Loading...
HomeMy WebLinkAboutBuilding Application�A11 Uf PILL 4 75 S. Frontage Rd. Vail, Colorado 81657 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project # Building Permit #: Bob - yillo 97079 249�Inspect�ons) TOWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION General Contractor: GA•YT0A! GoN57Ku.J,Tlonl Town of Vail Reg. No.: 333 14 Contact Person and Phone #'s: C*MY = 80l 598 -1203 Email address: CRr�t �a �� - GD S CoM Fax #: 041 _ 5'I oro Contractor Signature: LWA COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials) BUILDING: $ ELECTRICAL: $ OTHER: $ PLUMBING: $ MECHANICAL: $ TOTAL: $ 6 696 570 For Parcel # Contact Eagle County Assessors Office at 970- 328 -8640 or visit www.ea-gle- countv.com Parcel # Job Name:1^ONR S9450AIS �FSoRT RT i'/�l L Job Address: � 14;81- Rpm 140.1 Cp $f(a5� egal Description LotA ,, B, G Block: Filing:5e�� n Subdivision: Owners Name: Address: 53 1 L cgok 1 Mon! WORM o S /XC I M14 i.t5 Phone: -0/23 An hitect/Desi ner: Address: ILL IiiaZ 15c 5 9r5 cm s EE &A9 &Lre 64 y3r Phone: 50- 61 *7- Address: P nM #neer lass: New W Addition( ) Remodel ( ) Repair ( ) Demo ( ) Other ( ) Work Type: Interior( ) ExteriorYQ Both ( ) Does an EHU exist at this location: YesX) No ( ) Type of Bldg.: Single- family ( ) Two - family ( ) Multi- family ( ) Commercial W Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: No/Type of Fireplaces Existing: Gas Appliances Gas Los Wood /Pellet Wood Burning No/Type of Fireplaces Proposed: Gas Appliances Gas Los Wood /Pellet Wood Burning NOT ALLOWED Does a Fire Alarm Exist: Yes Q) No( ) 11 Does a Fire Sprinkler System Exist: Yes 00 No( ) FOR OFFICE USE ONLY Type of Construction: Date Received: cupancy Group:, _ Accepted By: F: \cdev \FORMS \Permits \Building \building-permit.DOC Page 1 of 16 02/09/2005 Project Name: Project Address: VII, accepted Department Of Community Development ❑ All Pages of application is complete Has DRB approval obtained ( if required) Provide a copy of approval form ❑ Condominium Association letter of approval attached if project is a Multi-Family complex 111A ❑ Plan Check Fee required at submittal for Projects valued over $100,000.00 (See attached -Construction Fee Schedule for calculations) �;y 405Complete site plan submitted I ublic Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No clumnctar n!%rI,;__ -_ allowed shoulders without written gm)roval material storacie ❑ Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) ;2/ Full floor plans including building sections and elevations(3 sets of plans for remodel/additions, 4 sets of plans for new SFR and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e.loads) JCY Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) .d Soils Report must be submitted U Itted prior to footing inspection Q/ Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity Of fireplaces shown I have read and understand the above listed submittal requirements: kPplicant's Signature: Date of submittal: Received By: _ ❑i BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, 'the estimated time for a total review may take up to six (6) weeks. All commercial (large or small) and all multi - family permits will have to follow the above Coned maximum requirements. Residential and small projects should take a lesser U"nt of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may take up to six (6) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must stilf$ay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Print name Signature Project Name:f.. Date: t U NO Town of Vail Survey Check all that apply Date; 1. Which Department(s) did you contact? Building Environmental Housing Admin Planning DRB PEC 2. Was your initial contact with our staff immediate slow or no one available 9. 3. If you were required to wait, how long was it before you were helped? 4. Was your project reviewed on a timely basis? /No If no, why not? 5. Was this your first time to file a DRB App PEC App Bldg Permit 6 " N/A Please rate the performance of the staff person who assisted you: 5 4 3 2 1 (5 is high) Name: (knowledge, responsiveness, availability) 7. Overall effectiveness of the Front Service Counter. 5 4 3 2 1 (5 is high) 8. What is the best time of day for you to use the Front Service Counter? 8. What comments do you have which would allow us to better serve you next time? f Thank you for taking the time to complete this survey. We are committed to improving our service. If you have any questions or comments please contact Russell Forrest, Community Development Director at (970) 479 -2139.