
�SYSTEM
CONTROL WITH ALL NEW,
ADVANCED USER FEATURES
5 FLOOR-STANDING AND 5 WALL-MOUNT
MO�DELS FROM 50,000 TO 285,000 BTU/HR
FIRING RATE MODULATION TO 5:1
LESS THAN 20 ppm NOx
DIRECTVENT FLEXIBILITYTO 100 FEET
UP TO 98% EFFICIENCY IN LOW TEMP
APPLICATI ONS
1 �
knightheatingboiler.com y � �;
0
AT/NG BO/LERS
r UP To 96% DOE AFUE EFF�c�ENCY
THE. BESTYOU CAN BUY IS NOW EVEN BETTER�
,
KNIGHT is recognized for its reliable, proven performance and high quality standards. Its award winning design assures contractors
and home owners peacle of mind and long term savings in operating costs.
Now, Lochinvar has rai ed the KNIGHT standard to even greater heights. The dramatically enhanced SMART SYSTEM"" control with
color display gives inst llers and maintenance personnel a greater level of control than ever before. It's easier to access all the
information they need setup, troubleshoot and monitor all boiler functions. Additionally, two new cascading options allow the
installer to fine-tune se uencing of multiple boiler installations.
More than ever, KNIGHT is the hest choice for traditional hydronic space heating, radiant floor heating and domestic hot
water applications.
�t1C1-11"e KKr�t��HT x1. ca
►,,.,.,...o,�.R t
NeG� mttre 87U'S? K!�
� � � i� �`�iz�s Front 399.0
; l�i�t�ute €or tnt�re de
�.._
All KN/GHT Boilers meet or
exceed the most stringent
requirements, with less
than 20 ppm NOx.
7he KNIGNT Boiler
has earned the
ENERGV SrAR, signi�ying
that it has met strict energy-
��� ��.� �u������, e(ficiency guidelines set by
� ,��,��� , the EPA and U.S.
Department of Energy.
REFINED DESIGN PUTS IVI�
AND INFORMATIC3N ATYUUI
The new SMART SYSTEM'" is the m�
integrated boiler control on the ma
LARGER LCD SCREEN
Displays more information. �
SoFr K�rs
For simple programming.
NAVIGATION DIAL
For fast transitions from screen to sc
and easy adjustment of settings.
MART
USB Poar �: �
U56 port permits connection to a laptop computer. SMARTSYSTF�JI,PC £,, J
software may be used to troubleshoot and program KMI6H1'�(tairfCtrocts. ._° ,
set date and time, monitor historical data, including faufts, trett�s �tld :_
energyconsumption. p,:3 ��z ��z� �
; �; s
ATA-GLANCE COLOR-CODING � f ��� � �` �
:< �
�.—_...--�.
� BLUE SCREEN �— ` YELLOW SCREEN
� � Normal system Maintenance due - shows
� operation. the installer's name and
� � � � � � �, °�'. ���e���` � , number on the display.
�...° ', ,..�" y...,: .�
NEW SELECTABLE CASCADE OPTIONS
�' RED SCREEN
' lockout mode - shows
active fault and
� ° ' instaUer's name and
'�% '�'" number on the display.
When multiple KNIGHT boilers are installed together, the SMART SYSTEM built-in sequencer can
be set for "Lead-Lag" cascade or "Efficiency Optimized" cascade operation.
LEAD-L4G CASCADE EFFItiENCY OPTIMIZED CASCADE
� � � � � � � 0
� � � � � � � �
The "lead" boiler modulates with demand to capacity. As demand This feature optimizes the modulation capabilities of the Boiler Plant
increases, additional boilers fire and modulate to capacity. This while evenly distributing run time across all cascaded boilers. Every 24
continues, with additional boilers firing and modulating to capacity hours the SMART SYSTEM automatically shiks the ist boiler on role to
until all units are operating. Every 24 hours, the SMART SYSTEM the next in the sequence, distributing run time equally.
automatically shifts the lead boiler role to the next in the sequence, -
distributing lead-lag runtimes equally. snnaarsrsreM cascode oPrro� auows z- e boners ro be sequencee.
� � � F
$.
�
������ � �
� ���'� �ri�� a ��
�" . ��� . �'`�� ` �:'�.
...1�. Y m,Z E��� X r
`J� �. � � ��1 ��
�` a � ��
�s � �. �
� : l: :
��r1 T��
�. '> '
� ����
iE#u S�n�C iA lRliia#e
N�S upi€pns on hots+ to
QUTPUT
r� r,�#e alit�ws �M5 to
L �btPt11'
sys#em pump allows
oF ftow, i n system,
a� . »� .n. � � . . .
C ai tow '
ien it
stem Ibop. ,
5 FLEXIBLE UPTIONS F4R DIRECT VENTING UP TQ 1OQ FEET�
Placement of units within a building will never be a problem with KNIGHT.
It permits up to 100 feet of air intake and 100 feet of exhaust vent with
3" PVC, CPVC, polypropylene or stainless steet pipe. Three Wall-Mounted
KNIGHTmodels (WBN 51 -106) also permit intake and vent runs up to 40
feet using 2" pipe.
D(red-Ment VeRital
S/DEW/LLL
VENT l 1
TERM/NATION
i
FA[70RY SUPPUm AND SHIPPED WITN EVERY MODEL .
s�
VerNcal with Sidewall Air Direct-Vent Vertiwl* Direct•Vent Sidewall*
An optional concenhic vent kit is sold separatefy to allow o single penetrntion (or 6oth combustion nir and vent pipes.
Direct-VeM Sidewall
:.,������� ���c�� ��n�����ca�s �r�n S��c��ir.�riorvs - F�.00a-STANO�ra� MQO��s
��.
E���s
BACK
� I �
Input Heating NEf
Modd Min. Max. AFUE Capacity 1=B=R
Number MBH MBH % INBH MBH
A
eoiu4iwa�
FRONT
A
POJUSTI�9LE�
-1N
`vt���.�-hr1t���r �ic�����
,_,2,a
� � 7
I �
FWE O NFIN_ET
SIDE ,e.irr
� �__,....,. ___
zaiu
I
TOP c—�
EtkGiRICnL
LONNEC?ILM1S
GAS � �
00 00
omFr .
G O
. �;<�
w�er ��e� . oauN�rvsnrt
isur
BOTTOM
�y-I:� I)-f .{ � .. . � . .. .. . . . , ...
L�'li<" li-3,�d� ,3; - r;;» S-I;y ti t-3;�� li2° � li�
WBN106 21 10S 95.4 94 82 29-1l4° 15-314° NA 10-3i4' 1� �, � - � � �
, _
��,��3/�4 3�iR" � 5 1/2 �� N�A 3-1/ � �_
WBN1S1 30 1S0 95.5 � 13S 119 24-714 2o-3/4 NA 15-3/4 &1/2 3-1/2`� 5-1/2` NA &3/4° 41/4` 2-3/4' 1/2° 1' 2` 2° 134
_.. _ _ __ _ � � ___,_____,___,__._._� _.. _ ,..__ � ___._
� ____ _
_...... __. a 43/4 1-1R 1/2 1 3 3 7b2
WBN211 42 21D 95.7 190 16$ . 29-7/4' 25" NA 10" 12 3-1/2` 5-1/2° NA 13" � 14 1-1/Z' 1/2' 1` 3 3" lJ7
KBN081 16 80 9S3 12 63 33-1/4 14 5-3/4 5 3 20-1/2 22 1-3/4 6-1 NA 1R 1 3 3 125
KBN106 ��21 105 95.4 � 94 82� 33- /1 4 14� 1(r�11 531� 4-47(1 1•ll2 20-UZ 22 1-3/4 (r1R NA 112 1 3� 3 21 9—
KBN151 30 � 150 95.5 135 119 33-114 18' 1�-1/4' 11-1l2 10 1-318" 21-1/4' 23` 1-3/4' 12` NA 1R� i` 3y 3' 157
"___— ....,.�.._.,�.�_.. ....y,._.�,�__..._.�.�... _ .....K._____....�..,,_ ...............�...._.Q,....._.....__H..__._.___..1,.�,._'�"����_.,�.....,.�__ . ....
KBN211 42 210 95.1 190 16S 33-1l4 22-i/4 16-1R 15-3/4 141/4 5-1(4 21-1/4 23 1-3/4 1�7/4 NA ll2 1 3 3 �%�
_._ .� .. . ___ _. . ,___ _..__._. ___�._ __ __._...._ _�_...�,_____ _.__. ___
KBN286 57 28S 96.0 260 226 42-1/4' 19-3l4' 12-3(4' 13-1/2' 6" 2' 34' 31' 11-3l4' 41/4' NA 3/4� 1-1/4' 4' 4" 224
_.... _ _
Notes: Indoor instalfation only. A11 in/ormation subject to change. Chonge "N" to "L" for LP gos models.
�'tk?, � .. �C'�_ �:,�'i:`� �.�.
SMART SYSTEM Digital Operating Control
Multi-Color Graphic LCD Display
with Navigation Dial and Soh Keys
Three SetpointTemperature Inputs
BuiU-in Cascading Sequencer for up to 8 Boilers
Cascade Multiple Sized Boilers
Lead Lag
E�ciency Optimization
Ou[door Reset Control with Outdoor Air Sensor
Programmable for Three Reset Temperature inputs
Programmable System Efficiency Optimizers
Night Setback w(Overide Function
DHW Night Setback w/Overide Function
Anti-Cyding
Outdoor Air Reset Curve
Ramp Delay
Boost Temperature & Time
Three Pump Control
System Pump with Paremeter for
Continuous Operation
Boiler Pump with Variable Speed Pump Control*
Domestic Hot Water Pump
Domestic Hot Water Prioritiza[ion
�- DHW tank piped with priority in Ihe 6oiler loop
DHW tank piped as a zone in the system with
the pumps controlled by the Smart System
> DHW Modulation Limiting
Separately Adjustable SH jDHW Switrhing Times*
Building Management System Integration
0-lOVDC Input to Control Modulation or Set Point
D-]OVDC Modulation Rate Output
0-lOVDC Input Signal from Variable
Speed System Pump*
0-lOVDC Input to Enable/Disable call for heat
'6xclusive feaNre, available anty Jram Lochirvar
°. n�
2"' '. -. ,�,,, x.>-� �-R
> High-VolWge 7erminal Strip
� 120 VAC / 60 Hertz / 1 Phase Power Suppfy
� Three Sets of Pump Contacts
> Low Voltage Terminal Strip
% 24 VAC Devlce Relay
: Proving Switch Contatts
: Flow Switch Contacts
> Alarm on Any failure Contacts
. Runtime Contads
. DHW Thermostat Contacts
� 3 Space Heat Thermostat Contacts
> System Sensor Contads
> DHW Tank Sensor Contacts
> Outdoor Air Sensor Contacts
> Cascade Contacts
� 0-lOVOC BMS Extemal Control Contact
� 0-SOVDC Boiler Rate Output Con[acts
� OdOVDC Variable Speed System Pump Signal Input
: 0-SOVDC Signal to Control Variable
Speed Boiler Pump
� Modbus Contacts
> Time Clock
> Data Logging
: Hours Running, Space Heating
% Hours Running, Domes[ic Hot Water
% Ignition Attempts
� Last SO Lockouts
? Access to BMS Settings through Gnphic LCD Display
> Maintenance Reminder
> Custom Maintenance Reminderwith Contractor Info
- Installer Abiliry to De-activate Service Reminder
> Low-Water Flow Safety Control & Indication
> Dual Level Password Securiry
� Customizable Freeze Protection Parameters
;� ���� � �
� �
STr��&L��:Ra� F�ATtIE���
> Energy StarT" Qualified
? Up to 96% DOE AFUE Efficiency
� Modulating Bumerwith 5:1 Tumdown
: Direct-Spark Ignition
- Low-NOx Operation
> Field Convertible from Natural to LP 6as
> ASME SWinless Steet Heat Exchanger
� 30 psi ASME ReliefValve
a Vertical & Horizontal DireR•Vent
PVC, CPVC, Polypropylene or 55 Ven[ing up to 100 teet
• Factory Supplied Sidewall Vent Termination
> SmaR System Control
� Condensate Trep
� Other Features
: Automatic Reset High Limit
Adjustable High Limit w/Manual Reset
: Boiler Ciralating Pump
: Adjustable Leveling Legs {KB Models only)
: Wall•Mount Bracket (WB Models only)
: Zero Clearances to Combus[ible Materials
> 12•Vear Limited Warranty (See Wananty Fo� Detailsi
(i�r�e�r���Ec�u�pr���:�r �..__. __�_.__..
; Modbus Communication
> Condensate Neutralization Kit
: Multi Tempera[ure Loop Control
: Flaw Swi[ch
: Low•Water CutoffwJManual Reset & Test
; Alarm Bell
% Concentric Vent Kit
> SMART SYSTEM PC Software
Stack Frame
� BMS Gateway to LON or BacNet
s i4[N6 �t�J�� �,......... _
> M9 Standard Construction
; M7 California Code
...__....._.
. � � g� � r � -� �
�
I •
�
__ �.�
_ _ __
z -
� N
O
_I _1-,
N
.
z
m r-. ,
�a
� a
� � ,
� "' _ r i
� _; �-
� /c N �
� �,� � . I �S _
. _..._. ...... . .. �J � , I.
—_"._♦ .
�
D
i x
-.r�.
�I
� -�p � A wIN � "d
�onnc�nn C I
paza�x �
�ccCCC -o
,zzzzz �
�o�doo nl
'tio0oo0 T,'
C v,� v, �n v� v, � I
� C C C C C
'9 'o '9 -o �u '9 �, I
� � � �y
�. tn Vi W.O� O� l
°o°oo�.I�OO m I
^n -� o -n -n
-� nl n
7 L 'r.. .
Y ,�.., I:�'I .
�i'
N
� I I_
-n
r
r
i
�
_ � m
O �
� D
m p
� c r a Z �
�� �, -7 ,��', X� c
A � � �
Q A F
�� -A 1
O
r
�
-- -- — -4 ��
- - � �— -
_ -- -- -� +��
� - .
