Project Street Address: Project#: PRJ 12-014 7
641 W Lions Head Circle NA NA
DRB#:
(Number) (Street) (Suite#)
Building Permit#: B 12—010 5
Building/Complex Name: Montaneros D
Contractor Information Lot#: 8 Block# 1 Subdivision: FI LING 3
Business Name: Skyline Mechanical INC
Business Address: 134 Airpark DR#2 C Work Class: New(�j Addition (�j Alteration (�
City Gypsum State: CO Zip: 81637 Type of Building:
Contact Name:
Justin Nielsen Single-Family�j Duplex�j Multi-Family�j
Commercial �j Other�j
Contact Phone: 970-524-6809
Contact E-Mail: lustin@skylinemeChaniCal.COm Work Type: Interior� Exterior� Both (Q
I hereby acknowledge that I have read this application,filled out Valuation of
in full the information required,completed an accurate plot plan, Work Included Plans Included Work
and state that all the information as required is correct. I agree to Electrical �Yes Q)No �Yes �No
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to Mechanical �Yes �)No �Yes �No 4500.00
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Plumbing �jYes �No �Yes �jNo
ordinances of the Town applicable thereto.
Building �Yes �)No �jYes �No
X Value of all work being performed: $ 4500
Owner/Owner's Representative Signature(Required) �value based on IBC Section 109.3&IRC Section 108.3�
Electrical Square Footage NA
Applicant Information Detailed Scope and Location of Work:
Applicant Name: Skyline Mechanical INC Replace 2ea Existing 90°/o Afue Furnaces with new
Applicant Phone: 970-524-6809 Carrier 97%AFUE Units
Applicant E-Mail: Justin@skylinemechanical.com
Project Information The Resort CO-Carrie Henderson
Owner Name:
Parcel#:
(For Parcel#,contact Eagle County Assessors Office at(970-328-8640 or visit
www.eag lecou nty.us/patie)
(use additional sheet if necessary)
For Office Use Only: Date Received:
Fee Paid:
Received From: REL'E�VE�
Cash Check#
CC: Visa/ MC Last 4 CC # exp date: TQ UVN O F VA I L 1
Auth #
04/13/2012 l : llpm
12-Mar-2012
;;� �
��� �
ENGINEERING • tOMFOftT SYSTEMSMM
PO BOX 8610•AVON.CO 81620•Telephone 970-845-7910
Fax 970-845-7522�E-mail drader@raderengineering.com
4/12/12
Justin Nielsen
Skyline Mechanical Inc.
PO Box 1258
Gypsum, CO 81637 �
justin a�skylinemechanical.com
RE: Montaneros Furnace Replacei��ent
641 West Lionshead Circle
Vail, CO 81657
REI Job#: 12023.00
Justin,
We have reviewed your project to replace the two existing 90%efticient Whirlpool 125 MBH gas-fired
furnaces with two new 97%etificient Carrier 80 MBH modulating furnaces. Our review process included
performing a site visit, review of heat loss calculations and review of equipment submittals. We have the
following summary review comments:
o The heat loss calculatio��submitted justifies the downsizing of the furnaces. The combined
output of the two furnaces is estimated to be 126 MBH whereas the total heat load is only 70
MBH.
o [t appears the existing 2"solid core PVC flue piping can be re-used to serve the new furnaces.
The existing piping is stamped with the ASTM D1785 stamp which is required by the new
furnaces. The vent lengths and pipe size are acceptable per the new manufacturer's vent tables.
o Two new 2" PVC pipes will need to be installed and routed to the outside for combustion air.
Terminate the flue and combustion air per the manufacturer's installation instructions.
. o The existing combustion air openi��gs ii�the mechanical room sho�ild be capped as they are no
lQnger being used.
o Install manual volume dampers on any outside air ductwork connections to the furnace return air
ducts, for balancing. Adjust to approximately 15%OSA, 85% RA.
o Install condensate neutralizers at each furnace,to neutralize the acidic condensate prior to
discharge into the sewer system.
o Verify proper operation of the existing condensate pump(s) ii�the mechanical room and replace
with new pump(s) if necessary. �
�y
�'��'�''n ``�r� ,�.
Sincerely, �";jr 8 ..��;".cro
,� �.„
y ��.,`dn""��•., . �' y • ''J
Y ti / �� ,
4!' �/ /
K 0 r�r f(2/r Z,`,.,>
. � � � �
.,.
,� a .,;� .
'��.'?,� ; r
t'Y� .P '+[i
`9 ut�,", '.y • �.'.
Bryan J. Houle, P.E. t��t���° ,�m, � �-,"'
�� .;�;:1 �-
Page 1 Commercial Heat Loss and Heat Gain Calculation 4/9/2012
Report Prepared By:
Skyline Mechanical
For: Montaneros Furnace Replacement
641 W. Lionshead Circle Vail
Fraser, CO 81657
Design Conditions: Vail; Latitude: 39; Time 4:00 PM
I ndoor: Outdoor:
Summer temperature: 70 Summer temperature: 90
Winter temperature: 72 Winter temperature: -20
Relative humidity: 50 Summer grains of moisture: 30
Daily temperature range: 30
Building Component Sensible Latent Total Total
Gain Gain Heat Gain Heat Loss
(BTUH) (BTUH) (BTUH) (BTUH)
Floor 1,725 sq.ft. 0 0 0 3,809
Floor(2) 180 sq.ft. 0 0 0 397
S Wall 224 sq.ft. 168 0 168 1,030
Window 32 sq.ft. 2,135 0 2,135 942
Door 20 sq.ft. 1,443 0 1,443 1,141
Leakage Summer 50 cfm 1,100 0 1,100 0
Leakage Winter 90 cfm 0 0 0 9,108
E Wall 48 sq.ft. 65 0 65 221
Window 32 sq.ft. 1,868 0 1,868 1,825
Door 40 sq.ft. 2,334 0 2,334 2,282
Leakage Summer 110 cfm 2,420 0 2,420 0
Leakage Winter 190 cfm 0 0 0 19,228
People/Vent 0 people 0 0 0 0
Ventilation 300 cfm 6,600 0 6,600 30,360
Whole Building -All Components 18,133 0 18,133 70,343
( 1.5 tons )
HVAC-Calc Commercial 4.0 by HVAC Computer Systems Ltd. 888 736-1101
Load calculations are estimates only,actual loads may vary due to weather and construction differences.