Loading...
HomeMy WebLinkAboutUpdates for Holy Cross PermitLay ton CONS vUMW wIrwI�ar�rrr th C144 PERMIT BOOKLET UPDATES 9090 South Sandy Parkway Salt Lake City, UT 84070 (801) 568 -9090 - FAX (801) 569 -5450 Date: 10 -09 -06 UPDATES FOR HOLY CROSS PERMIT BOOKLET: Add the following information: New / Replace Existing Please insert AEI s Utility Permit into the CDOT Permit Application section. If there are any questions please let me know. Thank you. ALPINE ENGINEERING, INC. September 27, 2006 Mr. Mike Verke'tis Colorado. Department of Transportation 222 South 6th Street, Room" 100 . Grand Junction; CO 81501 RE: Four Seasons Resorts: Holy Cross Utility Permit Dear-Mike: On behalf of Holy ,Cross- Electric, we are requesting a MOT Utility Permit to relocate an existing Holy Cross electric line, which currently crosses.the Four Seasons Resort site. The relocated electric line will be a buried, longitudinal installation primarily paralleling the South Frontage Road and within the MOT right -of -way. The 2 -4inch conduits will contain 30 /24.9 Yl14.4 KV primary electric cable to serve the Four Seasons Resort. Along with the application we have included a traffic control plan, the necessary insurance and a site plan depicting the relocation. Should you have any questions or comments, please do not hesitate to call our office. P.O. Box 4603 • Frisco, Colorado 804 43 • (970) 453 -6064 , Fax (970) 453 -6631 ,oLORADO DEPARTMENT OF TRANSPORTATION UTILITY/ SPECIAL USE PERMIT APPLICATION Please print or type V tr ucfions: olete this form, attach all required documents, and submit it to the appropriate permit office. To determine which documents are auired, refer to the back side of this form and /or contact the Permit Office. You must submit all required documents or the Iapplication will be deemed to be incomplete and will not be accepted. Please do not FAX completed forms or documents. Permittee: property or utility owner / Name Address , co % �f/ `�i� �/� ` S r �! Q Z— Contact person �f / 7 p !% %� U J honer{ 2— Applicant if other than permittee Name Address Contact person ! 7C� Telephone activity Description: (furnished by permittee) Purpose of Utility Permit I ❑ Installation )S�<djust/relocation ❑ Removal ❑ Maintenance or existing facility Facility , size, class of trans /mittant, design ress e or potential, etc. 1� tY(tYP 2- 4" ply�i �g �V' �� 3�"/Z�•9 /%� 1 Df Installation Longitudinal (parallel) Buried* ❑ Attach to Highway Structure #.- ❑ Transverse (crossing) ❑ Aerial /Ground- mounted 'urpose if for other than Utility Permit ❑ Landscaping ❑ Survey ❑ Other (describe) ❑ Construction within right -of -way date Hi Tvw y t o. - - - - County - City/Town 70 i'E:;!0A1746 ocation relative to SH milepost(s) nation relative to intersecting feature(s), e.g., cross street, str. #, etc. 2-85 Wao,Af_ JIAI6 ended start date and planned duration of work Jitional remarks Wwill own or operate underground facilities in State Highway rights -of -way: Indicate contact person for Telephone location information: 3�z :e to Excavators: You must notify owners or operators of underground utilities at least two (2) business days prior to making or beginning -ations in the vicinity of such utilities, as required under Section 9 -1.5 -103, CRS. CALL UTILI iY NOTIFICATION CENTER OF )RAD.O (UNCC), 1- 800 -922 -1987, FOR MARKING OF MEMBER UTILITIES. Contact non - member utiiities directly. El �plication requirements — submit with completed application form bmit required application documentation in sets of four — collated 1. LETTER OF REQUEST (on letterhead of City or Utility Company) as necessary to: a. document that the owner concurs in the application, if the applicant is other than the permittee; and /or b. more fully describe the nature of the proposed work, status of required clearances (see item 5 below), etc. 2. PLAN AND PROFILE clearly showing the following: a. Distance of the proposed work or facility from right -of -way (ROW) fine. b. Distance from S.H. milepost and intersection streets. c. 