CC ENTERPRISES - TRAFFIC CONTROL SPECIALISTS, INC
Contractor; fAMN CONSTRUCTION REVISED
Project; 4 SEASONS - VAIL - SOUTH FRONTAGE ROAD (POLE RELOCATE)
Method of Handling Traffic, SHOULDE=R CLOSED ON FOUR LANE ROAD
PREPARED BY: N
Y-66 W_ 05/�5/Ob' w
ATSSA TCS NAME DATE
PHONE: 970 - 242.90 S
CERTIFICATION # 00037043 u�m
ISSUE DATE: 11 /11 /2QD4 wm
pAn
EXPIRATION DATE: 1 6/2008
200'
3W y FRONTAGE RD
WORK ZONE
kv
li
NOTE:
1. CONTRACTOR WILL NEED SHOULDER CLOSED AND SIDEWALK CLOSED FOR POLE RELOCATION.
WORK WILL LAST FOR ONE WEEK, CONTRACTOR WILL BE DIGGING A TRENCH SOUTH FROM
FRONTAGE ROAD, AT NIGHT, TRENCH WILL BE BARRICADED WITH DRUMS AND FENCE.
2. REFER TO MUTCD FIGURE 6H -3 FOR TYPICAL APPUCATION,
SIGNS:
1 -SHOULDER WORK 2 - UTILITY WORK AHEAD
2 - SIDEWALK CLOSFD 2 - TYPE II BARRICADE
DRUMS/LIGHTS FENCE