� ( —�
� _
�
r�,�..� �„�„
_ _"._ . '— _ �_ �w�
I A _
_ — � �--
��
I �' - --- - f-��
� y,
�I �A _._ ._ ,__. _ `
' � 1
� �I �
i — - � �.�
IA
_. _ __IV I � :,.;;� . . __ f
� �
� �
� �
n x
� D
� �
� z
d �
z
�
�
�i
I r�—_
� I � p
�"" o
C7 ' r�- �
� I' � F
I�
� � �
z
z � �
c�
�" PoN'ER ..- z . .�. . . . _. _
! r lIOV � �
• PON'ER m ,�
• z �NUETRAL � �
• L3oilerPump -� .�-- —
• It�ilcr Nwnp— � '�. � �� `
• 5«���mPump____ �.:. "� �
m � ��• S�smmPump � V� �
• 1>H\4' I'ump �
• �HW Pump - z �
__ z
� ���k„ m
• ALAR�I ^ O
� m –� ' �]
r � �
� Dhw Srnsor � p� . �'['�
DM1�� Senwr -- � �
� UhwSensor—__ _ z._ _ y
---- -- _
S
� �,���������,�� � Cd
• Uutduur Sensor r � O
Analag Inpm -. . . r `� � Hy
� �- r�naleg hryu� ._.. . � �1
_ � Flied_—__ z0 /v
. ___ .. • Im:rluck __... z
� • Li�w N'atcr �h�y
O • ('u�o�F __— _� � . /r
M�1
��rf �•� ����n cm- '"� � '�'
� • Limit —. _.. n 00 �\
m --- p �y1
r � F�o. z
d � sw;��n -- z
z=° __°°_—_ .
O
�
O
�
C"
� . —
�
z
�
0.�y
/'+
- ... �
N �
W �
p ' �
� �
a
� �
J �
_ �
� �
.. _--"._._._ .. . z
—___ O
NELT�IDLE � �' �
DENAND � "' �
— m
r
i �
— i_ ;O
_-�z
��rLT �"-; >�
�'_ �
� tiYtiTEM PMP 1 '"' — r
. _ _ _. _—._— �.1 —
� 7s
PUWER �
� Z J'
� �
� �
� �
a �
r �
m �
�
d n
�
\ /
�
��zr�z��z
a�aa�aa�a
_�c x � o� �n a� w r�
���ky yC�O�'� C
k kyC ����H lC
'�vz� �
ybr�►c
O � x �
o z
�
'A
K
Y
z
e
�
�
� r � �i I� � [
�CO►�� "" 7
�rx n.�
�oz�c� � 7
�z��'•°ac
�Y��'� v� r
YC�`"�� C d
��z� o
O � ►C D
...� � y
y � o �
Cr1
� II�I�I�IOI�
d
�
y
Y
�
�
0
�
�
O
r
d
�
�
z
�
�
y
�
0
Y
�
O
z
�
�
'C
..
'�
�
�
N
�
�
E
�+
�+
i
A
C�y r����
��°�ooddb000�oy�o
a� ,��by�, ;,�y�o����
z � % � � � 7 H 'C �.�, C" 'd "'3 � �' �-7
,.�d � n�' �'' d v' r" TJ G� p t� � 7
,..�tdCrJ2� C�Or.,b�z�lz
�b�'�royR�bp� y��
y�� "� ►o xr�.�
� � � � � � �
2���N '�
--zr�r�
..d?z
.� �
° � �� `_' � ~ � n� oo '� `_' •°� � � � � � �
,Jti,�'°o°°o'_' `''�� oo°�` ; oY
� o �
� r-� W~~ N W N i--' � W N�� O� Vi �
� N� O O� � v' �'' O O O N'..�i� iY
� � N
`7 �+ � N � W Cn .r �
N�..� p(l� N w W�O O� �I G'� V� �� N O�
�, O tn � O w N
Oo O W
� '° � � w w w N�
r�j N�O �1 �l p� ��--� �, N N O� N tli 00
� Cli c.n N O O� NO 00 i%
A
O F- O O � "� �
� �`� O� � N N N�� C O
�� � U�i c�i� ��''� N W O O tn �] tn �
.--� cn �
O � � �
�`' ��°o °o 0 0 0 0 0 0 0 0 o c o�
U
�
° C O �
°``o 0 o O o� o°•° O o 0 0 o O�
cn'„ oo °O y
�
o � � �
�`' ��°o 0 0 0 0 0 0 0 0 0 o c o�
U �
° o o �
N�O O pO '�pJ O O O � � O O O O O O�
�
�
� O O �
N� � O O O O O 0 � O O O O O O�
C/i �
O
N H+ A W� O O
W A O O�O 01
� � � O � r
�
�
NEOTHERM°
Date:
Project #:
Hydronic Boiler
NTH Hydronic Boiler
Indoor Sizes 285-850
Submitta/ Data ���
NeaNny Sj�afems Company
Engineer: Projed Name:
Prepared By: Location:
Bid Date: Contractor:
Standard • High condensing efficiency
Equipment • Modulation down to 20% of full
fi�e (5:1 turndown)
• Sealed combustion chamber
• Pre-mix stainless steel burner
• Low NOx system exceeds the
most stringent regulations for air
quality - 10 ppm NOx
• Horizontal or vertical direct vent
• Horizontal vent and air terminals
• Vent and air pipe lengths of up to
100 equivalent feet (each)
• Built-in condensate trap
• Vent temperature cutoff feature
• Direct spark ignition system
• Indirect water heater priority
• Sensor for indirect domestic
water tank
• 160 psi maximum working
pressure
• Stainless steel heat exchanger
with welded construction
(no gaskets)
• ASME "H" stamp
• 75 psi (517 kPa) ASME rated
pressure relief valve
• Water flow switch (3s9-850 only)
• Temperature & pressure gauge
• Drain valve
• Multiple pump control for boiler
pump, system pump and indirect
domestic water pump, each
with delay
• Optional pump (sized to model)
available for field installation
(285-500 only)
• Electronic PID modulating control
• Large user-interface and display
• Alarm output
• Accepts external (a-2omA or o-� ov)
modulation control
• Outdoor reset
• Outdoor air temperature sensor
• On/off toggle switch
• Manual reset high limit
• Burner site glass
• 2ero clearance to combustible
surfaces
• 10-year limited warranty
Boiler Data Number of Units:
❑
Fuel
❑ Natural
❑ Propane
Pump Options
❑ Pump-included (285-500 only)
❑ No pump
Factory ❑ CSD-1
Mounted (covers FM & GAP) (500-850)
Options ❑ Low water cutoff (500-850)
❑ High & Low gas pressure
switches (500-850)
���
���
❑ Additional auto reset high limit
❑ Bell for ignition failure
A,
�11
H
"I�E:T ' ���
_ . �' �
-•' �n.
❑ 30 psi pressure relief valve
❑ 50 psi pressure relief valve
❑ 60 psi pressure relief valve
❑ 75 psi pressure relief valve (std)
❑ 125 psi pressure relief valve
❑ 150 psi pressure relief valve
Sizing Data M�e1 Input Output AFUE Thermal Comb. Gas Water
Effiaenc Efficien Conn Size Con S'
� BTU/h kW
❑ NTH 285 285,000 83.5
❑ NTH 399 399,000 116.9
❑ NTH 500 500,000 146.5
❑ NTH 600 600,000 175.8
❑ NTH 750 750,000 219.8
❑ NTH 850 850,000 249.1
NOTES:
For other boiler ratings:
Boiler Horsepower: HP = ut ut
33,475
BTU/h kW
269,040 78.8
382,242 112.0
475,000 138.4
576,000 167.0
723,000 208.9
810,000 236.7
95.4
N/A
N/A
N/A
N/A
N/A
Y
%
N/A
94.0
95.0
95.3
96.6
95.7
Radiation Surtace: EDR sq. ft. = OUtDUt
150
�Y
% inches
94.4 '/. NPT
95.6 3/. NPT
95.0 1 NPT
96.0 1 NPT
96.4 1'/z N PT
95.4 1Y2 NPT
n. ize
inches
1'/a N PT
1'/< N PT
1'/z NPT
1'/2 N PT
2 NPT
2 NPT
Accessories ❑ Water flow switch (285 only) � High & Low gas pressure ❑ Additional auto reset high limit
for Field ❑ Low water cutoff switches
Mounting
Suggested Service
� Clearances Appliance Access Clearance
Surface inches cm
Left Side 1 2.5
Right Side 72 31
Top 24 61
Back 6 15
Closet, Front 6 15
Alcove, Front 24 61
Vent — —
Certified by CSA for zero clearance to combustible materials on all sides.
E/ectrical Boiler Pump Connections Ratings
Data SizeS (System Pump and DHW Pump Connedions)
Volts Phase Amps
285-850 120 Single 2*
No Pump
285-500 120
With Pump
" Minimum 15A circuit required
Less
Single than
6'
115V — Maximum 1 HP
115V — Maximum 1 HP
Intake Exhaust Maximum
Vent System (Air) (Vent) Allowable
Size Pipe Pipe Equivalent Length`
z85 3" 3" 20 ft 6 m
4" 4" 100 ft 30 m
399 4" 4" 100 ft 30 m
500 4" 4" 100 ft 30 m
600 4" 4" 40 ft 22 m
6"'"` 6"*' 100 ft"' 30 m'"`
750 4" 4" 40 ft 22 m
6" 6" 100 ft 30 m
850 4" 4" 40 ft 22 m
6" 6" 100 ft 30 m
Instailations in the U.S. require exhaust vent pipe that is a combination of PVC 8
CPVC complying with ANSI/ASTM D1785 F441, polypropylene pipe that complies
with ULC S636, or stainless steel complying with UL1738. Installations in Canada
require exhaust vent pipe that is certified to ULC S636.
Intake (air) pipe may be ABS, PVC, CPVC or galvanized material.
Installer must comply fully with manufacturer's installation instructions, including use
of minimum exhaust length CPVC, to maintain ANSI Z21.13 safety certification.
Closet and alcove installations do not allow the use of PVC under any circumstances
* To calculate max equivalent length, measure the linear feet of the pipe, and add 5
feet (1.5m) for each elbow used.
" Allowed only if the vent pipe is no more than 20 equivalent feet longer than the air
Temperature Rise in °F
Water Flow 20°F 25°F 30°F 35°F 40°F
Requirements Flow H!L Flow H/L Flow H/L Flow H/L Flow H/L
Size gpm feet gpm feet gpm feet gpm feet gpm feet
285 27 25.5 22 17.5 18 14 15 10.5 13 8
399 38 28 31 20 25 14.5 22 11 79 9
500 48 24 38 16 32 12 27 9 24 8
600 58 44 46 31 38 22 33 18 29 15
750 72 37 58 23 48 17 41 13 36 10
850 81 33 65 22 54 15 46 10 41 8
Size
285
399
500
600
750
850
11°C
Flow H/L
Ipm m
102 7.8
144 8.5
180 7.3
218 13.4
274 11.3
307 10.1
14°C
Flow
Ipm
81
116
144
174
219
246
Temperature Rise in °C
17°C
H/L
m
5.3
6.1
4. 9
9.4
7. 0
6. 7
Flow
Ipm
68
96
120
145
182
205
H/L
m
4. 3
4.4
3. 7
6. 7
5. 2
4. 6
19°C
Flow H/L
Ipm m
58 3. 2
83 3.4
103 2.7
125 5.5
156 4.0
175 3.0
22°C
Flow H/L
Ipm m
51 2.4
72 2. 7
90 2.4
109 4.6
137 3.0
154 2.4
Dimensional
�Data, Sizes
285-500
�
NTH
Size
285
399
500
285
399
500
�
A
in
26
31
37
cm
66
79
94
24Yz—
62
FRONT VIEW
B
in
7
5
5
cm
18
13
13
D
in
6
4'/.
4'/.
cm
15
11
11
TOP VIEW
Optionai Pump Location
(field-mounted)
I
r
E
in
71
14'/:
15
cm
28
37
38
RIGHT SIDE VIEW
F
in
17
21 Y:
26
cm
43
55
66
G
in
74
19'/.
20'/:
cm
36
49
52
* NeoTherm is shipped with
adapters for the air and vent
that accept standard pipe of
the proper size and type.
T*
; Dimensions shown in inches cm.
�
� z�i2
�
I
' 38
97
J
in
9'/.
8��4
5'/.
cm
25
21
15
K
in
13'/.
18'/:
20
cm
34
47
51
L
in
20��4
25
27'/a
cm
51
64
69
�o
BACK VIEW
AIR
INLET' VENT*
in in
4'/: 4'/:
4'/: 4Y:
4'/: 4'/:
cm cm
11 11
11 11
11 11
Dimensions are nominal.
j3r z-- ���
�R01!'��
ENGIIVEERItVG CONSULTRIVTS
DRILL AND EPDXY OBSERVATIONS
Project: 377 pav�r ��,n, �,'�- Date: t/%�,�/�
Job Number: Report Number: )
Location: 1.)
2.)
3.)
Orientation (vertical/horizontal):
Drilling Equipment: �.f�,,�.,,.te�- �}�.�`%j
Hole Diameter / Length (inches)
Hole Spacing: /V /�J
��� ^� T �
!`�g �':� a'�; � , ��,�� � L.
Method to Clean Nole: (,,�,• r�, ��.,���, 4J� lf�,� ��,r.,
Rebar / Bolt-Size / Length / Type: ;� �/ j�,, r /� � �% " ,�,� ;, �,�,�� ��
Epoxy Type: .'S r'�k► /�' n �. %c�r ��'x� — _�-
Placement Method:
Drawing or RFI referenced: ��c�nK r�o,-�e•rf ��/���,�°tl,�1;� 1,,, %. j.�,,,� % �,n�
Additional Reinforcing Steel:
Notification (Contractor / Name): 8 /C :5 �� �.
