Loading...
HomeMy WebLinkAboutPEC120014 Application Department of Community Development 75 South Frontage Road ���� �� ��j� Vail, CO 81657 RECEI VED Tel: 970-479-2128 www.vailgov.com By David Rhoades at 4:06 pm, Apr 13, 2012 Development Review Coordinator Amendment to District Boundaries (Rezoning) or Zoning Ordinance Application for Review by the Planning and Environmental Commission General Information: An amendment of the zoning regulations or change in zone district boundaries may be initiated by the Town Council, by the Planning and Environmental Commission, by petition of any resident or property owner in the Town, or by the Administrator. Required criteria and findings for such petition are stated in Section 12-3-7C, Vail Town Code. Relevant sections of the Vail Town Code can be found on the Town's website at www.vailgov.com. The proposed project may also require other permits or applications and/or review by the Design Review Board and/or Town Council. Fee: $1300 Description of the Request: Rezone SDD#23, Vail National Bank Building to GU District Physical Address: 108 South Frontage Road Parcel Number: 210106408001 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: Vail Clinic Inc. Mailing Address: PO Box 40,000 Vail Co Phone: 9�0-476-2451 Owner's Signature: Primary Contact/Owner Representative: Rick Pylman/Jim Wear Mailing Address: PO Box 2338 Edwards, CO 81632 Phone: Pylman 926-6065 Wear 790-1603 E-Mail: rick@pylman.com Fax: N/A For Office Use Only: Cash_ CC: Visa / MC Last 4 CC # 016 8 Exp. Date: 0 6/14 Auth # 0 7 6 6 9 9 Check # Fee Paid: 51300 . 00 Received From: PYlman Associates Meeting Date: 0 5/14/2 012 PEC No.: PEC 12 0 014 Planner: Project No: PRJ12-014 2 Zoning: Land Use: Location ofthe Proposal: Lot: D2 Block: Subdivision: vAIL vILLAGE FILING 2 TUWN OF Val�. JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER The applicant must submit written joint property owner approval for applications affecting shared ownership properties such as duplex, condominium, and multi-tenant buildings. This form, or similar written correspondence, must be com- pleted by the adjoining duplex unit owner or the authorized agent of the home owner's association in the case of a con- dominium or multi-tenant building. All completed forms must be submitted with the applicants completed application. I, (print name) , a joint owner, or authority of the association, of property located at , provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address not- ed above. I understand that the proposed improvements include: (Signature) (Date) Additionally, please check the statement below which is most applicable to you: 1 understand that minor modifications may be made to the plans over the course of the review process to ensure compli- ance with the Town's applicable codes and regulations. (Initial here) 1 understand that all modifications, minor or otherwise, which are made to the plans over the course of the review pro- cess, be brought to my attention by the applicant for additional approval before undergoing further review by the Town. (Initial here) PLANNING AND ENVIRONMENTAL COMMISSION PROCESS Pre-application Meetinq A pre-application meeting with Town of Vail Staff is not required; however, highly recommended. The purpose of a pre- application meeting is to identify any critical issues pertaining to the proposal and to determine the appropriate develop- ment review process for an application. Town of Vail Planning Staff reserves Thursday afternoons for pre-application meetings. Please call the Development Review Coordinator at 970-479-2128 to schedule a meeting for Thursday after- noon. Deadlines and Meetinq Dates The Planning and Environmental Commission meets on the 2nd and 4th Mondays of each month beginning at 1:00 pm. Complete applications are due in the Office of Community Development no later than 12:00 noon on the submittal deadlines below: Submittal Deadline Meetin Date Continued. . , Continued. . , December 12, 2011 January 9, 2012 Submittal Deadline Meeting Date December 26, 2011 Januar 23, 2012 Jul 16, 2012 Au ust 13, 2012 Janua 16, 2012 Februa 13, 2012 Jul 27, 2012 Au ust 27, 2012 Januar 30, 2012 Februa 27, 2012 Au ust 13, 2012 Se tember 10, 2012 Februar 13, 2012 March 12, 2012 Au ust 27, 2012 Se tember 24, 2012 Februar 27, 2012 March 26, 2012 Se tember 10, 2012 October 8, 2012 March 12, 2012 A ril 9, 2012 Se tember 22, 2012 October 22, 2012 March 26, 2012 A ril 23, 2012 October 12, 2012 November 12, 2012 A ril 16, 2012 Ma 15, 2012 October 29, 2012 November 26, 2012 A ril 30, 2012 Ma 28, 2012 November 12, 2012 December 10, 2012 Ma 14, 2012 June 11, 2012 November 26, 2012 Meetin Canceled May 29, 2012 June 25, Z012 December 17, 201Z January 14, 2012 Tuesda June 11, 2012 Jul 19, 2012 December 28, 2012 Janua 28, 2012 June 25, 2012 Jul 23, 2012 Application Submittal Submit all required information under the submittal requirements section of this application by the deadlines stated above. Incomplete applications will not be processed. Upon receipt of a complete application, the Community Develop- ment Department shall review the submitted materials for general compliance with the appropriate requirements