Loading...
HomeMy WebLinkAboutB12-0082�ov�� a� v�«. Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 . ' �= `_ _.- www.vailgov.com =`'�` CJevelopment Review Coordinator TRANSMITT/�L FORM Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be perFormed until the revisions are approved 8� the permit is re-issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: bQ Revisions ( ) Response to Correction Letter % � g o� attached copy of correction letter (y4Deferred Submittal ( ) Other Project Street Address: �S� L?�vtr �a...•� G t'c� (Number) (Street) BuildinglComplex Name: Contractor Information (Suite #) Description / List of Changes: Business Name: r s�� �d AC '� � �es�.Lc.ncL ��j�v. �o�wG C�(�o�rKJ Business Address: !� /1�ync �►..�.�. �. City ��ew State: �� Zip: _� Contact Name: �VL ��� Contact Phone: _ _ 9 %d. �/ '� / , /G ��y � (use additional sheet if necessary) Contact E-Mail: ����v_����,6�, � fa(S �,,,,�,� I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, Intemational Building and Residential Codes and other ordinances of the T a� thereto. X_ ,� ,� Owner/Owner's Representative Signature (Required) Applicant Information Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: Plumbing: Electrical: $ $ Co 7, ODI� -T Mechanical: $ oi3 ��Q Total: $ � i Applicant Name: _,�V£ ��,r,� � Date R�� e� �� ��� , ;�� 9�7b. � Applicant Phone: �17/. LGS� ' � i t J�� 0 6 Za,� Applicant E-Mail: _,i�.-���yc�2�..,�,(f.cay,� ; i � ; j r, For Office Use Only: T To`/�/A 1 O C, f�� rvlV � Y Fee Paid: Received From: � �r �( ��'� Cash Check # _ V CC: Visa / MC Last 4 CC ,# exp. date: n�th # � � ���. � �� �' � �iil ' Yf�� SKYL�NE MECHAN�CAL, �NC_ P.O. Box 1258, 134 Airpark Dr. Unit 2-A Gypsum, Co. 81637 970-524-6809 Fax 970-524-6810 www.skvlinemechanical.com 387 Beaver Dam Circ% Eqruipment Submitta/ 6-� �-�2 FC-1 FC-2 FC-3 FC-4 FC-5 H P-1-2 EF-1 EF-2 � EF-3 E F-4 Remote GB-24 � � � Job Name: Reference: System No.: �// c �. GENERAL FEATURES • R410A or R22 refrigerant-compatible • Lightweight, low-profile compact design • Customizable wide airflow pattern enables better air distribution—d'uection of each vane can be adjusted to fit room layout through Deluxe MA or ME controllers • Auto wave airflow in heating mode—unit independently cycles through horizontal and vertical positions for more even heat distribution • Four-speed fan settings and auto fan speed adjustrnent mode • Comer-pocket design for simplified installation • Built-in condensate lift mechanism; lifts to 33-1/2 in. • Outside air capability • Multiple sizes up to 36,000 Btu/h • i-see sensor option uses infrared rays to search for hot and cold spots SPECIFICATIONS Capacity` Cooling .........................................................36,000 Btu/h Heating .........................................................40,000 Btu/h Power Power Source ...........................208 / 230V, 1-phase, 60Hz Power Consumption Cooling ......................................................0.16 kW Heating......................................................0.15 kW Current Cooling...................................................................1.07 A Heating...................................................................1.00 A Minimum Circuit Ampaciry (MCA) ............................1.34 A Maximum Overcurrent Protection (MOCP) Fuse............15 A External Finish...Grille (White; Munsell No. 6.4Y 8.9 / 0.4) External Dimensions Inches ................................11-3/4 h x 33-1/8 w x 33-1/8 d mm ..............................................298hx840wx840d Location: Schedule No. Date: Grille (PLP-40BAU): Inches ...............................1-3/8 h x 37-7/16 w x 37-7/16 d mm ..................................................35hx950wx950d Net Weight Unit .............................................................60 Ibs. / 27 kg Grille ...........................................................13 Ibs. / 6 kg Coil Type ........................................................Cross Fin (Aluminum Plate Fin and Copper Tube) Fan Type x Quantity ..............................................Turbo Fan x 1 Airflow Rate (Low - Mid 1- Mid 2- High)..........777 - 883 - 989 -1059 cfm Motor Type.........................................................DC Motor Output.........................................................0.120 kW Standard Air Filter .................Polypropylene Honeycomb Refrigerant Piping Dimensions R410A Liquid (High Pressure) ....................3/8" / 9.52 mm Flare Gas (Low Pressure) .....................5/8" / 15.88 mm Flare R22 Liquid (High Pressure) ....................3/8" / 9.52 mm Flare Gas (Low Pressure) .....................3/4" / 19.05 mm Flare Drainpipe Dimension Sound Pressure Level (Low - Mid 1- Mid 2- High). ................O.D. 1-1/4" / 32 mm .......35 - 38 - 41 - 43 d8(A) Options pAir Outlet Shutter Plate (2 pieces)............PAC-SH5ISP-E p High-Efficiency Filter (MERV 10) ..............PAC-SH59KF-E p Multi-function Casement .........................PAC-SH53TM-E p i-see Sensor Corner Panel .......................PAC-SAIME-E p Wireless Signal Receiver ...........................PAR-SA9FA-E ' Cooling / Heatlng capacity indicated at the maximum value at operation under the following condiGons: Cooling: Indaor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F (35°C) DB Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB ! 43°F (6°C) WB Note: Ventilation air: Providing sufficient ventilation air is an important part of every building design. ASHRAE Standard 62 provides the minimum ventilation air requirement. Also, check local codes. � Ventilation rt intake hole� `O o � `° �b �' Branch duct hoM � - rn �i O r`� N � lh N U O Suspension bdt M70 or W3�@ Suspensio� Dolt ���� noie '16 860-970 25/32 to 1-25/ ,o oolt pitch � '� n � ^ For MA-Remote controiler terminel block (�5) IIndoor unit/Outdoor unk conneclirg tertninal bbck (TBS) � m mF �°j = o � d+ o � Q a� �w�e gdlle �� � 19-11/1615a N � Air outlet hd � Comer pocket 37-3/8 9: IrWoor unit • a o li Grille Min.941/2(2400) from 1ba Min.19-11/16(500) �� Entire PB^P��Y c u � $ � .� � N � Branch duct hole Unit : inch(mm) Detail connecting of branch duct Detail drawing of ventilation air intake hole Burn,g Frole Dreinpipe /Connected tl�e ettached 1 connected to VP-25 ;Ib�uble pipe a socket. / , �e�1 � �� lilt rt�echanism �nd Drein emer�, age hole Auto vana (Air outbl) � Vane motor Keep 25/64(10) to 79/32(15) belween unit ceiling and ceiling siab. Burting hde p8ch Cut out hde � Ceiling In case of standard 9dlle In case of wireless siqnal receiver � Emeryency operation switch<Cooling> Emerp�nty operetion swkch<HSanng> Receiver ��� Operation lamp DEFROST/STAND BY lamp Note: 1. As for drainpipe, please use O.D. 7-1/4(32) PVC TUBE. Drain lift mechanlsm is included. 2. As for suspension bolt, please use Mt0 or 3/8. (Procured at local site) 3. Electrical box may be removed for the service purpose. Make sure to slack the electrical wire linle bh for controUpower wires cannection. 4. The height ot the indoor unit is able to 6e adjusted with Me grille att�hed. 5. For the instaliation of the optlonal high effkiency filter or optlonal muld-functional casement. 1 Add 5-5/16'(135mm) to the dimensions marked with an' on the fpures. 2 The optional high eKciency filter becomes optional multi-functional casement and concomitant use. 6. When installing Me branch ducts, be sure b Msulate adequately. Othenvise condensation end dripping may occur. As for necessary installation / service space, please refer to the bottom, bft figure. Models 1 2 A B C D PLFY-P72NBMU�E Relrigeran1 pipe Rehiperant pipe ...e12.7 PLFY-P15NBMLLE ���e6.�5 Flvedconnectan���t/2 Flared connection iJd" PLFY-P1eNBMU-E RHrigeraM p�e Relrge2nt pipe e12.7 / 015.88 e6.35 /e9.52 Flared connection 12"' / 5/B" =�rz taY�s &5d32 2-2 Flaredconnection (compatible) l2ai� (zsel 1�) ('��) 114-/ 3�8" (compatible) PLFY-P24NBMU-E �f �M Fefngerantpipe...e75.88 PLFY-P30NBMU-E ^� �� Flared connection ...5l8 s9.52 PLFY-P36NBMU-E Flaredconnection ReMgerantpipe e15.88/m19.05 ._ye- Flaredconnection 5/8" / 3N" >>-vi6 �t3/� -ni32 a-�re2 (compatlble) lze�) 125e1 le5) IT�) YIbuW�N Ebe41e Ak CendltlonMp i RMrlqrtNion Sy�Ymt Wp1u NyWrM ISO f001 cartifk�ibn Mn SeAw M00 a11M MMUtIM�I EW WrA Wq�nMtlon �60) w.a on .'wi.. a a�r�ry w'r.ou.. r« m. w�� er Mrp.r.uon.na rr ET� , ; ,� ����.��. 160 AWioAnUan 6y�4m ��STE� 3� Tw ISO f000 �wN� N a P� aW�aNr�tla� �Y�bm rM�INY b prMry YwrtN1N� u Wp�YhA Ey tlr 180.160 MO7 urtlhs quYHy tirnMiM !uM m tM •tlaiP�� � Certlflcete Numbsr FM3356! awwpm.m, peaucuon, in.wwbn.ne nuuwy.w�e«• w. preauen ewe.e r� wtlia+z.d qr�L ��$� � 1 �,V riwsiw �.ewe ur tonaroonxy a wnq.r.uon Sywna wor�o .eowne «w�nnn«xr �'''�})��� m�^p�m.M H�Mm .uwva iso t/oo� artlne�neM1 9,�1�•�: U r A 5 iM 1801�000 MM M� M OI tMG/M �OV�nq b MlrkOnm�MY prOlKtlOn tN C1'tlN �n«�.n�.i s,.�a,e o,,.��.a� �so�. CanHle�b Numbar ECf7J1t27 C SD - PLFY-P36NBMU-E - t- 201104 m MITSUBISHI ELECTRIC / HVAC 2011 MiTSUBisHi ELECTRIC HVAC Advanced Products Division Mitsubishi ElecUic 8 Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toll Free: 800-433-4822 (#4) www.mehvac.com Speciflcations are subject to change wkhout notice. � � i �: Job Name: Reference: System No.: ,; �� �. .� , .. �= . ,, ,.�'���° . ,, GENERAL FEATURES • R410A refrigerant • 9-7/8" (250mm) high for low ceiling heights • Eleven sizes from 6,000 to 54,000 Btu/h • Ducted fan coil supporting multiple configurations for flexible installation • Five static pressure settings from 0.14"WG up to 0.60"WG • Choice of fan speed settings • Built-in condensate lift; lifts to 27-9/16" (700mm) • Auto fan mode • Quiet opera6on from 26 to 45 d6(A) SPECIFICATIONS Capacity* Cooling................................... Heating................................... .............8,000 Btu/h .............9,000 Btu/h Power Power Source ............................208 / 230V, 1-phase, 60Hz Power Consumption Cooling.............................................................0.06 kW Heating.............................................................0.04 kW Current Cooling........................................................................0.56 A Heating........................................................................0.45 A Minimum CircuitAmpacity (MCA) at 0.60"WG ..................1.05 A Maximum Overcurrent Protection (MOCP) Fuse .................15 A External Finish .................................Galvanized-steel Sheet External Dimensions Inches ...............................9-7/8 H x 27-9/16 W x 28-7/8 D mm ..............................................250 H x 700 W x 732 D Location: Schedule No. Date: Net Weight Unit ...........................................................51 Ibs. / 23 kg CoilType .................................................................Cross Fin (Aluminum Plate Fin and Copper Tube) Fan Type x Quantity ...........................................Sirocco Fan x 1 Airflow Rate (Low-Mid-High) ........................212 - 265 - 300 CFM External Static Pressure.....0.14 - 0.20 - 0.28 - 0.40 - 0.60"WG (External static pressure is factory set to 0.20"WG) Motor Type ...............................................DC Brushless Motor Output ...........................................................0.085 kW Air Filter ....................................Polypropylene Honeycomb Refrigerant Piping Dimensions Liquid (High Pressure) ..................1/4" / 6.35 mm (Brazed) Gas (Low Pressure) ....................1/2" / 12.7 mm (Brazed) Drafnpipe Dimension ..............................O.D.1-1/4"/32 mm Sound Pressure Levels Low-Mid-High ...................................26 - 28 - 29 dB(A) OPTIONS a External Heater Adapter ...............CN24RELAY-KIT-CM3 a Filter Box (Includes 2" MERV 13 filter) ...............FBM2-1 ' Cooling / Heating capacity indicated at the maximum value at operation under the following conditions: Cooling: Indoor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F (35°C) DB Heating: Indoor 70°F (21°C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C) WB Note: Ventilation air: Providing sufficient ventilation air is an impor- tant part ot every building design. ASHRAE Standard 62 provides the minimum ventilation air requirement. Also, check local codes. ,�. ` �..A,..,. =`' � � (A) Space required for service and maintenance. (B) Provide an access door for maintenance at the bottom. Note 1 Use M10 suspension bolts. (not supplied) 2 Provide an access door for maintenance at the bottom. 3 The dimensions in the table are those of the PEFY-P24, 27, 30, 36, 48, 54NMAU-E models, which have 2 fans. The PEFY-P06, 08, 12, 15, 18NMAU-E model have 1 fan. 4 To connect an intake duct, uninstall the air filter on the unit, and install a field supplied airfilter on the intake duct on the intake side. 5 If using a ventilation air connection, air temperature must be at neutral conditions. MYhubbl�l ENCtrk Alr Condllonl�p i fl�Mqntlon SytNnu Worb r.quNM I80 ,�, � �. �. ,� a �. � ,,.�� o...� �� w.a� ,.�.ay� i�..R.�n..m�m.w�a�ro.�+�.�,a.. 1 , �,p ,� ����p �� E .�.�.,� (� � 7M I60 9000 wrN� b� pI�M wlho�lrilbn ayp�m rNMMp b qw11ry �rrnnlNs r Cartifleate Num6ar FM9368! '�wn.a by en. iEO. KO f007 o.Nxw qw�ry wrmei.s b.a.a an tM •AUpn, Nw1oV^M^L ModueUon.In�Wblbn uM wxII1M' wMaa• ler preAUelt bultl �1 M �ulhorCW pML �•�. ,.{.� i"� .�$Q �'� WY� IMUOMM EMetrk Alr CqidllaNnp i R�MOMtlbn SM�1^� WerW �CWnO �nrlronmmhl WU111 � �unspM�rntMNm�b�MWI501�001pNllt�tlOn. � �� en f»�.,C,...AS�., 71r �O 1�W0 prW 4� aN o/ sbnAWS WPN4q b�nvYOnm�nl�l p�olaaUOn ul !y 1M «,•..•°x Y�brNtlonM EMertO Ory�nlyllon (150�. CMMeata NumMr EC97J1417 C SD - PEFY-P08NMAU-E -1 - 201103 MITSUBISHI ELECTRIC HVAC Advanced Products Division Mitsubishi Electric 8 Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toll Free: 800-433-4822 (#4) www.mehvac.com Specifications are subject to change without notice. � Job Name: Location: Drawing Reference: Schedule No. No.: �� �� � � : �` � �� � �„��°._ �, ,�.; GENERAL FEATURES • R410A refrigerant • 7-7/8" (200 mm) high for low ceiling heights • Six sizes from 6,000 to 24,000 Btu/h • Ducted fan coil supporting multiple configurations for flexible installation • Four external static pressure options from 0.02" WG to 0.20" WG; factory set at 0.06" WG • Choice of fan speed settings • Built-in condensate lift; lifts to 21-11/16" (550 mm) • Auto fan mode • Quiet operation from 22 to 40 d6(A) SPECIFICATIONS Capacity* Cooling Heating ................................15,000 Btu/h ...............................17,000 Btu/h Power Power Source ...........................208 / 230V, 1-phase, 60Hz Power Consumption Cooling...........................................................0.07 kW Heating...........................................................0.05 kW Current Cooling........................................................................0.55 A Heating........................................................................0.45 A Minimum Circuit Ampacity (MCA) ..............................0.69 A Maximum Overcurrent Protection (MOCP) Fuse .............15 A External Finish ................................Galvanized Steel Sheets External Dimensions Inches ....................................7-7/8 h x 39 w x 27-9/16 d mm ..............................................200 h x 990 w x 700 d Date: Net Weight .......................................................541bs. /24 kg Coil Type ...........................................................Cross Fin (Aluminum Fin and Copper Tube) Fan Type x Quantity ...........................................Sirocco Fan x 3 Airflow Rate (Low - Mid - High) ...................282 - 335 - 388 cfm Extema� Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG Motor Type.........................................................DC Motor Output.........................................................0.096 kW Air Filter ...................................Polypropylene Honeycomb Refrigerant Piping Dimensions Liquid (High Pressure) .................1/4" / 6.35 mm Brazed Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm Sound Pressure Levels Low - Mid - High ..........................28 - 30 - 33 d6(A) OPTIONS o External Heater Adapter ...............CN24RELAY-KIT-CM3 o Filter Box (Includes 1" MERV 8 filter) .................FBL1-2 o Bottom Return Adapter Plate ...............................BRP-2 ' Cooling / Heating capacity indicated at the maximum value at opera- tion under the following conditions: Cooling: Indoor 80°F (27°C) DB ! 67°F (19°C) WB, Outdoor 95°F (35°C) DB Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C) WB Note: Ventilation air: Providing sufficient ven6lation air is an important part of every building design. ASHRAE Standard 62 provides the mini- mum ventilation air requirement. Also, check local codes. � � c� `� � E W � .� N O m � .S � wn.�a.ni e�vfc ur cawawny a n.try...um sysrm. wor�u.�r.d iso f007 unMCatlon una.r ErM� f000 ot tlw k�w�leml NriAvA OryrYatbn (IS0) Eib � ��.�.����..��.�.�M�.�W • . . / eentlitlonln9 Walpnwnt � q0 Authoriaatlen fy�bm </STE� �^ TM ISO 9000 wrin h� P�nt MMw��tlon ry�bm nbqn0 b 9uYM omnlNt Y CeAlflule Number F►W569 ���a Oy IM 150. ISO f00t e�MN�s OwHry wR.rNfN W W en iM'M�qn. aw�m.m, w�uciwn, in.mrua� aw .