Field Representative: ,��1 � �c � �� r t�
1008 3rd Avenue, Suite D P.O Sox 464
Grand Junction, CO 81501 Gypsum CO 81637
P:(970)242-4300 Tel:(970) 524 0720
F:(970)524-0721 O�ces: Denver, Loveland, Westem Slope, Granby, Casper WY Fax:(970) 524 0721
. DE120430-01
'� L ' 1 1
ENGINEERING CDNSULTRNTS
DRILL AND EPDXY OBSERVATIONS
Project: 387 Beaver Dam Road Date: April 30, 2012
Job Number: 12-6524
Client: Beck Building Company Report Number: 1
PO Box 4030
Vail, Colorado 81658
Attn: Mr. Steve Boderck
Location 1.) Stair Tower Footings
2.)
3.)
_ _ �..___. .. �.,_.. .._..__ .. _ __ _. ..._._. .n_.___. . __,__
Orientation (vertical/horizontal): Horizontal
_ , __.....__ �._. .. . _. . . ._._.. ... .. _. _ _.
Drilling Equipment: Hammer Drill
_ ____._ . __ .. ._.w. .._., ., _.
Hole Diameter / Length (inches): 5/8", 6"
_
Hole Spacing: N/A
Method to Clean Hole: Brush and Vacuum
_.
Rebar / Bolt-Size / Length / Type: #4 Bar, 24" min. Length
Page 1 of 1
EpoXY TYpe: Sika Anchor Fix1 .
. __ _ _
Placement Method: N/A _
_. .. _ � _ _ _
Drawing or RFI referenced: Plans Dated 4/20/12 by T. Boyle Engineering, Plans sheet S1
Additional Reinforcing SteeL• N/A
._. _ _ _
Notification (Contractor / Name): Beck/Steve
Field Representative: Kevin McClure - _
Grand Junction Gypsum
1008 3rd Avenue, Suite D Corporate Office P.O. Box 464
Grand Junction, CO 81501 41 Inverness Drive East Gypsum, CO 81637
P:(970)242-4300 Englewood, CO 80112 P:(970)524-0720
F:(970)524-0721 P:(303)289-1989 F:(970)524-0721
.
f
Ta� 0�' YAIL .
REPORT OF SPECIAL INSPECTIt1NS
Project: 387 Beaver Dam Road Permit Number. 612-0082
Project L.ocation: 387 Beaver Dam Road Vail Coforado
Owner Fred Tresca
Address 387 Beaver Dam Road Gity: Vail Z1p: 81657
�Ji�t�4?pe'��k}�Kt�i� Special Inspections Agency
In Respansible Charge: Ground Enqineerinq Gansultants. Inc. - Scatt Richards, PE
Address: P4 Bax 464
City: Gvpsum State: CO Zip: 81637 Phone: (970) 524 0720
Fax: t97Q1 524 0721 E-mail: scottr(a�qroundenq.com chrish@groundenq.com
This Report of Special Inspections attached is submitted as a condition from permit issuance in
accordance with Section 1704 Internatiana( Building Code. It includes a Schedule of Special Inspection
Services applicable to the above referenced project as well as the identity of the individuals, agencies,
or firms intended to be retained for conducting these inspections. The Special Inspectar(s) shall keep
recards af all inspectians and shall furnish interim inspection reports to the registered design
professional in responsible charge at a frequency agreed upon by the permit applicant and building
official prior to the start of work. Discrepancies shall be brought to the immediate attention of the
contractor and design professional in responsible charge for correction. If the discrepancies are not
corrected, the discrepancies shall be brought to the attention of the building official by the registered
design professional in responsible charge prior to the completion of that phase of work. A Fina! Report
of Special Inspections shall be submitted by the design professional in responsible charge to the
building o�cial at the conclusion of the project and before a certificate of occupancy will be issued.
Prepared by:
Scott Richards PE
Type or Print Name
-�" ? ,
�- °`r f°` � �^ � �-_
f Signature
6-5-12
Date
To be filied out by the jurisdiction and returned to applicant
Building Official's Acceptance of Special Inspections
Frequency of Interim reports:
Signature
Pre
Monthly Bi-Monthly
Per Attached Schedule
-10-
Date
Upon Completion
Permit Number
�quired
i l j
FINAL REPORT OF SPECIAL INSPECTIQNS
Project: 387 Beaver Dam Road Permit Number: 812-0082
Project Locatian: 387 Beaver Dam Road
Owner Fred Tresca
Rddress 387 Beaver Dam Road City: Vail Zip: 81657
Special Inspections Agency
���fi��Ci,�Vt�4�3�15�Idgk�X Ground Enqineerinq Cnnsuftan#s, Inc. - Scott Richardst PE
Address: PO Bax 464
City: Gvpsum State: CO Zip: 81637 Phone: (9i0) 524 0720
Fax: {970) 524 0721 E-mail: scottr(a�graundenq.com chrish a().proundenq.com
To the best of my information, knowledge, and belief, the speciai inspections andlor testing required for
Chis project, have been cornpleted in accordance with the contract dacuments.
Interim reports submitted prior to this Final Report ofi Speciaf Inspections farm a basis for, and are to be
considered an integral part of this fina( report. Any discrepancies that were nated in all interim reports
have been cor�ected.
Prepared by:
Scott Richards. PE
Type or Print Name
,�"
,_,��.b,��' r' ""�,� ,
� Signature
s-s-�z
Date
-12-
Preparer's Seal and Signature Required
NOTE: TI-�IS PERlVIIT MUST BE POSTED ON JOBSI�E AT ALL T1MES
i•
TOWh' �F VAII,'` .
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.4792139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B12-0082
Job Address: 387 BEAVER DAM CIR VAIL
Location......:
Parcel No....: 210107111017
OWNER HIBOU COLORADO PROPERTIES LL 04/02/2012
HIBOU MANAGEMENT
3066 SW 38TH AVE
MIAMI
FL 33146
APPLICANT BECK BUILDING COMPANY 04/02/2012 Phone: 970-949-1800
780 NOTTINGHAM ROAD, AVON
PO BOX 4030
VAIL
CO 81658
License: C000003131
CONTRACTOR BECK BUILDING COMPANY 04/02/2012 Phone: 970-949-1800
780 NOTTINGHAM ROAD, AVON
PO BOX 4030
VAIL
CO 81658
License: C000003131
Description:
UPGRADE EXISTING INTERIOR FINISHES, MODIFICATION OF STAIR
TOWER, CONVERSION OF EXISTING STORAGE AREA TO FAMILY ROOM,
RELOCATION OF SPA
Occupancy: R-3 Type Construction: VB
Project #:
Applied.....:
Issued. . . :
PRJ11-0654
04/02/2012
04/18/2012
Valuation: $710,000.00
..>.......,�..xx.......xx><>,,.....,,,,,��.,.,,.��..,,�„�,...�,,.....,.,� .............. FEE SUMMARY ,,,,,.,,.,,�„��....�,...,,............,...................,.....<......__...._.,
Building Permit -----------> $4,231.25 Bldg Plan Check ----------> $2,750.31 Use Tax Fee-----------------------> $14,000.00
Electrical Permit ---------> $115.00 Flec Plan Check -----------> $74.75 Restuarant Plan Review--------> $0.00
Mechanical Permit ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit --------> $180.00 Plmb Plan Check ---------> $45.00 Recreation Fee--------------------> $190.05
Investigation-----------------------> $0.00
Will Call------------------------------> $15.00
TOTAL PERMIT FEES--------------> $21,601.36
Payments-------------------------------> $21,601.36
BALANCE DUE------------------------> $0.00
..�..>.......>.,....,.......« .....................x.....................,....,...,«......., .......x.�......«............�.»...,,�.............,....................xxxxxx................
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM.
S-i . ��-- y, ��.,�
Signature of Owner or Contractor Date
T v� ,/��� �Z� t-;
Print Name
combination permit_012811
,xx...� ...............x„<,x..,,,,,,>,..,,,,.,....,>............,.,,,,.,....,,,,.,.,.<..,..,..>,>..,«..<...,.................,...,��........,,,...,...,.,......,...,.,..........�...
CONDITIOiVS OF APPi�OVAL TO BE MET PRIOR TO FIfVAL �IGN OFF
Permit #: 612-0082
Owner: HIBOU COLORADO PROPERTIES LLC
Address: 387 BEAVER DAM CIR VAIL
Location:
,....... � ............. x,,.........,...,,............,...,........,.....,............,,...,... �....».......,,...»...,,. �..,...,...............,.,...,. �..................,,....,.,,.....
combination permit_012811
�
3
! V�!'t1 V� �17.1L �
****«.**************�*************************.*.*.**************************«************««««*********************««*********«*******,.************.,*
REQUIRED INSPECTIONS AND STATUSES
Permit #: B12-0082
Owner: HIBOU COLORADO PROPERTIES LLC
Address: 387 BEAVER DAM CIR VAIL
Location:
* «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «*
Item: 00010 BLDG-FOOTING
Item: 00020 BLDG-Foundation/Steel
Item: 00120 ELEC-Rough
Item: 00220 PLMB-Rough/D.W.V.
Item: 00230 PLMB-Rough/Water
Item: 00240 PLMB-Gas Piping
Item� 00310 MECH-Heating
!te,n 00315 PLMB-Gas Piping
Item: 00320 MECH-Exhaust Hoods
Item: 00410 Special inspect-progress rept
Item: 00030 BLDG-Framing
Ite;n: 00050 BL[?G-InsulatsQn
Item: 00060 BLDG-Sheetrock Nail
Item: 00070 BLDG-Misc.
Item: 00190 ELEC-Final
Item: 00290 PLMB-Final
Item: 00390 MECH-Final
Item: 00420 Special Inspect-final rept
Item: 00542 PLAN-FINAL
Item: 00090 BLDG-Final
�,
, �_
; �:
�r
combination permit_012811
******************************��***���*��***************�*���*�**********�***********�***�**
TOWN OE VAIL, COLORf1D0 Statement
****=x****�*�:*******�*************�:*�**********************��***********�****************++**
Statement Number: R120000299 Amount: $18,608.3904/18/201204:09 PM
Payment Method: Check Init: SAB
Notation: 21225 - Beck
Permit No: B12-0082 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-071-1101-7
Site Address: 387 BEAVER DAM CIR VAIL
Location:
Total Fees: $21,601.36
This Payment: $18,608.39 Total ALL Pmts: $21,601.36
Balance: $0.00
********************************************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
BP 00100003111100
PP 00100003111100
RF 11100003112700
UT 11000003106000
WC 00100003112800
BUILDING PERMIT FEES
PLUMBING PERMIT FEES
RECREATION FEES
USE TAX 4 0
WILL CALL INSPECTION FEE
4,231.25
172.09
190.05
14,000.00
15.00
-----------------------------------------------------------------------------
Job IVame: 3'�� B�h�,Y�t2...D�M f2�
i� Job Address y�'�- $C_A'��R- �filM �Q,
�� OF �� � Permit No.: � 1� - OO� o�
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The owner or his/her representative, on the advice of the design professional in responsible charge, shall
complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tesis
Scheduled to the Town of Vail for review and approval. Signatures are required on both pages;
photocopied or faxed signatures are acceptable.
The owner and hislher general contractor, where applicable, shall also acknowledge the following
conditions applicable to Special Inspection Testing:
1. Contractor is responsible for proper notification to the Inspection or Testing agency for items
listed.(Page 1) (IBC 1704)
2. Only the testing laboratory should take samples and transport them to their laboratory.
3. Copies of all laboratory reports and inspections are to be sent directly to tt�e Town of Vail by the Testing
agency on a weekly basis.
4. Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail
for review and approval.( Page 2)
5. The special inspector is responsible to immediately notify ihe Town of Vail Building Official in writing of
any concerns andlor problems encountered.
6. It is the responsibility of the contractor to revisw the Town of Vail approved plans for additional
inspection or testing requirem�ents that may be noted. A pre-construction conference at the job site is
recommended to review special inspection procedures.
7. The special inspector shall use only the Town of Vail approved drawings.
8. AN special inspection field reports must be left on site for review by the Town of Vail staff prior to
required inspections or re-inspections.
BEFORE OCCUPANCY WtLL BE GRANTED: The special inspection agency shall submit a signed and
sealed statement that al! items requiring testing and inspection were fulfifled and reported. Those i#ems not
tested andlor inspected shall be noted in this statement. A copy of the statement sha11 be maintained at the
job site for the Building Inspector's review prior io final inspection.
Acknowledgement: ��i�+1/V+��e- f Gt�j.
f �'��`.�� ,'�c%�Vt�wr,w�. �
ipnat e Print Name Date
Special
Agency:
Signature
C�2LxJNP F�lGIN�6fz-t�VC�, c"..aNS V c.-"i'P*�t'S
�r�� �U-�---�, y-►g--��.,
Print Name
Date
Project
Arch/Eng:
Signature $t� � Print Name Date
�' C3�+�� 'D�wa Co..,.�sh,�1�!J
Contractor. �,� .�7�v1 UovL2u` 7• /8• �.�
Signature Print Name Date
-3-
� � L5 Il v L�-,
�,'
� � APR 18 2012 �I
��� ,
TOWN OF VAIL
�
i
7�wN OF YAIL '
SPECIAL INSPECTION AND TESTING SCHEDULE
(IBC 1704)
Project Name: ���" ���=1°�.. L�iRh �.C� Permit #
Owner's Name:
Testing Inspection Signalure Prin Name Date
��-�� „ C�R�li+k�G—NC�i�•!6�'.2ar.�� G��Vc.T��'S
Agency: t'.�...."'�� �-•,-t�-s�.- c'..Ht"�! � N u-t—r'a �-i-�J�3�t�
Testing Inspection S:gnature Print Name Date
Hereby certifies that the Testingllnspection Agency named above has been engaged to pe�form structural tests and
inspections during construction as checked below, to satisty all applicabie portions of the Building Code.
Prior to final inspection, the Inspection Agency shail submit a siatement that aii items of desig�ated work performed
were reported. Any +tems checked but not tested or inspected will be noted and explained. Whenever any designated
items on the list are ready for sampling, testing, or inspection, it shall be the responsibility of the contractor to give
timely notice to ihe Inspection agency so that the required services may be performed.