of the zoning code. If the application is not in compliance with zoning code requirements, the application and submittal materi- als shall be returned to the applicant with a written explanation of non-compliance. Planninq and Environmental Commission Meetinq Requirements 1. Prior to the meeting, for new construction and additions, the applicant must stake and tape the project site to indicate property lines, proposed buildings and building corners. All trees proposed to be removed must be marked. The applicant must ensure that staking done during the winter is not buried by snow. 2. The applicant, or their representative(s), shall be present at the Planning and Environmental Commission_public meeting. The item will be postponed if the applicant fails to appear before the Planning and Environmental Commis- sion, on their scheduled meeting date. SUBMITTAL REQUIREMENTS The Town of Vail offers two (2) methods for submittal of materials for review of applications. Materials can be submitted either digitally or on paper. Whichever method you select all materials shall be submitted in that format throughout the Design Review process. The Town encourages you to consider using the submittal of digital documents and plans. If submitting digitally all elements of the application shall be uploaded to the Town's share file site as a complete set of materials. If submitting paper three (3) copies of the materials noted with an asterisk (*) and one (1) copy of all others are required. The materials necessary to have a complete application are as follows: ❑ Stamped, addressed envelopes and a list of the property owners adjacent to the subject property, including properties behind and across streets. The list of property owners shall include the owners' name (s), corresponding mailing ad- dress, and the physical address and legal description of the property owned by each. The applicant is responsible for correct names and mailing addresses. This information is available from the Eagle County Assessor's office. ❑ Completed application form including owner's signature (cover sheet). ❑ Application fee ❑ Joint Property Owner Written Approval Letter, if applicable (pg. 2). This form is applicable to all applicants that share ownership of the subject property. For example, the subject property where construction is occurring is a duplex, condominium or multi-tenant building. This form shall be completed by the applicant's neighbor/joint property owner. In the case of a multiple-family dwelling or multi-tenant building, the authority of the association shall complete this form. ❑ A written statement addressing the following: • A description of the proposed changes in district boundaries. • How the proposed change in district boundaries is consistent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the Town of Vail's development objectives. • How the proposed change in district boundaries is compatible with and suitable to adjacent uses and appro- priate for the area. • How the proposed change in district boundaries is in the best interest of the public health, welfare and safety. ❑ A map indicating the existing and proposed district boundaries (Three copies) ❑ The Administrator and/or PEC may require the submission of additional plans, drawings, specifications, samples and other materials (including a model) if deemed necessary to determine whether a project will comply with Design Guidelines or if the intent of the proposal is not clearly indicated. ❑ If this application requires separate review by any local, State or Federal agency other than the Town of Vail, the ap- plication fee shall be increased by$200.00. Examples of such review, may include, but are not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineers 404, etc. ❑ The applicant shall be responsible for paying any publishing fees which are in excess of 50% of the application fee. If, at the applicant's request, any matter is postponed for hearing, causing the matter to be re-published, then, the entire fee for such re-publication shall be paid by the applicant. Applications deemed by the Community Development Department to have design, land use or other issues which may have a significant impact on the community may require review by consultants in addition to Town staff. Should a deter- mination be made by the Town staff that an outside consultant is needed, the Community Development Department may hire the consultant. The Department shall estimate the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of the determination. Expenses incurred by the Town in excess of the amount forwarded by the applicant shall be paid to the Town by the applicant within 30 days of notifica- tion by the Town. Any excess funds will be returned to the applicant upon review completion. Please note that only complete applications will be accepted. All of the required information must be submitted in order for the application to be deemed complete. Town of Vail Special Development District #23 Vail National Bank Building Re-Zone Request Apri12012 Vail National Bank Building 1 April 16,2012 Town of Vail Special Development District #23 Vail National Bank Building Re-Zone Request Apri12012 