HomeMy WebLinkAboutB12-0029 SPECIAL INSPECTION AND TESTING AGREEMENTt TMWN SPECIAL INSPECTION AND TESTING SCHEDULE
(IBC 1704)
Project Name: — M 49)1LH6 Perm.t #
Owner's Name:
Testing Inspec , A nature Print e Date
Agency: -- f�' " " ' �5 �J i �2.
Testing Insp Ion siq,.wre I'dit Name Date
Hereby certifies that the Testing /Inspection Agency named above has been engaged to perform structural tests and
inspections during construction as checked below, to satisfy all app!Icable portions of the Building Code.
Prior to final inspectlon, the Inspection Agency shall submit a statement that all items of designated work performed
were reported. Any Items checked but not tested or inspected will be noted and explained. Whenever any designated
items on the list are ready for sampling, testing, or Inspection. It shall be the responsibility of the contactor to give
timely notice to the Inspecron agency so that the required services may be performed.
Reinforcing Tests
Inspection of Reinforcing Placement
Tendon Tests
Inspection of Tendon Placement
Inspection of Concrete Placerent
Inspection of Concrete Batching
Inspection of Panel Attachment 8 Inserts
Compression Tests
Inspection of Stressing/Transfer
PILING, CAISSONS, CAPS, TIES:
Inspection of Reinforcing Placement
Inspection of Corictete Placement
Inspection of Concrete Batching
Specify othortests. inspec.Hons orspecial instructions required.
UNDERPINNING:
Temporary/Permanent
Inspection of Steel Fabrication
Inspection of Reinforcing & forms
Inspection of Concrete Placement
Inspection of Tiebacks
SOIL NAILS:
Temporary Shoring
Permanent Wall
STRUCTURAL STEEL;
Sampla & Test (List specific members belo%
Shop Iderdficatlon & Welding�spect o
Shop Ultrasonic Inspection
Shop Rod ography
Field Welding Inspe
Field Bolting lmpcctionfl
Field Ultrasonic In lion
Field Radiography
theta: Deck Welding Inspection
FIREPROOFING:
Inspection. & Placement
SOILS:
Acceptance Tests a
Molstwe- Density peterminationl7l"
Field Density
Drilled Piers
Deep Foundaton
STRUCTURAL WOOD:
Inspection of Fabrication
Inspection of Truss Joirt Fabrkcatlon
Sample &Test Components
Inspection of Glu tam Fabrication
SMOKE CONTROL:
SPECIAL CASES:
SPECIAL INSPECTION:
Seismic Resistance
Mind Requlrernents
10
GROUND can
provide this service
through a sub-
contractor if
requested.
REINFORCING STEEL.:
Tensile & Bend, one set per eat per tons
Inspection of Placement
Inspecllo of Welding�
Epoxy /
� •Q_,
IV1ASONRY:
_ }�
Prelim. Acceptanco Tests (Masonry Unls. VJa1f P isms)
Subsequent Tests (Mortar. Grout. Field Wall Prisms)
In regards to
Inspection of Placement and Grouting Sjk
confirming use
CONCRETE, SHOTC GROUT AND MORTAR.
the
Conaeta
Shot Grout Mortar
of
Aggzgate lestsfordesign
sp ecified and
P
Suitabllilyor ag oe
tarot Dosl
approved mix
Test Panel
design during
Batch Plant Inspection
Cerient Grab sample
actual
Inspect Placing _
Corrpression Tests
Caatspeurnen'
placement.
PIr4.un CamNoc r
Reinforcing Tests
Inspection of Reinforcing Placement
Tendon Tests
Inspection of Tendon Placement
Inspection of Concrete Placerent
Inspection of Concrete Batching
Inspection of Panel Attachment 8 Inserts
Compression Tests
Inspection of Stressing/Transfer
PILING, CAISSONS, CAPS, TIES:
Inspection of Reinforcing Placement
Inspection of Corictete Placement
Inspection of Concrete Batching
Specify othortests. inspec.Hons orspecial instructions required.
UNDERPINNING:
Temporary/Permanent
Inspection of Steel Fabrication
Inspection of Reinforcing & forms
Inspection of Concrete Placement
Inspection of Tiebacks
SOIL NAILS:
Temporary Shoring
Permanent Wall
STRUCTURAL STEEL;
Sampla & Test (List specific members belo%
Shop Iderdficatlon & Welding�spect o
Shop Ultrasonic Inspection
Shop Rod ography
Field Welding Inspe
Field Bolting lmpcctionfl
Field Ultrasonic In lion
Field Radiography
theta: Deck Welding Inspection
FIREPROOFING:
Inspection. & Placement
SOILS:
Acceptance Tests a
Molstwe- Density peterminationl7l"
Field Density
Drilled Piers
Deep Foundaton
STRUCTURAL WOOD:
Inspection of Fabrication
Inspection of Truss Joirt Fabrkcatlon
Sample &Test Components
Inspection of Glu tam Fabrication
SMOKE CONTROL:
SPECIAL CASES:
SPECIAL INSPECTION:
Seismic Resistance
Mind Requlrernents
10
GROUND can
provide this service
through a sub-
contractor if
requested.
I,
\` Job Na me:
1' Job Address:
TOiVH YAII, Permit No.:
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The cwner cr h'.s/her representative, on the advice of the design professional in responsible charge, shalt
complete, seal, sign and submit a copy of the Special Inspection Agreement and S:ructt,ral Tests
Scheduted to the Tcwn of Vail fcr review and approval. Signatures are required on both pages;
photocopied or faxed signatures are acceptable.
The cwner and his,'her general contractor, where applicable, shall also acknowledge the following
cond tions applicable to Special Inspection Testing:
1. Contractor is responsible for proper notification to the Inspection or Testing agency for items
listed (Page 1) (18C 1704)
2. Cnly the testing laboratory should take samples and tanspert them to their laboratory.
3. Copies of all laboratory renors and inspections are to be sent directly to the Towr, of Vail by the Testing
agency an a weekly basis.
4. Inspection acency to submit names and qual,5cation3 of on -site special inspectors to the down of Vail
fcr review and approval.( Page 2)
5. The special inspector is responsib'e to Immediately notify the Town of Vail Suildir,g Official in wri5ng of
any concerns and/or problems encoxtered.
6. It is the responsib'lity of the contractor to review the Town of Vail approved plans for addi!ioral
inspection or testing regt,irements that may be noted. A pre constructiei conference at the job site is
recommended to review special inspection procedures.
7. The special inspector shall use only the Town of Vaii approved drawings.
8. All special inspection fie'd reports must be 'eft on site for review by t Town of Vail staff prior to
required inspections or re- inspections.
BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and
sealed statement that all items requiring lesting and inspection were `ulfil'ed and reported. Those items not
tested and /or inspected sha'I be noted in this statement. A copy of the statement shall be rna'.nfained at the
job site for the Building lrspe ;lor's review prior to final inspection.
Acknowlcdg m
Owner:
� oy�' S ure " s Date
Special Insp %� �t� �' �f7_ 1 2_
Agency:
Prrt Name Date
Projectr� �Z
Arch!Eng: 0X
Sigiature Print Name D e
Contractor.
Sig P rt Natw Date
--3-
IXi :,n =fwnI ,o G19UN0
Evan Kuhn°ga�
M�
0.a: D12M.1016],Ol -0600'