�umry..rvk..• ar vroe�. s�m n .� .w�ain.a vr�i z ���` � 4�I xw�w.ni eiacac u. cawino�i� a �Nny...na� sr.�. wo�x..ca+na «,���m d V m.�.o.i��.r+�.wew �so ��am �.nin�.ua,. � UKAS `y f�...� tH I50110W'wb� h� W ol NnUrd� �PWYIny b�mNa�x�riW pM�etlon Mt Cy IM ...T �a,.i s�.w.,a ory.mnno� Mc�. CMMleab Numbw ECY7Ji227 C SD - PEFY-P15NMSU-E - 1- 201103 �O MITSUBISHI ELECTRIC / HVAC 2011 Unit : mm(in) V � O � � � � � T�y v y m C a � � `� O n K � � mW 'm� �.c� � y �a � � .r'.. T � � � m C � � C � > .��. � N Q�� L a N V N � �a �, ��� � � LL � L � � ��W E s d ti � m�a W$�t �„w �e�� ��m v�w�m � m N ; V � Z � C C N � � � o � j 2 � � o� CON`p " �L..W. d}a} N r � n U ��L�L � 7 V�i N N y W �ll d �Y�taaS� � N M � m O �� Z � MITSUBISHI /\ ELECTRIC HVAC Advanced Products Division Mitsubishi ElecUic � Electronics USA, inc. 3400 Lawrenceviile Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toll Free: 800�33-4822 (#4) www.mehvac.com Speciflcations are subject to change without notice. Job Name: Drawinq Reference: System No.: _,,.,........-e,_ , ,:, � ..---.._"" �."` � ..-- ,�,� • W,,,M, "°�' ���� . ���' � � ....--*.�'""""..- � . ?'° ....--, ' ' ,,�_ � GENERAL FEATURES • R410A refrigerant • 7-7/8" (200 mm) high for low ceiling heights • Six sizes from 6,000 to 24,000 Btu/h • Ducted fan coil supporting multiple configurations for flexible installation • Four external static pressure options from 0.02" WG to 0.20" WG; factory set at 0.06" WG • Choice of fan speed settings • Built-in condensate lift; lifts to 21-11/16" (550 mm) • Auto fan mode • Quiet operation from 22 to 40 d6(A) SPECIFICATIONS Capacity* Cool i ng . . . . . . . . . . . . . . . . . . Heating ..... ........ ... .. ....................................6,000 Btu/h ....................................6,700 Btu/h Power Power Source ...........................208 / 230V, 1-phase, 60Hz Power Consumption Cooling ...........................................................0.05 kW Heating...........................................................0.03 kW Current Cooling........................................................................0.41 A Heating........................................................................0.31 A Minimum Circuit Ampacity (MCA) ..............................0.52 A Maximum Overcurrent Protection (MOCP) Fuse .............15 A External Finish External Dimensions I nches . . .. ........ .. . .. mm..................... ............Galvanized Steel Sheets .........7-7/8 h x 31-1/8 w x 27-9/16 d ...................200 h x 790 w x 700 d Location: Schedule No. Date: Net Weight .......................................................42 Ibs. / 19 kg Coil Type ...........................................................Cross Fin (Aluminum Fin and Copper Tube) Fan Type x Quantity ...........................................Sirocco Fan x 2 Airflow Rate (Low - Mid - High) ...................176 - 212 - 247 cfm Extemal Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG Motor Type.........................................................DC Motor Output.........................................................0.096 kW Air Filter ...................................Polypropylene Honeycomb Refrigerant Piping Dimensions Liquid (High Pressure) .................1/4" / 6.35 mm Brazed Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm Sound Pressure Levels Low - Mid - High ..........................22 - 24 - 28 d6(A) OPTIONS o External Heater Adapter ...............CN24RELAY-KIT-CM3 o Filter Box (Includes 1" MERV 8 filter) .................FBL1-1 o Bottom Return Adapter Plate ...............................BRP-1 ' Cooling / Heating capacity indicated at the maximum value at opera- tion under the following conditions: Cooling: Indoor 80°F (27°C) DB ! 67°F (19°C) WB, Outdoor 95°F (35°C) DB Heating: Indoor 70°F (21 °C) DB, Outdoor 47°F (8°C) DB / 43°F (6°C) WB Note: PEFY-P06NMSU-E cannot be used with PUHY/PURY-P-TGMU or PQHY/PQRY-P-TGMU units. Note: Ventilation air: Providing sufficient ventilation air is an important part of every building design. ASHRAE Standarcl 62 provides the mini- mum ventilation air requirement. Also, check Iocal codes. � d U C N u c .£ � U ._ N U n h m .� � Wwbbhl ENttrk �Ir CaW111oNny L RMrIqN�tlon Er�4m� Works K4u4M 1!O f007 wMflutlon uiMr E�rM� f000 d IM InbmNbnY Ar�EVA Or9�� (�1 OuW on � rMw ot WNIry wrrr�IN� lor tM P�� ol nMp�nHOn M W • .Pp 1�/ coneltlonlnppulpm�nR r E 190 Autlwriralim Sy�bm (�STEp �• TM 150 9000 wrin b� P�nt a1tlarmtlon ayM�m nl�tlrq b V�KY omnWa u Certlflnle Number FM33588 �w ���O. ISO f007 cvtllNS outliry .rrriWS W�W on IM •MNyn, � �, w�+w�, x,.�.irm� .na w,u�w..,aws• ro. w��+• ww n umwuee a.nc ��� � MltruEtrhl Ehcble Ak CmEltlml • n0 IIMr19KMion BY�� Worlu �eWrN �nrkanmenal 8 m�napMnwN �Y� YanOW ISO i�Wl urtllle�tlon. y� � UlAS TrISO/�WO�wNtb�sNO1tW�MrO��PWYMOb�pol�clbnwtMlM ."m Y�Ym�llontl 6tarMVtl Orqntratlon (150� Grtlfkab NumGr EC97Jt227 C SD - PEFY-P06NMSU-E -1 - 201103 � MITSUBISHI ELECTRIC / HVAC 2011 � � o� am � � h :a ;$g �� h � W N .- � 0 � y � � �CN ,.W, � T � � Z N N � 7 ap C m �F� >� vl q E� ta uv c a �m�m 8� LL V t� m N� a E o m� � ° ° W E �= n � 'n� mw�m �jma 3$� Z�cc mZ'v �'�mc � ° � t Z � � O O� C O N O.-. �Lmaa r ma�yyy � ta.IL�'c � $r Rww �� �x�-taa5... .= c�i ri v 0 ^� Z S�bl Unit : mm(in) MITSUBISHI ELECTRIC HVAC Advanced Products Division Mitsubishi Electric 8 Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Faz: 800-889-9904 Toll Free: 800-433-4822 (#4) www.mehvac.com Specifications are subject to change without notice. Job Name: Location: Drawing Reference: Schedule No. System No.: GENERAL FEATURES • R410A refrigerant • 7-7/8" (200 mm) high for low ceiling heights • Six sizes from 6,000 to 24,000 Btu/h • Ducted fan coil supporting multiple configurations for flexible installation • Four external static pressure options from 0.02" WG to 0.20" WG; factory set at 0.06" WG • Choice of fan speed settings • Built-in condensate lift; lifts to 21-11/16" (550 mm) • Auto fan mode • Quiet operation from 22 to 40 d6(A} SPECIFICATIONS Capacity'` Cooling ..........................................................12,000 Btu/h Heating ..........................................................13,500 Btu/h Power Power Source ...........................208 ! 230V, 1-phase, 60Hz Power Consumption Cooling...........................................................0.07 kW Heating...........................................................0.05 kW Current Cooling........................................................................0.53 A Heating........................................................................0.43 A Minimum Circuit Ampaciry (MCA) ..............................0.67 A Maximum Overcurrent Protection (MOCP) Fuse .............15 A External Finish ................................Galvanized Steel Sheets External Dimensions Inches ................................7-7/8 h x 31-1/8 w x 27-9/16 d mm ..............................................200hx790wx700d ` Date: Net Weight .......................................................46 Ibs. / 20 kg Coil Type ...........................................................Cross Fin (Aluminum Fin and Copper Tube) Fan Type x Quantity ...........................................Sirocco Fan x 2 Airflow Rate (Low - Mid - High) ...................211 - 282 - 370 cfm Extemal Static Pressure ...............0.02 - 0.06 - 0.14 - 0.20"WG Motor Type.........................................................DC Motor Output .........................................................0.096 kW Air Filter ...................................Polypropylene Honeycomb Refrigerant Piping Dimensions Liquid (High Pressure) .................1/4" / 6.35 mm Brazed Gas (Low Pressure) .....................1/2" / 12.7 mm Brazed Drainpipe Dimension .......................O.D. 1-1/4" / 32 mm Sound Pressure Levels Low - Mid - High ..........................23 - 28 - 35 dB(A) OPTIONS a External Heater Adapter ...............CN24RELAY-KIT-CM3 e Filter Box (Includes 1" MERV 8 filter) .................FBL1-1 o Bottom Return Adapter Plate ...............................BRP-1 ` Cooling / Heating capacity indicated at the mauimum value at opera- tion under the following conditions: Cooling: Indoor 80°F (27°C) DB / 67°F (19°C) WB, Outdoor 95°F (35°C) DB Heating: Indoor 70°F (21 °C) OB, Outdoor 47°F (8°C) DB / 43°F (6°C) WB Note: Ventila6on air: Providing sufficient ventilation air is an important part of every building design. ASHRAE Standard 62 provides the mini- mum ventilation air requirement. Also, check local codes. m u C m c E m t� .� O w N a � .� � � ��„�N.���.�,,�.W�,.�..a� ,�, ���.���.�.�.,����, E*� � w..ao�.r.�n..ma�.�nrw�.m.,ro.u�.pod�..r�amny.mwn.�ew • � �/ eondtlonlnppulpnwnt Y q0 Autlqriralien $yWm ��Ep E TM ISO 9000 wrin b� P�m rMOrR�tlon �Y�mm �1a11o0 a 9uYb omnlM� as � Certiflnte Numbar FM33588 ��a ���• ��1 ertlMa y�Wlry warw�llw NwA m IM •YSlyn. aw.apm.n�, v��wn. x�.�rano� .ne .u.m.ry..�..• ar yroe�. e�m N �n �unwnzea punc "�� �' W MIUUMShI EMCIrk iUr ConMtloniep i RNAqr�llon Sy�bm� Works �caulntl �nrMOnm.nhl � � nu�nwn� �Yabm WIiArY 180 1�007 qrlllle�tlon. W ��f ��,.�.C..�.� S Tw ISO 11000 wrb� b� aNW �nGrM WWYIn' lo �nvYwm�nW praMGlon M M tlr ._° �.na,r e�.wb ay.nn.non pwF C�rtllfeaU NumWr EC97J1Yl7 C SD - PEFY-P12NMSU-E - 1- 201103 0 MITSUBISHI ELECTRIC / HVAC 2011 Unit : mm(i�) tc . U s O � T � °av q � �N �B d r e am 0 a� r � N� `m W = N m U� C y l0 � C � w « T l6 m Z c� ui > °a B C � > w � N � E � L v d v a �m m ��� 8°t� m 7 O W E d N� m�a u'8�i� �,�s` �e� ay v�w� �o 3�8 Z�my ��� o(,1m` ��pZy� y N� C O N °�t maa a°,� � a U � } } V1 ? m m N N lL �L � N m t �p W W m � Y F t d d 5« � c�i vi v a (� Z ci�l � MITSUBISHI /� ELECTRIC HVAC Advanced Products Division Mitsubishi ElecUic � Electronics USA, Inc. 3400 Lawrenceviile Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toli Free: 800-433-4822 (#4) www.mehvac.com Specifications am subject to change without notice. Job Name: � Drawing Reference: System No.: � OUTDOOR VRF SYSTEM FEATURES • Single-phase outdoor unit with variable refrigerant flow zoning (VRF) technology • Inverter-driven (variable speed) compressor • Total refrigerant piping length of 394' (120 m) • Uses CITY MULTI indoor units and Controls Network • External finish: Precoated Galvanized-steel Sheets • Operating Outdoor Temperature Range Cooling: 23°F — 115°F (-5° � +46°C) DB* Heating: 0°F � +60°F (-18° — +15°C) WB ' If PKFY-PO6/08 indoor units are connected, then range is 50°F - 115°F (10°C - 46°C). Location: Schedule No. Date: ,;���(�l�;l,j��i�i��, �. � IIII II ) INfI l� It1t il� ili�lil I�� I 1 r ^ �1fIIN{ilGt << �� � � fUl/lt�l���fi�+;n' � , �unlweu) �'t11��11��'���wi' I �� .i.�n�i u�u �iri iiiij in i i �.�,;,,,:„��;,�„� , �� � .�„i��E1��;=,u"b1 � ��' I�;��l, �""� � , � I`I Itl t�'f�'�INN! � �Illllll�i� jltl ��I�3� 1 ii�u n; n rii i ut� �. ��'�i�t�'� ""�p�ini+6L� � , �,�,;,�'�,�,�,;�,� ;., ,� ,, � �;; ��!, i, �'t ," .�- I ER R � ` � . ..�. OPTIONAL PARTS ❑ Branch Joint (T-Branch) ..............................CMY Y62-G-E ❑ Header - Four-Branch ..................................CMY-Y64-G-E ❑ Header - Eight-Branch ...................................CMY-Y68-G-E ❑ Air Outlet Guide (One Piece)"* ....................PAGSG59SGE ❑ Wind Baftle (One Piece)"" ....................................WB-PA2 ❑ Drdin Pan ................................................PAC-SG64DP-E ❑ Drain Sodcet .. ..........................................PAC-SG61 DS-E " PUMY requires two ouUet guides or wind baifles tor installation. Specificationa Model Name Unit Type PUMY-P36NHMU Nominal Cooling Capaclty BtuTh 36,000 Nominal Heating Capacity Btu/h 40,000 Extemal Dimensions (H x W x D) In. / mm 53-3/16 x 37-7/16 x 13 (+1-3/16) / 1,350 h x 950 w x 330 (+30) Net Weight Lbs. / kg 287 / 130 Electrical Power Requirements Voltage, Phase, Hertr 208 / 230V, 1-phase, 60Hz Cooling Power Input kW 3.22 Heating Power Input kW 2.93 Cooli�g Current (208I230V) A 14.2 / 157 Heating Current (208/230V) A 12.9 / 14.2 Minimum Circuit Ampacity (MCA) A 26 Recommended Fuse/Breaker Size A 30 Maximum Fuse Size A 40 Liquid (High Pressure) 3/8 / 9.52 Piping Diameter (Brazed) (In. / mm) Gas (Low Pressure) 5/8 (15.88 Total Capacity 50 to 130% of Outdoor Unit Capacity Indoor Unit Model / Quantity PO6 to P36 / 1 to 6 Sound Pressure Levels dB(A) 49/51 Fan Type x Quantity Propeller Fan x 2 Airflow Rate CFM 3,530 Direct<Irive Inverter Motor Output kW 0.086 Compressor Operating Range 33°/a to 100% Compressor Type x Quantity Inverter-driven Scroll Hermetic x 1 Compressor Motor Output kW 2.4 Refrigerant R410A Lubricant FVSOS High-pressure Protection Device 601 psi / 4.15 MPa Compressor / Fan Protection Device Overheat Protection /Thermal Stivitch Inverter Protection Device Overheat / Overcurrent Protection Blue Fin Anti-corcosion Protection: Cellulose- and polyurethane-resin coating treatment applied to condenser coil that protects it from air contaminants; t1 um thick; Salt Spray Test Method - no unusual rust development to 240 hours. `� `... �� �� ��� # � a 0 � � 0 s�� $ a � � �� a a� � ��� ���� � ��� � �� ��� � �� � � � ���� � �� ��•� a� $ � , LL � 3�B LL Ati M i � E �� w � � a 3gp , � w � � %'� � �: ffi U � " � ��� '` W� `� o � . � S .= o # �� � � � � �+ m 'cn � U O � � � � ��� � � w � ��W� � � � � Mnsu0lsM lYetrk Alr CaMItloNrq i Mlrlqn�tlm fysWw� WorYS KQukM ISO 900/ prtHk�Uen uM�r BwM� f000 0l iM Y�brtYtlonY 3W�AW Or9Nli�lbn (150) � e..sa an .�•rv a w.�r••.�.�. �a me v�� a nnyw.non .ne r� • . o � ea�anromna �whw�� I50 AWwrinlbn 8yaMn �� �; m. ao coao ..rw. r. pam wua'mue� .rw� r.��ro m q�ruy ..�r.nio.. � .eqwn.a ey m• iso. iso soo� �.nm.a w�nv.r,.m.. e.a.e e� uw'«.ie^, CMMCate NumDer FM3J568 ye��op��4 p���, kyWl�tlon mE au:lYar awvkw' la yrodueb OWk M �n �uthorizW p4n1. �� �.{� y�� ],SQ `�y W YlbuWtM ENe41e �k GaWlibnln9 � R�MqM�bn SYN,N WMka �CW�rM MvFOnnMnW j ��1� � � mnry.n.nt synwn w�e.ra Ifo 7�ooi enune.um. .�� � Us�C�A 5 1M ISO 7�000 Mrlw b a wl of �bndrt0� WP�Y��O b�nNmmMnW poNetlon M py iM .. . �nrw�.i swb.a aw�wuo� �so� GrtMOat� NumWr EC97J7�7 C SD - PUMY-P36NHMU - 1- 201007 � MITSUBISHI ELECTRIC / HVAC 2010 mm(in) � nn�TSUB�sH� /� ELECTRIC HVAC Advanced Products Division Mitsubishi Electric & Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fau: 800-889-9904 Toll Free: 800-433-4822 (#4) www.mehvac.com Specifications are subject to change without notice. � � � �i i o��.ss-os IEF-1 I � � E7 �/ � i sp e��� IIII I', , l% y Specification Submittal Data / Panasonic Ventilation Fan Deseription Ventilating fan shall be Low Noise ceiling mount type rated for continuous operation. Fan shall be ENERGY STAR rated and certified by the Home Ventilating Institute (HVI). Evaluated by the Underwriters Laboratories and conform to both UL and cUL standards. Motor/Blower. • Four-pole totaliy encbsed condenser motor rated for continuous use. • Power Rating shall be 120 volts and 60 Hz. • Fan shail be UL and cUL listed for tub/shower enclosure when used with a GFCI branch circuit wiring. • Motor equipped with thermal�utoff fuse. • Removable with permanently lubricated plug-in motor. Housing: • Rust proof paint, gaNanized steei body. • Detachable dual 4' or 6' diameter duct adaptor. • Buift in backdraft damper. • 6cpandable extension bracket up to 24". • Double hanger bar system allowing for ideal positioning. Grille: • Attractive design using PP material. • Attaches directly to housing with torsion springs. Warranty: • ALL Parts: For period of 3 years from the date of the original purchase. Arehksetunl Speeifiwtions: Ventilating fan shall be of the ceiling mount, ENERGY STAR rated type, with no less than 80 CFM and no more than less than <0.3 sone as certified by the Home Ventilating Institute (HVI) at 0.1 static pressure i� inches water gauge (w.g.) with no less than 62 CFM and no more than 0.4 sone as certified by FM at 0.25 w.g. Power Consumption shall be no greater than14.7 watts at 0.1 w.g. and 14.5 watts at 0.25 w.g ENERGY STAR rated with efficiency of no less than 5.8 CFM/watt at 0.1 w.g and 4.5 CFM/watt at 0.25 w.g. The motor shall be totaly enclosed, four pole condenser type engineered to operate continuousiy. Power rating shall be 120v/60Hz. Included is a detachable dual 4" or 6' diameter duct adaptor. Duct diameter shall be no less than 4". Fan shali be U� and cUL listed for tub/ shower enclosure when used with GFCI branch circuit wiring. Fan shall be ASHRAE 622, LEED, ENERGY STAR IAP, EarthCraft, Cal'rfornia Tftle-24, and WA Ventilation Code compliant. ,_ Specifications: WhisperCelling FV-08VQ5 4� � 6� �`� (standar� Static Pressure in i�ches w.g. 0.1 025 Air Volume (CFM) 80 62 Noise (sones) <0.3 0.4 Ventilatlon Fan power Consumption (watts) 14.7 14.5 CI18f8C�Q�iSUC8 E�ergy Eificiency (CFM/Watt) 5.8 4.5 (HVI tested data for 0.1' S.P.) Speed (RPM) 829 1089 Current (amps) 0.12 0.12 Power Rating (V/Hz) 12W60 ENERGY STAR rated YES As of date 4/11 For complete Installation Instructions visit www.panasonic.com/building Q o.eo ; � := o.so � § 0 a` 0.40 � w N �.� 020 o.io o.00 o zo �o eo _• �:��� ,2 4" or 6" duct ����o 'D�f�s''2• ��. �; 5 e 1'� / , ,o �� �?