REINFORCING STEEL: UNDERPINNING:
Tensila 8 Bend, one set per heat per tons TemporarylPermanent
inspection of Piacement inspection of Steel Fabricalion
Inspection of Wefding inspection of Reiniorcing 8 Forms
� Epoxy QK ��(x�nlb� Inspection of Concreta Placement
Inspection of Tiebacks
MASONRY:
Prelim. Acceplance Tests (Masonry Uniis, Wall Prisms) SOIL NAILS:
Subsequent Tests (Mortar, Grout, Field Wail Prisms) Temporary Shoring
Inspection of Placement and Grouting Permanent Wall
PRECAST CONCRETE:
Reinforcing Tests
Inspection of Reinforcing Placement
Tendon Tests
Inspection of Tendon P�acement
Inspection of Concrete Placement
Inspection of Concrete Batching
Inspection of Panei Atiachment & tnserts
Compression Tests
Inspection of StressinglTransfer
PILING, CAISSONS, CAPS, TIES:
inspection of Reinforcing Piacement
Inspection of Concrete Piacement
Inspeciion of Concrete Batching
Specify other tes[s, inspectfons or specia! i�structions requi�ed.
�
STRUCTURAL STEEL:
Sample 8 Tesl (List specific members below)
Shop Identdfication & Weiding Inspection
Shop U�trasonic Inspection
Shop Radiography
Field Welding lnspection
Field Boliing Inspection
Field Uilrasonic InspecUon
Field Radiography
Metal Oeck Welding Inspection
FIREPROOFiNG:
inspection & Placement
: Zi7L��
Acceptance Tests
Moisiure-Density DelerminaCbn
Field Density
Drilled Piers
Deep Foundation
STRUCTURAL WOOD:
Inspaction of Fabricatio�
Inspection of Truss Joint Fabrication
Sample 8 Test Componenis
Inspection of Glu lam Fabrication
SMOKE CONTROL:
SPECIAI CASES:
SPECIAL INSPEC710N:
Seismic Resistance
Wind Requirements
TOWN OF VAIL'
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Te I: 970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate appiications are required for alarm & s rinkler)
Project Street Address: Project #: '� J� � � `7
.� l�S,vr�? �,•�. �'. a�� � 1� 1 t � ��- �:�
DRB #: �--.; 1�- I
(Number) (Street) (Suite #) ,/� �
Building Permit #: 1) � � '�-� C� C—
Building/Complex Name: �
Contractor Information Lot #: Block # Subdivision:
Business Name: �GK �i,��a.o�,v� G'o„-,f�iarf�
� Work Class: New �j Addition �j Alteration (�j
Business Address: r,� �, �/.p��
City VR/L State: �[Z Zip: S�� Sp� Type of Building:
� Single-Family �j Duplex �j Multi-Family (�
Contact Name: JTLu£ ��F2.GK
Commercial �j Other �j
Contact Phone: 9%d • y7/• /�oSy
Contact E-Mail: S�c� ��bu. �ds. co.,� Work Type:
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
ordinances of the Town applicable thereto.
x �i�,��
Owner/Owner's Representative Signature (Required)
Electrical
Mechanical
Plumbing
Building
Interior � Exterior � Both l�
Valuation of
Work Included Plans Included Work
�Yes �)No �Yes �No 3 30
�Yes �)No �Yes �No
�Yes �jNo �Yes �No ��
�Yes �)No �Yes �jNo 7�To
Value of all work being performed: $ 71 b��Gb,v�
(value based on IBC Section 109.3 & IRC Section 108.3�
Electrical Square Footage ,�C�
Applicant Information Detailed Scope and Location of Work:
Applicant Name: �uE /Jo�tr2Ct� ���rs� C�l��s�...� �.���..� r �..�c1.�S�
Applicant Phone: 4 i t� ' Y 7!' lCo 5`i rns �.f , L', � o�� . e�. o i c�i,a .� �►�o.�«^ .
Applicant E-Mail: S�e.�� �u��b.�..��s . cd...� CX�1� .,� S�r-a� %e 1� �a...� o�
L A�P'L��
Project Information (�^
Owner Name: t�2Fo T��c a
Parcel#: .Z1C7I —071' I1—017
(For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit
www.eag lecou nty. us/patie)
For Office Use Only:
Fee Paid:
Received From:
Cash Check #,
CC: Visa / MC Last 4 CC #
Auth #
exp date:
�Y�..-� � I.w P"@O �/V� . iG'C� s� . u I� L, �
���� � .
(use additional sheet if necessary)
Date
� � L� �
' APR o 2 2012
i'�- �C� `� ' �-f6
)1NN C�F VAIL
5uw� ��u�r 3•30• J Z�
� �
��:�
� �..K
�i 8 � �i�i�.vr��+ Ci r�I G
• /m w� -�' !�� �d� ���
• �,� r� a� u-� ���� ��f�
� G�G !�f �
�� ., �
�
�,
,� ' � � ��
#
. � �H� �
'1�C�'Itilr'G � • C�C{'Crid�'
—
�uX9���ZZ�
�/p�, w. sJT�""
�G�Ix�Irwb ffa4:b
0
REScheck Software Version 4.4.3
Compliance Certificate
Project Title: 387 Beaver Dam Circle
Energy Code: 2009 IECC
�ocation: Vail, Colorado
Construction Type: Single Family
Project Type: Addition/Alteration
Heating Degree Days: 9248
Climate Zone: 6
Construction Site: Owner/Agent:
387 Beaver Dam Circle Michael Suman
Vail, CO 81657 Suman Architects
P.O. Box 7760
Avon, CO 81620
970 471 6122
michael@sumanarchitects.com
Compliance: 0.4% Better Than Code Maximum UA: 515 Your UA: 513
The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Wall 1-Stair east: Wood Frame, 16" o.c.
Window 1: Wood Frame:Double Pane with Low-E
Window 2: Wood Frame:Double Pane with Low-E
Wall 2-Kitchen east: Wood Frame, 16" o.c.
Exemption: Framing cavity filled with insulation.
Window 3: Wood Frame:Double Pane with Low-E
Window 4: Wood Frame:Double Pane with Low-E
Wall 3-Guest North: Wood Frame, 16" o.c.
Exemption: Framing cavity filled with insulation.
Window 5: Wood Frame:Double Pane with Low-E
Wall 4-Stair north: Wood Frame, 16" o.c.
Window 6: Wood Frame:Double Pane with Low-E
Window 7: Wood Frame:Double Pane with Low-E
Wall 5-North Elevation: Wood Frame, 16" o.c.
Exemption: Framing cavity filled with insulation.
Window 8: Metal Frame with Thermal Break:Double Pane with
Low-E
Window 9: Wood Frame:Double Pane with Low-E
Wall 6: Wood Frame, 16" o.c.
Exemption: Framing cavity filled with insulation.
Window 10: Wood Frame:Double Pane with Low-E
Window 11: Wood Frame:Double Pane with Low-E
Door 1: Glass
Door 2: Solid
Ceiling 1-Stair Roof: Cathedral Ceiling
Floor 1: Slab-On-Grade:Heated
Insulation depth: 6.0'
��`�" '�� , � jJ��:
-� o
�.�"� �i ra.
No• 24348d
�'��'� =� � z�� �2 �G�
�`�F� A R��`��
Designer/Contractor:
Tom Solawetz
Beck Building Company
Avon, CO 81620
970 904 1302
tom@beckbuilds.com
105 19.0
28
66
18
9
16
308 19.0
32
92
140
35
33
49
113
18
143
417
59.0
0.0
0.0
0.0
21.0
1
0.350 10
0.330 22
0.350 6
0.330 3
0.350 6
11
0.350 11
0.330 30
0.350 49
0.330 12
0.350
0.330
0.450
0.300
12
16
51
5
3
265
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Title: 387 Beaver Dam Circle Report date: 03/28/12
Data filename: S:\Suman\SA-Projects\1111 TrescaWctive\Documents\6 Code 8� DRB Coorespondence\387 BDC rescheck
1.rck Page 1 of 6
Name - Title
�
� /�-_ 3 �z�� �z
Signature Date
� �
Project Title: 387 Beaver Dam Circle Report date: 03/28/12
Data filename: S:\Suman\SA-Projects\1111 TrescaWctive\Documents\6 Code & DRB Coorespondence\387 BDC rescheck
1.rck Page 2 of 6
■
onsu ln
Asbestos Inspection and Sampling Report
387 Beaver Dam Circle, Vail, CO
Presented To:
Beck Building Company
Attn: Steve
780 Nottingham Rd
Avon, CO 81620
Performed & Prepared By:
Mr. Dave Sinkbeil
DS Consulting, Inc.
PO Box 6864
Vail, CO 81620
(720) 201-6611
Project Details:
Project Number: 5522
Conducted: March 9, 2012
TABLE OF CONTENTS
PROJECT OVERVIEW
1.0 Introduction
2.0 Scope of Work
3.0 Site Description
4.0 Certifications
5.0 Inspection, Sampling & Analytical Procedures
5.1 Inspection Procedures
5.2 Sampling Procedures
5.3 Analytical Procedures
6.0 Homogeneous Areas
6.1 Material Friability
6.2 Material Classifications
6.3 Material Conditions
6.4 Sample Quantities
7.0 Overview of Findings
8.0 Conclusion & Recommendations
9.0 Asbestos Abatement & Demolition Requirements
10.0 Major Asbestos Spill Response
11.0 Disclaimer & Limitations
APPENDIX A Inspector & Firm Asbestos Certificates
APPENDIX B Analytical Data
2
PROJECT OVERVIEW
_ _ __ ___ ___ ___. ___ __ __ ___ __ __ __ __ _ __.
1.0 Introduction
On March 9, 2012, Mr. Dave Sinkbeil with DS Consulting, Inc. (DSC) conducted a limited asbestos
inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACMs) within a
portion of the residence located at 387 Beaver Dam Circle, Vail, Colorado.
The purpose of the limited inspection was to identify and sample potentially hazardous friable and non-
friable ACM that may be impacted by upcoming restoration activities.
2.0 Scope of Work
The scope of the limited inspection and bulk-sampling was limited to specific areas of the residence
defined by Steve with Beck Builds. The only areas sampled were two walls in the main floor entry hall
and stairway to the next level and one wall in the lower level of the residence where renovation activities
are planned. The remaining areas within the residence or any out-building on the property were not
included in the scope of the inspection. The limited asbestos inspection did not constitute a full building
inspection and does not fulfill the asbestos inspection requirements for structures that are to be
demolished.
3.0 Site Description
The structure is a multi-level, single-family residence with attached garage.
4.0 Certifications
The limited asbestos inspection and bulk-sampling was conducted by Mr. Dave Sinkbeil with DSC. DSC is
a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm,
Registration No. 14912. Mr. Sinkbeil is a CDPHE certified Building Inspector; having certification number
13015 (see Appendix A for certificates).
5.0 Inspection, Sampling & Analytical Procedures
5.1 Inspection Procedures
The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and
CDPHE certified Building Inspector. The inspection procedures included identifying and sampling
suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis,
classifying the materials and assessing their condition, and compiling a final report detailing the
inspection and the analytical results of the bulk-samples.
5.2 Sampling Procedures
Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were
collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances
Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and
CDPHE Regulation Number 8, Part B- Asbestos (Reg. 8).
�
DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the
classification and quantity of each homogeneous area. Some minor destructive sampling was
conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate
and quantify suspect ACM. It should be noted that additional ACM might be located in these and other
inaccessible areas.
Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B- Asbestos.
However, all demolition/abatement activities should be performed following the applicable
Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited
to, the appropriate asbestos training for the type of material being removed/disturbed as well as having
a properly trained supervisor onsite, using wet removal methods, wearing adequate personal
protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers,
personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be
landfill disposal requirements for these materials, depending on the facility. DSC recommends that all
demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a
final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been
completed, but before any containments are dismantled and the area is reoccupied.
5.3 Analytical Procedures
All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program
(NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see
Appendix B for laboratory report).
The percentage of asbestos within each individual bulk-sample can vary depending on sample location,
homogeneity of the material, and the type of application. Any sample reporting a"TRACE" amount of
asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the
point-count method and verified to be less than 1%.
6.0 Homogeneous Areas
A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of
application. The asbestos content of the bulk-samples collected within a homogeneous area can be
applied to the entire homogenous area if they conform to the above characteristics and the regulated
minimum sample quantities of each type of material are collected and analyzed.
6.1 Material Friability
A material can either be friable or non friable. A friable material is one that, when dry, can be
pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable
material may become friable if its condition had deteriorated or has been impacted by forces that have
rendered it friable.
6.2 Material Classifications
Sampled materials are divided into one of the following three categories:
Surfacing Material: sprayed or troweled onto structural building members
Thermal System insulation (TSI): any type of pipe, boiler, tank, or duct insulation
Miscellaneous Material: all other materials not classified in the above two categories
4
6.3 Material Conditions
Sampled materials are placed into one of the three following categories of conditions:
Good: none to very little visible damage or deterioration
Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded
over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the
damage is localized
Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or
otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed,
or one-quarter if the damage is localized
6.4 Sample Quantities
DSC collected at least the minimum number of samples from each homogeneous area necessary to meet
all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this
report are approximate and on-site verification of the exact quantity of each material is required. The
following outlines the minimum sample quantities required per homogeneous area:
Surfacing Materials: up to 1,000 ftz of material requires a minimum of three (3) samples; between
1,000 ftz and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ftz of
material requires a minimum of seven (7) samples; one (1) sample of each patch
Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3)
samples; at least one (1) sample must be collected from each patch; and collect enough samples
sufficient to adequately assess the material and determine the asbestos content for TSI fittings
such as pipe elbows or T's.
Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content
7.0 Overview of Findings
Asbestos was not reported within any of the bulk-samples collected and analyzed. DSC collected a
total of three (3) asbestos bulk-samples of one (1) homogeneous area.
Table 1 below describes the materials composing each homogeneous area as well as the locations of each
bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of
material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample.
Please see Appendix B: Analytical Data for the layer break-down of each bulk-sample.