Annlicant Vail Valley Medical Center 181 West Meadow Drive Vail Colorado Legal Counsel Jim Wear Sherman & Howard 1000 South Frontage Road West Vail Colorado Land Plannin� Rick Pylman Pylman&Associates, Inc. 137 Main Street, Suite C107W Edwards Colorado Vail National Bank Building Z April 16,2012 1.0 Introduction The purpose of this application is to provide information relative to a request for a re-zoning of the property legally described as the VNB Building from the current zoning designation of Town of Vail SDD #23 to the General Use (GU) District. The VNB Building is located at 109 South Frontage Road, directly adjacent to the Vail Valley Medical Center and across the street from the Vail Municipal complex and is now more commonly known as the US Bank Building. This application contains the information required by Chapter 12-3-7: Amendment of the Town of Vail Municipal Code to review and approve this application. 2.0 Existing SDD # 23 History The existing bank and office building on the site was originally built sometime in the early 1980's under a High Density Multiple Family Zone District. In 1989 the property was re-zoned from High Densiry Multiple Family to Commercial Service Center and Town of Vail SDD #23,the Vail National Bank Building,was established. These zoning actions brought the properry into conformance with the current uses and allowed for approval of a proposed remodel and building expansion. The purpose of the SDD overlay was to limit some of the retail and industrial commercial uses allowed in the Commercial Service Center Zone District and to establish specific controls over setbacks and building height. The establishment of SDD # 231imited the allowable commercial uses to professional offices; banks and financial institutions; business and office services, and travel agencies. Shortly thereafter, in 1990, SDD# 23 was amended as the result of a comprehensive review of the Vail Valley Medical Center (WMC) property, the Doubletree Hotel (now Evergreen Lodge) property and the Vail National Bank Building properry. This comprehensive review led to the construction of the parking garage on the Evergreen Lodge and WMC sites and transferred some required VNB Building parking into the new parking garage. The SDD#23 zone district has remained in place since that time. The current uses still include a bank and professional office space. Vail National Bank Building 1 April 16,2012 3.0 Vail Vallev Medical Center The Vail Valley Medical Center is a private, not-for-profit organization dedicated to providing quality healthcare for 50,000 residents of a six county region. The WMC is governed by a Board of Directors composed of community leaders. The original facility was founded in Vail Village in 1965 and provided accommodation for four patients and a few ancillary services. This original Vail Clinic was relocated from a Vail Village location to the present site on West Meadow Drive in 1967,with a significant expansion occurring in 1979. In 1980 the Vail Clinic was renamed the Vail Valley Medical Center. Additional significant expansions were completed in 1987, 1999 and 2002. In 2004 the Vail Valley Medical Center purchased the adjacent VNB Building. Much of the office space in the VNB Building is currently affiliated in some manner with the WMC operations. Today,the VVMC provides comprehensive medical care with over 190 physicians, 58 acute beds, and a professional and support staff of over 700 people and is recognized as the second largest employer in the town. The WMC provides medical care for over 4,000 admitted or observation patients and over 30,000 emergency room and outpatient clinic patients per year. In 2009 the Town of Vail, with the cooperation of the WMC, commissioned an independent analysis of the economic impact of the WMC upon the Vail community. The purpose of this analysis was to provide Town of Vail residents and decision makers a basis of understanding of the economic impact upon the community as the WMC continues to evaluate future expansion, redevelopment and/ or market repositioning of the WMC facility. This analysis is available for public viewing on the Town of Vail website. In January of 2012 the WMC, the Steadman Clinic and the Town of Vail entered into a non-binding Memorandum of Understanding (MOU) to redevelop the Town of Vail Municipal site with a new medical office building, new municipal center and a joint use parking garage. This redevelopment of the TOV Municipal Building site will precipitate a comprehensive revised and updated development planning process for the existing WMC site and the WMC owned VNB Building property. Vail National Bank Building Z April 16,2012 4.0 Request for Re-Zoning of the VNB Building As the redevelopment of the Town of Vail Municipal site moves forward there will be both short and long term implications to the VNB Building that will require some form of zoning and development review. In the short term, one of the important components of the new medical office building on the municipal site is the incorporation of an upper level enclosed walkway connecting this new facility to the existing WMC operations. Under the proposed conceptual designs