Loading...
HomeMy WebLinkAboutB02-0350TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970 - 479 -2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PROJECT TITLE: ADD /ALT SFR BUILD PERMIT Permit #: B02 -0350 Job Address: 1476 WESTHAVEN DR VAIL Status ...: ISSUED Location.....: 1476 W HAVEN DRIVE #25 Applied..: 10/15/2002 Parcel No...: 210312108025 Issued . .. 11/12/2002 Project No sss*** sssssssr: e�ss** s* srr* ssss*** es** rsrsrssrs** rs* srvsrss�* w* rssr* r+ s*** ss *sr * *rrr.sssrsrssss *ssr�:�s *s: *sss *s: sss * *s *sssrssssss * * * *srssr *s * *r *r Expires. .: 05/11/2003 OWNER KAUFMAN JAMES M. & JANE G. 10/15/2002 Phone: Item: 05100 BUILDING DEPARTMENT 3405 DEEPHAVEN AVE 11/12/2002 GCD Action: AP WAYZATA MN Item: 05400 PLANNING DEPARTMENT 55391 11/11/2002 ao Action: AP License: Item: 05500 PUBLIC WORKS CONTRACTOR WARZECHA ENTERPRISES, INC. 10/15/2002 Phone: 970 - 390 -3674 P.O. BOX 1384 VAIL, CO 81658 License: 541 -B APPLICANT WARZECHA ENTERPRISES, INC. 10/15/2002 Phone: 970 - 390 -3674 P.O. BOX 1384 VAIL, CO 81658 License: 541 -B Desciption: ENCLOSE LOWER DECK TO ACCOMODATE NEW BATHROOM Occupancy Type Factor Sq Feet Valuation T,otals... 78 $30,500.00* Number of Dwelling Units: 0 Town of Vail Adjusted Valuation: $30,500.00 Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pallet: 0 • ssss* ss* s* ss* ss** s***** * * *ssssssssssss * * *ss * * * * * * *ssss *sss * * * * * ** FEE SUMMARY * * *s *ssssssssss *sss *ss *ssss sss * ** *sss *: * * * * « * * * *s *ss *sssss Building ------ > $357.00 Restuarant Plan Review - -> $0.00 Total Calculated Fees - - - - -> $631.05 Plan Check --- > $232.05 DRB Fee ------------- — ---- > $0.00 Additional Fees ------------ > $75.00 Investigation -> $0.00 Recreation Fee ------------ > $39.00 Total Permit Fee---- - - - - -> $706.05 Will Call - - - -> $3.00 Clean -up Deposit --------- > $0.00 Payments ------------------- > $706.05 TOTAL FEES---- - - - - -> $631.05 BALANCE DUE--- - - - - -> $0.00 sss*** sssssssr: e�ss** s* srr* ssss*** es** rsrsrssrs** rs* srvsrss�* w* rssr* r+ s*** ss *sr * *rrr.sssrsrssss *ssr�:�s *s: *sss *s: sss * *s *sssrssssss * * * *srssr *s * *r *r Approvals: Item: 05100 BUILDING DEPARTMENT 11/12/2002 GCD Action: AP Item: 05400 PLANNING DEPARTMENT 11/11/2002 ao Action: AP Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS :* sss :s *ss *s * *s *ssss *sss *:►. * *ss *s :. sss :.ssss *sssssss sss: s**** s******* s* s** : : : : : : :. :.s * *s * * *s * * * : : :. :. : : *: sss *s * * * *s *sss : : : : :ss *ss *s *s *s * : * * : : : : :: See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R000003425 Amount: $706.05 11/12/200203:20 PM Payment Method: Check Init: DDG Notation: Warzecha 3101 ----------------------------------------------------------------------------- Permit No: B02 -0350 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 210312108025 Site Address: 1476 WESTHAVEN DR VAIL Location: 1476 W HAVEN DRIVE #25 Total Fees: $706.05 This Payment: $706.05 Total ALL Pmts: $706.05 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code ------------------- BP 00100003111100 CL 00100003123000 PF 00100003112300 RF 11100003112700 WC 00100003112800 Description Current Pmts ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 357.00 CONTRACTOR LICENSES 75.00 PLAN CHECK FEES 232.05 RECREATION FEES 39.00 WILL CALL INSPECTION FEE 3.00 DEC 02 2002 11:14AM HP LASERJET 3200 KRMOON&ILTANIM, INC. P.O. BOX 4672 970-949 -9391 PAIL, C0L0RA0O 81668 IFAX1949 -1577 FIELD REPORT TO: DATE.' 11/27/2002 Tom Warzecha ARRIVE: 5:00 pm DEPART., 5:20 pm WEATHER: Cool /Clear ATTFM7ON: Tom Warzecha JOB NLWBE/i: 0203 -16 PROJECT.- Coldstream Unit 025 PRESENTAT SITE Tom Warzecha, Shane STATUS Of COMPLETION.• Masonry Foundation nearly completed i visited the site referenced above to observe the reinforcing steel recommended in the record from earlier today: '2. Vertical wall steel was intended to be 66's at 48" on center lapping the 15 x 2' -6 x 6' dowels. Instead, the dowels were installed as shown in the original cast-in -place concrete details, and the additional vertical bars were omitted. This would stilt exceed the required minimum reinforcing steel, however the dowels are too short, and do not extend into the .bond beam at the top of the wall. We recommend installing #5's x 2'-0 minimum vertical at the top of the wall lapped with the existing dowels at 48'.' The additional #5 