'Distance line will be within ROW, or if it crosses ROW. d. "Facility type: (Water, Gas, Phone, Power, Fiber Optic cable, Oil, etc.). e. *Nature of installation: (buried, overhead, or attached to a highway structure). If attached to a highway structure, submit a separate drawing, in �dicating the structure ;umber, And showing attachment details. "If application for Utility Permit only 3. TRAFFIC CONTROL PLAN (required on all operations) that conforms to the "Manual on Traffic Control Devices for Streets and Highways" (Part VI). 4. INSURANCE REQUIREMENTS: a. A permittee shall ensure that all permitted operations, whether performed by the permittee or by subcontractors, are adequately and continuously covered by liability insurance. The types and minimum amounts of insurance acceptable to CDOT are as follows: 1. Workers Compensation Insurance in accordance with prevailing laws. 2. Comprehensive General Public Liability and Property Damage Insurance: Combined Bodily Injury and Property Damage $150,000 per person $600,000 each occurrence 3. Comprehensive Auto Liability and Property Damage Insurance: Combined Bodily Injury and Property Damage $150,000 per person $600,000 each occurrence b. Certificates) of Insurance from permittee and /or subcontractors' insurance carrier(s), naming Colorado _ _ _ _ _ _ _ _ . _ _ _ _ _ _ Department of Transportat_i_on as additional insured party_, shall be furnished. 5. ENVIRONMENTAL, ECOLOGICAL, ARCHAEOLOGICAL, AND HISTORICAL CLEARANCES: The Utility /Special Use Permit applicant must satisfactorily address these items, in accordance with applicable law, as a condition to issuance of a Utility /Special Use Permit. Exampfes of such clearances include Colorado Discharge Permit System permits or Corps of Engineers 404 Discharge of Dredged or Fill Material permits. The letter of request for a Utility /Special Use Permit should include a discussion of the status of any required clearances. :turn completed application plus all required enclosures to Colorado Department of Transportation, Attn: Utility !rmit Office, at one of the following addresses as appropriate to this permit: -gion 1: 18500 East Colfax Avenue Region 2: 905 Erie Avenue Aurora, CO 80011 Pueblo, CO 81002 303 - 757 -9157 719- 546 -5433 gion 3: 222 South 6t' Street, Room 100 Region 4: 14202 nd Street Sig and Grand Junction, CO 81501 -2769 Greeley, CO 80632 nd JCT.) 970- 248 -7230 970 - 350 -2111 fir 1205 West Ave., Box A Region 5: 3803 N. Main Ave., Suite 300 1m ) Alamosa, CO 8 110 1 (Durango) Durango, CO 81301 719- 589 -3616 970- 385 -8360 ion 6: 3401 Quebec Street, Suite 8400 Denver, CO 80207 303- 377 -6602 G7 Lavton CONSMUCTINa WH 1NMONrY PERMIT BOOKLET UPDATES 9090 South Sandy Parkway Salt Lake City, UT 84070 (801) 568 -9090 • FAX (801) 569 -5450 Date: 10 -09 -06 UPDATES FOR HOLY CROSS PERMIT BOOKLET: Add the following information: New / Replace Existing Please insert Holy Cross Energy Underground Right -of -way Easement information into the Electrical Agreement section. If there are any questions please let me know. Thank you. HOLY CROSS ENERGY UNDERGROUND RIGlfr-OF=WAY EASEIMENT KNOW ALL MEN BY THESE PRESENTS. that the undersigned, SCORPIO CONDOMINIUM ASSOCIATION (hereinafter called 'Grantor'), for a good and valuable consideration, the receipt whereof Is hereby acknowledged, does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address Is P. 0. !ox 2150, Glenwood Springs, Colorado (hereinafter called'Grantatl and to its successors and assigns, the right of Ingress and egress across lands of Grantor, situate In the County of Eagle. State of Colorado, described as follows; A parcel of land situated In Sections 6 and 7, Township 5 South, Range 80 West of the r P.M., more particularly described on the Condominium Map For Scorpio Condominiums at Reception No. 231790 In the office of the Eagle County Clark and Recorder, Eagle, Colorado. And, to construct, reconstruct, repair, change, enlarge, re- ohaso, operate, and maintain an underground electric transmission or distribution line, or both, with the underground vaults, conduit, fixtures and equipment used or useable In connection therewith, togetherwith associated equipment required above ground, within the above , mooned lands, upon an easement described as follows: An Easement containing underground power lines with above ground pad mmated equipment as constructed, the location of said Easement upon the above described property Is shown on Exhibit A attached hereto and made a part hereof by reference. The rights herein granted specifically allow Grantee to install additional underground and /or pad-mounted facilities within the easement described 'herein. It shall be the Grantors responsibility to ensure that splice vaults, switchgear vaults and tra isformar vaults installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary egWpment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of arty Improvements, landsca ping, or other obstructions. The ground surface grade shall not be ahered within ten (10) feet of said splice, swkchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall he even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed In the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping. and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear: Grantor hereby agrees to maintaih the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Saki corrections will be made at the sole cost and expense of Grantor. Together with the right to remove any and all trees, brush. vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such Is ressonabfy necessary for the implementation and use of the rights hereinabove granted. In areas. where vegetation is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responsible for damage to said additional landscaping or surface improvements caused by exercise of Its rights granted by this easement Grantor agrees that all facilities Installed by Grantee on the above described lands, shall remain the property of Grantee, and shall be removable at the option of Grantee. Grantor covenants that it Is the owner of the above described lands and that the said lands are free and clear of encumbrances and (lens whatever character, except those held by the following: As recorded in the real property records. . TO HAVE AND TO HOLD, said rightof4ay and easement, together with all and singular, the rights and privileges appertaining thereto, unto Grantee, its successors and assigns, forever. i WITNESS EREOF, Grantor has caused these press to be duty executed on this 20th day of �SeT)temVer 20 8`� The Individual signing this Holy Cross Energy Underground Right-of-Way Easement hereby represents that he /she has full power and authority to sign, execute, and delhrer this Instrument. STATE OF COLORADO ) CITY & COUNTY OF DENVER ss. 20 cab Wog by K1ch 1 a CONDOMINIUM ASSOCIATION. WITNESS my hand and offlcial seal. My commisslon expires: 9/19/07 SCORPIO CONDOMINIUM ASSOCIATION M me this 20 th day of v NE t�aeYPreslde r �+ ,,,,.,, �(�► r :2 t emb e r u cfaxmRsId of 5 ORPIO i ftBLIC ; notary Pubilt / � • '•�,`� 0 Address; 1600 Stout St.. Suite 1600 Denver CO -06 80203 W10006- 19167:SZ -96, 63: Vail - 4 Seasons Redevelopment 545 smrlaNvroom4now Revise -1 U rl* • M'to_ r :.—v —ISO POINT OF OMNINO SCORPIO CONDOMINIUMS 9OOIIMO CONDOMMM A9.l061 TXK NO. $79108'45 "E A OF Zj1, r 475 W=W MW 9.50' �001f 774 M9E DESCRIBED PARCEL EASEMENT DESCRIPTION An easement located on Scorpio Condominiums, A Portion of Lot D, Vail Village, Second Filing, recorded In Book 335 at Page 436 In the Office of the Eagle County Clark and Recorder, described as follows: Beginning at the northeast corner of sold Scorpio Condominiums, whence the northwest corner of said Scorpio Condominiums beors N79'08'45 'W, 175.00'; thence along the northerly line of said Scorpio Condominiums N79'08'45 "W, 9.50 feet; thence departing sold northerly line S10'51'15 "W, 101.07 feet; thence S79'08'45 "E, 9.50 feet to a point on the easterly line of said Scorpio Condominiums; thence N10'51'15'E, 101.07 feet to the Point of Beginning. The described parcel contains 0.022 acres more or less. 23048 / •' N S7 9.50 45E W o. z LOT C, AMENDED MAP OF 'SHEET 1 OF 2, VAIL VILLAGE SECOND FILING, RECEPTION NO. 97199 �I *�'J 0259 OON151ENTAL COURT. 