�9• ��9 \ �02 � 3. �h� . FV-08VQ5 Model Ouantity Comments Project: Location: Architect: Engineer: Contractor: Submitted by: Date: Panawnie Homs and Environmsnt Company Division of Panasonic Corporation of North America One Panasonic Way Secaucus, NJ 07094 www.panason ic. co m/bu i Id i ng �� c � L u s � 4" Duct �-OQ�/ - • 20 Feat —.—.10 F�at - • 60 Feet — 80 Feet - • 100 Fee � 6" Duct to ioo Airflow(cFM) E F-2-3-4 � E��i i sp e���� i I%� r r� Specification Submittal Data / Panasonic Ventilation Fan Dsscriptlon Ventilating fan shall be Low Noise ceiling mount type rated for continuous operation. Fan shail be ENERGY STAR rated and certified by the Home Ventilating Institute (HVI). Evaluated by the Underwriters Laboratories and conform to both UL and cUL standards. Motor/Blower. • Four-pole totally enclosed condenser motor rated for continuous use. • Power Rating shall be 120 voits and 60 Hz. • Fan shail be UL and cUL listed for tub/shower enclosure when used with a GFCI branch circuit wiring. • Motor equipped with thermal-cutoff fuse. • Removable with pertnanently lubricated plug-in motor. Housing: • Rust proof paint, galvanized steel body. • Detachabie dual 4' or 6' diameter duct adaptor. • Built in backdraft damper. • Expandable extension bracket up to 24". • Double hanger bar system allowing for ideal positioning. Griile: • Attractive design using PP material. • Attaches directly to housing with torsion springs. Warranty: • ALL Parts: For period of 3 years from the date of the originai purchase. ArchR�ctural Specifleatlons: Ventilating fan shall be of the ceiling mount, ENERGY STAR rated type, with no less than 110 CFM and no more than less than <0.3 sone as certified by the Home Ventilating Institute (HVI) at 0.1 static pressure in inches water gauge (w.g.) and with no less than 91 CFM and no more than 0.5 sone as certified by HVI at 0.25 w.g. Power Consumption shall be no greater than 21.1 watts at 0.1 w.g. and 20.7 watts at 0.25 w.g. ENERGY STAR rated with efficiency of no less than 5.3 CFM/watt at 0.1 w.g. and 4.5 CFM/watt at 0.25 w.g. The motor shall be totally enclosed, four pole condenser type engineered to operate continuousty. Power rating shall be 120v/60Hz. Included is a detachable dual 4` or 6" diameter duct adaptor. Duct diameter shail be no less than 4". Fan shall be UL and cUL listed for tub/ shower enclosure when used with GFCI branch circuit wiring. Fan shall be ASHRAE 622, LEED, ENERGY STAR IAP, EarthCraft, Califomia Tftle-24, and WA Ventilation Code compliant. Specifications: WhisperCeiling FV-11 VQ5 4• or s° n��t (Standar� Static Pressure i� inches w.g. 0.1 0.25 Air Volume (CFM) 110 91 Noise (sones) <0.3 0.5 Ventilation Fan power Consumption (watts) 21.1 20.7 Characteristics Energy Efficiency (CFM/Watt) 5.3 4.5 (HVI tested data for 0.1' S.P.) Speed (RPM) 950 1161 CuRent (amps) 0.18 0.17 Power Rating (VMz) 120/60 ENERGY STAR rated YES As of date 4/11 For complete Installation Instructions visit www.panasonic.com/building q� 0.60 a r � 0 70 � a 0.80 u a` � o.so w N 0.10 0.90 o.zo o.a FV-11 VQ5 FV-11 VQ5 o.00 i�� --�-�- - ,- - i 0 t5 SO 75 100 125 Airllow(CPM) Model Quantity Comments ProJect: Location: Architect: Engineer: Contractor. Submitted by: Date: Panasonic Hom� and Environm�nt Compaoy Diviaion of Panasonic Corporation of North America One Panasonic Way Secaucus. NJ 07094 www.panason i c.c o m/b u i I ding �,c�Lus � '�io�sss-i� 4" Duct FV-11V05 - • 20 FeM ._..._. �0 F�et � • 60 Feet —!0 Feet - • ioo v..c 6" Duct � Job Name: Drawing Reference: Svstem No.: A�� a as o ��� � a� ���� � � F . top � �� � � �� �� �� O i � � � ��: o� :�,� o 0 ,.., � .�-�-I� .�.�..� PAR-FL32MA PAR-FA32MA (Signal receiving unit) OVERVIEW OF CITY MULTI� CONTROLS NETWORK (CMCI� • Consists of TG-2000 integrated system software, AG-150/ GB-SOADA/GB-24�I'G24 centralized controllers, web browsers, timers, remote controllers, and BMS interfaces. � • TG-2000 integrated system software supports up to 40 AG-150/GB-SOADA centralized controllers (licensed for PC sofiware features) for a maximum of 2,000 indoor units from a single PC. • AG-150 centralized controller operates up to 50 indoor units with optional control via a field-supplied PC with licensed software. • GB-SOADA centralized controller operates up to 50 indoor units via a field-supplied PC with licensed software. • GB-24 central controller operates up to 24 indoor units via a field-supplied PC with licensed sof�ware. • TC-24 standalone centralized controller operates up to 24 indoor units via an integral touch screen interface. • Remote controllers consist of Deluxe MA, Simple MA Wireless MA, and ME. • UO controllers consist of D1D0 (PAC-YG66DCA) and AI (PAGYG63MCA) for third-party equipment control. • LonWorks� and BACnet�' interfaces also available. • Interlocking of LOSSNAY� ERV units for control via the AG-150/GB-SOADA/GB-24/TG24 centralized controllers. Signal receiving unit Non-polarized 2-wire Wireiess • remote � controller Location: Schedule No. Date: PAR-FL32MA WIRELESS MA REMOTE CONTROLLER SPECIFICATIONS • Used in conjunction with PAR-FA32MA MA Remote Controller Receiver. • Maximum signal receiving distance is appmximately 22' (7m). • Maximum signal receiving angle is approximately 45 to the left and right of center. • Install a minimum of 3' (1 m) away from a television or radio. • Controls group operation for up to 16 indoor units in a single group. • Supports both Fahrenheit and Celsius. • User Functions allows user to set: - On/Off - Set Temperature - Operation Mode (Heat, Cool, Dry, Fan, Auto [R2-Series only]) - Fan Speed setting - Airflow direction (depending on indoor unit) • Range of set temperature depends on the indoor unit: Cool/Dry: 67°F to 87°F / 19°C to 30°C Heat: 63°F to 83°F / 17°C to 28°C Auto: 67°F to 83°F / 19°C to 28°C • On/Off timer: One On/Off setting for one day. • Function Lockout: Individually prohibits all functions of each remote controller. • Grouping: Can only be used in same group with PAC-YTSICRA Simple MA Remote Controllers, PAR-21MAA Deluxe MA Remote Controllers, and other wireless receivers with up to two remote controllers per group. Wireless remote controller cannot group indoor units served by separate outdoor units. • Dimensions: 2-1/4" W x 6-1/4" H x 3/4" D(58 x 159 x 19mm). PAR-FA32MA WIRELESS MA REMOTE CONTROLLER RECEIVER SPECIFICATIONS • On/Off lamp to indicate unit operation and enor status. • Enable heat and cool operation (at pre-set parameters) from the receiver for when the remote is not operational. • Wiring: Connects using two-wire, stranded, non-polar control wire to TB-15 connection terminal on the indoor unit. Requires crossover wiring for grouping across indoor units. • Dimensions: 2-3/4" W x 43/4" H x 7/8" D(70 x 120 x 23mm). Non- polarized 2-wire Signal . receiving � unit Wireless remote � controller Non- polarized 2-wire Signal � receiving unit Wireless remote � controller �) x��� � � �b p j)�d p�� � ��= _ ° :�, %� - ..:sE `�i��J ON/OFF jF TEMC � O � � � .-' '-r PAR-FL32MA 19f3/al PAR-FA32MA 70[2-3/4] 22.5[�/e] i0 ON/OFF � � � N � � i�,ilfAt OCOOL N 0 0 .�.11RUe�N BKTnIc Unit:mmjin.] O O HqtixfuBAl�� c F a�� l^iiEL <ARL C N_F t�;. $IIMlAI1. Gt�1�EKQti f OY�ITb��C(Ntt�. 1[432Nmtl�SBT:f/I�r_ �CSOIIf.Lt�t.lt4�LL ( f,! l�. tLt4Ntl.'1 t n F+K9 if Bt71LL<1_£�`, iLtARymt Lii.279 E�n 2 e�-31lYt�c ( ti £ ��. • W AN���.« Mhnin. kbart w �����4+teNt:xl plb�l�.pa'rx!IY •Xnen N 1�ttx i r� N Wu 0c .Y �rw�tbwey�mVe�la'a, � IKti� �Mw i�4i MM� ec4r a. plor�:.a� MEtwE+tt�x'.� t1hwYM�NMpn •Irrrf:�.I�ry�.Mtw q�r�xti�tw NiMwtl� �st��nllr •iodw�tl�'aMrtrW ro.w �IrNIIaM1T�aw.• ��.p01G �pIE0p111 0 � Wtwblahl EMCtrk Alr CondltlonMp � R�IAyx�llo� 5y1tNn1 Worka �equlrW 180 fooi e.nme.non w,a.r s.nn fooa a m. mw�n�wi mnare aw+*•uo„ fiso) E*/� � w..a�.�.w..awriM..rt.,:a.ro,m.woe�cu�or�.mwono�a�a.k • . . / contlltlonin9 Mulpmn�. Y so.�m«mtl� s,.w� 57E� TM t50 9000 arW la � pWq rMOrlx�ibn W Wm M�tlnp m 9ua1M �rraniN� r �pV�4lW h' �M ISO. I30 l001 qrtlM� WYIIY M�rtr�Hp WMG en tlN'Maipn. Certiflcate Num6er FM33568 a�opm�n; ProAUetlon. M�blbUen �nE auvl�ry wrvlc�s' M pro0ueb Culk �t �n �uthorfteE plmt �, '�``� d� t:� [$Q � � WUUWM EMetrk Alr ConNlbNnq � RNrly�ndon fYN�� W� KVW�� �^vlronm�nhl ` rr% F ��OM� �Y�Mn �UM�rd ISO 1�007 nrqllutlrn. A \.�.1 J U N�5 d iM ISO 1�000 rris h� wt ol NanE�rd� �PPN�q ro�nvkonm�nfal Oro�� wt Gy IM �'•...�^` �wmeeo�r awa..a o.yenr.non psoi. c.rtnkau Numwr ece�dt�n C SD - PAR-FL32MA and PAR-FA32MA - 1- 201008 � MITSUBISHI ELECTRIC / HVAC 2010 � MITSUBISHI /_ ELECTRIC HVAC Advanced Products Division Mitsubishi Electric & Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toll free: 800�33-4822 (#4) www.mehvac.com Specifications are subject to change without notice. � � Job Name: Drawing Reference: System No.: � �` ��, � t . �o , � GB-24 Centralized Controller OVERVIEW OF CITY MULTI� CONTROLS NETWORK (CMCN) • Consists of TG-2000 integrated system softwaze, AG-150/ GB-SOADA/GB-24�I'G24 centralized controllers, web browsecs, timers, remote controllers, and BMS interfaces. • TG-2000 integrated system software supports up to 40 AG-150/GB-SOADA centralized controllers (licensed for PC software features) for a maximum of 2,000 indoor units from a single PC. • AG-150 centralized controller operates up to 50 indoor units with optional control via a field-supplied PC with licensed software. • GB-SOADA centralized controller operates up to 50 indoor units via a field-supplied PC with licensed software. • GB-24 central controller operates up to 24 indoor units via a field-supplied PC with licensed software. • TC-24 standalone centralized controller operates up to 24 indoor units via an integral touch screen interface. • Remote controllers consist of Deluxe MA, Simple MA Wireless MA, and ME. • I/O controllers consist of DIDO (PAGYG66DCA) and AI (PAC-YG63MCA) for third-party equipment control. • LonWorks� and BACnet� interfaces also available. • Interlocking of LOSSNAY°� ERV units for control via the AG-150/GB-SOADA/GB-24/TG24 centralized controllers. GB-24 STANDARD PACKAGE • GB-24 Centralized Controller • PAC-SCSOKUA Power Supply • SW-Mon: PC Monitoring • SW-Sch: PC Scheduling • SW-Email: Online Error Email • SW-Maint: Online Maintenance Tool Location: Schedule No. Date: SOFTWARE FEATURES • SW-Mon: Monitoring enables building manager to customize and operate all indoor units from a network PC's web browser for up to 24 units per GB-24. • SW-Sch: PC Scheduling enables building manager to customize daily, weekly and annual schedules from a network PC's web browser from up to 24 indoor units per GB-24. Schedules can be applied to a single indoor unit, a group of indoor units or collectively (batch) to all indoor units controlled by the GB-24. • SW-Email: Online Error Email Distribution when an enor occurs on the CITY MULTI system monitored by the GB-24. The fault will be detected and a detailed alert will be sent via email to the necessary personnel. • SW-Maint: Online Maintenance Tool software performs maintenance diagnostics via network PC and GB-24 Centralized Controller. Does not require CMS-MNG-E converter/cable. GB-24 CENTRALIZED CONTROLLER SPECIFICATIONS • Manages up to 24 indoor units. Units can be controlled individually, in a group or in a collecrive batch operation. • Selectable setback mode with heating and cooling set points. • Controls On/Off, Operation mode selecrion (Cool, Heat, Auto [R2-Series only], Dry, Fan, Setback), temperature setting and air flow direction. • Scheduling: Supports daily, weekly, annual schedules through licensed operation via PC brower. • RJ-45 IOBASE-T Ethernet port supports interconnection directly to PC or to Local Area Network (LAN), PC browser and TG-2000 software functions require Mitsubishi Electric HVAC issued software licenses. • Permits or prohibits remote controller functions such as On/Off, Change Operation Mode and Set Temperature adjustment. • Requires manual addressing using dip switch to the M-NET communication bus (default address is 000.) • Wiring: requires power supply unit (PAGSCSOKUA). • Dimensions: 5-1/8 H x 9-7/8 W x 1-1/2" D • Extemal inputloutput signals can be used for batch operations such as Start/Stop and Emergency Stop. � \� • GB-24 CENTRALIZED CONTROLLER DIMENSlON5 .. � , � � ; � f � • � �— � '�e� / � 2� {97�d� I .� __.._ . _ _ ___ � e � �ao, �a ��'EB BRO�'�'SER PC REQUIREMENTS � `''� 00 e e 0 t�� Unit:mm[in.] ��� m ar� � / 3 � abwn ; � � Item Requirements CPti Pentium� 133MHz or faster IPentium 300MHz or more recommended blemo � 64MB or more 128MB or more recommended) Screen Resolution 1024 x 768 or hi her recommended Compatible MicrosoR� Internet Explorer 6.0 or later (Note: Javao execution environment is required [Sun Microsysems� Java Windows� p]u m Vet. 1.4.2 or later Check the Sun Micros stems Java Plu m vetsion in "Java" in the control anel Browser �-� �• Y g-� P )• Onboard LAN Port or LAN Card One connector IOBASE-T Other Pointin device such as a mouse. • 100 - 240VAC t10 %; 0.8A— 0.4A; SOHz/60Hz single-phase. � • Fuse: 6.3A time delay type. • Output voltage/current: M-NET: 23.0 — 32.OVDC; DC power supply: 24VDC f5% 0-7.SA. • Dimensions: (H x W x D) 6-11/16 x 10-11/16 x 2-7/8". • Weight: 3-1/81bs. • Indoor installation in field-supplied control panel or surface mount attachment (sold separately). PAC-SCSIKUA POWER SUPPLY DIMENSIONS �`� -�� C� ��.�.r., �'� �:��;°�, w�, �,,,�:,,.:.�,�M° :� :. +_ �� ^�" - :Y� c �-.L:ii:.�� •;��' ['.i ��' ::;i�%f'�/!L1 � =,':1. � � w � � � � � � � � � a c� �� � � M � � r � � . _ _ _ _ _ . _. _.� . � �� ' ,.`, .; iu' `r.��.— � t•■■■t�.�_ TB2,TB3 NlpublMl Elsclrlt Air Can0ltbNnp i MMqNtllon SysMns Worka spiW�U q0 � 9ow unim.non u�w.r s.�.. a000 d n» ue.nreonr sr.w.ra ay.�a.uon Pso� E� I e...a oo . r.a.. a w��r •.r.�u.. io. m. orod�uon a n��yv.non .na rr • . . / eon�tlonln9 MN�P�� Y ISO AuMwrizHlan Sy�bm ��E m TM ISO 8000 wrlw h a Wenl �u111qtraWn aY�� rN�tlnO b 9�nY wartantNa Y ttIpWNM bY Ne ISO. ISO l001 pMM� W�IIty wrrY�qN NNA en IM'M��On. Certiflcate Number FM33568 �,p„w„i, P,,,a„�,,,, �„��,,, .,,e.�auw �•' �« woa�d e�m N .i wenorirae p.m. � �> i r $Q � � MMSUEkN ENCbIC Ak CandMbninp i NMIpMNIOn ByaWnt Wa/k� �CquleM �nrkonm�nW I417U1 manp�nwrt qsbn aundvd ISO 110ot weXk�uon TlS �.�r.�. �RAS ��,.,- .�d ,. rn. roo u000..N.. r..« e�,�,�e.'a.ppymy eo «m.a.�.nr p.oa�ao� ..e nr u,. eern.uon.i ltra.re aqentr+�an �soF Grtflfuu NumMr EC97J1227 TB1 Unit: mm (in.) � MITSUBISHI /_ ELECTRIC HVAC Advanced Products Division Mitsubishi ElecUic b Electronics USA, Inc. 3400 Lawrenceville Suwanee Rd. Suwanee, GA 30024 Tele: 678-376-2900 • Fax: 800-889-9904 Toll Free: 800�33-4822 (#4) www.mehvac.com C SD - GB-24 Base Package -1 - 201012 O MITSUBISHI ELECTRIC / HVAC 2010 SpecificaGons are subject to change without noUce. � � , "�;; _ r� _.�,, m. 4d �a . ��� _ � x.' � �� � � �, >. �� I * I � i �--�^ N ___ zm m � -�i a - O � zw _ T n `� a O I� .,�H, n�, .�,,� ,� ,� ' I �I � I�T ^' O , I I � r.. — � I� . y '� fi � � � � z ,; j � � , � � � � � x :!�- �' — , _' __-- - < _ � m p �I 1.? �,�±—� II�II� �� Ap'__ — LJ—__—� . � — G .— —'.__T I.�I- . �.. y I _ A � n Y O i i� � F T— __ __._.. � ..._ _ ,�,i I � .. P. � I I li�i;' o ^ � )))) C \ _ _� �' W' � ra �__ '" 1 E _ .- __ _. �,� ..- D � i- I = � � � , � r - - - - _ � � £ �? N�n �� � ^ ' � A v . rn��-u ��i _... _ _.. ���..m.. � a _ _ -.. +:.a.:d . s _� � y q � A � � �g'^. s F ,- H y� _ :,: a � .... A'i n..in�i��ou.�.nan..e - _ I'�I�'� l _ � ni ro -o i, �i `c 'ti O� U A W N— b � ..�- �% �.% :.i .n � C r'"� .'9 7� 7 'F A C C C C C C � zzzzzz 'b c��edo v� ^n -� -n -n -n -n CO0000 � v����� C�CCCG [17 c�i�>���� � C— �--� N N C U'z t/i Vi O� O� r..y � ln � cn�tn �O �D � � � � � � `r'; W 'r1 'i'1 'i'1 'i'1 ' i�i �� n C�i n i� 7 0 0 .n , _ . i f. I '�� c � ; mwoH,, a, _,,,,�. i � �— . -- — � � — � ' - ,PW , a��, � � x � ~ � ~ _ - � ' A ' I'� J — � i H _" � __ — - ',. IA Z � _ -�_�� LJI O � A � I I� k �. . Om �� m D z A oN z� -� � O r ! �i z� �� z x ' � m x3 za n ,. � �' R = o� �� � x^ o ' L � � D �� O I D z i -� _ _ N O z , � � _ �� z r � { A � � _ � F;� � z ��� _.. �� rn � �� n� Y � � � �z dn z � W � v � C�1 � G t17 � d a � � � r" m � C� -' �� a - � � _ I � _ �Ti � o iA +� f^� � � �.. - x W f � � �y Q i _______ �"D. _h�` R I J�_�_�_...-. V � LD " � I G 'C _- p 5 I � i G4 pm — I � �_____ i r--- , i, i �; i _- AaW�o�:;� R�, _ �„ME��� ��,s � I r„M �o <n < �. p � a.e x I - < _ ;� , " � _ �, I _ ,� �, � __ ,� ., o = av OI = nATHE0.NtKTni '�. - oEMAno� - o, � . ;, � � I A ', ' i . . . .. ... ��i � __ . .. .._.. . _ � . . _J _ ,, i, " � -- � ':3 ti � — -�'' O A '� F _3 � ° y n raN�°r:>�„ R �n.,.«.,� , Z � ,„E � .,.�,� Y ° a:R � = Z — - a n.«ue .� � -f = M � � -- ' � - „� o oEM �, � � i K �.a N ' ' I _ I i�--- _ i,' - � - � p I" , E I , F 7 z_� - _ � � < -�� +. y ^ 'i O K � F _ >' � - x ., I y ��i � ,. � , � � � � i ii � o I � ---�� �� �� ----- --- ----- --� � � ,^�n �� --- ��' �; � > -��� � 3 ^:I� �_� p � o ti� — � � ' �-� i��� �,-o �__ _ o — - -� ��: �.5�,,,; .. _ ' _ A _ ..�''�—_ _._ . _ n � - � ' — � _ _ A . .... - --__ Q - r - � _ . ,. - - - - � - ,u.��.,� - _ �!,,: � _ . ..