�r:�:3���
HA Sample Material Sample Material Material Estimated Material As6estos
# ID Description Location Classification Condition Quantity Friability Content
Thick/Rough Surfacing l
1 DW1-1 Material on Drywall Lowest Level Interior Wall SM G �250 ft" Friable ND
Thick/Rough Surfacing Main Entry Hall/Stairway
1 DW1-2 Material on Drvwall Wall to Next Level SM G �250 ftz Friable ND
Thick/Rough Surfacing Main Entry Hall/Stairway to
1 DW1-3 Material on Drywall Wall Next Level SM G �250 ftz Friable ND
HA - Homogeneous Area G- Good CHRY - Chrysotile SM - Surfacing Material
ND - None-detect D- Damaged ACT - Actinolite MM - Miscellaneous Material
TR - Trace, <1% Visual Estimate SD - Significantly Damaged TSI - Thermal System Insulation
8.0 Conclusion & Recommendations
ACM was not identified within the areas of the residence that were within the scope of the limited
inspection and bulk-sampling performed on March 9, 2012; therefore, no professional abatement activities
are required to remove or disturb the above-referenced sampled materials.
9.0 Asbestos Abatement & Demolition Requirements
If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of
the regulatory trigger levels of 50 linear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of
a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the
work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ftz on
other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE
prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a
CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal
for project design, abatement oversight and air monitoring upon request.
CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing
materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed
without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is
prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are
not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or
contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos
containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated
concrete), these materials must be abated of all ACM prior to shipping offsite for recycling.
OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA
29 CFR 1926.1101 requires that workers performing construction-related activities be protected from
asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply
with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities.
These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal-
exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated
areas, etc.
10.0 Major Asbestos Spill Response
If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is
deemed a"Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section
III.T.1. - Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be
conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if
asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any
other areas or on building contents, they should be included in the scope of professional abatement and
decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major
Asbestos Spill occurs:
• Restrict access to the area and post warning signs to prevent entry to the area by persons other
than those necessary to respond to the incident.
• Shut off or temporarily modify the air handling system to prevent the distribution of asbestos
fibers to other areas.
• Immediately contact the Division by telephone, submit a notification in compliance with
subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance
with subsection III.G. (Permits).
• Be exempted from the requirements to have a certified Supervisor on-site at all times, until such
time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur
after the immediate danger has passed shall be supervised by a person certified by the Division.
• Using certified Supervisors and certified Workers in accordance with section II. (Certification
Requirements) of this Regulation, seal all openings between the contaminated and
uncontaminated areas and establish none-detect air pressure within the contaminated area in
accordance with paragraph [II.J. (Air Cleaning and None-detect Pressure Requirements). This is to
be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator
openings, corridor entrances, grills, drains, grates, diffusers and skylights.
• HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the
contaminated area, or discard these materials.
• Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling).
• HEPA vacuum or wet clean all surfaces in the contaminated area.
• Discard all materials in accordance with subsection III.R. (Waste Handling).
• Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air
monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air
samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart
E(EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM
that remains in the area and
• Comply with any other measures deemed necessary by the Division to protect public health.
11.0 Disclaimer & Limitations
The activities outlined in this report were conducted in a manner consistent with a level of care and
expertise exercised by members of the environmental consulting and industrial hygiene profession. All
activities were performed in accordance with all applicable federal, state, and local regulations as well as
generally accepted standards and professional practice. IVo warranty is either expressed or implied. DSC
assumes no responsibility or liability for error in public information utilized, statements from sources
other than DSC, or developments resulting from situations outside the scope of this project.
The details provided within this report outline the inspection activities on the date(s) indicated and
should not be relied upon to represent conditions at a later date, the limited number of bulk-samples
collected, and the laboratory results of those bulk-samples. The laboratory results contained in this
report apply specifically to the materials in which bulk-samples were collected. The results do not
include or apply to any other materials within the structure that were not sampled, but may contain
asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk-
sampling activities would be required to determine if any other materials contain asbestos.
This report has been prepared on behalf of and exclusively for use by the Client, with specific application
to their project as discussed in the scope of work. The results of any surfacing material indicated in this
report also includes any associated overspray of that material, e.g., under carpet, above suspended
ceilings, etc. The information contained in this report is intended as supplementary material for
abatement design and is not to be used as the scope of work for abatement activities, bidding or billing
:
purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding
further investigation or remediation deemed necessary. DSC can provide a full scope of work for
abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other
third parties supplying information which may have been used in the preparation of this report.
0
` �.4 �
�; a-�`
� {'
�ia '_
#°
� .
APPENDIX A
INSPECTOR & FlRM ASBESTOS CERTIFICATES
`-�.,�.::°` �.'°u�'� �� �'��' �;��
��' % S'4°�� n ; �y � „}�' L„ �:' �, � i .'
� . '� .s�',_. � : -' � ; . � .� . _.,
P �+i r � i .r� ♦ ,s � '+� r Jl� ar '�11 .w�� �hl.r'_
STATE nF COLORADO
ASB�:S"1'OS
CERTIFICATION* �
Colorado Uepartmc;u ef Yublic Hralth �
and Enviraum�t �
Air Pollulitm fontrol Di�iaiun �:.
This ��eni[ies t�:u "�
David Sinkbeil ,�
Certifica�ion No: 13015 '�
has mtt �he rcquimments of ZSJ-50�, CR.S and Air Qualiry Comml _"
Commission Reguluion No, 9, Parl B, arnl i� heirby cmific�l 6} the ;ii
::ate ��fColoredo in the (all.+uinE dixiplirtt- �
:
lnspecrorManagement Planner�* '
Inurd: 926M11 �
�
Fiplmw: �,26R012 �
•vmuveAP ]Ay�wY..�
• IM ma4'�r b wm, c�li .tl kP�M�n •1 �.+r.ea Ohwtw�pwMV.tw.�.�+r
�a�jfr�/r. nW diy4�� ►w+Iw Jnc
%w..-.���-_ _.:.._. ..... -__a _ �C_:_:�. �� . !:�:'#::
1 0
��- �i
�
= t a [T; �
� ! � � �
° " � z —!
S
��''' � � � _ � �
� a� ? O � `z.,c7 i7 �
._' a O " O� a C ~Sj
�° 7 _ � �< z
z � �ti ' -• = � 3 = v; C
_ � .< _ � = v� s � - ,—
�� T=� q° ' c'-= [" i
- ,� i' � _ — r' �
__� r � � „�O, n .,
�h w — pZp Z
�-�C~ = v o � ' r
� ;� ` �
4:' j` _ F , z �
f. -: � � l", w
� J. �
�R� � _
8 '
� L +
APPENDIX B
ANALYTICAL DATA
�t
_ ,' � EMLab P&K
;.
Report for:
David Sinkbeil
DS Consulting, Inc.
5366 Flatrock Ct.
Morrison, CO 80465
Regarding: Project: D-387 Beaver Dam Cir. Vail, CO
EML ID: 898493
Approved by:
J`�'iiSiti.�,� � �
Approved Signatory
Andrea Robarge
Dates of Analysis:
Asbestos-EPA Method 600/R-93/116: 03-12-2012
Service SOPs: Asbestos-EPA Method 600/R-93/116 (EPA-600/M4-82-020 (SOP 01264))
All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The
results relate only to the items tested. The results include an inherent uncertainty of ineasurement associated with estimating
percentages by polarized light microscopy. Measurement uncertainty data can be provided when requested.
EMLab P&K ("the Company") shall have no liability to the client or the client's customer with respect to decisions or
recommendations made, actions taken or courses of conduct implemented by either the client or the clienYs customer as a result
of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for
the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential
damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been
advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the
Test Results exceed the amount paid to the Company by the client therefor.
Document Number: 200091 - Revision Number: 5
EMLab P&K, LLC EMLab ID: 898493, Page 1 of 2
Client: DS Consulting, Inc.
C/O: David Sinkbeil
Re: D-387 Beaver Dam Cir. Vail, CO
EMLab P&K
4955 Yarrow Street , Arvada, CO 80002
(800) 651-4802 Fax (623) 780-7695 www.emlab.com
Date of Sampling: 03-09-2012
Date of Receipt: 03-12-2012
Date of Report: 03-12-2012
ASBESTOS PLM REPORT: EPA-600/M4-82-020 & EPA METHOD 600/R-93-116
Total Samples Submitted: 3
Total Samples Analysed: 3
Total Samples with Layer Asbestos Content > 1%: 0
Location: �WI-1 Lab ID-Version$: 3994260-I
Sample Layers Asbestos Content
Off-White Drywall With Brown Paper ND
White Joint Compound ND
Cream Tape ND
White Texture ND
Tan Paint ND
Composite Non-Asbestos Fibrous Content: 15°/a Cellulose
< 1% Glass Fibers
Sam le Com osite Homo eneit : Moderate
Location: DWI-2 Lab ID-Version$: 3994261-1
Sample Layers Asbestos Content
---- _ - --- --------- ------- ------- _ - —
Off-White Drywall With Brown Paper ND
White Texture ND
Tan Paint ND
Composite Non-Asbestos Fibrous Content: 10% Cellulose
< 1 % Glass Fibers
Sam le Com osite Homo eneit : Moderate
Location: �W1-3 Lab ID-Version$: 3994262-I
Sample Layers Asbestos Content
-- - - --- -- -----_____ _— -- _ _-
Off-White Drywall With Brown Paper ND
White Texture ND
Tan Paint ND
Composite Non-Asbestos Fibrous Content: 10% Cellulose
< 1 % Glass Fibers
Sam le Com osite Homo eneit : Moderate
The results relate only to the items tested. Interpretation is left to the company and/or persons who conducted the field work. The test report
shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product
certification, approval, or endorsement by NVLAP, N[ST, or any agency of the federal government.
All samples were received in acceptable condition unless otherwise noted. EMLab P&K reserves the right to dispose of all samples after a
period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.
Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When
detected, the minimum detection and reporting limit is less than 1% unless point counting is performed.
$ A"Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is
reflected by the value of "x".
EMLab P&K, LLC EMLab ID: 898493, Page 2 of 2
LOAD CALCULATION
PER N.E.C. EXAMPLE D1 ( a)
TRESCA RESIDENCE - 03/30/2012
GENERALLOAD-
4,402 SQ. FT. @ 3W/FT
SMALL APPLIANCE
LAUNDRY
TOTAL
3000VA @ 100%
17,706 VA - 3,000 VA = 14,706 VA @ 35%
NET LOAD IN VOLT-AMPS
MAJOR LOADS -
CLOTHES DRYER
HEAT TRACE
HOT TUB
STEAM GENERATOR
SAUNA
ELECTRIC OVEN
HUMIDIFICATION LOAD
NET CALCULATED LOAD
MINIMUM FEEDER AMPS
LOAD IN VOLT-AMPS
13,206.00
3,000.00
1,500.00
17,706.00
3,000.00
5,147.00
8,147.00
5,500.00
12, 000.00
12, 000.00
10, 000.00
10,000.00
10,000.00
9,000.00
76,647.00
319.36
SERVICE BUSSING / MAIN AMPACITY 400.00
TRESCA RESIDENCE
, PRIMARY RESIDENCE - GARAGE ,
PANEL P1
_ _ ,.- - i -
DESCRIPTION P�Q� ' QO��g G���O I� �Q� \�� i�Q� G���O 'll QO��g P�Q� DESCRIPTION
�
PANEL P2 SUPPLY 100 , 2 1 S 1 S ', 2 1 20 ', KITCHEN APPLIANCE
PANEL P2 SUPPLY 100 2 3 S 2 S 4 1 20 ' LAUNDRY APPLIANCE
CLOTHES DRYER 30 2 5 S 1 S 6 2 � 50 RANGE
CLOTHES DRYER 30 2 7 4 S I 2 S 8 2 50 RANGE
+- ± .. 1 ' EPD 10 2 20 WEST HEAT TRACE
NEW ROOF HEAT TRACE 20 2 9 EPD I,
NEW ROOF FIEAT TRACE 20 2 ' 11 EPD 2 ' EPD ' 12 2 20 WEST HEAT TRACE
_ _ __ . -- -
STAIR POWER 20 7 13 AF 1 EPD 14 2 20 EAST HEAT TRACE
-- - � - .
POWER VENT SYSTEM 20 ' 7 15 � S 2 EPD 16 2 20 EAST HEAT TRACE
---- --
MASTER BATH STEAM ' 50 I 2 17 S �' 1 EPD 18 2 20 S.W. HEAT TRACE
, � , ,
MASTER BATH STEAM ' 50 i, 2 19 S 2 I EPD 20 2 20 � S.W. HEAT TRACE
HUMIDIFICATION I 30 � 2 21 S 1 ' EPD i 22 2 20 I N.E. HEAT TRACE
HUMIDIFICATION 30 2 23 S 2 �I EPD I 24 2 20 N.E. HEAT TRACE
__ _._.. _ �_ _
KITCHEN RECEPS 20 1 25 S 1 S 26 ' 1 , 20 KITCHEN APPLIANCE
KITCHEN RECEPS 20 ' 1 27 S 2 GFCI 28 1 20 BOILERS 1 AND 2
CLOTHES WASHER 20 1 29 S 1 S 30 1 20 � BOILERS 3 AND 4
REFRIGERATOR 20 1 ! 31 S 2 S 32 1 i 20 PUMPS AND CONTROLS
KITCHEN EXHAUST ' 20 � 1 33 S 1 S 34 1 ' 20 PUMPS AND CONTROLS
DISHWASHER I 20 1 35 S I 2 S 36 �, 2 20 I�IUMIDIFICATION
DISPOSAL / INSTA-HOT � 20 1 37 S 1 S ' 38 I 2 20 HUMIDIFICATION
--_ _ _- --_ _ _ . -- -- ---
KITCHEN RECEPS ' 20 1 39 S 2 S 40 �, 2 20 HUMIDIFICATION
MASTER BATH TOWEL I 20 1 41 S I 1 S 42 2 20 HUMIDIFICATION
- __ � ._
- , --.