0205 ORECKENRIOOE. COLORADO 50424 P.O. 80X 4003 • MOD, COLORADO 80443 970 453 -0064 • FAX 463 -5631 .:r Lsayton CONSMUCIING I"""ff rT Mrr 'L PERMIT BOOKLET UPDATES 9090 South Sandy Parkway Salt Lake City, UT 84070 (801) 568 -9090 - FAX (801) 569 -5450 Date: 10 -09 -06 UPDATES FOR HOLY CROSS PERMIT BOOKLET: Add the following information: New / Replace Existing Please insert Holy Cross Energy Underground Right -of -way Easement information into the Electrical Agreement section. If there are any questions please let me know. Thank you. N-E L' HOLY CROSS ENERGY UNDERGROUND RIGHT -OFWAY EASEIMENT KNOW ALL MEN 6Y THESE PRESENTS. that the undersigned, SCORPIO CONDOMINIUM ASSOCIATION (hereinafter called 'Grantor'), for a good and valuable consideration, the receipt whereof Is hereby acknowledged. does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address Is P. 0. Box 2150, Glenwood Springs, Colorado (hereinafter alled'Grantee7 and to Its successors and assigns, the right of Ingress and egress across lands of Grantor, situate in the County of Eagle, State of Colorado, described as follows: A parcel of land situated In Sections 6 and 7, Township 5 South, Range 60 West of the 6" P.M., more particularly described on the Condominium Map For Scorpio Condominiums at Reception No. 231790 In the office of the Eagle County Clerk and Recorder, Eagle, Colorado. And. to construct, reconstruct, repair, change, enlarge, re-phass, operate, and maintain an underground electric transmission or distribution line. or both, with the underground vaults, conduit, fixtures and equipment used or useable In connection therewith, togetherwith associated equipment required above ground, within the above, m tioned lands, upon an easement described as follows: An Easement containing underground poser lines with above ground pad mounted equipment as constructed, the location of said Easement upon the above described property Is shown on Exhibit A attached hereto and made a part hereof by reference. The rights herein granted specifically allow Grantee to install additional underground and /or pad - mounted facilities within the easement described herein. It shall be the Grantors responsibility to ensure that splice vaults, switchgear vaults and transformer vaults installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary equipment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of any Improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said spike vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed In the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be fiat, level and free of Improvements, landscaping, and other obstructions. improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. Grantor hereby agrees to maintalh the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Said corrections will be made at the sole cost and expense of Grantor. TogethervAlt the right to remove arry and all trees, brush, vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such Is reasonably necessary for the implementation and use of she rights hereinabove granted. In areas where vegetation is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responsible for damage to said additional landscaping or surface improvements caused by exercise of Its rights granted by this easement. Grantor agrees that all facilities Installed by Grantee on the above described lands, shall remaln the property of Grantee, and shall be removable at the option of Grantee. Grantor covenants that It Is the owner of the above described lands and that the said lands are free and clear of encumbrances and ()ens pf whatsoever character. except those held by the fo(iowing: AS recorded in the real property records. TO HAVE AND TO HOLD, said right-of-way and easement, together with all and singular, the rights and prMleges appertaining thereto, unto Grantee. its successor and assigns, forever. I WfT� mr EREOF, Grantor has caused these p20septs to be duly executed on this 20th day of The Individual signing this Holy Cross Energy Underground Right-of-Way Easement hereby represents that he /she has full power and authority to sign, execute, and defter this instrument. STATE OF COLORADO CITY & COUNTY OF DENVER ss. The Q�9oing Ira 20 V . by CONDOMINIUM A WITNESS my hand and official seal. My commission expires: 9/19/07 SCORPIO CONDOMINIUM ASSOCIATION me this 20th day of Notary c., c tA0TAjck : Z 0 : 'PUBLIC : �O Address. 