___ . ------+ �� � -- � . � ---: ---T � � � . - -- 3 i - � �s- ' --------- - �----- ----- --- � ' i °z � � '- �d � ___________.._ ___- I _ ��� ____ `� __��� - � _ i i $ �_ - � s � - � �-- - , -- --- - -- �- , - r�n - __- --- = J. --- - 7C -- - ' ._ w - � - PWR --- a -_ _ A__;� —�..SYSPMP �n - W � _ O - z a � ,., - - - X - -- --- _ .. ,_o - - ---- -- - - _ _ - - - �, -' - z -----------,� :.,::., -�., � � � r ---- ---� t�. -'�< n , _� � I � O I�y� �fG� I I r-__- -__ � � A �'�"� wl � y I I O ' R T 3I ryy ` p I � _ , � Ib � _ N+ I$�� O� � .. .�`lx.-_'..:.pi �I j � ''92 I I _ _--_�� — � _ . .. .. � n i ... I ' { I I . m < < ... . � � --� i � � r o : :� : ....;. � , o _ w I� �H i � - � -- _ a '�--- � � � F � $ r ^ b � �� ' < � a - -----� � A z A � � V' pp . n � r J . _ L � � n I U I� � . L- [�i � � � � r I � � Q � n � � cn R` � � D t� � D ��y^z V 4J z � � � RadiantWorks Professional Mechanical Summary Report si5izo�2 Project Information Contact Information Project Number Designed By G PECK Project Quote Company Name GT SANDERS Project Name 387 BEAVER DAM CIRCLE Phone Number Designed For Project Assumptions Outdoor Temp -21 °F Elevation 8150 ft Wind Speed 10 mph Job Type Residential VAIL , CO (Colorado) Pump Specs Zo�e Name Flow Head Delta T Supply Fluid Temp Zone 1 0.4 0.2 20 140 Zone 2 2.4 1.1 20 140 Zone 3 1.8 1.4 20 140 Zone 4 1.8 2.3 20 140 Zone 5 12 1.1 20 140 Zone 6 1.8 1.4 20 140 Zone 7 1.2 2.2 20 140 Zone 8 1.9 2.6 20 140 Heated Area Descriptions � Application Construction Heated Area Product Totals Zone 1<> Room List (STORAGE /CONDITIONED CRAWLER) Radiant Heating ThinSlab 313 ftZ (2) 200' Lengths of 1/2" RadiantPEX+ Zone 2<> Room List (FAMILY ROOM, STAIR 1/ OFFICE / BATH, BEDROOM / BATH #1, BEDROOM / BATH #2) Radiant Heating ThinSlab 1116 ft2 (6) 200' Lengths of 1/2" RadiantPEX+ � Zone 3<> Room List (LAUNDRY / HALLWAY, KITCHEN, DINING RM / ENTRY / STAIRS) Radiant Heating ThinSlab Zone 4<> Room List (LIVING ROOM) Zone 5 <> Room List (GARAGE) Radiant Heating Radiant Heating Zone 6<> Room List (MASTER BATH / CLOSETS / STAIR #2) Radiant Heating Zone 7<> Room List (MASTER BEDROOM / STAIR #1) Radiant Heating Zone 8<> Room List (GUEST SUITE / STAIR, GUEST BATH) Radiant Heating ThinSlab ThinSlab ThinSlab ThinSlab ThinSlab 746 ft2 424 ftz 538 ft2 613 ft' 324 ft' 502 ft2 (4) 200' Lengths of 1/2" RadiantPEX+ (3) 200' Lengths of 1/2" RadiantPEX+ (3) 200' Lengths of 1/2" RadiantPEX+ (4) 200' Lengths of 1/2" RadiantPEX+ (2) 200' Lengths of 1/2" RadiantPEX+ (3) 200' Lengths of 1/2" RadiantPEX+ 387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 1 of 3 RadiantWorks Professional Mechanical Summary Report 6/5/2012 Heating Load Summary Tube Back/Edge Total Total Supp. Spacing Intensity Losses Required Provided Needed Zone1 3009 27036 STORAGE /CONDITIONED CRAWLER 12 9.61 2.69 3009 27036 Zone 2 21885 41353 FAMILY ROOM 12 18.7 1.42 6302 12306 STAIR 1/ OFFICE / BATH 12 21.05 1.56 6546 11940 BEDROOM / BATH #1 12 17.17 1.38 4172 8881 BEDROOM / BATH #2 12 21.62 1.59 4865 8226 Zone 3 16484 35802 LAUNDRY / HALLWAY 12 26.63 1.85 3861 11420 KITCHEN 12 13.83 1.26 3623 10068 DINING RM / ENTRY / STAIRS 12 26.55 2.10 9000 14314 Zone 4 16880 16847 LIVING ROOM 12 39.81 2.30 16880 16847 YES Zone 5 10687 44776 GARAGE 12 19.86 1.74 10687 44776 Zone 6 16502 22344 MASTER BATH / CLOSETS / STAIR #2 12 26.92 1.85 16502 22344 Zone 7 10721 12538 MASTER BEDROOM / STAIR #1 12 33.09 2.60 10721 12538 Zone 8 17854 21031 GUEST SUITE / STAIR 12 36.53 2.68 16437 17155 GUEST BATH 12 27.25 1.63 1417 3876 Project Summary Total Flow: 12.3 GPM Total System Head: 2.6 ft Boiler Load: 122982 BTU/h Total System Volume: 52 Gallons Total Heated Area: 4576 ftz Please verify all project information for accuracy. 387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 2 of 3 • RadiantWorks Professional Mechanical Summary Report 6/5/2012 Signature: Date: 387 BEAVER DAM CIRCLE.rad Copyright(c) Watts Radiant 2008 Page 3 of 3 � ���� NEAT/NQ BO/LER � �_. �SYSTEM CONTROL WITH ALL NEW, ADVANCED USER FEATURES 5 FLOOR-STANDING AND 5 WALL-MOUNT MO�DELS FROM 50,000 TO 285,000 BTU/HR FIRING RATE MODULATION TO 5:1 LESS THAN 20 ppm NOx DIRECTVENT FLEXIBILITYTO 100 FEET UP TO 98% EFFICIENCY IN LOW TEMP APPLICATI ONS 1 � knightheatingboiler.com y � �; 0 AT/NG BO/LERS r UP To 96% DOE AFUE EFF�c�ENCY THE. BESTYOU CAN BUY IS NOW EVEN BETTER� , KNIGHT is recognized for its reliable, proven performance and high quality standards. Its award winning design assures contractors and home owners peacle of mind and long term savings in operating costs. Now, Lochinvar has rai ed the KNIGHT standard to even greater heights. The dramatically enhanced SMART SYSTEM"" control with color display gives inst llers and maintenance personnel a greater level of control than ever before. It's easier to access all the information they need setup, troubleshoot and monitor all boiler functions. Additionally, two new cascading options allow the installer to fine-tune se uencing of multiple boiler installations. More than ever, KNIGHT is the hest choice for traditional hydronic space heating, radiant floor heating and domestic hot water applications. �t1C1-11"e KKr�t��HT x1. ca ►,,.,.,...o,�.R t NeG� mttre 87U'S? K!� � � � i� �`�iz�s Front 399.0 ; l�i�t�ute €or tnt�re de �.._ All KN/GHT Boilers meet or exceed the most stringent requirements, with less than 20 ppm NOx. 7he KNIGNT Boiler has earned the ENERGV SrAR, signi�ying that it has met strict energy- ��� ��.� �u������, e(ficiency guidelines set by � ,��,��� , the EPA and U.S. Department of Energy. REFINED DESIGN PUTS IVI� AND INFORMATIC3N ATYUUI The new SMART SYSTEM'" is the m� integrated boiler control on the ma LARGER LCD SCREEN Displays more information. � SoFr K�rs For simple programming. NAVIGATION DIAL For fast transitions from screen to sc and easy adjustment of settings. MART USB Poar �: � U56 port permits connection to a laptop computer. SMARTSYSTF�JI,PC £,, J software may be used to troubleshoot and program KMI6H1'�(tairfCtrocts. ._° , set date and time, monitor historical data, including faufts, trett�s �tld :_ energyconsumption. p,:3 ��z ��z� � ; �; s ATA-GLANCE COLOR-CODING � f ��� � �` � :< � �.—_...--�. � BLUE SCREEN �— ` YELLOW SCREEN � � Normal system Maintenance due - shows � operation. the installer's name and � � � � � � �, °�'. ���e���` � , number on the display. �...° ', ,..�" y...,: .� NEW SELECTABLE CASCADE OPTIONS �' RED SCREEN ' lockout mode - shows active fault and � ° ' instaUer's name and '�% '�'" number on the display. When multiple KNIGHT boilers are installed together, the SMART SYSTEM built-in sequencer can be set for "Lead-Lag" cascade or "Efficiency Optimized" cascade operation. LEAD-L4G CASCADE EFFItiENCY OPTIMIZED CASCADE � � � � � � � 0 � � � � � � � � The "lead" boiler modulates with demand to capacity. As demand This feature optimizes the modulation capabilities of the Boiler Plant increases, additional boilers fire and modulate to capacity. This while evenly distributing run time across all cascaded boilers. Every 24 continues, with additional boilers firing and modulating to capacity hours the SMART SYSTEM automatically shiks the ist boiler on role to until all units are operating. Every 24 hours, the SMART SYSTEM the next in the sequence, distributing run time equally. automatically shifts the lead boiler role to the next in the sequence, - distributing lead-lag runtimes equally. snnaarsrsreM cascode oPrro� auows z- e boners ro be sequencee. � � � F $. � ������ � � � ���'� �ri�� a �� �" . ��� . �'`�� ` �:'�. ...1�. Y m,Z E��� X r `J� �. � � ��1 �� �` a � �� �s � �. � � : l: : ��r1 T�� �. '> ' � ���� iE#u S�n�C iA lRliia#e N�S upi€pns on hots+ to QUTPUT r� r,�#e alit�ws �M5 to L �btPt11' sys#em pump allows oF ftow, i n system, a� . »� .n. � � . . . C ai tow ' ien it stem Ibop. , 5 FLEXIBLE UPTIONS F4R DIRECT VENTING UP TQ 1OQ FEET� Placement of units within a building will never be a problem with KNIGHT. It permits up to 100 feet of air intake and 100 feet of exhaust vent with 3" PVC, CPVC, polypropylene or stainless steet pipe. Three Wall-Mounted KNIGHTmodels (WBN 51 -106) also permit intake and vent runs up to 40 feet using 2" pipe. D(red-Ment VeRital S/DEW/LLL VENT l 1 TERM/NATION i FA[70RY SUPPUm AND SHIPPED WITN EVERY MODEL . s� VerNcal with Sidewall Air Direct-Vent Vertiwl* Direct•Vent Sidewall* An optional concenhic vent kit is sold separatefy to allow o single penetrntion (or 6oth combustion nir and vent pipes. Direct-VeM Sidewall :.,������� ���c�� ��n�����ca�s �r�n S��c��ir.�riorvs - F�.00a-STANO�ra� MQO��s ��. E���s BACK � I � Input Heating NEf Modd Min. Max. AFUE Capacity 1=B=R Number MBH MBH % INBH MBH A eoiu4iwa� FRONT A POJUSTI�9LE� -1N `vt���.�-hr1t���r �ic����� ,_,2,a � � 7 I � FWE O NFIN_ET SIDE ,e.irr � �__,....,. ___ zaiu I TOP c—� EtkGiRICnL LONNEC?ILM1S GAS � � 00 00 omFr . G O . �;<� w�er ��e� . oauN�rvsnrt isur BOTTOM �y-I:� I)-f .{ � .. . � . .. .. . . . , ... L�'li<" li-3,�d� ,3; - r;;» S-I;y ti t-3;�� li2° � li� WBN106 21 10S 95.4 94 82 29-1l4° 15-314° NA 10-3i4' 1� �, � - � � � , _ ��,��3/�4 3�iR" � 5 1/2 �� N�A 3-1/ � �_ WBN1S1 30 1S0 95.5 � 13S 119 24-714 2o-3/4 NA 15-3/4 &1/2 3-1/2`� 5-1/2` NA &3/4° 41/4` 2-3/4' 1/2° 1' 2` 2° 134 _.. _ _ __ _ � � ___,_____,___,__._._� _.. _ ,..__ � ___._ � ____ _ _...... __. a 43/4 1-1R 1/2 1 3 3 7b2 WBN211 42 21D 95.7 190 16$ . 29-7/4' 25" NA 10" 12 3-1/2` 5-1/2° NA 13" � 14 1-1/Z' 1/2' 1` 3 3" lJ7 KBN081 16 80 9S3 12 63 33-1/4 14 5-3/4 5 3 20-1/2 22 1-3/4 6-1 NA 1R 1 3 3 125 KBN106 ��21 105 95.4 � 94 82� 33- /1 4 14� 1(r�11 531� 4-47(1 1•ll2 20-UZ 22 1-3/4 (r1R NA 112 1 3� 3 21 9— KBN151 30 � 150 95.5 135 119 33-114 18' 1�-1/4' 11-1l2 10 1-318" 21-1/4' 23` 1-3/4' 12` NA 1R� i` 3y 3' 157 "___— ....,.�.._.,�.�_.. ....y,._.�,�__..._.�.�... _ .....K._____....�..,,_ ...............�...._.Q,....._.....__H..__._.___..1,.�,._'�"����_.,�.....,.�__ . .... KBN211 42 210 95.1 190 16S 33-1l4 22-i/4 16-1R 15-3/4 141/4 5-1(4 21-1/4 23 1-3/4 1�7/4 NA ll2 1 3 3 �%� _._ .� .. . ___ _. . ,___ _..__._. ___�._ __ __._...._ _�_...�,_____ _.__. ___ KBN286 57 28S 96.0 260 226 42-1/4' 19-3l4' 12-3(4' 13-1/2' 6" 2' 34' 31' 11-3l4' 41/4' NA 3/4� 1-1/4' 4' 4" 224 _.... _ _ Notes: Indoor instalfation only. A11 in/ormation subject to change. Chonge "N" to "L" for LP gos models. �'tk?, � .. �C'�_ �:,�'i:`� �.�. SMART SYSTEM Digital Operating Control Multi-Color Graphic LCD Display with Navigation Dial and Soh Keys Three SetpointTemperature Inputs BuiU-in Cascading Sequencer for up to 8 Boilers Cascade Multiple Sized Boilers Lead Lag E�ciency Optimization Ou[door Reset Control with Outdoor Air Sensor Programmable for Three Reset Temperature inputs Programmable System Efficiency Optimizers Night Setback w(Overide Function DHW Night Setback w/Overide Function Anti-Cyding Outdoor Air Reset Curve Ramp Delay Boost Temperature & Time Three Pump Control System Pump with Paremeter for Continuous Operation Boiler Pump with Variable Speed Pump Control* Domestic Hot Water Pump Domestic Hot Water Prioritiza[ion �- DHW tank piped with priority in Ihe 6oiler loop DHW tank piped as a zone in the system with the pumps controlled by the Smart System > DHW Modulation Limiting Separately Adjustable SH jDHW Switrhing Times* Building Management System Integration 0-lOVDC Input to Control Modulation or Set Point D-]OVDC Modulation Rate Output 0-lOVDC Input Signal from Variable Speed System Pump* 0-lOVDC Input to Enable/Disable call for heat '6xclusive feaNre, available anty Jram Lochirvar °. n� 2"' '. -. ,�,,, x.>-� �-R > High-VolWge 7erminal Strip � 120 VAC / 60 Hertz / 1 Phase Power Suppfy � Three Sets of Pump Contacts > Low Voltage Terminal Strip % 24 VAC Devlce Relay : Proving Switch Contatts : Flow Switch Contacts > Alarm on Any failure Contacts . Runtime Contads . DHW Thermostat Contacts � 3 Space Heat Thermostat Contacts > System Sensor Contads > DHW Tank Sensor Contacts > Outdoor Air Sensor Contacts > Cascade Contacts � 0-lOVOC BMS Extemal Control Contact � 0-SOVDC Boiler Rate Output Con[acts � OdOVDC Variable Speed System Pump Signal Input : 0-SOVDC Signal to Control Variable Speed Boiler Pump � Modbus Contacts > Time Clock > Data Logging : Hours Running, Space Heating % Hours Running, Domes[ic Hot Water % Ignition Attempts � Last SO Lockouts ? Access to BMS Settings through Gnphic LCD Display > Maintenance Reminder > Custom Maintenance Reminderwith Contractor Info - Installer Abiliry to De-activate Service Reminder > Low-Water Flow Safety Control & Indication > Dual Level Password Securiry � Customizable Freeze Protection Parameters ;� ���� � � � � STr��&L��:Ra� F�ATtIE��� > Energy StarT" Qualified ? Up to 96% DOE AFUE Efficiency � Modulating Bumerwith 5:1 Tumdown : Direct-Spark Ignition - Low-NOx Operation > Field Convertible from Natural to LP 6as > ASME SWinless Steet Heat Exchanger � 30 psi ASME ReliefValve a Vertical & Horizontal DireR•Vent PVC, CPVC, Polypropylene or 55 Ven[ing up to 100 teet • Factory Supplied Sidewall Vent Termination > SmaR System Control � Condensate Trep � Other Features : Automatic Reset High Limit Adjustable High Limit w/Manual Reset : Boiler Ciralating Pump : Adjustable Leveling Legs {KB Models only) : Wall•Mount Bracket (WB Models only) : Zero Clearances to Combus[ible Materials > 12•Vear Limited Warranty (See Wananty Fo� Detailsi (i�r�e�r���Ec�u�pr���:�r �..__. __�_.__.. ; Modbus Communication > Condensate Neutralization Kit : Multi Tempera[ure Loop Control : Flaw Swi[ch : Low•Water CutoffwJManual Reset & Test ; Alarm Bell % Concentric Vent Kit > SMART SYSTEM PC Software Stack Frame � BMS Gateway to LON or BacNet s i4[N6 �t�J�� �,......... _ > M9 Standard Construction ; M7 California Code ...__....._. . � � g� � r � -� � � I • � __ �.� _ _ __ z - � N O _I _1-, N . z m r-. , �a � a � � , � "' _ r i � _; �- � /c N � � �,� � . I �S _ . _..._. ...... . .. �J � , I. —_"._♦ . � D i x -.r�. �I � -�p � A wIN � "d �onnc�nn C I paza�x � �ccCCC -o ,zzzzz � �o�doo nl 'tio0oo0 T,' C v,� v, �n v� v, � I � C C C C C '9 'o '9 -o �u '9 �, I � � � �y �. tn Vi W.O� O� l °o°oo�.I�OO m I ^n -� o -n -n -� nl n 7 L 'r.. . Y ,�.., I:�'I . �i' N � I I_ -n r r i � _ � m O � � D m p � c r a Z � �� �, -7 ,��', X� c A � � � Q A F �� -A 1 O r � -- -- — -4 �� - - � �— - _ -- -- -� +�� � - . � ( —� � _ � r�,�..� �„�„ _ _"._ . '— _ �_ �w� I A _ _ — � �-- �� I �' - --- - f-�� � y, �I �A _._ ._ ,__. _ ` ' � 1 � �I � i — - � �.� IA _. _ __IV I � :,.;;� . . __ f � � � � � � n x � D � � � z d � z � � �i I r�—_ � I � p �"" o C7 ' r�- � � I' � F I� � � � z z � � c� �" PoN'ER ..- z . .�. . . . _. _ ! r lIOV � � • PON'ER m ,� • z �NUETRAL � � • L3oilerPump -� .�-- — • It�ilcr Nwnp— � '�. � �� ` • 5«���mPump____ �.:. "� � m � ��• S�smmPump � V� � • 1>H\4' I'ump � • �HW Pump - z � __ z � ���k„ m • ALAR�I ^ O � m –� ' �] r � � � Dhw Srnsor � p� . �'['� DM1�� Senwr -- � � � UhwSensor—__ _ z._ _ y ---- -- _ S � �,���������,�� � Cd • Uutduur Sensor r � O Analag Inpm -. . . r `� � Hy � �- r�naleg hryu� ._.. . � �1 _ � Flied_—__ z0 /v . ___ .. • Im:rluck __... z � • Li�w N'atcr �h�y O • ('u�o�F __— _� � . /r M�1 ��rf �•� ����n cm- '"� � '�' � • Limit —. _.. n 00 �\ m --- p �y1 r � F�o. z d � sw;��n -- z z=° __°°_—_ . O � O � C" � . — � z � 0.�y /'+ - ... � N � W � p ' � � � a � � J � _ � � � .. _--"._._._ .. . z —___ O NELT�IDLE � �' � DENAND � "' � — m r i � — i_ ;O _-�z ��rLT �"-; >� �'_ � � tiYtiTEM PMP 1 '"' — r . _ _ _. _—._— �.1 — � 7s PUWER � � Z J' � � � � � � a � r � m � � d n � \ / � ��zr�z��z a�aa�aa�a _�c x � o� �n a� w r� ���ky yC�O�'� C k kyC ����H lC '�vz� � ybr�►c O � x � o z � 'A K Y z e � � � r � �i I� � [ �CO►�� "" 7 �rx n.� �oz�c� � 7 �z��'•°ac �Y��'� v� r YC�`"�� C d ��z� o O � ►C D ...� � y y � o � Cr1 � II�I�I�IOI� d � y Y � � 0 � � O r d � � z � � y � 0 Y � O z � � 'C .. '� � � N � � E �+ �+ i A C�y r���� ��°�ooddb000�oy�o a� ,��by�, ;,�y�o���� z � % � � � 7 H 'C �.�, C" 'd "'3 � �' �-7 ,.�d � n�' �'' d v' r" TJ G� p t� � 7 ,..�tdCrJ2� C�Or.,b�z�lz �b�'�royR�bp� y�� y�� "� ►o xr�.� � � � � � � � 2���N '� --zr�r� ..d?z .� � ° � �� `_' � ~ � n� oo '� `_' •°� � � � � � � ,Jti,�'°o°°o'_' `''�� oo°�` ; oY � o � � r-� W~~ N W N i--' � W N�� O� Vi � � N� O O� � v' �'' O O O N'..�i� iY � � N `7 �+ � N � W Cn .r � N�..� p(l� N w W�O O� �I G'� V� �� N O� �, O tn � O w N Oo O W � '° � � w w w N� r�j N�O �1 �l p� ��--� �, N N O� N tli 00 � Cli c.n N O O� NO 00 i% A O F- O O � "� � � �`� O� � N N N�� C O �� � U�i c�i� ��''� N W O O tn �] tn � .