Project Name: WALKWAYS/ASPHALT REPAIRS DRB Number: DRB120088
Project Description:
REPLACE ASPHALT IN FRONT OF BUILDINGS 9 & 10, REPLACE BUILDING 9 ENTRANCE
WALKWAYS WITH PAVERS, REGRADE TO ELIMINATE STEPS &TIMBERS, MODIFY WALKWAY
BETWEEN BUILDINGS 9 & 10 TO ELIMINATE STEPS.
Participants:
OWNER RACQUET CLUB OWNERS ASSOC 04/09/2012
4695 VAIL RACQUET CLUB DR
VAIL
CO 81657
APPLICANT RACQUET CLUB OWNERS ASSOC 04/09/2012
4695 VAIL RACQUET CLUB DR
VAIL
CO 81657
CONTRACTOR VAIL RACQUET CLUB 04/09/2012 Phone: 970-331-1861
STEVE LOFTUS
4695 VAIL RACQUET CLUB DRIVE
VAIL
CO 81657
License: C000003247
Project Address: 4695 VAIL RACQUET CLUB DR VAIL Location: VAIL RACQUET CLUB
Legal Description: Lot: Block: Subdivision: VAIL RACQUET CLUB CONDOM
Parcel Number: 2101-124-0002-1
Comments:
BOARD/STAFF ACTION
Motion By: Action: STAFFAPP
Second By:
Vote: Date of Approval: 04/10/2012
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
Cond: 202
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Planner: Bill Gibson DRB Fee Paid: $250.00
TOWN OF VAIL/
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970 -479 -2128
www.vailgov.com
Application for Design Review
Minor Exterior Alteration APR 0 2012
General Information: This application is required for all proposals involving minor change s'tn h11ft
ments, such as roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town
Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects requiring de-
sign review must receive approval prior to submitting a building permit application. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department, as outlined in
the submittal requirements. The project may also need to be reviewed by the Town Council and /or the Planning and
Environmental Commission. Design review approval expires one year from the date of approval, unless a building per-
mit is issued and construction commences.
Fee: '25 r Multi - Family /Commercial
for Single Family /Duplex
r Single Family Duplex C✓ Multi Family
Commercial
Description of the Request: Replace asphalt in front of bldgs 9 & 10, replace bldg 9 e ntr a nc e walkw with
pavers, regrade to eliminate steps & timbers, modify walkway between bldgs 9 & 10 to eliminate steps.
Physical Address: 4630 Racquet Club Drive
Parcel Number
(Contact Eagle Co. Assessor at 970 - 328 -8640 for parcel no.)
Property Owner Racquet Club Owners Asso ciation
Mailing Address: 4695 Racquet Cub Drive, Vail, CO 81657
Phone: 970 331 1861
Owner's Signature:
Primary Contact/ Owner
. Steve Loftus
Mailing Address: 4695 Racquet Club Drive; Vai CO 8
Phone: 970 331 1861
E -Mail: steveloftus @vailracquetclub.com Fax: 970 477 3061
For Office Use Only: ?
Cash_ CC: is / MC Last 4 CC # 7 Exp
Fee Paid: U '
Meeting Date:
Planner:
Zoning:
Date: t # 00Z&Check #
Received From: 1410
DRB No.: ,1 ki�) I ooss
Project No: ?z_5 I D, DI 3Q
Land Use:
Location of the Proposal: Lot: Block: Subdivision: J JN PLAr1c—r>
Vail Racquet Club — Condo Bldg 9
Walkway Improvements
Unlike most of the other condo bldgs, Bldg 9 has steps
going down from the parking area in front of the bldg to
the stairtower entrance walkways. These steps can be
hazardous with snow and the lack of grade causes puddles
and ice problems.
The plan is to replace the Bldg 9 concrete entrance
walkways with pavers (same Pavestone Plaza Series winter
blend color pattern to match new walkways as shown
here for the Club building entry walkway). Grade will be
modified to eliminate steps.
Vail Racquet Club — Condo Bldg 9
Walkway Improvements
Bldg 9 is the only condo bldg that
has a timber retaining wall in front
like this. The timbers are in poor
condition (mostly damage from
snow plowing operations).
Bldgs without timbers in front (just
grass landscaping rolling down from
the asphalt) perform much better
and eliminate the falling hazard
associated with the timber wall.
The asphalt in front of bldgs 9 & 10
is to be replaced this spring.
Eliminating the timbers and the re-
grading/re- landscaping work is to
be completed as part of that work.
i
AC
a
This is the south end of the walkway between Bldgs 9 & 10,
ending in the parking lot. All the steps can be eliminated by
swinging this end of the walkway a few feet to the left (it will end
in the grass area where you see the boulders).
This area of the walkway will be demoed, fill brought in to raise &
smooth the grade. The walkway will then be restored, swinging to
the left with gentle curves, eliminating steps & timbers. Finally,
the landscaping (lawn, flower beds & boulders) will be restored.
This walkway will remain concrete for now (the plan is to convert
it to pavers when back patio areas are replaced).
Vail Racquet Club
Condo Bldg 9
Walkway
Improvements