1600 Stout St., 2Suite 1600 W/Oir06- 19167:S2 -96, 63: Vail - 4 Seasons Redevelopment 5-15-06 sc rriDenver r r;Snow Rev01se�9 A01 EASEMENT DESCRIPTION SCORPIO CONDOMINIUMS aoo M C0001iMM ASWIM710M. MO. OMMOW N iW►P Pat sow oarMM04W A PORl1di as dR MW t 06 VA VLLA'K W� FLW DESCRIBED PARCEL An easement located on Scorpio Condominiums, A Portion of Lot D, Vall Vlliage, Second Fling, recorded In Book 335 at Page 436 in the Office of the Eagle County Clark and Recorder, described as follows: Beginning of the northeast corner of sold Scorpio Condominiums, whence the northwest corner of said Scorpio Condominiums boors N79'08'45 "W, 175.00'; thence along the northerly line of said Scorpio Condominiums N79'08'45 "W, 9.50 feet; thence departing said northerly line S10'51'15 "W, 101.07 feet; thence S79'08'45 "E, 9.50 feet to a point on the easterly line of said Scorpio Condominiums; thence N70'51'15'E, 101.07 feet to the Point of Beginning. The described parcel contains 0.022 acres more or less. 1 E* 79'08'45 "E 9.50 PANT OF SEQNNIHO LOT C, AMENDED MAP OF 'SHEET 1 OF 2, VAIL VILLAGE SECOND FILING, RECEPTION NO. 97199 F tV N ! SCAL • 11-W z 0259 CONT91ENTAL COURT, j205 BRECKENRIDGE, COLORADO $0424 P.O. BOX 4$03 • FNSCO, COLORADO 80443 870 453 -0064 • FAX 463 -8831 .> Lavton C0N8TR1JCTDN4 *ffH MOR/TY PERMIT BOOKLET UPDATES 9090 South Sandy Parkway Salt Lake City, UT 84070 (801) 568 -9090 - FAX (801) 569 -5450 Date: 10 -09 -06 UPDATES FOR HOLY CROSS PERMIT BOOKLET: Add the following information: New / Replace Existing Please insert AEl s Utility Permit into the CDOT Permit Application section. If there are any questions please let me know. Thank you. a I fi ALPINE ENGINEERING, INC. September 27, 2006 ivir..Mike Vericetis Colorado Department of Transportation 222 South 6th Street, Room 100 Grand Junction; CO 81501 RE: Four Seasons Resorts:.Holy Cross Utility Permit Dear-Mike: On behalf of Holy Cross-Electric, we are requesting a CDOT Utility Permit to relocate an existing Holy Cross electric line, which currently crosses the Four Seasons Resort site. The relocated electric line will be a buried, longitudinal installation primarily paralleling the South Frontage Road and within the CDOT right -of -way. AVIN Then -4inch conduits will contain 30/24.9 Y/14.4 KV primary electric cable to serve the Four Seasons Resort. Along with the application we have included a traffic control plan, the necessary insurance: and a site plan depicting the relocation. Should you have any questions or comments, please do not hesitate to call our office. Sincerely, 6 Cry es McNeil, P.E. JM /la P.O. Box 4603 • Frisco, Colorado 80443 • (970) 453 -6064 Fax (970) 453 -6631 .a ,OLORADO DEPARTMENT OF TRANSPORTATION If UTILITY/ SPECIAL USE PERMIT APPLICATION Please print or type mplete this form, attach all required documents, and submit it to the appropriate permit office. To determine which documents are i quired, refer to the back side of this form and /or contact the Permit Office. You must submit all required documents or the I application will be deemed to be incomplete and will not be accepted. Please do not FAX completed forms or documents. Permittee: property or utility owner Name Address swgez- C, person _ _ / U e e hone Applicant if other than permittee p /� Name �// / � %� /✓ / ��e �. . Address / O , `c_- -;--��� Contact person G��IC�, Telephone activity Description: (furnished by permittee) Purpose of Utility Permit ❑ installation )F�<Adjust/relocation ❑ Removal ❑ Maintenance or existing facility Facility (type, size, class of transmittant, design ress e or potential, etc. �u�`�3 w�:�� w %�� G°�- r���c,�r 3��aae�Z�•9 `/�� .g IV of Installation iRr—Longitudinal (parallel) X Buried" ❑ Attach to Highway Structure #: ❑ Transverse (crossing) ❑ Aerial /Ground - mounted 'urpose if for other than Utility Permit ❑ Landscaping ❑ Survey ❑ Other (describe) ❑ Construction