--� cn � O � � � �`' ��°o °o 0 0 0 0 0 0 0 0 o c o� U � ° C O � °``o 0 o O o� o°•° O o 0 0 o O� cn'„ oo °O y � o � � � �`' ��°o 0 0 0 0 0 0 0 0 0 o c o� U � ° o o � N�O O pO '�pJ O O O � � O O O O O O� � � � O O � N� � O O O O O 0 � O O O O O O� C/i � O N H+ A W� O O W A O O�O 01 � � � O � r � � NEOTHERM° Date: Project #: Hydronic Boiler NTH Hydronic Boiler Indoor Sizes 285-850 Submitta/ Data ��� NeaNny Sj�afems Company Engineer: Projed Name: Prepared By: Location: Bid Date: Contractor: Standard • High condensing efficiency Equipment • Modulation down to 20% of full fi�e (5:1 turndown) • Sealed combustion chamber • Pre-mix stainless steel burner • Low NOx system exceeds the most stringent regulations for air quality - 10 ppm NOx • Horizontal or vertical direct vent • Horizontal vent and air terminals • Vent and air pipe lengths of up to 100 equivalent feet (each) • Built-in condensate trap • Vent temperature cutoff feature • Direct spark ignition system • Indirect water heater priority • Sensor for indirect domestic water tank • 160 psi maximum working pressure • Stainless steel heat exchanger with welded construction (no gaskets) • ASME "H" stamp • 75 psi (517 kPa) ASME rated pressure relief valve • Water flow switch (3s9-850 only) • Temperature & pressure gauge • Drain valve • Multiple pump control for boiler pump, system pump and indirect domestic water pump, each with delay • Optional pump (sized to model) available for field installation (285-500 only) • Electronic PID modulating control • Large user-interface and display • Alarm output • Accepts external (a-2omA or o-� ov) modulation control • Outdoor reset • Outdoor air temperature sensor • On/off toggle switch • Manual reset high limit • Burner site glass • 2ero clearance to combustible surfaces • 10-year limited warranty Boiler Data Number of Units: ❑ Fuel ❑ Natural ❑ Propane Pump Options ❑ Pump-included (285-500 only) ❑ No pump Factory ❑ CSD-1 Mounted (covers FM & GAP) (500-850) Options ❑ Low water cutoff (500-850) ❑ High & Low gas pressure switches (500-850) ��� ��� ❑ Additional auto reset high limit ❑ Bell for ignition failure A, �11 H "I�E:T ' ��� _ . �' � -•' �n. ❑ 30 psi pressure relief valve ❑ 50 psi pressure relief valve ❑ 60 psi pressure relief valve ❑ 75 psi pressure relief valve (std) ❑ 125 psi pressure relief valve ❑ 150 psi pressure relief valve Sizing Data M�e1 Input Output AFUE Thermal Comb. Gas Water Effiaenc Efficien Conn Size Con S' � BTU/h kW ❑ NTH 285 285,000 83.5 ❑ NTH 399 399,000 116.9 ❑ NTH 500 500,000 146.5 ❑ NTH 600 600,000 175.8 ❑ NTH 750 750,000 219.8 ❑ NTH 850 850,000 249.1 NOTES: For other boiler ratings: Boiler Horsepower: HP = ut ut 33,475 BTU/h kW 269,040 78.8 382,242 112.0 475,000 138.4 576,000 167.0 723,000 208.9 810,000 236.7 95.4 N/A N/A N/A N/A N/A Y % N/A 94.0 95.0 95.3 96.6 95.7 Radiation Surtace: EDR sq. ft. = OUtDUt 150 �Y % inches 94.4 '/. NPT 95.6 3/. NPT 95.0 1 NPT 96.0 1 NPT 96.4 1'/z N PT 95.4 1Y2 NPT n. ize inches 1'/a N PT 1'/< N PT 1'/z NPT 1'/2 N PT 2 NPT 2 NPT Accessories ❑ Water flow switch (285 only) � High & Low gas pressure ❑ Additional auto reset high limit for Field ❑ Low water cutoff switches Mounting Suggested Service � Clearances Appliance Access Clearance Surface inches cm Left Side 1 2.5 Right Side 72 31 Top 24 61 Back 6 15 Closet, Front 6 15 Alcove, Front 24 61 Vent — — Certified by CSA for zero clearance to combustible materials on all sides. E/ectrical Boiler Pump Connections Ratings Data SizeS (System Pump and DHW Pump Connedions) Volts Phase Amps 285-850 120 Single 2* No Pump 285-500 120 With Pump " Minimum 15A circuit required Less Single than 6' 115V — Maximum 1 HP 115V — Maximum 1 HP Intake Exhaust Maximum Vent System (Air) (Vent) Allowable Size Pipe Pipe Equivalent Length` z85 3" 3" 20 ft 6 m 4" 4" 100 ft 30 m 399 4" 4" 100 ft 30 m 500 4" 4" 100 ft 30 m 600 4" 4" 40 ft 22 m 6"'"` 6"*' 100 ft"' 30 m'"` 750 4" 4" 40 ft 22 m 6" 6" 100 ft 30 m 850 4" 4" 40 ft 22 m 6" 6" 100 ft 30 m Instailations in the U.S. require exhaust vent pipe that is a combination of PVC 8 CPVC complying with ANSI/ASTM D1785 F441, polypropylene pipe that complies with ULC S636, or stainless steel complying with UL1738. Installations in Canada require exhaust vent pipe that is certified to ULC S636. Intake (air) pipe may be ABS, PVC, CPVC or galvanized material. Installer must comply fully with manufacturer's installation instructions, including use of minimum exhaust length CPVC, to maintain ANSI Z21.13 safety certification. Closet and alcove installations do not allow the use of PVC under any circumstances * To calculate max equivalent length, measure the linear feet of the pipe, and add 5 feet (1.5m) for each elbow used. " Allowed only if the vent pipe is no more than 20 equivalent feet longer than the air Temperature Rise in °F Water Flow 20°F 25°F 30°F 35°F 40°F Requirements Flow H!L Flow H/L Flow H/L Flow H/L Flow H/L Size gpm feet gpm feet gpm feet gpm feet gpm feet 285 27 25.5 22 17.5 18 14 15 10.5 13 8 399 38 28 31 20 25 14.5 22 11 79 9 500 48 24 38 16 32 12 27 9 24 8 600 58 44 46 31 38 22 33 18 29 15 750 72 37 58 23 48 17 41 13 36 10 850 81 33 65 22 54 15 46 10 41 8 Size 285 399 500 600 750 850 11°C Flow H/L Ipm m 102 7.8 144 8.5 180 7.3 218 13.4 274 11.3 307 10.1 14°C Flow Ipm 81 116 144 174 219 246 Temperature Rise in °C 17°C H/L m 5.3 6.1 4. 9 9.4 7. 0 6. 7 Flow Ipm 68 96 120 145 182 205 H/L m 4. 3 4.4 3. 7 6. 7 5. 2 4. 6 19°C Flow H/L Ipm m 58 3. 2 83 3.4 103 2.7 125 5.5 156 4.0 175 3.0 22°C Flow H/L Ipm m 51 2.4 72 2. 7 90 2.4 109 4.6 137 3.0 154 2.4 Dimensional �Data, Sizes 285-500 � NTH Size 285 399 500 285 399 500 � A in 26 31 37 cm 66 79 94 24Yz— 62 FRONT VIEW B in 7 5 5 cm 18 13 13 D in 6 4'/. 4'/. cm 15 11 11 TOP VIEW Optionai Pump Location (field-mounted) I r E in 71 14'/: 15 cm 28 37 38 RIGHT SIDE VIEW F in 17 21 Y: 26 cm 43 55 66 G in 74 19'/. 20'/: cm 36 49 52 * NeoTherm is shipped with adapters for the air and vent that accept standard pipe of the proper size and type. T* ; Dimensions shown in inches cm. � � z�i2 � I ' 38 97 J in 9'/. 8��4 5'/. cm 25 21 15 K in 13'/. 18'/: 20 cm 34 47 51 L in 20��4 25 27'/a cm 51 64 69 �o BACK VIEW AIR INLET' VENT* in in 4'/: 4'/: 4'/: 4Y: 4'/: 4'/: cm cm 11 11 11 11 11 11 Dimensions are nominal. j3r z-- ��� �R01!'�� ENGIIVEERItVG CONSULTRIVTS DRILL AND EPDXY OBSERVATIONS Project: 377 pav�r ��,n, �,'�- Date: t/%�,�/� Job Number: Report Number: ) Location: 1.) 2.) 3.) Orientation (vertical/horizontal): Drilling Equipment: �.f�,,�.,,.te�- �}�.�`%j Hole Diameter / Length (inches) Hole Spacing: /V /�J ��� ^� T � !`�g �':� a'�; � , ��,�� � L. Method to Clean Nole: (,,�,• r�, ��.,���, 4J� lf�,� ��,r., Rebar / Bolt-Size / Length / Type: ;� �/ j�,, r /� � �% " ,�,� ;, �,�,�� �� Epoxy Type: .'S r'�k► /�' n �. %c�r ��'x� — _�- Placement Method: Drawing or RFI referenced: ��c�nK r�o,-�e•rf ��/���,�°tl,�1;� 1,,, %. j.�,,,� % �,n� Additional Reinforcing Steel: Notification (Contractor / Name): 8 /C :5 �� �. Field Representative: ,��1 � �c � �� r t� 1008 3rd Avenue, Suite D P.O Sox 464 Grand Junction, CO 81501 Gypsum CO 81637 P:(970)242-4300 Tel:(970) 524 0720 F:(970)524-0721 O�ces: Denver, Loveland, Westem Slope, Granby, Casper WY Fax:(970) 524 0721 . DE120430-01 '� L ' 1 1 ENGINEERING CDNSULTRNTS DRILL AND EPDXY OBSERVATIONS Project: 387 Beaver Dam Road Date: April 30, 2012 Job Number: 12-6524 Client: Beck Building Company Report Number: 1 PO Box 4030 Vail, Colorado 81658 Attn: Mr. Steve Boderck Location 1.) Stair Tower Footings 2.) 3.) _ _ �..___. .. �.,_.. .._..__ .. _ __ _. ..._._. .n_.___. . __,__ Orientation (vertical/horizontal): Horizontal _ , __.....__ �._. .. . _. . . ._._.. ... .. _. _ _. Drilling Equipment: Hammer Drill _ ____._ . __ .. ._.w. .._., ., _. Hole Diameter / Length (inches): 5/8", 6" _ Hole Spacing: N/A Method to Clean Hole: Brush and Vacuum _. Rebar / Bolt-Size / Length / Type: #4 Bar, 24" min. Length Page 1 of 1 EpoXY TYpe: Sika Anchor Fix1 . . __ _ _ Placement Method: N/A _ _. .. _ � _ _ _ Drawing or RFI referenced: Plans Dated 4/20/12 by T. Boyle Engineering, Plans sheet S1 Additional Reinforcing SteeL• N/A ._. _ _ _ Notification (Contractor / Name): Beck/Steve Field Representative: Kevin McClure - _ Grand Junction Gypsum 1008 3rd Avenue, Suite D Corporate Office P.O. Box 464 Grand Junction, CO 81501 41 Inverness Drive East Gypsum, CO 81637 P:(970)242-4300 Englewood, CO 80112 P:(970)524-0720 F:(970)524-0721 P:(303)289-1989 F:(970)524-0721 . f Ta� 0�' YAIL . REPORT OF SPECIAL INSPECTIt1NS Project: 387 Beaver Dam Road Permit Number. 612-0082 Project L.ocation: 387 Beaver Dam Road Vail Coforado Owner Fred Tresca Address 387 Beaver Dam Road Gity: Vail Z1p: 81657 �Ji�t�4?pe'��k}�Kt�i� Special Inspections Agency In Respansible Charge: Ground Enqineerinq Gansultants. Inc. - Scatt Richards, PE Address: P4 Bax 464 City: Gvpsum State: CO Zip: 81637 Phone: (970) 524 0720 Fax: t97Q1 524 0721 E-mail: scottr(a�qroundenq.com chrish@groundenq.com This Report of Special Inspections attached is submitted as a condition from permit issuance in accordance with Section 1704 Internatiana( Building Code. It includes a Schedule of Special Inspection Services applicable to the above referenced project as well as the identity of the individuals, agencies, or firms intended to be retained for conducting these inspections. The Special Inspectar(s) shall keep recards af all inspectians and shall furnish interim inspection reports to the registered design professional in responsible charge at a frequency agreed upon by the permit applicant and building official prior to the start of work. Discrepancies shall be brought to the immediate attention of the contractor and design professional in responsible charge for correction. If the discrepancies are not corrected, the discrepancies shall be brought to the attention of the building official by the registered design professional in responsible charge prior to the completion of that phase of work. A Fina! Report of Special Inspections shall be submitted by the design professional in responsible charge to the building o�cial at the conclusion of the project and before a certificate of occupancy will be issued. Prepared by: Scott Richards PE Type or Print Name -�" ? , �- °`r f°` � �^ � �-_ f Signature 6-5-12 Date To be filied out by the jurisdiction and returned to applicant Building Official's Acceptance of Special Inspections Frequency of Interim reports: Signature Pre Monthly Bi-Monthly Per Attached Schedule -10- Date Upon Completion Permit Number �quired i l j FINAL REPORT OF SPECIAL INSPECTIQNS Project: 387 Beaver Dam Road Permit Number: 812-0082 Project Locatian: 387 Beaver Dam Road Owner Fred Tresca Rddress 387 Beaver Dam Road City: Vail Zip: 81657 Special Inspections Agency ���fi��Ci,�Vt�4�3�15�Idgk�X Ground Enqineerinq Cnnsuftan#s, Inc. - Scott Richardst PE Address: PO Bax 464 City: Gvpsum State: CO Zip: 81637 Phone: (9i0) 524 0720 Fax: {970) 524 0721 E-mail: scottr(a�graundenq.com chrish a().proundenq.com To the best of my information, knowledge, and belief, the speciai inspections andlor testing required for Chis project, have been cornpleted in accordance with the contract dacuments. Interim reports submitted prior to this Final Report ofi Speciaf Inspections farm a basis for, and are to be considered an integral part of this fina( report. Any discrepancies that were nated in all interim reports have been cor�ected. Prepared by: Scott Richards. PE Type or Print Name ,�" ,_,��.b,��' r' ""�,� , � Signature s-s-�z Date -12- Preparer's Seal and Signature Required NOTE: TI-�IS PERlVIIT MUST BE POSTED ON JOBSI�E AT ALL T1MES i• TOWh' �F VAII,'` . Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.4792139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B12-0082 Job Address: 387 BEAVER DAM CIR VAIL Location......: Parcel No....: 210107111017 OWNER HIBOU COLORADO PROPERTIES LL 04/02/2012 HIBOU MANAGEMENT 3066 SW 38TH AVE MIAMI FL 33146 APPLICANT BECK BUILDING COMPANY 04/02/2012 Phone: 970-949-1800 780 NOTTINGHAM ROAD, AVON PO BOX 4030 VAIL CO 81658 License: C000003131 CONTRACTOR BECK BUILDING COMPANY 04/02/2012 Phone: 970-949-1800 780 NOTTINGHAM ROAD, AVON PO BOX 4030 VAIL CO 81658 License: C000003131 Description: UPGRADE EXISTING INTERIOR FINISHES, MODIFICATION OF STAIR TOWER, CONVERSION OF EXISTING STORAGE AREA TO FAMILY ROOM, RELOCATION OF SPA Occupancy: R-3 Type Construction: VB Project #: Applied.....: Issued. . . : PRJ11-0654 04/02/2012 04/18/2012 Valuation: $710,000.00 ..>.......,�..xx.......xx><>,,.....,,,,,��.,.,,.��..,,�„�,...�,,.....,.,� .............. FEE SUMMARY ,,,,,.,,.,,�„��....�,...,,............,...................,.....<......__...._., Building Permit -----------> $4,231.25 Bldg Plan Check ----------> $2,750.31 Use Tax Fee-----------------------> $14,000.00 Electrical Permit ---------> $115.00 Flec Plan Check -----------> $74.75 Restuarant Plan Review--------> $0.00 Mechanical Permit ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit --------> $180.00 Plmb Plan Check ---------> $45.00 Recreation Fee--------------------> $190.05 Investigation-----------------------> $0.00 Will Call------------------------------> $15.00 TOTAL PERMIT FEES--------------> $21,601.36 Payments-------------------------------> $21,601.36 BALANCE DUE------------------------> $0.00 ..�..>.......>.,....,.......« .....................x.....................,....,...,«......., .......x.�......«............�.»...,,�.............,....................xxxxxx................ DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. S-i . ��-- y, ��.,� Signature of Owner or Contractor Date T v� ,/��� �Z� t-; Print Name combination permit_012811 ,xx...� ...............x„<,x..,,,,,,>,..,,,,.,....,>............,.,,,,.,....,,,,.,.,.<..,..,..>,>..,«..<...,.................,...,��........,,,...,...,.,......,...,.,..........�... CONDITIOiVS OF APPi�OVAL TO BE MET PRIOR TO FIfVAL �IGN OFF Permit #: 612-0082 Owner: HIBOU COLORADO PROPERTIES LLC Address: 387 BEAVER DAM CIR VAIL Location: ,....... � ............. x,,.........,...,,............,...,........,.....,............,,...,... �....».......,,...»...,,. �..,...,...............,.,...,. �..................,,....,.,,..... combination permit_012811 � 3 ! V�!'t1 V� �17.1L � ****«.**************�*************************.*.*.**************************«************««««*********************««*********«*******,.************.,* REQUIRED INSPECTIONS AND STATUSES Permit #: B12-0082 Owner: HIBOU COLORADO PROPERTIES LLC Address: 387 BEAVER DAM CIR VAIL Location: * «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * «* Item: 00010 BLDG-FOOTING Item: 00020 BLDG-Foundation/Steel Item: 00120 ELEC-Rough Item: 00220 PLMB-Rough/D.W.V. Item: 00230 PLMB-Rough/Water Item: 00240 PLMB-Gas Piping Item� 00310 MECH-Heating !te,n 00315 PLMB-Gas Piping Item: 00320 MECH-Exhaust Hoods Item: 00410 Special inspect-progress rept Item: 00030 BLDG-Framing Ite;n: 00050 BL[?G-InsulatsQn Item: 00060 BLDG-Sheetrock Nail Item: 00070 BLDG-Misc. Item: 00190 ELEC-Final Item: 00290 PLMB-Final Item: 00390 MECH-Final Item: 00420 Special Inspect-final rept Item: 00542 PLAN-FINAL Item: 00090 BLDG-Final �, , �_ ; �: �r combination permit_012811 ******************************��***���*��***************�*���*�**********�***********�***�** TOWN OE VAIL, COLORf1D0 Statement ****=x****�*�:*******�*************�:*�**********************��***********�****************++** Statement Number: R120000299 Amount: $18,608.3904/18/201204:09 PM Payment Method: Check Init: SAB Notation: 21225 - Beck Permit No: B12-0082 Type: COMBINATION BLDG PERMIT Parcel No: 2101-071-1101-7 Site Address: 387 BEAVER DAM CIR VAIL Location: Total Fees: $21,601.36 This Payment: $18,608.39 Total ALL Pmts: $21,601.36 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts BP 00100003111100 PP 00100003111100 RF 11100003112700 UT 11000003106000 WC 00100003112800 BUILDING PERMIT FEES PLUMBING PERMIT FEES RECREATION FEES USE TAX 4 0 WILL CALL INSPECTION FEE 4,231.25 172.09 190.05 14,000.00 15.00 ----------------------------------------------------------------------------- Job IVame: 3'�� B�h�,Y�t2...D�M f2� i� Job Address y�'�- $C_A'��R- �filM �Q, �� OF �� � Permit No.: � 1� - OO� o� SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tesis Scheduled to the Town of Vail for review and approval. Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and hislher general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1) (IBC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to tt�e Town of Vail by the Testing agency on a weekly basis. 4. Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for review and approval.( Page 2) 5. The special inspector is responsible to immediately notify ihe Town of Vail Building Official in writing of any concerns andlor problems encountered. 6. It is the responsibility of the contractor to revisw the Town of Vail approved plans for additional inspection or testing requirem�ents that may be noted. A pre-construction conference at the job site is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. AN special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re-inspections. BEFORE OCCUPANCY WtLL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that al! items requiring testing and inspection were fulfifled and reported. Those i#ems not tested andlor inspected shall be noted in this statement. A copy of the statement sha11 be maintained at the job site for the Building Inspector's review prior io final inspection. Acknowledgement: ��i�+1/V+��e- f Gt�j. f �'��`.�� ,'�c%�Vt�wr,w�. � ipnat e Print Name Date Special Agency: Signature C�2LxJNP F�lGIN�6fz-t�VC�, c"..aNS V c.-"i'P*�t'S �r�� �U-�---�, y-►g--��., Print Name Date Project Arch/Eng: Signature $t� � Print Name Date �' C3�+�� 'D�wa Co..,.�sh,�1�!J Contractor. �,� .�7�v1 UovL2u` 7• /8• �.� Signature Print Name Date -3- � � L5 Il v L�-, �,' � � APR 18 2012 �I ��� , TOWN OF VAIL � i 7�wN OF YAIL ' SPECIAL INSPECTION AND TESTING SCHEDULE (IBC 1704) Project Name: ���" ���=1°�.. L�iRh �.C� Permit # Owner's Name: Testing Inspection Signalure Prin Name Date ��-�� „ C�R�li+k�G—NC�i�•!6�'.2ar.