HomeMy WebLinkAboutDRB120092 APPLICATION Design Review Board
ACTION FOAM
Department of Community Development
7M W VARM 75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.7139 fax: 970.47!9.2452
COMAC r CEYE MOM web: www.vailgov.com
Project Name: FORD PARK IMPROVEMENTS DRB Number: DRB120092
Project Description:
IMPROVEMENTS TO FORD PARK RELATED TO THE REALLOCATION OF THE CONFERENCE
CENTER FUNDS
Participants:
OWNER TOWN OF VAIL 04/11/2012
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT TOWN OF VAIL 04/11/2012
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
Project Address: 841 VAIL VALLEY DR VAIL Location: FORD PARK
Legal Description: Lot: Block: Subdivision: Ford Park Unplatted
Parcel Number: 2101-081-0000-2
Comments:
BOARD/STAFF ACTION
Action: CONCEPT
Conditions:
Cond: 200
(PLAN): A conceptual review is NOT a Design Review Board
approval.
Planner: Bill Gibson
c
roWm of vn�
FE C [E U V LE
ANK i U 1012 '
TOWN O F VAU
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970 - 479 -2128
www.vailgov.com
Development Review Coordinator
Application for Design Review
Conceptual Review
General Information: A conceptual review may be requested by an applicant where new construction or ma-
jor changes are to occur on a property. A conceptual review does not serve as a final approval and an addi-
tional application is required for final review. The conceptual review is intended to allow the applicant to intro-
duce the project to the Design Review Board and receive comments. The DRB does not vote on conceptual
reviews.
Fee: $0
Single Family Duplex Multi - Family Commercial n
Description of the Request: 5,-- _p�yv•r�n�.W�ks - S+ra v��,�•-• Sc�e _ :.-�rwD
k.. Ac V. . nn
Physical Address: ��� J�,,�l �n1
Parcel Number: 1 (9 L (Contact Eagle Co. Assessor at 970 - 328 - 8640 for parcel no.)
Property Owner:
Mailing Address:
lV Sl
Phone: 4 - A 4 t-2 -\ 00
Owner's Signature: �w� o �- lac.; ` S �a nZaan. �'� M�► �,e,[
Primary Contact/ Owner Representative:
Mailing Address: - 1 57 S
Phone: yA i q. Z l V 1
E -Mail: c, (&A Fax:
For Office Use Only:
Cash CC: Visa / MC Last 4 CC # Exp. Date: Auth # Check #
Fee Paid: Received From:
Meeting Date: y��yt� /Z DRB No.:
Planner: �6 Project No:
Zoning
Land Use:
Location of the Proposal: Lot: Block: Subdivision: _ N PL &TT eD
Prooerty Information
Property Address
S f
Development Standards
Parcel #
Existing
Proposed
Gross Residential Floor Area
(maximum)
Chapter 12 -15
Legal Description
Development Site Area
sq ft
acres
3'1p� a-�. •
buildable sq
ft
Zone District / SDD #
&p ftt r A J d e-
Hazard Zones
Sections 12 -21 & 14 -7
Snow Avolonche
High Severity Moderate Severity
N
Debris Flow
High Flow Moderate Flow
High Avalanche
Rockfall
High Severity Medium Severity
/
Excessive Slopes
_30% N/A
Side ft
Floodploin
0 ear Aao d lain Floodway
Wetlands N/A
Creeks, Streams
Section 12 -14 -17
Gore Creek n
Other tributary:
adjacent to site N/A
on site adjacent to site C N A
Project Information
Project Description
S f
Development Standards
Allowed
Existing
Proposed
Gross Residential Floor Area
(maximum)
Chapter 12 -15
Primary sq ft
Secondary sq ft
EHU sq ft
TOTAL sq ft
250 Addition Interior Conversion
Credits:
Setbacks (minimum)
Section 14 -10 -4
Front ft
Side ft
Side ft
Rear ft
Watercourse ft
Site Coverage (maximum)
see definition Section 12 -2 -2
Building Height (maximum)
see definition Section 12 -2 -2
Sloping ft
Flat ft
Landscaping
See definition Section 14 -2 -1
Section 14 -10 -8
Softscape sq ft
Hardscape sq ft
TOTAL sq ft
Driveway
Sections 14 -3 -1 & 14 -3 -2
Max Curb -cuts
Max Grade @ cen-
terline
Min Width
Heated drive?
Yes No
Yes No
Snow Storage %
Parking
Sections 12 -10 & 14 -5
#Enclosed Spaces
#Unenclosed
TOTAL
Outdoor Lighting (maximum)
Section 14 -10 -7
# fixtures
B RAU N
1, ASSOCIATES, INC.
LAND PLANNING & COMMUNITY DEVELOPMENT
April 10, 2012
Mr. Bill Gibson
Town of Vail
75 South Frontage Road
Vail, CO 81657
RE: Ford Park Improvement Plan
DRB Conceptual Review
Dear Bill:
Enclosed you will find material for an April 18th Design Review Board Conceptual
Review of the Town of Vail's improvement plans for Ford Park. Material provided
includes:
1. DRB Application Form
2. Ford Park Illustrative Plan Phase I Improvements
3. 11x17 Conceptual Plan set
4. Disc of Illustrative Plan and Conceptual Plan set
This application is provided on behalf of the Town and the three main Park Stakeholders
—the Vail Valley Foundation, the Betty Ford Alpine Garden and the Vail Recreation
District. The design team includes AECOM and Zehren Associates. You will notice in
the plan set drawings prepared by Zehren Assoicates for the restroom/maintenance
building, the restroom/concessions building and the Gerald Ford Amphitheater
(restrooms, overlook and lawn seating). AECOM is in the process of completing plans
for the athletic fields (and the two restroom buildings), pedestrian circulation, East Betty
Ford Way and transit/parking facilities. These drawings will be provided in the next few
days.
Please do not hesitate to call with any questions you may have.
Regards,
Thomas A. Braun
CC: Todd Oppenheimer
Opal Building • 225 Main Street • Suite G-002 • Edwards, Colorado • 81632
970-926-7575 • 970-926-7576 fax • www.braunassociates.com