this walkway will land on and traverse the VNB Building property. In the longer term, the relocation of the Steadman Clinic and Howard Head Sports Medicine to the new medical office building on the municipal site will create new opportunities for the WMC site. There are two possible zoning alternatives to address the VNB Building. The first alternative would be to amend the existing SDD to allow the proposed pedestrian walkway as an allowed use. In accordance with Town of Vail SDD submittal requirements this would require a level of design detail that is not currently available. Then, as long-term WMC site redevelopment options are explored and determined, another SDD Amendment, most likely in parallel with a review process for the VVMC site,would be required. The second and preferred option is to re-zone the VNB Building to match the WMC site. The Vail Valley Medical Center site is zoned General Use (GU). This would address both the short and long term zoning issues associated with this property. Virtually all uses within the GU District, other than open space and bike trails, are listed as Conditional Uses. This allows for a review process of the VNB Building site that would match that of the adjacent WMC site and the Town of Vail Municipal site. In the short term, a zone district designation of GU would allow for a timely Conditional Use review of a detailed design of the proposed bridge as those plans are further refined. This application of the GU zone district will create a legal non-conforming situation with the existing bank and office use. It is the applicant's understanding that a bank use will be allowed as long as it remains an uninterrupted use and that the GU zoning will allow for the continued use of the existing offices for medical and healthcare related purposes. For the long term, the GU zoning would facilitate the potential elimination of a property line between the VNB Building and the WMC site and allow for Vail National Bank Building 3 April 16,2012 the development of a comprehensive future development plan for the integrated site. The generation of an updated development plan for the WMC and VNB Building sites will be a comprehensive process that will involve an in-depth review of all existing systems and components of the WMC operation, a thorough review of future health care trends and a comprehensive visioning exercise for the future needs and desires of the facility. This comprehensive development plan will analyze and address community issues and goals related to the VVMC site such as emergency vehicle access, West Meadow Drive traffic and a permanent helicopter landing pad location, among other things. VNB Building, Vail CO Zone District Amendment .,�.;.;,� . . �� � .._ �R�r � �..�:�,,R � . ,��..�` �- -¶ ��l���lf� ���,� - s��� r� � . �3h�'� - �~� :�'�K��;""��." Rr' Ft' 1� ��r- ' �► �`� ...�, �� r a .�� ,.� .��!b�'�_ ~ , �r �t�?��t•nr f� . � '�`��r`�i"`vi.=,rr�'i- !�I ;���� n, � � t ,!� �����_��.i6. ���,�f, s�, .�f ,�t�+�� ��F�.,� �� �v � ` � • �: � � '_�a��• �f�' .�.� ''�'!� .���' �, °� �$. �-�' '~�,�►�.�� � q� y .� * �y, /� -.� �_' ��. � �4R�b�'��riv% .� `�fi� 1 a � �.:a.,�{, �Y--. �� y°�}i, �. �'� ,d„5�j �t+� �r'�"�� 4t;Ii t NF�d i.n `�a� � J� ��Y.� •� ���, ..�9 �'�,� �"'� ! . �76� ��'d/� ,., i � " ' � � r �k'A't � ,...: � ��(--- - ti +g�' �' � �` n � _ � '�'� . ..� ��. r��,�' '��"��.ry`�� `l� r�`.,��T �' 7�°' �, �� '�*'�;� yF�� �'��� �' � �►i, .. r, � � � �,.: .�fi�s'" + ,�;l���.�►r°`'i- 'k� ,� ti r�'�. ��'.'�?ai4d ��`���Y� �����r�� !,� � � - ��; ''s'�* �y, y,��� � +r .. F�i^ ��. ,r �` � I• :�:. '��i', . J@ '� � � `� u-.a., - . � t•• �f�'.r T+i'°��' '�: +��' � 'S:�"������ T� ����;^' ��-_ 1�, �� ���Yy y�.. ��, ����� :'� ���,;� , � �� "* � � p 4 _�1r'7�����7�� R-�� A. .::T� '�it4� d�� ► . _ �Yd'at��t s. 3w. �+� '�^ �}t ��.: �i1f� r., � `i � �ar'� �+Cl�� � � �� k4 kBF t+ � �r�I'% f As �'^p, � � � ��.�^:�� x �y ,�� ... ,a.;a:�!�,v�'.As'� i��x�'�i�.�., ..�4r�.� ;�t_..a.. ..� ��_. _ .._t� ,_r�����!!�c.`-''�a.'. ...� Capyright 2011 Esri.All rights reserved.Tue Apr 10 2012 02:54:59 PM. Vail National Bank Building tl. April 16,2012 5.0 Criteria for Evaluation The Town Code describes eight factors that shall be used by the planning and environmental commission and town council as the principal means of considering a proposed zone district boundary amendment. Those factors and the applicant's response to each follows below: (1) The extent to which the zone district amendment is consistent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; and The Vail Land Use Plan is the most relevant master plan document to consider with this factor. The Vail National Bank Building property does not lie within the boundaries of either the Vail Village or Lionshead master plan documents. The Vail Land Use Plan was adopted in 1986 and updated in 2009. The most applicable goals from the plan are Goal 1.3 - "The quality of development should be maintained and upgraded whenever possible" and Goal 6.1 - "Services should keep pace with increased growth". The primary purpose of this re-zoning request is to allow the Vail Valley Medical Center an opportunity to plan for future growth and upgrades of the existing