�� G��Vc.T��'S Agency: t'.�...."'�� �-•,-t�-s�.- c'..Ht"�! � N u-t—r'a �-i-�J�3�t� Testing Inspection S:gnature Print Name Date Hereby certifies that the Testingllnspection Agency named above has been engaged to pe�form structural tests and inspections during construction as checked below, to satisty all applicabie portions of the Building Code. Prior to final inspection, the Inspection Agency shail submit a siatement that aii items of desig�ated work performed were reported. Any +tems checked but not tested or inspected will be noted and explained. Whenever any designated items on the list are ready for sampling, testing, or inspection, it shall be the responsibility of the contractor to give timely notice to ihe Inspection agency so that the required services may be performed. REINFORCING STEEL: UNDERPINNING: Tensila 8 Bend, one set per heat per tons TemporarylPermanent inspection of Piacement inspection of Steel Fabricalion Inspection of Wefding inspection of Reiniorcing 8 Forms � Epoxy QK ��(x�nlb� Inspection of Concreta Placement Inspection of Tiebacks MASONRY: Prelim. Acceplance Tests (Masonry Uniis, Wall Prisms) SOIL NAILS: Subsequent Tests (Mortar, Grout, Field Wail Prisms) Temporary Shoring Inspection of Placement and Grouting Permanent Wall PRECAST CONCRETE: Reinforcing Tests Inspection of Reinforcing Placement Tendon Tests Inspection of Tendon P�acement Inspection of Concrete Placement Inspection of Concrete Batching Inspection of Panei Atiachment & tnserts Compression Tests Inspection of StressinglTransfer PILING, CAISSONS, CAPS, TIES: inspection of Reinforcing Piacement Inspection of Concrete Piacement Inspeciion of Concrete Batching Specify other tes[s, inspectfons or specia! i�structions requi�ed. � STRUCTURAL STEEL: Sample 8 Tesl (List specific members below) Shop Identdfication & Weiding Inspection Shop U�trasonic Inspection Shop Radiography Field Welding lnspection Field Boliing Inspection Field Uilrasonic InspecUon Field Radiography Metal Oeck Welding Inspection FIREPROOFiNG: inspection & Placement : Zi7L�� Acceptance Tests Moisiure-Density DelerminaCbn Field Density Drilled Piers Deep Foundation STRUCTURAL WOOD: Inspaction of Fabricatio� Inspection of Truss Joint Fabrication Sample 8 Test Componenis Inspection of Glu lam Fabrication SMOKE CONTROL: SPECIAI CASES: SPECIAL INSPEC710N: Seismic Resistance Wind Requirements TOWN OF VAIL' Department of Community Development 75 South Frontage Road Vail, CO 81657 Te I: 970-479-2128 www.vailgov.com Development Review Coordinator BUILDING PERMIT APPLICATION (Separate appiications are required for alarm & s rinkler) Project Street Address: Project #: '� J� � � `7 .� l�S,vr�? �,•�. �'. a�� � 1� 1 t � ��- �:� DRB #: �--.; 1�- I (Number) (Street) (Suite #) ,/� � Building Permit #: 1) � � '�-� C� C— Building/Complex Name: � Contractor Information Lot #: Block # Subdivision: Business Name: �GK �i,��a.o�,v� G'o„-,f�iarf� � Work Class: New �j Addition �j Alteration (�j Business Address: r,� �, �/.p�� City VR/L State: �[Z Zip: S�� Sp� Type of Building: � Single-Family �j Duplex �j Multi-Family (� Contact Name: JTLu£ ��F2.GK Commercial �j Other �j Contact Phone: 9%d • y7/• /�oSy Contact E-Mail: S�c� ��bu. �ds. co.,� Work Type: I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances of the Town applicable thereto. x �i�,�� Owner/Owner's Representative Signature (Required) Electrical Mechanical Plumbing Building Interior � Exterior � Both l� Valuation of Work Included Plans Included Work �Yes �)No �Yes �No 3 30 �Yes �)No �Yes �No �Yes �jNo �Yes �No �� �Yes �)No �Yes �jNo 7�To Value of all work being performed: $ 71 b��Gb,v� (value based on IBC Section 109.3 & IRC Section 108.3� Electrical Square Footage ,�C� Applicant Information Detailed Scope and Location of Work: Applicant Name: �uE /Jo�tr2Ct� ���rs� C�l��s�...� �.���..� r �..�c1.�S� Applicant Phone: 4 i t� ' Y 7!' lCo 5`i rns �.f , L', � o�� . e�. o i c�i,a .� �►�o.�«^ . Applicant E-Mail: S�e.�� �u��b.�..��s . cd...� CX�1� .,� S�r-a� %e 1� �a...� o� L A�P'L�� Project Information (�^ Owner Name: t�2Fo T��c a Parcel#: .Z1C7I —071' I1—017 (For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit www.eag lecou nty. us/patie) For Office Use Only: Fee Paid: Received From: Cash Check #, CC: Visa / MC Last 4 CC # Auth # exp date: �Y�..-� � I.w P"@O �/V� . iG'C� s� . u I� L, � ���� � . (use additional sheet if necessary) Date � � L� � ' APR o 2 2012 i'�- �C� `� ' �-f6 )1NN C�F VAIL 5uw� ��u�r 3•30• J Z� � � ��:� � �..K �i 8 � �i�i�.vr��+ Ci r�I G • /m w� -�' !�� �d� ��� • �,� r� a� u-� ���� ��f� � G�G !�f � �� ., � � �, ,� ' � � �� # . � �H� � '1�C�'Itilr'G � • C�C{'Crid�' — �uX9���ZZ� �/p�, w. sJT�"" �G�Ix�Irwb ffa4:b 0 REScheck Software Version 4.4.3 Compliance Certificate Project Title: 387 Beaver Dam Circle Energy Code: 2009 IECC �ocation: Vail, Colorado Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 9248 Climate Zone: 6 Construction Site: Owner/Agent: 387 Beaver Dam Circle Michael Suman Vail, CO 81657 Suman Architects P.O. Box 7760 Avon, CO 81620 970 471 6122 michael@sumanarchitects.com Compliance: 0.4% Better Than Code Maximum UA: 515 Your UA: 513 The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Wall 1-Stair east: Wood Frame, 16" o.c. Window 1: Wood Frame:Double Pane with Low-E Window 2: Wood Frame:Double Pane with Low-E Wall 2-Kitchen east: Wood Frame, 16" o.c. Exemption: Framing cavity filled with insulation. Window 3: Wood Frame:Double Pane with Low-E Window 4: Wood Frame:Double Pane with Low-E Wall 3-Guest North: Wood Frame, 16" o.c. Exemption: Framing cavity filled with insulation. Window 5: Wood Frame:Double Pane with Low-E Wall 4-Stair north: Wood Frame, 16" o.c. Window 6: Wood Frame:Double Pane with Low-E Window 7: Wood Frame:Double Pane with Low-E Wall 5-North Elevation: Wood Frame, 16" o.c. Exemption: Framing cavity filled with insulation. Window 8: Metal Frame with Thermal Break:Double Pane with Low-E Window 9: Wood Frame:Double Pane with Low-E Wall 6: Wood Frame, 16" o.c. Exemption: Framing cavity filled with insulation. Window 10: Wood Frame:Double Pane with Low-E Window 11: Wood Frame:Double Pane with Low-E Door 1: Glass Door 2: Solid Ceiling 1-Stair Roof: Cathedral Ceiling Floor 1: Slab-On-Grade:Heated Insulation depth: 6.0' ��`�" '�� , � jJ��: -� o �.�"� �i ra. No• 24348d �'��'� =� � z�� �2 �G� �`�F� A R��`�� Designer/Contractor: Tom Solawetz Beck Building Company Avon, CO 81620 970 904 1302 tom@beckbuilds.com 105 19.0 28 66 18 9 16 308 19.0 32 92 140 35 33 49 113 18 143 417 59.0 0.0 0.0 0.0 21.0 1 0.350 10 0.330 22 0.350 6 0.330 3 0.350 6 11 0.350 11 0.330 30 0.350 49 0.330 12 0.350 0.330 0.450 0.300 12 16 51 5 3 265 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: 387 Beaver Dam Circle Report date: 03/28/12 Data filename: S:\Suman\SA-Projects\1111 TrescaWctive\Documents\6 Code 8� DRB Coorespondence\387 BDC rescheck 1.rck Page 1 of 6 Name - Title � � /�-_ 3 �z�� �z Signature Date � � Project Title: 387 Beaver Dam Circle Report date: 03/28/12 Data filename: S:\Suman\SA-Projects\1111 TrescaWctive\Documents\6 Code & DRB Coorespondence\387 BDC rescheck 1.rck Page 2 of 6 ■ onsu ln Asbestos Inspection and Sampling Report 387 Beaver Dam Circle, Vail, CO Presented To: Beck Building Company Attn: Steve 780 Nottingham Rd Avon, CO 81620 Performed & Prepared By: Mr. Dave Sinkbeil DS Consulting, Inc. PO Box 6864 Vail, CO 81620 (720) 201-6611 Project Details: Project Number: 5522 Conducted: March 9, 2012 TABLE OF CONTENTS PROJECT OVERVIEW 1.0 Introduction 2.0 Scope of Work 3.0 Site Description 4.0 Certifications 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures 5.2 Sampling Procedures 5.3 Analytical Procedures 6.0 Homogeneous Areas 6.1 Material Friability 6.2 Material Classifications 6.3 Material Conditions 6.4 Sample Quantities 7.0 Overview of Findings 8.0 Conclusion & Recommendations 9.0 Asbestos Abatement & Demolition Requirements 10.0 Major Asbestos Spill Response 11.0 Disclaimer & Limitations APPENDIX A Inspector & Firm Asbestos Certificates APPENDIX B Analytical Data 2 PROJECT OVERVIEW _ _ __ ___ ___ ___. ___ __ __ ___ __ __ __ __ _ __. 1.0 Introduction On March 9, 2012, Mr. Dave Sinkbeil with DS Consulting, Inc. (DSC) conducted a limited asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACMs) within a portion of the residence located at 387 Beaver Dam Circle, Vail, Colorado. The purpose of the limited inspection was to identify and sample potentially hazardous friable and non- friable ACM that may be impacted by upcoming restoration activities. 2.0 Scope of Work The scope of the limited inspection and bulk-sampling was limited to specific areas of the residence defined by Steve with Beck Builds. The only areas sampled were two walls in the main floor entry hall and stairway to the next level and one wall in the lower level of the residence where renovation activities are planned. The remaining areas within the residence or any out-building on the property were not included in the scope of the inspection. The limited asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. 3.0 Site Description The structure is a multi-level, single-family residence with attached garage. 4.0 Certifications The limited asbestos inspection and bulk-sampling was conducted by Mr. Dave Sinkbeil with DSC. DSC is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm, Registration No. 14912. Mr. Sinkbeil is a CDPHE certified Building Inspector; having certification number 13015 (see Appendix A for certificates). 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and CDPHE certified Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk-samples. 5.2 Sampling Procedures Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE Regulation Number 8, Part B- Asbestos (Reg. 8). � DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. Some minor destructive sampling was conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B- Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited to, the appropriate asbestos training for the type of material being removed/disturbed as well as having a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers, personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be landfill disposal requirements for these materials, depending on the facility. DSC recommends that all demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been completed, but before any containments are dismantled and the area is reoccupied. 5.3 Analytical Procedures All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see Appendix B for laboratory report). The percentage of asbestos within each individual bulk-sample can vary depending on sample location, homogeneity of the material, and the type of application. Any sample reporting a"TRACE" amount of asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the point-count method and verified to be less than 1%. 6.0 Homogeneous Areas A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of application. The asbestos content of the bulk-samples collected within a homogeneous area can be applied to the entire homogenous area if they conform to the above characteristics and the regulated minimum sample quantities of each type of material are collected and analyzed. 6.1 Material Friability A material can either be friable or non friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 6.2 Material Classifications Sampled materials are divided into one of the following three categories: Surfacing Material: sprayed or troweled onto structural building members Thermal System insulation (TSI): any type of pipe, boiler, tank, or duct insulation Miscellaneous Material: all other materials not classified in the above two categories 4 6.3 Material Conditions Sampled materials are placed into one of the three following categories of conditions: Good: none to very little visible damage or deterioration Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 6.4 Sample Quantities DSC collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required. The following outlines the minimum sample quantities required per homogeneous area: Surfacing Materials: up to 1,000 ftz of material requires a minimum of three (3) samples; between 1,000 ftz and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ftz of material requires a minimum of seven (7) samples; one (1) sample of each patch Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T's. Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content 7.0 Overview of Findings Asbestos was not reported within any of the bulk-samples collected and analyzed. DSC collected a total of three (3) asbestos bulk-samples of one (1) homogeneous area. Table 1 below describes the materials composing each homogeneous area as well as the locations of each bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample. Please see Appendix B: Analytical Data for the layer break-down of each bulk-sample. �r:�:3��� HA Sample Material Sample Material Material Estimated Material As6estos # ID Description Location Classification Condition Quantity Friability Content Thick/Rough Surfacing l 1 DW1-1 Material on Drywall Lowest Level Interior Wall SM G �250 ft" Friable ND Thick/Rough Surfacing Main Entry Hall/Stairway 1 DW1-2 Material on Drvwall Wall to Next Level SM G �250 ftz Friable ND Thick/Rough Surfacing Main Entry Hall/Stairway to 1 DW1-3 Material on Drywall Wall Next Level SM G �250 ftz Friable ND HA - Homogeneous Area G- Good CHRY - Chrysotile SM - Surfacing Material ND - None-detect D- Damaged ACT - Actinolite MM - Miscellaneous Material TR - Trace, <1% Visual Estimate SD - Significantly Damaged TSI - Thermal System Insulation 8.0 Conclusion & Recommendations ACM was not identified within the areas of the residence that were within the scope of the limited inspection and bulk-sampling performed on March 9, 2012; therefore, no professional abatement activities are required to remove or disturb the above-referenced sampled materials. 9.0 Asbestos Abatement & Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 50 linear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ftz on other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated concrete), these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction-related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal- exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 10.0 Major Asbestos Spill Response If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is deemed a"Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section III.T.1. - Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: • Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. • Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). • Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. • Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish none-detect air pressure within the contaminated area in accordance with paragraph [II.J. (Air Cleaning and None-detect Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings, corridor entrances, grills, drains, grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the contaminated area, or discard these materials. • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all surfaces in the contaminated area. • Discard all materials in accordance with subsection III.R. (Waste Handling). • Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E(EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area and • Comply with any other measures deemed necessary by the Division to protect public health. 11.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. IVo warranty is either expressed or implied. DSC assumes no responsibility or liability for error in public information utilized, statements from sources other than DSC, or developments resulting from situations outside the scope of this project. The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date, the limited number of bulk-samples collected, and the laboratory results of those bulk-samples. The laboratory results contained in this report apply specifically to the materials in which bulk-samples were collected. The results do not include or apply to any other materials within the structure that were not sampled, but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk- sampling activities would be required to determine if any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the Client, with specific application to their project as discussed in the scope of work. The results of any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, etc. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the scope of work for abatement activities, bidding or billing : purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. DSC can provide a full scope of work for abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 0 ` �.4 � �; a-�` � {' �ia '_ #° � . APPENDIX A INSPECTOR & FlRM ASBESTOS CERTIFICATES `-�.,�.::°` �.'°u�'� �� �'��' �;�� ��' % S'4°�� n ; �y � „}�' L„ �:' �, � i .' � . '� .s�',_. � : -' � ; . � .