- --- - ---- . _ _
LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREAS.
EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 200-AMP / 2-POLE MAIN BREAKER
BREAKER TYPES S=STANDARD, AF=ARC-FAULT, EPD=30mA EQUIP PROT, GFCI=5mA PERSONAL PROT
---- __ _ _ __ I . _ . _ --- - _ . - __
J_ ___
TRESCA RESIDENCE
� PRIMARY RESIDENCE - GARAGE '
PANEL P2
'
DESCRIPTION � �g �O � I � �O , �g � I DESCRIPTION
P�•� Q�\• G�'` '��Q ,���� ''��Q II G�� Q�\, I P�Q
LOWER LEVEL N. RECEPS ' 20 1 1 S I 1 S 2 1 20 ', MECH ROOM LTNG
LOWER LEVEL S. RECEPS 20 1 3 S 2 S I� 4 1 20 SUMP PUMP
NORTH CRAWL SPACE 20 1 5 S 1 S 6 1 20 � S. BATH RECEPS
�
FAN COIL 20 1 7 S 2 � S 8 1 ' 20 W. BATH RECEPS
MASTER BED RECEPS 20 1 9 S 1 S � 10 1 � 20 E. BATH RECEPS
MICROWAVE OVEN 20 1 11 S 2 I S �, 12 1 ' 20 ' GARAGE RECEPS
- _ _ -- _--- -1- -
------
MAIN LEVEL ENTRY AREA 20 I 1 13 S 1 S ' 14 1 , 20 ! N. MASTER BATH RECEP
i�
GREAT ROOM RECEPS 20 1 15 S ! 2 S 16 ! 1 20 S. MASTER BATH RECEP
-----� - _ - -- - --_
SEWAGE LIFT STATION 20 1 17 S 1 ' S ' 18 ' 1 ' 20 S.E. CRAWL SPACE
'
GARAGE DOOR OPENER 20 1 19 S 2 S 20 1 20 '� S.W. CRAWL SPACE
MASTER CLOSET RECEP I, 20 1 21 AF 1 ' S ' 22 1 I 20 POWDER ROOM RECEP
- � - - � ----- -- -. . _-- --- -
MASTER BED RECEPS 20 1 23 AF 2 S 24 1 20 MASTER JACUZZI
L-TOUCH MOD 9- ENCL C 20 1 25 S 1 AF 26 � 1 20 NEW L-TOUCH MODULE
L-TOUCH POWER SUPPLY 20 1 27 S 2 � S ' 28 1 20 GREAT ROOM A-V EQUIP
L-TOUCH SPARE - ENCL C 20 1 29 S 1 � S �� 30 ! 1 20 , SECURITY PANEL
L-TOUCH MOD 1- ENCL A 20 1 31 S 2 S 32 �� 1 20 L-TOUCH MOD 5- ENCL B
L-TOUCH MOD 2- ENCL A I 20 1 33 S ' 1 S 34 1 20 L-TOUCH MOD 6- ENCL B
L-TOUCH MOD 3- ENCL A 20 1 35 S 2 S 36 � 1 20 L-TOUCH MOD 7- ENCL B
1/2 HOT RECEPS ' 20 1 � 37 S ' 1 S 38 1 20 L-TOUCH MOD 8- ENCL B
L-TOUCH MOD 4- ENCL A 20 ! 1 , 39 S 2 �i S ! 40 1 20 L-TOUCH SPARE - ENCL B
, I � t
L-TOUCH SPARE - ENCL A 20 1 41 S , 1 42 I _' SPACE
----- _ ___ __ _ --- - � � - -
___� __
----
- ---- - _ _
LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREAS.
-T - -
--_ _.... __ _ _ _ - _--- - i- - �_. -- ._.
EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 100-AMP / 2-POLE BREAKER IN P1
BREAKER TYPES S=STANDARD, AF=ARC-FAULT, EPD=30mA EQUIP PROT, GFCI=5mA PERSONAL PROT
TRESCA RESIDENCE
- - - __ __-- _.__ _�__ _ . .
� --_ _ _----
SECONDARY RESIDENCE - GARAGE
PANEL P3 �
-- ---. _—_ � _ -
DESCRIPTION II' Q� ��r� ��O Q� il � Q� ��O ��g ' Q� DESCRIPTION
. �` O � -1 I��� ,�-1 i G� QO e,�`
P IQ G � i
1/2 HOT RECEPS 20 1 1 ' S 1 S 2 2 50 � SAUNA HEATER
L-TOUCH MOD 12 - ENCL A 20 1 3 S 2 S 4 2 I 50 SAUNA FIEATER
-___ - -� _ __ _-�- - -�I �F-
GARBAGE DISPOSAL 20 1 5 S 1 S 6 i 1 � 20 KITCHEN RECEPS
REFRIGERATOR 20 1 7 S �� 2 S 8 1 20 ' KITCHEN RECEPS
GUEST MICROWAVE OVEN 20 1 9 S 1 S 10 1 20 BATHROOM RECEPS
L-TOUCH MOD 10 - ENCL A' 20 1 11 S 2 S 12 1 20 GARAGE RECEPS
L-TOUCH MOD 11 - ENCL A 20 1 13 S 1 S 14 1 20 GARAGE DOOR OPER,4TOR
L-TOUCH MOD 13 - ENCL A 20 1 15 S 2 AF 76 1 20 FAMILY ROOM LTNG
- - ------ _. : _ _
NEW L-TOUCFI MODULE 20 1 17 AF 1 AF �� 18 1 20 FAMILY ROOM LTNG
� .___�
NEW L-TOUCH MODULE 20 1 19 AF 2 AF I 20 1 20 ' FAMILY ROOM RECEPS
___ . �
MOTORIZED SFIADES 20 1 21 AF 1 AF 22 1 20 ' FAMILY ROOM RECEPS
SPA COVER 20 1 23 S 2 S 24 1 20 EXTERIOR LTS / RECEPS
A-V EQUIPMENT '♦ 20 7 25 S 1 S 26 1 20 A-V EQUIPMENT
_ _ .. _ -- -----___ _ __ _
GAS FIREPLACE - FIREPIT 20 1 27 S 2 AF 28 '1 20 CLOSET / STORAGE LTNG
__ _ - _ ----- —
A-V EQUIPMENT 20 1 29 S 1 S 30 1 20 A-V EQUIPMENT
_ . --
GUEST FP / TV EQUIPMENT '' 20 1 31 AF 2 S 32 1 20 SECURITY CAMERAS
i�-- _ --- _ __ _
HUMIDIFICATION 20 2 33 S 1 S 34 1 20 SUMP PUMP ALARM
_ ___ _ _ _ _ ___ _ . . _ ,
HUMIDIFICATION 20 2 35 S ' 2 S 36 1 I 20 WATER SYSTEM
WATER PRESSURE PUMP 20 1 37 3 1 S 38 1 20 RADON SYSTEM OPTION
WINE COOL COMPRESS I 20 ' 1 39 S 2 AF � 40 1 20 WINE ROOM POWER
SPACE 41 1 42 SPACE
LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREA3.
I_ , _ —� ,
PROPOSED INCREASE FROM 100-AMP SUPPLY TO 150-AMP SUPPLY (FEEDER AND EQUIPMENT)
____ _ __ _ __— ___ . �
EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 100-AMP / 2-POLE MAIN BREAKER
- -- -- - _ _ _ ---- --
BREAKER TYPES S=STANDARD, AF=ARC-FAULT. EPD=30mA EQUIP PROT. GFCI=5mA PERSONAL PROT
0
�a .
�
�
Y'
1
-�,..�
u 1,
t��
t T _ T� , �
. , .. . . .."�
1^' ~_ �--".1�"
_...
�p�—}�.:-�---
-. -+_�7". ��� ��--
...
• � ...- _� .... _,_.. � ,..:e-�----"'
..».. _._ -'
, ,�..-�°s - . =.,�s�' r�
� � ,, � y :;.t � � � y a .'
� -« #�� j �i .�'+S {.� � yy, x t 1
s--�- _ ... ,.> e . �:; • �gd}�.' r�'SP A,, i Y �°� � �r a� '�' � �Y % ` ��
�', fl
�+ ; �g�, !" �+ r
�3�`�� �, ����� t ��.; � � � • :
r,'r�", ,�!� � �+�;v ��'' g���� '-
.+'< t �';� �,�}"P�;��{ ' �"�,i "'► '.,� ��'�
��r �Fd � .�"�� z +r' ���' `'� "y ' ` ,
, .�
{ n� "
fi��,'t�„sz,��t� �r'�!����'�t'�%i''„i�'.�� 1",
ry�r�. �f; �4�, x "_ "' ` . ���
5
r
� �.� , " . F 1� . � ��
���� ����� ���
. �� •'�l�,��� .
'�, � �? �` $
�
�-�' .
i
� `_
. `. �°.
�wa� +.�k�� i
�� W."µ�..�`- aa.°�!+�e"VVaa.siu._ _..
.:. A-^".f;.
j
� i
a. �* :. �'
' �yy�µy.� eY"::,.
L' ��*�"
r�ar
��-�'
y''^� ,,
�' e J
f
���s `l � j , /i ��` .
A'..��. .a . _.�'�. �N;
� ,-��v i #„,., :
�°� .r
�t "
��� �
. �,;-,.
-.�•�r�,��r•
38� B��w �� ���-
� I
;
,. r!'
�
s
�' �
._ J
� _
.E�t� i e
r
}>r
� _1t
�
y t
�
� c �,«� _
�
�
.. t� _... .. . _ . �- ... .,, �,. .. �... . . . _ . . . .
,�... ... ..
. .._,---. _.�. _ _. .._ . . .. . . ��. � :
.N r ,. , _. , -� ___. . _ — �._
:�
f �. y . s •1.': .. �� � .. ..�.
, _,�: � ,� , �, f, � ..9:�: x 4,•, ,«,.
�,�i � � ! � , i � . +� �°�„ : y�r; • *; . , • r�.v ,.t � �t � ; �- �.
w�� �` . �i � � 1 1. � . x. ',. ✓' � Y s . +�x � • -s.� .. •d�s ( ;{ % t '.� ,.�.
�.`4.� �',tir F �, � � �4 y+F,'y � .y��� ��., . '�� �-� � rr�w ��',�jei�� ��'„� �� %! .� 2 �� � ,-r �
� R1 M�
ir , . . « . �„ , .�s . , � t- , .9, . �° >.. � M/ � +.
F t .1 � i . . . . �" . . . � , ' " , - J,a� „� - o f.'
Ye } �'. • � . �' . _
6.±,....:'tiilt �:V. .. � . �, � � . . . . �si" _ ia,
"'-:,�e ' 1 i —_ � r .. _ . . . r . t � . � . _ . . . �i ' , .
�
. e . ° r'_yj;' .
4 Ki�
� .. ..... � _
� '
R
� Y��
F �
t � ' r r
�
� �€ T .
�, �
i� � . _ ry.,�.�, ,, _ - �
� y� y� � ,`�, � _ _ ,- ��. •�• � �F � � � ,� � �
� •
�„�� ��y� �. �� ^� 1 . _. � u��`.�j�iij i c, tie�„ % . � i
�r+� �� i�` sa' .�� 1 � ? . . �. � �. ' �� � .y�'wr. � �.M � �� .. ' � � ;� , .
�j��`� � # n • t �t ,�. � a� .w • , �l ' w � , } w � �'. A
�7L,�� � � i; #� �. � �� � ��* `� . � . � "'��"`�I''{i, , � ,� � � t '�1+� �,,, �� �y, > �.�" j"� � �":��3s• � �!. .�i
�`±e-. . ` t'� y` t t� t �'. • . j�}R � F" �`�f, � �� +a yw� `s•' • yli+ .�•+..+ �'� .. �� �T .:.
. `;.,:�K.."..,Ii.�,. f_~�'F #� �i.��,4' r'..y"'M'.;r�'���d�'e`' t� , .' . . �� �`�: � t � � � ,
, *
4.,�y� . ,a�' �„ .�� e � t'' ; y;"�`��,'�.z�:�
�w ' �''+ �` ' :�� �, � °
� � ±�
�.�;� . t ,�°; �
,�
� �� A �
w, �
H tilator° Multi-Sided S�eries:
ea
the Possibilities are Unlimited!
• Clean, louverless design
• Choice of corner, peninsula and see-through configurations
• Available in direct vent or B-vent versions
• Extensive choice of decorative fronts, surrounds, granite and
marble finishing materials
• Two-toned painted refractory
• Optional fan for direct vent models
• Modulating flame control with variable BTU/Hour input
and flame height: 25,900 to 37,000 BTU/hour input for
36" models; 14,700 to 21,000 BTU/hour input for
31 " model
• Available with revolutionary IntelliFireT"' ignition system
• Certified for installation in bedrooms; direct vent models
also certified for mobile homes
• Direct vent models preserve Indoor Air Quality (IAQ) and
provide efficient zone heating
• Heater listed to ANSI Z21.88 standards (DV models)
IntelliFireT""
• Eliminates a standing pilot, reducing fuel consumption, saving
money and being environmentally friendly
• Dependable in a power outage with battery backup
�- � ,
� � �e: �
�w -_� � �
�� ��'� � ��� �
: � � �
, . . �'� .,. �...:. , ���i' �.� . �`' �
, 36° See-through model shown with Craftsman front
and custom surround
�
, ` : +�
� � _.. �
31" See-through model shown
with Portfolio front
�!