within right -of -way fate Highway No. - - - - - Cotin �- - �o - �G -C;ty/ town ocation relative to SH milepost(s) ��Wzv 0 nation relative to intersecting feature(s), e.g., cross street, str. #, etc. 2-1661 U164::7 DoC VA16 a' ended start date and planned duration of work 67 WT Jitional remarks wiii own or operate unaerground tacdities in State Highway rights -of -way: Indicate contact person for Telephone %Wotnd location information: ;e to Excavators: You must notify owners or operators of underground utilities at least two (2) business days prior to making or beginning 'ations in the vicinity of such utilities, as required under Section 9 -1.5 -103, CRS. CALL UTILITY NOTIFICATION CENTER OF )RADO (UNCC), 1- 800 -922 -1987, FOR MARKING OF MEMBER UTILITIES. Contact non - member utilities directly. sack side for detailed application requirements and mailing instructions CooT Form #12ss 4102 �phcation requirements — submit with completed application form Submit required application documentation in sets of four— collated 1. LETTER OF REQUEST (on letterhead of City or Utility Company) as necessary to: a. document that the owner concurs in the application, if the applicant is other than the permittee; and /or b. more fully describe the nature of the proposed work, status of required clearances (see item 5 below), etc. 2. PLAN AND PROFILE clearly showing the following: a. Distance of the proposed work or facility from right -of -way (ROW) line. b. Distance from S.H. milepost and intersection streets. c. *Distance line will be within ROW, or if it crosses ROW. d. *Facility type: (Water, Gas, Phone, Power, Fiber Optic cable, Oil, etc.). e. *Nature of installation: (buried, overhead, or attached to a highway structure). If attached to a hig ha, „ structure, submit separate drawing, indicating the structure number, And showing attachment details. *If application for Utility Permit only 3. TRAFFIC CONTROL PLAN (required on all operations) that conforms to the "Manual on Traffic Control Devices for Streets and Highways” (Part VI). 4. INSURANCE REQUIREMENTS: a. A permittee shall ensure that all permitted operations, whether performed by the permittee or by subcontractors, are adequately and continuously covered by liability insurance. The types and minimum amounts of insurance acceptable to CDOT are as follows: 1. Workers Compensation Insurance in accordance with prevailing laws. 2. Comprehensive General Public Liability and Property Damage Insurance: Combined Bodily Injury and Property Damage $150,000 per person $600,000 each occurrence 3. Comprehensive Auto Liability and Property Damage Insurance: Combined Bodily Injury and Property Damage $150,000 per person $600,000 each occurrence b. Certificate(s) of Insurance from permittee and /or subcontractors' insurance carrier(s), naming Colorado __.__ - Departme._nt of Transportation as additional ins red party_,_shall be furnished. 5. ENVIRONMENTAL, ECOLOGICAL, ARCHAEOLOGICAL, AND HISTORICAL CLEARANCES: The Utility /Special Use Permit applicant must satisfactorily address these items, in accordance with applicable law, as a condition to issuance of a Utility /Special Use Permit. Examples of such clearances include Colorado Discharge Permit System permits or Corps of Engineers 404 Discharge of Dredged or Fill Material permits. The letter of request for a Utility/Special Use Permit should include a discussion of the status of any required clearances. -EUM compieieo application plus all required enclosures to Colorado Department of Transportation, Attn: Utility �rmit Office, atone of the following addresses as appropriate to this permit: -gion 1: 18500 East Colfax Avenue Aurora, CO 80011 303 - 757 -9157 gion 3: 222 South 6�' Street, Room 100 sig and Grand Junction, CO 81501 -2769 nd JCT.) 970- 248 -7230 I 1205 West Ave., Box A 1 a) Alamosa, CO 81101 719- 589 -3616 ion 6: 3401 Quebec Street, Suite 8400 Denver, CO 80207 303- 377 -6602 F1 Region 2: 905 Erie Avenue Pueblo, CO 81002 719- 546 -5433 Region 4: 14202 nd Street Greeley, CO 80632 970- 350 -2111 Region 5: 3803 N. Main Ave., Suite 300 (Durango) Durango, CO 81301 970 -385 -8360