� . _., P �+i r � i .r� ♦ ,s � '+� r Jl� ar '�11 .w�� �hl.r'_ STATE nF COLORADO ASB�:S"1'OS CERTIFICATION* � Colorado Uepartmc;u ef Yublic Hralth � and Enviraum�t � Air Pollulitm fontrol Di�iaiun �:. This ��eni[ies t�:u "� David Sinkbeil ,� Certifica�ion No: 13015 '� has mtt �he rcquimments of ZSJ-50�, CR.S and Air Qualiry Comml _" Commission Reguluion No, 9, Parl B, arnl i� heirby cmific�l 6} the ;ii ::ate ��fColoredo in the (all.+uinE dixiplirtt- � : lnspecrorManagement Planner�* ' Inurd: 926M11 � � Fiplmw: �,26R012 � •vmuveAP ]Ay�wY..� • IM ma4'�r b wm, c�li .tl kP�M�n •1 �.+r.ea Ohwtw�pwMV.tw.�.�+r �a�jfr�/r. nW diy4�� ►w+Iw Jnc %w..-.���-_ _.:.._. ..... -__a _ �C_:_:�. �� . !:�:'#:: 1 0 ��- �i � = t a [T; � � ! � � � ° " � z —! S ��''' � � � _ � � � a� ? O � `z.,c7 i7 � ._' a O " O� a C ~Sj �° 7 _ � �< z z � �ti ' -• = � 3 = v; C _ � .< _ � = v� s � - ,— �� T=� q° ' c'-= [" i - ,� i' � _ — r' � __� r � � „�O, n ., �h w — pZp Z �-�C~ = v o � ' r � ;� ` � 4:' j` _ F , z � f. -: � � l", w � J. � �R� � _ 8 ' � L + APPENDIX B ANALYTICAL DATA �t _ ,' � EMLab P&K ;. Report for: David Sinkbeil DS Consulting, Inc. 5366 Flatrock Ct. Morrison, CO 80465 Regarding: Project: D-387 Beaver Dam Cir. Vail, CO EML ID: 898493 Approved by: J`�'iiSiti.�,� � � Approved Signatory Andrea Robarge Dates of Analysis: Asbestos-EPA Method 600/R-93/116: 03-12-2012 Service SOPs: Asbestos-EPA Method 600/R-93/116 (EPA-600/M4-82-020 (SOP 01264)) All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the items tested. The results include an inherent uncertainty of ineasurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data can be provided when requested. EMLab P&K ("the Company") shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the clienYs customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor. Document Number: 200091 - Revision Number: 5 EMLab P&K, LLC EMLab ID: 898493, Page 1 of 2 Client: DS Consulting, Inc. C/O: David Sinkbeil Re: D-387 Beaver Dam Cir. Vail, CO EMLab P&K 4955 Yarrow Street , Arvada, CO 80002 (800) 651-4802 Fax (623) 780-7695 www.emlab.com Date of Sampling: 03-09-2012 Date of Receipt: 03-12-2012 Date of Report: 03-12-2012 ASBESTOS PLM REPORT: EPA-600/M4-82-020 & EPA METHOD 600/R-93-116 Total Samples Submitted: 3 Total Samples Analysed: 3 Total Samples with Layer Asbestos Content > 1%: 0 Location: �WI-1 Lab ID-Version$: 3994260-I Sample Layers Asbestos Content Off-White Drywall With Brown Paper ND White Joint Compound ND Cream Tape ND White Texture ND Tan Paint ND Composite Non-Asbestos Fibrous Content: 15°/a Cellulose < 1% Glass Fibers Sam le Com osite Homo eneit : Moderate Location: DWI-2 Lab ID-Version$: 3994261-1 Sample Layers Asbestos Content ---- _ - --- --------- ------- ------- _ - — Off-White Drywall With Brown Paper ND White Texture ND Tan Paint ND Composite Non-Asbestos Fibrous Content: 10% Cellulose < 1 % Glass Fibers Sam le Com osite Homo eneit : Moderate Location: �W1-3 Lab ID-Version$: 3994262-I Sample Layers Asbestos Content -- - - --- -- -----_____ _— -- _ _- Off-White Drywall With Brown Paper ND White Texture ND Tan Paint ND Composite Non-Asbestos Fibrous Content: 10% Cellulose < 1 % Glass Fibers Sam le Com osite Homo eneit : Moderate The results relate only to the items tested. Interpretation is left to the company and/or persons who conducted the field work. The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, N[ST, or any agency of the federal government. All samples were received in acceptable condition unless otherwise noted. EMLab P&K reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified. Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. $ A"Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x". EMLab P&K, LLC EMLab ID: 898493, Page 2 of 2 LOAD CALCULATION PER N.E.C. EXAMPLE D1 ( a) TRESCA RESIDENCE - 03/30/2012 GENERALLOAD- 4,402 SQ. FT. @ 3W/FT SMALL APPLIANCE LAUNDRY TOTAL 3000VA @ 100% 17,706 VA - 3,000 VA = 14,706 VA @ 35% NET LOAD IN VOLT-AMPS MAJOR LOADS - CLOTHES DRYER HEAT TRACE HOT TUB STEAM GENERATOR SAUNA ELECTRIC OVEN HUMIDIFICATION LOAD NET CALCULATED LOAD MINIMUM FEEDER AMPS LOAD IN VOLT-AMPS 13,206.00 3,000.00 1,500.00 17,706.00 3,000.00 5,147.00 8,147.00 5,500.00 12, 000.00 12, 000.00 10, 000.00 10,000.00 10,000.00 9,000.00 76,647.00 319.36 SERVICE BUSSING / MAIN AMPACITY 400.00 TRESCA RESIDENCE , PRIMARY RESIDENCE - GARAGE , PANEL P1 _ _ ,.- - i - DESCRIPTION P�Q� ' QO��g G���O I� �Q� \�� i�Q� G���O 'll QO��g P�Q� DESCRIPTION � PANEL P2 SUPPLY 100 , 2 1 S 1 S ', 2 1 20 ', KITCHEN APPLIANCE PANEL P2 SUPPLY 100 2 3 S 2 S 4 1 20 ' LAUNDRY APPLIANCE CLOTHES DRYER 30 2 5 S 1 S 6 2 � 50 RANGE CLOTHES DRYER 30 2 7 4 S I 2 S 8 2 50 RANGE +- ± .. 1 ' EPD 10 2 20 WEST HEAT TRACE NEW ROOF HEAT TRACE 20 2 9 EPD I, NEW ROOF FIEAT TRACE 20 2 ' 11 EPD 2 ' EPD ' 12 2 20 WEST HEAT TRACE _ _ __ . -- - STAIR POWER 20 7 13 AF 1 EPD 14 2 20 EAST HEAT TRACE -- - � - . POWER VENT SYSTEM 20 ' 7 15 � S 2 EPD 16 2 20 EAST HEAT TRACE ---- -- MASTER BATH STEAM ' 50 I 2 17 S �' 1 EPD 18 2 20 S.W. HEAT TRACE , � , , MASTER BATH STEAM ' 50 i, 2 19 S 2 I EPD 20 2 20 � S.W. HEAT TRACE HUMIDIFICATION I 30 � 2 21 S 1 ' EPD i 22 2 20 I N.E. HEAT TRACE HUMIDIFICATION 30 2 23 S 2 �I EPD I 24 2 20 N.E. HEAT TRACE __ _._.. _ �_ _ KITCHEN RECEPS 20 1 25 S 1 S 26 ' 1 , 20 KITCHEN APPLIANCE KITCHEN RECEPS 20 ' 1 27 S 2 GFCI 28 1 20 BOILERS 1 AND 2 CLOTHES WASHER 20 1 29 S 1 S 30 1 20 � BOILERS 3 AND 4 REFRIGERATOR 20 1 ! 31 S 2 S 32 1 i 20 PUMPS AND CONTROLS KITCHEN EXHAUST ' 20 � 1 33 S 1 S 34 1 ' 20 PUMPS AND CONTROLS DISHWASHER I 20 1 35 S I 2 S 36 �, 2 20 I�IUMIDIFICATION DISPOSAL / INSTA-HOT � 20 1 37 S 1 S ' 38 I 2 20 HUMIDIFICATION --_ _ _- --_ _ _ . -- -- --- KITCHEN RECEPS ' 20 1 39 S 2 S 40 �, 2 20 HUMIDIFICATION MASTER BATH TOWEL I 20 1 41 S I 1 S 42 2 20 HUMIDIFICATION - __ � ._ - , --. - --- - ---- . _ _ LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREAS. EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 200-AMP / 2-POLE MAIN BREAKER BREAKER TYPES S=STANDARD, AF=ARC-FAULT, EPD=30mA EQUIP PROT, GFCI=5mA PERSONAL PROT ---- __ _ _ __ I . _ . _ --- - _ . - __ J_ ___ TRESCA RESIDENCE � PRIMARY RESIDENCE - GARAGE ' PANEL P2 ' DESCRIPTION � �g �O � I � �O , �g � I DESCRIPTION P�•� Q�\• G�'` '��Q ,���� ''��Q II G�� Q�\, I P�Q LOWER LEVEL N. RECEPS ' 20 1 1 S I 1 S 2 1 20 ', MECH ROOM LTNG LOWER LEVEL S. RECEPS 20 1 3 S 2 S I� 4 1 20 SUMP PUMP NORTH CRAWL SPACE 20 1 5 S 1 S 6 1 20 � S. BATH RECEPS � FAN COIL 20 1 7 S 2 � S 8 1 ' 20 W. BATH RECEPS MASTER BED RECEPS 20 1 9 S 1 S � 10 1 � 20 E. BATH RECEPS MICROWAVE OVEN 20 1 11 S 2 I S �, 12 1 ' 20 ' GARAGE RECEPS - _ _ -- _--- -1- - ------ MAIN LEVEL ENTRY AREA 20 I 1 13 S 1 S ' 14 1 , 20 ! N. MASTER BATH RECEP i� GREAT ROOM RECEPS 20 1 15 S ! 2 S 16 ! 1 20 S. MASTER BATH RECEP -----� - _ - -- - --_ SEWAGE LIFT STATION 20 1 17 S 1 ' S ' 18 ' 1 ' 20 S.E. CRAWL SPACE ' GARAGE DOOR OPENER 20 1 19 S 2 S 20 1 20 '� S.W. CRAWL SPACE MASTER CLOSET RECEP I, 20 1 21 AF 1 ' S ' 22 1 I 20 POWDER ROOM RECEP - � - - � ----- -- -. . _-- --- - MASTER BED RECEPS 20 1 23 AF 2 S 24 1 20 MASTER JACUZZI L-TOUCH MOD 9- ENCL C 20 1 25 S 1 AF 26 � 1 20 NEW L-TOUCH MODULE L-TOUCH POWER SUPPLY 20 1 27 S 2 � S ' 28 1 20 GREAT ROOM A-V EQUIP L-TOUCH SPARE - ENCL C 20 1 29 S 1 � S �� 30 ! 1 20 , SECURITY PANEL L-TOUCH MOD 1- ENCL A 20 1 31 S 2 S 32 �� 1 20 L-TOUCH MOD 5- ENCL B L-TOUCH MOD 2- ENCL A I 20 1 33 S ' 1 S 34 1 20 L-TOUCH MOD 6- ENCL B L-TOUCH MOD 3- ENCL A 20 1 35 S 2 S 36 � 1 20 L-TOUCH MOD 7- ENCL B 1/2 HOT RECEPS ' 20 1 � 37 S ' 1 S 38 1 20 L-TOUCH MOD 8- ENCL B L-TOUCH MOD 4- ENCL A 20 ! 1 , 39 S 2 �i S ! 40 1 20 L-TOUCH SPARE - ENCL B , I � t L-TOUCH SPARE - ENCL A 20 1 41 S , 1 42 I _' SPACE ----- _ ___ __ _ --- - � � - - ___� __ ---- - ---- - _ _ LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREAS. -T - - --_ _.... __ _ _ _ - _--- - i- - �_. -- ._. EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 100-AMP / 2-POLE BREAKER IN P1 BREAKER TYPES S=STANDARD, AF=ARC-FAULT, EPD=30mA EQUIP PROT, GFCI=5mA PERSONAL PROT TRESCA RESIDENCE - - - __ __-- _.__ _�__ _ . . � --_ _ _---- SECONDARY RESIDENCE - GARAGE PANEL P3 � -- ---. _—_ � _ - DESCRIPTION II' Q� ��r� ��O Q� il � Q� ��O ��g ' Q� DESCRIPTION . �` O � -1 I��� ,�-1 i G� QO e,�` P IQ G � i 1/2 HOT RECEPS 20 1 1 ' S 1 S 2 2 50 � SAUNA HEATER L-TOUCH MOD 12 - ENCL A 20 1 3 S 2 S 4 2 I 50 SAUNA FIEATER -___ - -� _ __ _-�- - -�I �F- GARBAGE DISPOSAL 20 1 5 S 1 S 6 i 1 � 20 KITCHEN RECEPS REFRIGERATOR 20 1 7 S �� 2 S 8 1 20 ' KITCHEN RECEPS GUEST MICROWAVE OVEN 20 1 9 S 1 S 10 1 20 BATHROOM RECEPS L-TOUCH MOD 10 - ENCL A' 20 1 11 S 2 S 12 1 20 GARAGE RECEPS L-TOUCH MOD 11 - ENCL A 20 1 13 S 1 S 14 1 20 GARAGE DOOR OPER,4TOR L-TOUCH MOD 13 - ENCL A 20 1 15 S 2 AF 76 1 20 FAMILY ROOM LTNG - - ------ _. : _ _ NEW L-TOUCFI MODULE 20 1 17 AF 1 AF �� 18 1 20 FAMILY ROOM LTNG � .___� NEW L-TOUCH MODULE 20 1 19 AF 2 AF I 20 1 20 ' FAMILY ROOM RECEPS ___ . � MOTORIZED SFIADES 20 1 21 AF 1 AF 22 1 20 ' FAMILY ROOM RECEPS SPA COVER 20 1 23 S 2 S 24 1 20 EXTERIOR LTS / RECEPS A-V EQUIPMENT '♦ 20 7 25 S 1 S 26 1 20 A-V EQUIPMENT _ _ .. _ -- -----___ _ __ _ GAS FIREPLACE - FIREPIT 20 1 27 S 2 AF 28 '1 20 CLOSET / STORAGE LTNG __ _ - _ ----- — A-V EQUIPMENT 20 1 29 S 1 S 30 1 20 A-V EQUIPMENT _ . -- GUEST FP / TV EQUIPMENT '' 20 1 31 AF 2 S 32 1 20 SECURITY CAMERAS i�-- _ --- _ __ _ HUMIDIFICATION 20 2 33 S 1 S 34 1 20 SUMP PUMP ALARM _ ___ _ _ _ _ ___ _ . . _ , HUMIDIFICATION 20 2 35 S ' 2 S 36 1 I 20 WATER SYSTEM WATER PRESSURE PUMP 20 1 37 3 1 S 38 1 20 RADON SYSTEM OPTION WINE COOL COMPRESS I 20 ' 1 39 S 2 AF � 40 1 20 WINE ROOM POWER SPACE 41 1 42 SPACE LOADS INDICATED IN BOLD PRINT ARE TO SUPPLY NEW EQUIPMENT OR RENOVATED AREA3. I_ , _ —� , PROPOSED INCREASE FROM 100-AMP SUPPLY TO 150-AMP SUPPLY (FEEDER AND EQUIPMENT) ____ _ __ _ __— ___ . � EXISTING PANEL IS 225-AMP SIEMENS 42-SPACE LOAD CENTER FED FROM 100-AMP / 2-POLE MAIN BREAKER - -- -- - _ _ _ ---- -- BREAKER TYPES S=STANDARD, AF=ARC-FAULT. EPD=30mA EQUIP PROT. GFCI=5mA PERSONAL PROT 0 �a . � � Y' 1 -�,..� u 1, t�� t T _ T� , � . , .. . . .."� 1^' ~_ �--".1�" _... �p�—}�.:-�--- -. -+_�7". ��� ��-- ... • � ...- _� .... _,_.. � ,..:e-�----"' ..».. _._ -' , ,�..-�°s - . =.,�s�' r� � � ,, � y :;.t � � � y a .' � -« #�� j �i .�'+S {.� � yy, x t 1 s--�- _ ... ,.> e . �:; • �gd}�.' r�'SP A,, i Y �°� � �r a� '�' � �Y % ` �� �', fl �+ ; �g�, !" �+ r �3�`�� �, ����� t ��.; � � � • : r,'r�", ,�!� � �+�;v ��'' g���� '- .+'< t �';� �,�}"P�;��{ ' �"�,i "'► '.,� ��'� ��r �Fd � .�"�� z +r' ���' `'� "y ' ` , , .� { n� " fi��,'t�„sz,��t� �r'�!����'�t'�%i''„i�'.�� 1", ry�r�. �f; �4�, x "_ "' ` . ��� 5 r � �.� , " . F 1� . � �� ���� ����� ��� . �� •'�l�,��� . '�, � �? �` $ � �-�' . i � `_ . `. �°. �wa� +.�k�� i �� W."µ�..�`- aa.°�!+�e"VVaa.siu._ _.. .:. A-^".f;. j � i a. �* :. �' ' �yy�µy.� eY"::,. L' ��*�" r�ar ��-�' y''^� ,, �' e J f ���s `l � j , /i ��` . A'..��. .a . _.�'�. �N; � ,-��v i #„,., : �°� .r �t " ��� � . �,;-,. -.�•�r�,��r• 38� B��w �� ���- � I ; ,. r!' � s �' � ._ J � _ .E�t� i e r }>r � _1t � y t � � c �,«� _ � � .. t� _... .. . _ . �- ... .,, �,. .. �... . . . _ . . . . ,�... ... .. . .._,---. _.�. _ _. .._ . . .. . . ��. � : .N r ,. , _. , -� ___. . _ — �._ :� f �. y . s •1.': .. �� � .. ..�. , _,�: � ,� , �, f, � ..9:�: x 4,•, ,«,. �,�i � � ! � , i � . +� �°�„ : y�r; • *; . , • r�.v ,.t � �t � ; �- �. w�� �` . �i � � 1 1. � . x. ',. ✓' � Y s . +�x � • -s.� .. •d�s ( ;{ % t '.� ,.�. �.`4.� �',tir F �, � � �4 y+F,'y � .y��� ��., . '�� �-� � rr�w ��',�jei�� ��'„� �� %! .� 2 �� � ,-r � � R1 M� ir , . . « . �„ , .�s . , � t- , .9, . �° >.. � M/ � +. F t .1 � i . . . . �" . . . � , ' " , - J,a� „� - o f.' Ye } �'. • � . �' . _ 6.±,....:'tiilt �:V. .. � . �, � � . . . . �si" _ ia, "'-:,�e ' 1 i —_ � r .. _ . . . r . t � . � . _ . . . �i ' , . � . e . ° r'_yj;' . 4 Ki� � .. ..... � _ � ' R � Y�� F � t � ' r r � � �€ T . �, � i� � . _ ry.,�.�, ,, _ - � � y� y� � ,`�, � _ _ ,- ��. •�• � �F � � � ,� � � � • �„�� ��y� �. �� ^� 1 . _. � u��`.�j�iij i c, tie�„ % . � i �r+� �� i�` sa' .�� 1 � ? . . �. � �. ' �� � .y�'wr. � �.M � �� .. ' � � ;� , . �j��`� � # n • t �t ,�. � a� .w • , �l ' w � , } w � �'. A �7L,�� � � i; #� �. � �� � ��* `� . � . � "'��"`�I''{i, , � ,� � � t '�1+� �,,, �� �y, > �.�" j"� � �":��3s• � �!. .�i �`±e-. . ` t'� y` t t� t �'. • . j�}R � F" �`�f, � �� +a yw� `s•' • yli+ .�•+..+ �'� .. �� �T .:. . `;.,:�K.."..,Ii.�,. f_~�'F #� �i.��,4' r'..y"'M'.;r�'���d�'e`' t� , .' . . �� �`�: � t � � � , , * 4.,�y� . ,a�' �„ .�� e � t'' ; y;"�`��,'�.z�:� �w ' �''+ �` ' :�� �, � ° � � ±� �.�;� . t ,�°; � ,� � �� A � w, � H tilator° Multi-Sided S�eries: ea the Possibilities are Unlimited! • Clean, louverless design • Choice of corner, peninsula and see-through configurations • Available in direct vent or B-vent versions • Extensive choice of decorative fronts, surrounds, granite and marble finishing materials • Two-toned painted refractory • Optional fan for direct vent models • Modulating flame control with variable BTU/Hour input and flame height: 25,900 to 37,000 BTU/hour input for 36" models; 14,700 to 21,000 BTU/hour input for 31 " model • Available with revolutionary IntelliFireT"' ignition system • Certified for installation in bedrooms; direct vent models also certified for mobile homes • Direct vent models preserve Indoor Air Quality (IAQ) and provide efficient zone heating • Heater listed to ANSI Z21.88 standards (DV models) IntelliFireT"" • Eliminates a standing pilot, reducing fuel consumption, saving money and being environmentally friendly • Dependable in a power outage with battery backup �- � , � � �e: � �w -_� � � �� ��'� � ��� � : � � � , . . �'� .,. �...:. , ���i' �.� . �`' � , 36° See-through model shown with Craftsman front and custom surround � , ` : +� � � _.. � 31" See-through model shown with Portfolio front �! 36" Peninsula model shown with Harbor front and end panel � � Multi-Sided �as Series Models Available* Confi uration Viewin Width Ventin S stem 31" See-throu h 31" Direct Vent 36" See-throu h 36" Direct or B-Vent 36" Left or Ri ht Corner 36" DirectVent 36" Peninsula 36" Direct or B-vent Options* Salem, Portfolio and Simon fronts fit the 31 " See-through model ����� ,�,�...���.�.� Salem Front 1'ur�tuiiu �r�ui (black & bronze) (black & bronze) Siin�il ��runt (black) (available in 31" and 36") Phoenix and Harbor doors, and Craftsman and Simon fronts fit the 36" models Phoenix Operable Door (black, pewter & bronze) Harbor Operable Door (black, pewter & bronze) Craftsman Front (black & bronze) Options Not Pictured* Venting Remote Controls and Wall Switches Direct Vent: DVI' & SLP Series pipe Fan Kit (direct vent only) B-Vent: 5" B-vent pipe Gas Conversion Kits Mantels and Surrounds *Please consult the MSRP book for a complete list of models and optional accessories Multi-Sided Series Technical Specifications 36" & 31" See-Through Direct Vent Models EIECTRICAL LEFT VIEW FRONT VIEW �p� 0K 36" & 31" See-Through Framing B ACCESS 36-IN RIGHT VIEW 3i-[xx[cHrv[Ew ELECTRICAL ,flfl � K fifl, ACCESS _ _ J � 1 t .- H GAS LINE i ACCESS F � \ � G � fH PRODUCT DIMENSIONS Location 36" model 31 " model Location 36" model 31 " model A 36 31-1/8 I 1-1/2 1-1/2 B 42-1/2 37-5/8 J 27 N/A C 24-1/8 21 K 8 N/A D 33-1/2 30-1/4 L 12 8 E 1 1 M 9-3/8 8-3/4 F 2-1/8 2-1/8 N 38 34-1/2 G 4/1/8 4-1/8 O 34-5/8 31-3/4 H 4-1/4 4-1/4 P 24 16 FRAMING DIMENSIONS A B C' D DVP SL Pipe B-Vent DVP B-Vent Model Pipe Pipe Rough Pipe Pipe Rough Rough Rough Rough Opening Rough Rough Opening Opening Opening Opening (Height) Opening Opening M��dth) (Width (Width) (Width) (Depth) (Depth) GDST43361 10 8-5/8 -- 38-3/4 23 -- 43 GBST43361 -- -- 7 38-1/2 -- 23 43 GDST38311 -- 8-5/8 -- 34-3/4 15 -- 38-1/8 'Adjust framing dimensions for interior sheathing (such as sheetrock) All dimensions in inches. The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the addition of drywall. Please refer to installation instructions for complete specifications and drawings when installing this product. Visit www.heatilator. com to download. 36" Peninsula Direct Vent Models ELECTRICAL ACCESS FRONT VIEW RIGHT VIEW 0K 36" Peninsula Framing �� O , p _ PRODUCT DIMENSIONS Location Inches Location Inches A 36 I 1-1/2 B 40-1/2 J 27 C 24-1/8 K 8 D 33-1/2 L 12 E 1 M 9-3/8 F 2-1 /8 N 38 G 4/1/8 O 34-5/8 H 4-1/4 P 24 FRAMING DIMENSIONS A B C' 0 DVP SL Pipe B-Vent DVP B-Vent Models P�pe Pipe Rough Pipe Pipe Rough Rough Rough Rough Opening Rough Rough Opening Opening Opening Opening (Height) Opening Opening (Width) (Width (Width) (Width) (Depth) (Depth) GDFL41361 10 8-5/8 -- 38-3/4 23 -- 41 GBFL41361 -- -- "" 38-1/2 -- 23 41 ' Adjust framing dimensions for interior sheathing (such as sheetrock) "See pipe manufacturer's installation instructions The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the addition of drywall. Please refer to installation instructions for compfete specifications and drawings when installing this product. Visit www.heatilator.com to download. 