36" Peninsula model shown with Harbor
front and end panel
�
�
Multi-Sided �as Series
Models Available*
Confi uration Viewin Width Ventin S stem
31" See-throu h 31" Direct Vent
36" See-throu h 36" Direct or B-Vent
36" Left or Ri ht Corner 36" DirectVent
36" Peninsula 36" Direct or B-vent
Options*
Salem, Portfolio and Simon fronts fit the 31 " See-through model
�����
,�,�...���.�.�
Salem Front 1'ur�tuiiu �r�ui
(black & bronze) (black & bronze)
Siin�il ��runt
(black) (available in 31" and 36")
Phoenix and Harbor doors, and Craftsman and Simon fronts fit the 36" models
Phoenix Operable Door
(black, pewter & bronze)
Harbor Operable Door
(black, pewter & bronze)
Craftsman Front
(black & bronze)
Options Not Pictured* Venting
Remote Controls and Wall Switches Direct Vent: DVI' & SLP Series pipe
Fan Kit (direct vent only) B-Vent: 5" B-vent pipe
Gas Conversion Kits
Mantels and Surrounds
*Please consult the MSRP book for a complete list of models and optional accessories
Multi-Sided Series
Technical Specifications
36" & 31" See-Through Direct Vent Models EIECTRICAL
LEFT VIEW FRONT VIEW
�p�
0K
36" & 31" See-Through
Framing
B
ACCESS
36-IN RIGHT VIEW 3i-[xx[cHrv[Ew
ELECTRICAL
,flfl � K fifl, ACCESS _ _
J
�
1
t
.- H
GAS LINE
i
ACCESS
F � \ �
G � fH
PRODUCT DIMENSIONS
Location 36" model 31 " model Location 36" model 31 " model
A 36 31-1/8 I 1-1/2 1-1/2
B 42-1/2 37-5/8 J 27 N/A
C 24-1/8 21 K 8 N/A
D 33-1/2 30-1/4 L 12 8
E 1 1 M 9-3/8 8-3/4
F 2-1/8 2-1/8 N 38 34-1/2
G 4/1/8 4-1/8 O 34-5/8 31-3/4
H 4-1/4 4-1/4 P 24 16
FRAMING DIMENSIONS
A B C' D
DVP SL Pipe B-Vent DVP B-Vent
Model Pipe Pipe Rough Pipe Pipe Rough
Rough Rough Rough Opening Rough Rough Opening
Opening Opening Opening (Height) Opening Opening M��dth)
(Width (Width) (Width) (Depth) (Depth)
GDST43361 10 8-5/8 -- 38-3/4 23 -- 43
GBST43361 -- -- 7 38-1/2 -- 23 43
GDST38311 -- 8-5/8 -- 34-3/4 15 -- 38-1/8
'Adjust framing dimensions for interior sheathing (such as sheetrock)
All dimensions in inches. The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the
addition of drywall. Please refer to installation instructions for complete specifications and drawings when installing this product. Visit www.heatilator.
com to download.
36" Peninsula Direct Vent Models
ELECTRICAL
ACCESS
FRONT VIEW RIGHT VIEW
0K
36" Peninsula Framing
��
O
, p _
PRODUCT DIMENSIONS
Location Inches Location Inches
A 36 I 1-1/2
B 40-1/2 J 27
C 24-1/8 K 8
D 33-1/2 L 12
E 1 M 9-3/8
F 2-1 /8 N 38
G 4/1/8 O 34-5/8
H 4-1/4 P 24
FRAMING DIMENSIONS
A B C' 0
DVP SL Pipe B-Vent DVP B-Vent
Models P�pe Pipe Rough Pipe Pipe Rough
Rough Rough Rough Opening Rough Rough Opening
Opening Opening Opening (Height) Opening Opening (Width)
(Width (Width) (Width) (Depth) (Depth)
GDFL41361 10 8-5/8 -- 38-3/4 23 -- 41
GBFL41361 -- -- "" 38-1/2 -- 23 41
' Adjust framing dimensions for interior sheathing (such as sheetrock)
"See pipe manufacturer's installation instructions
The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the addition of drywall.
Please refer to installation instructions for compfete specifications and drawings when installing this product. Visit www.heatilator.com to download.
36" Corner Direct Vent Models
34-5/8„
LEFT VIEW
36" Corner Framing
R! 8•'
� �, \
�
. �
\ � �
�
p �' �
� , . �.
FRONT VIEW
I /8„
3-1/2°
ELECTRICAL
ACCESS
2-1/8•'
RIGHT VIEW
� 4-1/4"
PRODUCT DIMENSIONS
Location Inches Location Inches
A 36 I 1-1 /2
B 42-1 /2 J 27
C 24-1 /8 K 8
D 33-1 /2 L 12
E 1 M 9-3/8
F 2-1/8 N 24-1/2
G 4/1/8 O 38
H 4-1/4 P 34-5/8
FRAMING DIMENSIONS
A B C' D
L41 I p pe SL Pipe Rough P Pe Rough
GDCR41361 Rough Rough Opening Rough Opening
Opening Opening (Height) Opening (Width)
(Width (Width) (Depth)
Inches 10 8-5/8 38-3/4 24 41
'Adjust framing dimensions for interior sheathing (such as sheetrock)
The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the addition of drywall. Please
refer to installation instructions for complete specifications and drawings when installing this product. Visit www.heatilator.com to download.
Who Would Benefit From Heatilator Multi-Sided
Gas Fireplace Series?
Home Owners:
• Who want their fireplace to provide a dramatic design statement in their home
• Who need a functional room divider to define living areas in their home
• Who want to preserve positive indoor air quality for their family (DV models)
• Who want warmth without waste through energy efficient zone heating (DV models with IntelliFire)
• Who want to increase the resale value of their home
Home Builders:
• Who want a dramatic focal point to make their home design more appealing to homebuyers
• Who need a functional room divider in key design areas such as the owner's suite, or separating living and
dining spaces
• Who want to provide their customers with fireplaces approved by all major Green building programs (DV models)
• Who want to increase the energy efficienry performance of their homes (DV models with IntelliFire)
• Who want to increase their customer's satisfaction with multiple finish styles and colors
1,. eatilator�
The�`rs st l�.c�fd�.t; i�z j�rc;��,F�R�xces
a brztnd of Hecrrtl� f, Honte Ted�no[ogies btc.
1915 West Saunders Street
Mt. Pleasant, Iowa 52641
800-927-6841 • heatilator.com
The information pmvided in this litenture is for planning purposes only and subject ro change.
Please consult [he insnlla[ion manua) Eor aaual insnllation. Actual p�odua appannce may
differ fmm product imagea. The flame and ember appearance may vary based on the type of fuel
burned and venting con6guntion used. For full warcanty details, go ro hatila[ocmm
"Pleax consult the MSRI' book for a complete liat of modela and optional xcessories.
H�fl.-10�?U-1008
� "
� � �����
.v4x �E
.�
i:�� * ,.��'� �
,�� �
v �� ;�
_@, � ; i . r . t:
1 ._ . � � �� . ���
!��' � �
' i
�
� .�_ " _
�mar9uis
COLLECT�ON by Kingsman
,�� �
�, �,
. '.�:,
�, ��ifl;.:
�' , ��
��' l��
�
k,
� ,
. . ./A. .�:.. �'.. i" �aw
f- � -.~a�'',... `�
�. ���
� � {-� . - w.. f_+ r �yu : A�z=
.. F-�.� i
t ���.}� � � � s,.Yi+ . �� �.. ` � .:.! ���II�I'° 4 ��I 41 iiti� �1,��...i 2 y�. "' ,ro _ .
�r�— f��llil
J���I
m'"� °� ,. _ < .,� �. ...
„�y- a_ i.,
�"" °•� `�,. � w ��._
K.�,.;`., ,���, JA
+ '
�. �M,�.�, ��� � �_
� k
� � �p
'� ` �c �I
� � '��
,M,?`„a,'�, , . �.
�
�
. y^.. VrY uzI" , " i. ° ,w-`v '"� . . � . -.�_� - •yqitlR W��,+�.
.t` p . ���a� .. ..I,y ..V. V.�"'."Yr y°V��w. i � sl • s�~
-: �w .,,,w�. W � '�,.x ,L _ . �.Y � . � r..e .. _ . � ' „'�,� +.�` ..,
r. ' "' '
,M ,` • +.�.w �-x �..� . �.,,�, �
'�'"" .`K� �'.�'%� � x"-�`-�.'�,-�����r ,..'�, � `� �� :
� �� v
'"�- r � , y�° � "",� �+r. , ,: z �` y- �� z' F�r �;=: a`,� s �` � c� � . A � -^« _ "M° . � ,•
3� :'',� cM`t'�- �`^" ^c *✓€ �"^M ��,�' �'4� �`^" U c�'" '� "�„'�
ti • • '�°'•w. -w,'�..,- � ,.. , t ��r � �� v� ...,; � .r
! �
.r � `"9y* .e„.,` r
,
w .,� � y',Q �+ . „ � _ . . . �`L�1l�
. � � � � � � �� � � �
�4.. ` �' � � � . ^" .�
ryr � - "+'+a. �.:. � ,.�.e., � . t � .. �
-r�;�r ,s x ^� °!` r .� +,s . �" . �e �"� Y*-a ' _ �� � " � ° r�" -.
� ,-� .s�,.,,.. ..,. � , y � '`t. , � � .
� . . �
` '�'n �,.y,f.r� �s-....� ~y,.,�,LL�,�r riw..�'y� ,�'�_� +acY 4' �" +.� .i �,� � "�►"W"� h
�..�. �� a. ��'is a( ''t�t°r*S"�.,�'�1�, t ,.,x Y � 'rr �..,x�„ �` ,. ... � � � ..� T . W � ."�yF�- ` ,. �� '�` �y � w";,;.� �
re , �, . �a . ,rw..� +t ,s� �"r- �„ , yr y . � '"
,� � ..�eM►�` �., �y, � r-+� ++�vy� , e =� "+4� _ �
!` �ut,�
,�:""�`�. k , > °� ;�'�, "r�,�,,';� ��'�", u. . , " � � 4 �" -'� .�' w � ° A `�'� "e . ,
„t � �4 ., . �C '"� . � � ,. � :�. � � r. t ... �` . _ .r '� ,.�"vr.`,y.tyy� "rS 7w,.�
� ,
� �
� r w .* � . ,��"�` �'� ..,� � . .�i � .
, � ti
° yy� ..s.. �+�,, '
� , ,^. �-. � . .
a. , ;*;# ... +�^"v
� r� Y �, � ��.�.,7k. � ,r.zt,�„ " � . � `/'.,r . � ., , � ".�.'+� : - �'f� ,; .;.
., ,
, ; ., +� , �� �A '�'w-�..r,uy.�. .:.�- "� *. ., a .�'�"'f�"wr ' �. �'^,r.,;� ' . ,1 ^� �M�+a ,�r �� 'aa'
' � , "'If � ,» �4I¢ Yr �;v�" �kl�` rA.art > �a""'_ "" � � " 1i` ' a� , . s � ✓ �'.,� 4 ^,'wah . "E'»a��..
•,
M
� , x . ,� � e
4Y+r.
.�
, . . . �tit.�(v"` „ -;.�r.-�� �_ . r � i�sr� . �:ft.. ' ..�i.rt.. 'm°'. , "'�� . :.7' a„y,z . .�,�.�w. . s+�. � �� -,.,� , _ '�"�a' ^:,`1i'�Iw^ w_ .
., ���d -� �
����� , ..�<. ��
Unit Illustratetl is a MQRB4436N Infinite Linear Direc[ Vent Flreplace - Na[ural Gas, MOR944366K Back Shield Kit -(or single sided viewing, MORB4436PL6 Porcelain Liner Back, MORB5143PLE Porcelain Liner Ends, surround provided by Palazzetti.
�:��y �o� �;��� 3g� ��.1�- ����
�
WALL SURROUND
FRAME & EDGE
> y �� �•��� a��r, "ti=� fiR^`'3'�• . _
~r� «i�`S�:�wiTi�:" . � ' .,' . . . . . �
.. • . .
. i
�.: ........ I
� j v.
�, ` , ' .. .. �.;y�, .
�:
t�i` ��'� �� � .
STYLING • ' �
.`; �
� � ��� � - � .. � �,{ �ti _ .
� �. ' �[��r1 . M %� �.y � t,tr L.
9 � i
� ,� � � ` �.. .� � , �
v,` �Ii� h ' °" , � �
. . � � ,�l. � ..
� �'t' �}�. . � �� . '��
ROCK COLLECTION �°� � � ..j:,,� .�� �,
,. w� �.y
�'\.� � .
r
�
�e�rT,,•,� �,,�
r �
F
�
DE .. .. ..._
i ��
t,� �
��
��
�` : ^ ��
DECORATIVE EMBER GLASS
_---"".,-.�.""'✓'"�
�� � ��:
� F.�;
s -
�- _ T , ° u*�:, .�-�,�?
� �;��
":.�Irp��'�... _�`�''
Unit Illustrated is a MORB696W lineer Multl-sitled Direct Vent Natural Gas Fireplace, MORB69618K Back Shield Kit - for Single Sided Viewing, MQRBD2 Drift Wood Branches - Three Plece Set,
MOROCK3 Rock Set - Con[emporary Collec[ion - Multl-Colored, MOEMBER Ember Chunks x 2. Surround provided by Palazzetti.
�( ���
„ � �''�`"'�' _
i �. �
i *� ' s �
� :�, ,y
� u`s . �<
�'"� �e �
t.� � .
r.
M:. .f
Ft�c
Inpitt ii�i�.f>'
Input (Mini
Glass Winetc3�.�
Electronic �<p��t�ar,
Millivolt
Glass Size
Venting
FE (P.4.1-02j
MOR64436NE MQRB4436LPE
MQRB4436N MQR64436LP
Natural Gas Liquid Propane
33,000 33,000
22,000 26,000
Ceramic Ceramic
Yes Yes
Yes Yes
35"Wx151/4"H
5/7" Kingsman Flex Vent
60.9% / 59.1% 60.9% / 59.1%
�r�'�ir`��L. �:,){�1`t�r�i��l�i T�!M K,iT
B �
FRAME p
MORB56245 / MOR86924 c �
A
H
E D G E �
�
MOR850195 i �
�^— G �
�
PRCi��, ;IP,�1�� ci���,r�.;�,:
� �^E
�I � F
� 1� K
� ��
a -
� , ._ _
-- --- r
� I l�•'.
�i � __ _ +�
i I i'.
1 � Ii
p g FRONT VIEW I F G �; �. SIDE
� � VIEW
i � C � i 'I
j �� p I � ' �.