facilities. The Land Use Map identifies the VNB Building property as Resort Area Accommodations and Services. While health care services are not specifically called out in the general list of uses the use certainly meets the description of the goal of the designation. The proposed re-zoning of the VNB Building to GU meets the overall goals of the Town of Vail Land Use Plan. (2) The extent to which the zone district amendment is suitable with the existing and potential land uses on the site and existing and potential surrounding land uses as set out in the town's adopted planning documents; and The entire purpose of this re-zoning request is so that the zoning of the site will have the same designation as the adjacent VVMV site, in order to allow future planning and design to further integrate the uses and compatibility of the two properties. Vail National Bank Building 5 April 16,2012 (3) The extent to which the zone district amendment presents a harmonious, convenient,workable relationship among land uses consistent with municipal development objectives; and The VVMC adjacent property and the municipal site across the Frontage Road are both zoned GU. The municipal site redevelopment facilitates a new medical office building use. The rezoning of the VNB Building to GU will allow a compatible relationship between these three properties and is consistent with municipal development objectives for the WMC in particular and for the community in general. (4)The extent to which the zone district amendment provides for the growth of an orderly viable community and does not constitute spot zoning as the amendment serves the best interests of the community as a whole; and This amendment is the first step in a process in which the Vail Valley Medical Center will update the long-range vision and facility plans for the future. The WMV is widely recognized as a critical component of the community. This rezoning absolutely provides for the growth of an orderly and viable community. The rezoning action will leave the VNB Building and the WMC site with the same zone district designation. (5)The extent to which the zone district amendment results in adverse or beneficial impacts on the natural environment, including,but not limited to,water quality, air quality, noise,vegetation, riparian corridors, hillsides and other desirable features; and The proposed rezoning will not result in an adverse impact to any of the factors listed above. All land uses, other than open space,trails and employee housing units, are listed as Conditional Uses in the GU Zone District. Any proposed uses for the site will be required to go through a detailed Conditional Use Permit review process that will address the above considerations. (6)The extent to which the zone district amendment is consistent with the purpose statement of the proposed zone district; and The purpose statement of the General Use Zone District reads as follows: The general use district is intended to provide sites for public and quasi-public uses which, because of their special characteristics, cannot be appropriately regu/ated by the development standards prescribed for other zoning districts, and for which development standards especially prescribed for each particular development proposal or project are necessary to achieve the purposes Vail National Bank Building ( April 16,2012 prescribed in section 12-1-2 of this title and to provide for the public welfare. The general use district is intended to ensure that public buildings and grounds and certain types of quasi-public uses permitted in the disfrict are appropriately located and designed to meet the needs of residents and visitors to Vail, to harmonize with surrounding uses, and, in the case of buildings and other structures, to ensure adequate light, air, open spaces, and other amenities appropriate to the permitted types of uses. (Ord. 29(2005) §28: Ord. 21(1994) § 1 The proposed amendment to GU allows the WMC site and the VNB Building to be viewed as a single site for future planning and design. The proposed use of the site is consistent with the goals of the GU Zone District. (7)The extent to which the zone district amendment demonstrates how conditions have changed since the zoning designation of the subject property was adopted and is no longer appropriate; and The original zoning of the site, High Density Multiple Family, never really fit the built use of the professional office building. The establishment of SDD #23 was completed in 1989 to bring the existing uses into better compliance with town zoning code. Since that time the WMC has purchased the properry. The uses have remained essentially the same, professional office and a bank,with medical office uses becoming the predominate type of professional office. As the VVMC looks to the future the proposed rezoning will allow an integrated land use and design approach to these two adjacent properties that are under single ownership. (8)Such other factors and criteria as the commission and/or council deem applicable to the proposed rezoning. To be determined by the Planning and Environmental Commission and/or Town Council. Vail National Bank Building '] April 16,2012