36" Corner Direct Vent Models 34-5/8„ LEFT VIEW 36" Corner Framing R! 8•' � �, \ � . � \ � � � p �' � � , . �. FRONT VIEW I /8„ 3-1/2° ELECTRICAL ACCESS 2-1/8•' RIGHT VIEW � 4-1/4" PRODUCT DIMENSIONS Location Inches Location Inches A 36 I 1-1 /2 B 42-1 /2 J 27 C 24-1 /8 K 8 D 33-1 /2 L 12 E 1 M 9-3/8 F 2-1/8 N 24-1/2 G 4/1/8 O 38 H 4-1/4 P 34-5/8 FRAMING DIMENSIONS A B C' D L41 I p pe SL Pipe Rough P Pe Rough GDCR41361 Rough Rough Opening Rough Opening Opening Opening (Height) Opening (Width) (Width (Width) (Depth) Inches 10 8-5/8 38-3/4 24 41 'Adjust framing dimensions for interior sheathing (such as sheetrock) The rough framing dimensions shown represent the distance from stud to stud only and do not take into consideration the addition of drywall. Please refer to installation instructions for complete specifications and drawings when installing this product. Visit www.heatilator.com to download. Who Would Benefit From Heatilator Multi-Sided Gas Fireplace Series? Home Owners: • Who want their fireplace to provide a dramatic design statement in their home • Who need a functional room divider to define living areas in their home • Who want to preserve positive indoor air quality for their family (DV models) • Who want warmth without waste through energy efficient zone heating (DV models with IntelliFire) • Who want to increase the resale value of their home Home Builders: • Who want a dramatic focal point to make their home design more appealing to homebuyers • Who need a functional room divider in key design areas such as the owner's suite, or separating living and dining spaces • Who want to provide their customers with fireplaces approved by all major Green building programs (DV models) • Who want to increase the energy efficienry performance of their homes (DV models with IntelliFire) • Who want to increase their customer's satisfaction with multiple finish styles and colors 1,. eatilator� The�`rs st l�.c�fd�.t; i�z j�rc;��,F�R�xces a brztnd of Hecrrtl� f, Honte Ted�no[ogies btc. 1915 West Saunders Street Mt. Pleasant, Iowa 52641 800-927-6841 • heatilator.com The information pmvided in this litenture is for planning purposes only and subject ro change. Please consult [he insnlla[ion manua) Eor aaual insnllation. Actual p�odua appannce may differ fmm product imagea. The flame and ember appearance may vary based on the type of fuel burned and venting con6guntion used. For full warcanty details, go ro hatila[ocmm "Pleax consult the MSRI' book for a complete liat of modela and optional xcessories. H�fl.-10�?U-1008 � " � � ����� .v4x �E .� i:�� * ,.��'� � ,�� � v �� ;� _@, � ; i . r . t: 1 ._ . � � �� . ��� !��' � � ' i � � .�_ " _ �mar9uis COLLECT�ON by Kingsman ,�� � �, �, . '.�:, �, ��ifl;.: �' , �� ��' l�� � k, � , . . ./A. .�:.. �'.. i" �aw f- � -.~a�'',... `� �. ��� � � {-� . - w.. f_+ r �yu : A�z= .. F-�.� i t ���.}� � � � s,.Yi+ . �� �.. ` � .:.! ���II�I'° 4 ��I 41 iiti� �1,��...i 2 y�. "' ,ro _ . �r�— f��llil J���I m'"� °� ,. _ < .,� �. ... „�y- a_ i., �"" °•� `�,. � w ��._ K.�,.;`., ,���, JA + ' �. �M,�.�, ��� � �_ � k � � �p '� ` �c �I � � '�� ,M,?`„a,'�, , . �. � � . y^.. VrY uzI" , " i. ° ,w-`v '"� . . � . -.�_� - •yqitlR W��,+�. .t` p . ���a� .. ..I,y ..V. V.�"'."Yr y°V��w. i � sl • s�~ -: �w .,,,w�. W � '�,.x ,L _ . �.Y � . � r..e .. _ . � ' „'�,� +.�` .., r. ' "' ' ,M ,` • +.�.w �-x �..� . �.,,�, � '�'"" .`K� �'.�'%� � x"-�`-�.'�,-�����r ,..'�, � `� �� : � �� v '"�- r � , y�° � "",� �+r. , ,: z �` y- �� z' F�r �;=: a`,� s �` � c� � . A � -^« _ "M° . � ,• 3� :'',� cM`t'�- �`^" ^c *✓€ �"^M ��,�' �'4� �`^" U c�'" '� "�„'� ti • • '�°'•w. -w,'�..,- � ,.. , t ��r � �� v� ...,; � .r ! � .r � `"9y* .e„.,` r , w .,� � y',Q �+ . „ � _ . . . �`L�1l� . � � � � � � �� � � � �4.. ` �' � � � . ^" .� ryr � - "+'+a. �.:. � ,.�.e., � . t � .. � -r�;�r ,s x ^� °!` r .� +,s . �" . �e �"� Y*-a ' _ �� � " � ° r�" -. � ,-� .s�,.,,.. ..,. � , y � '`t. , � � . � . . � ` '�'n �,.y,f.r� �s-....� ~y,.,�,LL�,�r riw..�'y� ,�'�_� +acY 4' �" +.� .i �,� � "�►"W"� h �..�. �� a. ��'is a( ''t�t°r*S"�.,�'�1�, t ,.,x Y � 'rr �..,x�„ �` ,. ... � � � ..� T . W � ."�yF�- ` ,. �� '�` �y � w";,;.� � re , �, . �a . ,rw..� +t ,s� �"r- �„ , yr y . � '" ,� � ..�eM►�` �., �y, � r-+� ++�vy� , e =� "+4� _ � !` �ut,� ,�:""�`�. k , > °� ;�'�, "r�,�,,';� ��'�", u. . , " � � 4 �" -'� .�' w � ° A `�'� "e . , „t � �4 ., . �C '"� . � � ,. � :�. � � r. t ... �` . _ .r '� ,.�"vr.`,y.tyy� "rS 7w,.� � , � � � r w .* � . ,��"�` �'� ..,� � . .�i � . , � ti ° yy� ..s.. �+�,, ' � , ,^. �-. � . . a. , ;*;# ... +�^"v � r� Y �, � ��.�.,7k. � ,r.zt,�„ " � . � `/'.,r . � ., , � ".�.'+� : - �'f� ,; .;. ., , , ; ., +� , �� �A '�'w-�..r,uy.�. .:.�- "� *. ., a .�'�"'f�"wr ' �. �'^,r.,;� ' . ,1 ^� �M�+a ,�r �� 'aa' ' � , "'If � ,» �4I¢ Yr �;v�" �kl�` rA.art > �a""'_ "" � � " 1i` ' a� , . s � ✓ �'.,� 4 ^,'wah . "E'»a��.. •, M � , x . ,� � e 4Y+r. .� , . . . �tit.�(v"` „ -;.�r.-�� �_ . r � i�sr� . �:ft.. ' ..�i.rt.. 'm°'. , "'�� . :.7' a„y,z . .�,�.�w. . s+�. � �� -,.,� , _ '�"�a' ^:,`1i'�Iw^ w_ . ., ���d -� � ����� , ..�<. �� Unit Illustratetl is a MQRB4436N Infinite Linear Direc[ Vent Flreplace - Na[ural Gas, MOR944366K Back Shield Kit -(or single sided viewing, MORB4436PL6 Porcelain Liner Back, MORB5143PLE Porcelain Liner Ends, surround provided by Palazzetti. �:��y �o� �;��� 3g� ��.1�- ���� � WALL SURROUND FRAME & EDGE > y �� �•��� a��r, "ti=� fiR^`'3'�• . _ ~r� «i�`S�:�wiTi�:" . � ' .,' . . . . . � .. • . . . i �.: ........ I � j v. �, ` , ' .. .. �.;y�, . �: t�i` ��'� �� � . STYLING • ' � .`; � � � ��� � - � .. � �,{ �ti _ . � �. ' �[��r1 . M %� �.y � t,tr L. 9 � i � ,� � � ` �.. .� � , � v,` �Ii� h ' °" , � � . . � � ,�l. � .. � �'t' �}�. . � �� . '�� ROCK COLLECTION �°� � � ..j:,,� .�� �, ,. w� �.y �'\.� � . r � �e�rT,,•,� �,,� r � F � DE .. .. ..._ i �� t,� � �� �� �` : ^ �� DECORATIVE EMBER GLASS _---"".,-.�.""'✓'"� �� � ��: � F.�; s - �- _ T , ° u*�:, .�-�,�? � �;�� ":.�Irp��'�... _�`�'' Unit Illustrated is a MORB696W lineer Multl-sitled Direct Vent Natural Gas Fireplace, MORB69618K Back Shield Kit - for Single Sided Viewing, MQRBD2 Drift Wood Branches - Three Plece Set, MOROCK3 Rock Set - Con[emporary Collec[ion - Multl-Colored, MOEMBER Ember Chunks x 2. Surround provided by Palazzetti. �( ��� „ � �''�`"'�' _ i �. � i *� ' s � � :�, ,y � u`s . �< �'"� �e � t.� � . r. M:. .f Ft�c Inpitt ii�i�.f>' Input (Mini Glass Winetc3�.� Electronic �<p��t�ar, Millivolt Glass Size Venting FE (P.4.1-02j MOR64436NE MQRB4436LPE MQRB4436N MQR64436LP Natural Gas Liquid Propane 33,000 33,000 22,000 26,000 Ceramic Ceramic Yes Yes Yes Yes 35"Wx151/4"H 5/7" Kingsman Flex Vent 60.9% / 59.1% 60.9% / 59.1% �r�'�ir`��L. �:,){�1`t�r�i��l�i T�!M K,iT B � FRAME p MORB56245 / MOR86924 c � A H E D G E � � MOR850195 i � �^— G � � PRCi��, ;IP,�1�� ci���,r�.;�,: � �^E �I � F � 1� K � �� a - � , ._ _ -- --- r � I l�•'. �i � __ _ +� i I i'. 1 � Ii p g FRONT VIEW I F G �; �. SIDE � � VIEW i � C � i 'I j �� p I � ' �. ; E _ i � ' . . �, _ _ ... __----.. _, �-r= : . , �— K �I I I 1 I C . 1. ... II I-♦- ���+'+��,.� f � I �� TOP VIEW �� .: �� ;� �.._.; _:.� E -.._ •..._..._" ---�---� I� N MQRB5143NE MQRB5143LPE MQRB5143N MORB5143LP Natural Gas Liquid Propane 40,000 40,000 28,000 31,000 Ceramic Ceramic Yes Yes Yes Yes 42" W x 15 1/4" H 5!1" Kingsman Flex / 5/8" Hard Pipe' 65.6% / 64% 65.6% / 64% ' with adaprer MORB4436 MQR85143 MOR66961 A 49'�a" B 3'�e" C 4're" D 233in•, E 1" F 23;s•' 56'�s" 74'ra" 3'ie" 3�ie" 4'ie" 43ie" 233/4. 233�4. �,. �. 23�8� 23�8� MQR84436 MOR85143 MORB6961 G 44'�e" H 1'n" I 1'�z" J 19',s" K 1" L 23/g�. A B C D E F G H I J K L M N 0 51'is" 69'ie" 1'�i' 1'n" ���z�. ���i. 19';s" 19be" �.. �.� 23�6� 23/8� MQRB4436 MQR85143 MQRB6961 44'�a" 13ba" 33'�e" 36bn" 39" 34" 375r8� 7'�e,. ���z» 2'n" 16'n" 16'n'• 8��a�. 2" 35" 51ba" 13'r," 40'ie" 43ba" 46" 34" 375�s" 7��8� ����� 2'iz" 16'�z" 16'r,» $��8. 2" 35" 69'�e" 13'rn" 58'ie" 61'ia" 64'�s" 38" 453�e" 7�ia�. ���z. 2'rz" 20'n" 20bz" 12're" z��e• 39" MQRB6961NE MQR66961LPE MQRB6961N MQRB6961LP Natural Gas Liquid Propane 62,000 62,000 43,000 48,500 Ceramic Ceramic Yes Yes Yes Yes 60" W x 15 1/4" H 7/10" Kingsman Flex Vent 51.1% / 51.8% 51.1% / 51.8% � f .;� . . , _.. > SIT Valve with Hi/Lo Flame and BTU Adjustment > Accent Lighting with Decorative Glass Ember Bed Choice of Millivolt or IPI electronic ignition system with battery backup, and cold climate switch Choose your view — Single Side or See Through for your viewing pleasure. Surround Trim Kit — Black, Pewter, or Stainless. Available in two sizes — Frame and Edge. Porcelain Liners, and Porcelain Bottoms � Drift Wood — Four Pieces Driftwood with Four Rocks ,`� or Three Piece Large Driftwood Set (5143/6961 models only) Rock Sets — Contemporary Collection in Natural, or Multi-Colored Decorative Stones or Ember Chunks Decorative Ember Glass — White, Azuria (Blue), or Bronze Remote Controls — On/Off, Thermostat, Modulating Height Front Width Depth Top Flue Model Actual Framing Actual Framing Actual Framing Infinite — MQRB4436 Single Sided 37��a" 38" 46" 46'�z" 16'�z" 17"" See Th�ough 375�e" 38" 46" 46'n" 16'�z" 15'�e"' Infinite — MORB5143 Single Sided 375�a" 38" 53" 53'n" 16'n" 17'" See Through 37��s" 38" 53" 53'.a" 16bz" 15'ie"' Grand Infinite — MOR86961 Single Sided 453ie" 45'ia" 69'ie" 71bz" 20'ri" 21"` See Through 4S3ie" 4S�iz" 69'�s" 7T��" 20'n" 193�a"* dependon( ol linislring rnateilal used �� ' �< # � � � n� ; , ��, � �, ``�;� �� �„� � _, � ;���' ��:i��� ��r - � _ . . � � � �a.�.�...�� ��- ��� ��� �. ��:�w ��� �� w-.� �� � ��ll���Xi�;°r����� 5 , Unit illu�t il�•U is a M(]f2HS1�3N li � [e L iie ii D�iiect Vrn� f� �����I���_F� � N itu ��il C,.is, MC)12H!�14.',SK S�<� �lii��uyli K�it, MUkl3 >143PLF F'c�rcvl� � I ���r I�iids. MC�f.8S01�5SS S� rr<>� icl Triii� E<1ge� St� �Ir ,� Sic�rl [)� c�r. t�rl wiih MC)G!�A A�iiii.i C31u�- GI<is�. 11-19-2012 Inspection Request Reporting Page 9 4:21 pm Vail, CO - Citv �f Requested Inspect Date: Tuesday November 20 2012 Site Address: 387 BEAVER DAM CIR �/AIL A/P/D Information Activity: 612-0082 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occu�pan�cy : Use: R-3 Insp Area: Owner: HIBOU COLORADO PROPERTIES LLC Contractor: BECK BUILDING COMPANY Phone: 970-949-1800 Description: UPGRADE EXISTING INTERIOR FINISHES, MODIFfCATION OF STAIR TOWER, CONVERSION OF EXISTING STORAGE AREA TO FAMILY ROOM, RELOCATION OF SPA Requested Inspection(s) Item: 542 PLAN-FINAL Requested Time: 08:00 AM Requestor: BECK BUILDING COMPANY Phone: 970-949-1800 Comments: 471-1654 Assigned To: BGIBSON Enter^� JMONDRAGON K Action: Time Exp: , � II�a��la � n-� ��� , Q �° P, ��� C�� nf c�� r Cor�.di-��%on U�ti �s Inspection History Item: 210 PLMB-Underground ""Approved'* 05/21/12 lnspector: Martin Action: Comment: At family room location only 06/07/12 Inspector: sgremmer Action: Comment: Item: 10 BLDG-FOOTING "" Approved " 05/03/12 Inspector: sgremmer Action: Comment: detail for section a/s1 05/31/12 Inspector: sgremmer Action: Comment: Slab rebar for CMU wall in basement 06/07/12 Inspector: sgremmer Action: Comment: Item: 20 BLDG-Foundation/Steel "* Approved ''* 05/03/12 Inspector: sgremmer Action: Comment: detail for section a/s1 06/07/12 Inspector: s� gremmer Action: Comment: CMU wall at MEch room Item: 120 ELEC-Rough ** Approved *` 06/08/12 Inspector: sgremmer Action: Comment: service lateraf OS/03/12 Inspector: sgremmer Action: Comment: Item: 200 MECH-Rou h '* Approved `* 08/02/1� Inspector: sgremmer Action: Comment: 09/27/12 Inspector: sgremmer Action: Comment: 10/11/12 Inspector: sgremmer Action: Comment: Snowmelt Item: 220 PLMB-Rough/D.W.V. *' Approved "* 08/02/1Z Inspector: sgremmer Action: Comment: Item: 230 PLMB-Rough/Water ** Approved "" 08/02/1Z Inspector: sgremmer Action: Comment: Item: 240 PLMB-Gas Piping ** Approved "" 08/02/12 lnspector: sgremmer Action: Comment: PI PARTIAL INSPECTION AP APPROVED PI PARTIAL INSPECTION PI PARTIAL INSPECTION AP APPROVED PI PARTIAL INSPECTION AP APPROVED PI PARTIAL INSPECTION AP APPROVED AP APPROVED AP APPROVED AP APPROVED AP APPROVED AP APPROVED AP APPROVED REPT131 Run Id: 14993 .--J------_�, (�/�� I I ��OJ � 12-04-2012 Inspection Request Reporting Page 3 4:08 pm Va�l, ('itv (�f U�'�"�' Requested Inspect Date: Wednesday December 05, 2012 Site Address: 387 BEAVER DAM CIR VAIL A/P/D Information Activity: B12-0082 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occupan�cy: Use: R-3 Insp Area: Owner: HIBOU COLORADO PROPERTIES LLC Contractor: BECK BUILDING COMPANY Phone: 970-949-1800 Description: UPGRADE EXISTING INTERIOR FINISHES, MODIFICATION OF STAIR TOWER, CONVERSION OF EXISTING STORAGE AREA TO FAMILY ROOM, RELOCATION OF SPA Re4uested Inspection(s) Item: Requestor: Comments: Assigned To: Action: Item: Requestor: Comments: Assigned To: Action: 542 PLAN-FINAL BECK BUILDING COMPANY 471-1654 B IB ON Ti e 90 BLDG-Finai BECK BUILDING COMPANY 471-1654 JMONDRAGON Time Exp: Inspection Historv Item: 210 PLMB-Underg round ** Approved "' 05/21/12 lnspector: Martin Action Comment: At tamily room location only 06/07/12 Inspector: sgremmer Action Comment: Item: 10 BLDG-FOOTING '`'`Approved'''' 05/03/12 Inspector: sgremmer Action: Comment: detail for section a/s1 05/31/12 Inspector: sgremmer Action: Comment: Slab rebar for CMU wall in basement 06/07/12 Inspector: sgremmer Action: Comment: Item: 20 BLDG-Foundation/Steel *" Approved *'` 05/03/12 Inspector: sgremmer Action: Comment: detail for section a/s1 06/07/12 In�spector: s� gremmer Action: Comment: CMU wall at MEch room Item: 120 ELEC-Rough �" Approved *" 06/08/12 Inspector: sgremmer Action: Comment: service lateraf 08/03/12 Inspector: sgremmer Action: Comment: Item: 200 MECH-Rough *' Approved "" 08/02/12 Inspector: sgremmer Action: Comment: 09/27/12 Inspector: sgremmer Action: Comment: 10/11/12 Inspector: sgremmer Action: Comment: Snowmelt Item: 220 PLMB-Rough/D.W.V. *"' Approved *' REPT131 Requested Time: 08:00 AM Phone: 970-949-1800 Entered By: JMONDRAGON K � Requested Time: 09:30 AM Phone: 970-949-1800 Entered By: JMONDRAGON K PI PARTIAL INSPECTION AP APPROVED PI PARTfAL �NSPECTION PI PARTIAL INSPECTION AP APPROVED PI PART�AL INSPECTION AP APPROVED PI PARTIAL INSPECTION AP APPROVED AP APPROVED AP APPROVED AP APPROVED Run Id: 15030 �' 1 12-04-2012 Inspection Request Reporting Page 3 4:08 pm Vail, CO - Citv Of Requested Inspect Date: Wednesday December 05 2012 Site Address: 387 BEAVE�2 DAM CIR VA�L A/P/D Information Activity: 612-0082 Type: COMBO Sub Type: ASFR Status: ISSUED Const Type: Occu an�c r: Use: R-3 Insp Area: Owner: HIBOU COLORADO PRO�ERTIES LLC Contractor: BECK BUILDING COMPANY Phone: 970-949-1800 Description: UPGRADE EXISTING INTERIOR FINISHES MODIFICATION OF STAIR TOWER, CONVERSION OF EXISTING STORAGE AREA TO FAMILY RdOM, RELOCATION OF SPA p! 542 PLAN-FINAL >r: BECK BUILDING COM s: 471-1654 o: BGIBSON Time Exp: Item: 90 BLDG-Final Requestor: BECK BUILDING COMPANY Comments: 471-1654 Assigned To: J ON Action: Time Exp: Requested Time: 08:00 AM Phone: 970-949-1800 Entered By: JMONDRAGON K Requested Time: 09:30 AM Phone: 970-949-1800 Entered By: JMONDRAGON K Insuection Historv Item: 210 PLMB-Underground "' Approved "" 05/21/12 lnspector: Martin Action: PI PARTIAL INSPECTION Comment: At family room location only 06/07/12 Inspector: sgremmer Action: AP APPROVED Comment: 1tem: 10 BLDG-FOOTING "" Approved "" 05/03/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: detail for section a/s1 05/31/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Slab rebar for CMU wall in basement 06/07/12 Inspector: sgremmer Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel "` Approved `* 05/03/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: detail for section a/s1 06/07/12 In�spector: s remmer Action: AP APPROVED Comment: CMU wall at �ch room Item: 120 ELEC-Rough " Approved "" 06/08/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: service laterar 08/03/12 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH-Roug h *' Approved *' 08/02/1T Inspector: sgremmer Action: AP APPROVED Comment: 09/27/12 Inspector: sgremmer Action: AP APPROVED Comment: 10/11/12 Inspector: sgremmer Action: AP APPROVED Comment: Snowmelt Item: 220 PLMB-Rough/D.W.V. "* Approved `" REPT131 Run Id: 15030 T. Boyle EngineeEing, lnc. 1650 Fallridge Road, Unit C-2 Vail, Colorado 81657 M�7ce Suman Su�an Architects 141 E. Meadow Drive, Suite 211 Vail, Colorado 81657 Field Report The following items were observed: The framing for this remodel is complete at this time. �2 v�: o�iozii2 � ► a - od� Project: 387 Beaver Dam Circle �=- Location: Vail, Colorado Contiactor. Beck Building Co. Owner: The Tresca's Weather: Partly Cloudy, 78 deg Present at Site: SteveBoderck Tim Boyle I have dete�mined that this framing has been completed per the plans and specifications issued by this office on March 30, 2012, with a couple of modifications that have been coordinated between Steve Boderck and myself during the construction process. I noted only one item that deviated slighdy from the original framing plans. The west end of the LVL `benY at the roof &aming that is described by Detail A/SS hangs off of an existing header instead of bearing in the wall with a triple 2x6 belbw as denoted on the plan. An L50 framing angle should be added to the noith side of this connection, and four additional LIAS LedgerLok fasteners should be "added to the connection in a toe-nail configuration. Feel free to give me a call if you have any questions or comments regarding this report. Cc: Steve Boderck — Beck Building Co.