; E _ i � ' . . �,
_ _ ... __----.. _,
�-r= : . ,
�— K �I
I I 1 I C . 1. ... II I-♦-
���+'+��,.� f � I
�� TOP VIEW �� .: ��
;� �.._.; _:.� E -.._ •..._..._" ---�---� I�
N
MQRB5143NE MQRB5143LPE
MQRB5143N MORB5143LP
Natural Gas Liquid Propane
40,000 40,000
28,000 31,000
Ceramic Ceramic
Yes Yes
Yes Yes
42" W x 15 1/4" H
5!1" Kingsman Flex / 5/8" Hard Pipe'
65.6% / 64% 65.6% / 64%
' with adaprer
MORB4436 MQR85143 MOR66961
A 49'�a"
B 3'�e"
C 4're"
D 233in•,
E 1"
F 23;s•'
56'�s" 74'ra"
3'ie" 3�ie"
4'ie" 43ie"
233/4. 233�4.
�,. �.
23�8� 23�8�
MQR84436 MOR85143 MORB6961
G 44'�e"
H 1'n"
I 1'�z"
J 19',s"
K 1"
L 23/g�.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
0
51'is" 69'ie"
1'�i' 1'n"
���z�. ���i.
19';s" 19be"
�.. �.�
23�6� 23/8�
MQRB4436 MQR85143 MQRB6961
44'�a"
13ba"
33'�e"
36bn"
39"
34"
375r8�
7'�e,.
���z»
2'n"
16'n"
16'n'•
8��a�.
2"
35"
51ba"
13'r,"
40'ie"
43ba"
46"
34"
375�s"
7��8�
�����
2'iz"
16'�z"
16'r,»
$��8.
2"
35"
69'�e"
13'rn"
58'ie"
61'ia"
64'�s"
38"
453�e"
7�ia�.
���z.
2'rz"
20'n"
20bz"
12're"
z��e•
39"
MQRB6961NE MQR66961LPE
MQRB6961N MQRB6961LP
Natural Gas Liquid Propane
62,000 62,000
43,000 48,500
Ceramic Ceramic
Yes Yes
Yes Yes
60" W x 15 1/4" H
7/10" Kingsman Flex Vent
51.1% / 51.8% 51.1% / 51.8%
� f .;� . . , _..
> SIT Valve with Hi/Lo Flame and BTU Adjustment
> Accent Lighting with Decorative Glass Ember Bed
Choice of Millivolt or IPI electronic ignition system with battery backup,
and cold climate switch
Choose your view — Single Side or See Through for your viewing pleasure.
Surround Trim Kit — Black, Pewter, or Stainless. Available in two sizes
— Frame and Edge.
Porcelain Liners, and Porcelain Bottoms �
Drift Wood — Four Pieces Driftwood with Four Rocks ,`�
or Three Piece Large Driftwood Set (5143/6961 models only)
Rock Sets — Contemporary Collection in Natural, or Multi-Colored
Decorative Stones or Ember Chunks
Decorative Ember Glass — White, Azuria (Blue), or Bronze
Remote Controls — On/Off, Thermostat, Modulating
Height Front Width Depth
Top Flue Model
Actual Framing Actual Framing Actual Framing
Infinite — MQRB4436
Single Sided 37��a" 38" 46" 46'�z" 16'�z" 17""
See Th�ough 375�e" 38" 46" 46'n" 16'�z" 15'�e"'
Infinite — MORB5143
Single Sided 375�a" 38" 53" 53'n" 16'n" 17'"
See Through 37��s" 38" 53" 53'.a" 16bz" 15'ie"'
Grand Infinite — MOR86961
Single Sided 453ie" 45'ia" 69'ie" 71bz" 20'ri" 21"`
See Through 4S3ie" 4S�iz" 69'�s" 7T��" 20'n" 193�a"*
dependon( ol linislring rnateilal used
�� '
�< #
� � �
n� ; ,
��, � �, ``�;�
�� �„� �
_, �
;���' ��:i���
��r -
�
_ . . � � � �a.�.�...�� ��-
���
���
�.
��:�w
���
��
w-.�
��
� ��ll���Xi�;°r����� 5 ,
Unit illu�t il�•U is a M(]f2HS1�3N li � [e L iie ii D�iiect Vrn� f� �����I���_F� � N itu ��il C,.is, MC)12H!�14.',SK S�<� �lii��uyli K�it, MUkl3 >143PLF F'c�rcvl� � I ���r I�iids. MC�f.8S01�5SS S� rr<>� icl Triii� E<1ge� St� �Ir ,� Sic�rl [)� c�r. t�rl wiih MC)G!�A A�iiii.i C31u�- GI<is�.
11-19-2012 Inspection Request Reporting Page 9
4:21 pm Vail, CO - Citv �f
Requested Inspect Date: Tuesday November 20 2012
Site Address: 387 BEAVER DAM CIR �/AIL
A/P/D Information
Activity: 612-0082 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occu�pan�cy : Use: R-3 Insp Area:
Owner: HIBOU COLORADO PROPERTIES LLC
Contractor: BECK BUILDING COMPANY Phone: 970-949-1800
Description: UPGRADE EXISTING INTERIOR FINISHES, MODIFfCATION OF STAIR TOWER, CONVERSION OF
EXISTING STORAGE AREA TO FAMILY ROOM, RELOCATION OF SPA
Requested Inspection(s)
Item: 542 PLAN-FINAL Requested Time: 08:00 AM
Requestor: BECK BUILDING COMPANY Phone: 970-949-1800
Comments: 471-1654
Assigned To: BGIBSON Enter^� JMONDRAGON K
Action: Time Exp:
, � II�a��la
� n-� ��� ,
Q �° P,
���
C�� nf c�� r Cor�.di-��%on U�ti �s
Inspection History
Item: 210 PLMB-Underground ""Approved'*
05/21/12 lnspector: Martin Action:
Comment: At family room location only
06/07/12 Inspector: sgremmer Action:
Comment:
Item: 10 BLDG-FOOTING "" Approved "
05/03/12 Inspector: sgremmer Action:
Comment: detail for section a/s1
05/31/12 Inspector: sgremmer Action:
Comment: Slab rebar for CMU wall in basement
06/07/12 Inspector: sgremmer Action:
Comment:
Item: 20 BLDG-Foundation/Steel "* Approved ''*
05/03/12 Inspector: sgremmer Action:
Comment: detail for section a/s1
06/07/12 Inspector: s� gremmer Action:
Comment: CMU wall at MEch room
Item: 120 ELEC-Rough ** Approved *`
06/08/12 Inspector: sgremmer Action:
Comment: service lateraf
OS/03/12 Inspector: sgremmer Action:
Comment:
Item: 200 MECH-Rou h '* Approved `*
08/02/1� Inspector: sgremmer Action:
Comment:
09/27/12 Inspector: sgremmer Action:
Comment:
10/11/12 Inspector: sgremmer Action:
Comment: Snowmelt
Item: 220 PLMB-Rough/D.W.V. *' Approved "*
08/02/1Z Inspector: sgremmer Action:
Comment:
Item: 230 PLMB-Rough/Water ** Approved ""
08/02/1Z Inspector: sgremmer Action:
Comment:
Item: 240 PLMB-Gas Piping ** Approved ""
08/02/12 lnspector: sgremmer Action:
Comment:
PI PARTIAL INSPECTION
AP APPROVED
PI PARTIAL INSPECTION
PI PARTIAL INSPECTION
AP APPROVED
PI PARTIAL INSPECTION
AP APPROVED
PI PARTIAL INSPECTION
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
REPT131 Run Id: 14993
.--J------_�,
(�/�� I I ��OJ
�
12-04-2012 Inspection Request Reporting Page 3
4:08 pm Va�l, ('itv (�f U�'�"�'
Requested Inspect Date: Wednesday December 05, 2012
Site Address: 387 BEAVER DAM CIR VAIL
A/P/D Information
Activity: B12-0082 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occupan�cy: Use: R-3 Insp Area:
Owner: HIBOU COLORADO PROPERTIES LLC
Contractor: BECK BUILDING COMPANY Phone: 970-949-1800
Description: UPGRADE EXISTING INTERIOR FINISHES, MODIFICATION OF STAIR TOWER, CONVERSION OF
EXISTING STORAGE AREA TO FAMILY ROOM, RELOCATION OF SPA
Re4uested Inspection(s)
Item:
Requestor:
Comments:
Assigned To:
Action:
Item:
Requestor:
Comments:
Assigned To:
Action:
542 PLAN-FINAL
BECK BUILDING COMPANY
471-1654
B IB ON
Ti e
90 BLDG-Finai
BECK BUILDING COMPANY
471-1654
JMONDRAGON
Time Exp:
Inspection Historv
Item: 210 PLMB-Underg round ** Approved "'
05/21/12 lnspector: Martin Action
Comment: At tamily room location only
06/07/12 Inspector: sgremmer Action
Comment:
Item: 10 BLDG-FOOTING '`'`Approved''''
05/03/12 Inspector: sgremmer Action:
Comment: detail for section a/s1
05/31/12 Inspector: sgremmer Action:
Comment: Slab rebar for CMU wall in basement
06/07/12 Inspector: sgremmer Action:
Comment:
Item: 20 BLDG-Foundation/Steel *" Approved *'`
05/03/12 Inspector: sgremmer Action:
Comment: detail for section a/s1
06/07/12 In�spector: s� gremmer Action:
Comment: CMU wall at MEch room
Item: 120 ELEC-Rough �" Approved *"
06/08/12 Inspector: sgremmer Action:
Comment: service lateraf
08/03/12 Inspector: sgremmer Action:
Comment:
Item: 200 MECH-Rough *' Approved ""
08/02/12 Inspector: sgremmer Action:
Comment:
09/27/12 Inspector: sgremmer Action:
Comment:
10/11/12 Inspector: sgremmer Action:
Comment: Snowmelt
Item: 220 PLMB-Rough/D.W.V. *"' Approved *'
REPT131
Requested Time: 08:00 AM
Phone: 970-949-1800
Entered By: JMONDRAGON K
�
Requested Time: 09:30 AM
Phone: 970-949-1800
Entered By: JMONDRAGON K
PI PARTIAL INSPECTION
AP APPROVED
PI PARTfAL �NSPECTION
PI PARTIAL INSPECTION
AP APPROVED
PI PART�AL INSPECTION
AP APPROVED
PI PARTIAL INSPECTION
AP APPROVED
AP APPROVED
AP APPROVED
AP APPROVED
Run Id: 15030
�'
1
12-04-2012 Inspection Request Reporting Page 3
4:08 pm Vail, CO - Citv Of
Requested Inspect Date: Wednesday December 05 2012
Site Address: 387 BEAVE�2 DAM CIR VA�L
A/P/D Information
Activity: 612-0082 Type: COMBO Sub Type: ASFR Status: ISSUED
Const Type: Occu an�c r: Use: R-3 Insp Area:
Owner: HIBOU COLORADO PRO�ERTIES LLC
Contractor: BECK BUILDING COMPANY Phone: 970-949-1800
Description: UPGRADE EXISTING INTERIOR FINISHES MODIFICATION OF STAIR TOWER, CONVERSION OF
EXISTING STORAGE AREA TO FAMILY RdOM, RELOCATION OF SPA
p! 542 PLAN-FINAL
>r: BECK BUILDING COM
s: 471-1654
o: BGIBSON
Time Exp:
Item: 90 BLDG-Final
Requestor: BECK BUILDING COMPANY
Comments: 471-1654
Assigned To: J ON
Action: Time Exp:
Requested Time: 08:00 AM
Phone: 970-949-1800
Entered By: JMONDRAGON K
Requested Time: 09:30 AM
Phone: 970-949-1800
Entered By: JMONDRAGON K
Insuection Historv
Item: 210 PLMB-Underground "' Approved ""
05/21/12 lnspector: Martin Action: PI PARTIAL INSPECTION
Comment: At family room location only
06/07/12 Inspector: sgremmer Action: AP APPROVED
Comment:
1tem: 10 BLDG-FOOTING "" Approved ""
05/03/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: detail for section a/s1
05/31/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Slab rebar for CMU wall in basement
06/07/12 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 20 BLDG-Foundation/Steel "` Approved `*
05/03/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: detail for section a/s1
06/07/12 In�spector: s remmer Action: AP APPROVED
Comment: CMU wall at �ch room
Item: 120 ELEC-Rough " Approved ""
06/08/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: service laterar
08/03/12 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 200 MECH-Roug h *' Approved *'
08/02/1T Inspector: sgremmer Action: AP APPROVED
Comment:
09/27/12 Inspector: sgremmer Action: AP APPROVED
Comment:
10/11/12 Inspector: sgremmer Action: AP APPROVED
Comment: Snowmelt
Item: 220 PLMB-Rough/D.W.V. "* Approved `"
REPT131 Run Id: 15030
T. Boyle EngineeEing, lnc.
1650 Fallridge Road, Unit C-2
Vail, Colorado 81657
M�7ce Suman
Su�an Architects
141 E. Meadow Drive, Suite 211
Vail, Colorado 81657
Field Report
The following items were observed:
The framing for this remodel is complete at this time.
�2
v�: o�iozii2 � ► a - od�
Project: 387 Beaver Dam Circle �=-
Location: Vail, Colorado
Contiactor. Beck Building Co.
Owner: The Tresca's
Weather: Partly Cloudy, 78 deg
Present at Site: SteveBoderck
Tim Boyle
I have dete�mined that this framing has been completed per the plans and specifications issued by this office on
March 30, 2012, with a couple of modifications that have been coordinated between Steve Boderck and myself
during the construction process.
I noted only one item that deviated slighdy from the original framing plans. The west end of the LVL `benY at the
roof &aming that is described by Detail A/SS hangs off of an existing header instead of bearing in the wall with a
triple 2x6 belbw as denoted on the plan. An L50 framing angle should be added to the noith side of this connection,
and four additional LIAS LedgerLok fasteners should be "added to the connection in a toe-nail configuration.
Feel free to give me a call if you have any questions or comments regarding this report.
Cc: Steve Boderck — Beck Building Co.