bars appeared to be in place as described, and we believe that the foundation is structurally complete. If you have any further questions, please do not hesitate to call. Tyler F. Aldrich 9 p.2 Vat ,NOV 27 2002 3:07PM HP LHSERJET 3200 KRMOONSULTANTS, INC. (ate 9OW91 P.O. BOX 4572 (FA)9 9015n VAIL, COLORADO 81858 RECORD DATE: 11/27/2002 PROJECT: Coldstream Unit #25 ❑ RR ❑ MEETING NOTES ® RESPONSE Attn: Tom Warzecha JOB NUMBER: 0203 -16 ❑ CLARIMATIOAi MANGE p.2 According to Greg Denkla, Town of Vail building inspector, the masonry foundation wall was not constructed as described in the record and detail dated 11/21/02. The following items shown in the previously noted detail were changed: 1. The standard wire joint reinforcement at 16" was not installed. Instead, the wall was constructed with (21145's continuous horizontal at the top and bottom of the wall, and (1145 was installed at approximately mid - height. This exceeds the UBC requirements for horizontal steel and is an acceptable substitution. 2. Vertical wall steel was intended to be #5's at 48" on center lapping the #5 x 2' -6 x 6" dowels. Instead, the dowels were installed as shown in the original cast -in -place concrete details, and the additional vertical bars were omitted. This would still exceed the required minimum reinforcing steel, however the dowels are too short, and do not extend into the bond beam at the top of the wall. We recommend installing #5's x 2'-0 minimum vertical at the top of the wall lapped with the existing dowels at 48 ". We have not visited the site to observe the wall steel as constructed. We are basing our recommendations on the description by Greg Denkla of the Town of Vail and the contractor. If the wall steel is not installed as described above, please contact us for further clarification. If you have any further questions, please do not hesitate to call SIGNED: Tyler F. Aldric ;✓G a .z CX 6 act ® 0 Q co s N COPY�Q: E Town Nall: ieg [ Jim Kauf 4 Ems-. � ` sew r-41 a �� V a d) ')r� w, «pE_b �Jj G O,pe F. W D 0: p •a > v 'C E.2 b B � 15 0 P yl �- v W � Sig . `U fe is pe E-u, o p7 J - y 03 r� a.c"3 gvy�u !A 33 > a o u J Inspection Request Reporting '\ 8293 rage I Requested Inspect Date: Tuesday, April 24, 2012 Inspection Area: GD Site Address: 14 1L 76 W HAVEN RIVE #25 A/P /D Information Activity: B02 -0350 Type: A -BUILD Sub Type: ASFR Use: V 1 -HR Status: ISSUED Insp Area: GD Con Occupancy: Comment: REINFORCING PER PLAN OR ALTERNATE. RECIEVED LETTER DATED 112702 BY KRM Owner: KAUFMAN JAMES M. & JANE G. 12/02/02 Inspector: GCD Action: AP APPROVED APPROVED BY KRM ENGINEERING LETTER DATED 12- 02 -02. ILC REQUIRED FOR NEW Contractor: WARZECHA ENTERPRISES, INC. Phone: 970 - 390 -3674 Comment: 01/16/03 Description: ENCLOSE LOWER DECK TO ACCOMODATE NEW BATHROOM FRAMING APPROVED.. CK F/P INSTALLATION ?? Requested Inspection(s) ** Approved ** Inspector: CDAVIS Action: AP APPROVED Comment: Item: 60 BLDG- Sheetrock Nail ** Approved ** 12/12/02 Inspector: cdavis Action: PI PARTIAL INSPECTION Comment: 01/30/03 Item: 90 BLDG -Final Requestor: WARZECHA ENTERPRISES, INC. Requested Time: Phone: 01:00 PM 970 - 390 -3674 Comments: 390 -3674 Assigned To: J ON Action: Z �v Time Exp: Entered By: JMONDRAGON K Inspection History Item: 10 BLDG - FOOTING "Approved ** 11/21/02 Inspector: GCD Action: CR CORRECTION REQUIRED SUBMIT REVISED FOUNDATION PLANS TO BUILDING DEPT FOR APPROVAL. Comment: 11/25/02 Comment: Inspector: cdavis Action: AP APPROVED Revised drawings recd. footing constructed per engineer stamped drawings Item: 20 BLDG - Foundation /Steel ** Approved * 11/27/02 Inspector: GCD Action: CR CORRECTION REQUIRED CMU WALL NOT PER PLAN PROVIDE ENG APPROVAL OF AS BUILT OR PROVIDE Comment: REINFORCING PER PLAN OR ALTERNATE. RECIEVED LETTER DATED 112702 BY KRM FOR ADDITIONAL VERTICAL STEEL. REINSPECTION REQD BY TOV OR ENG. 12/02/02 Inspector: GCD Action: AP APPROVED APPROVED BY KRM ENGINEERING LETTER DATED 12- 02 -02. ILC REQUIRED FOR NEW Comment: STRUCTURE LOCATED IN SETBACK. Item: 30 BLDG - Framing ** Approved ** 01/15/03 Inspector: JRM Action: DN DENIED DENIED ILC NOT APPROVED, MECH PERMIT NOT ISSUED. CONTRACTOR NOTIFIED Comment: 01/16/03 Inspector: JRM Action: AP APPROVED Comment: FRAMING APPROVED.. CK F/P INSTALLATION ?? Item: 50 BLDG - Insulation 01/17/03 ** Approved ** Inspector: CDAVIS Action: AP APPROVED Comment: Item: 60 BLDG- Sheetrock Nail ** Approved ** 12/12/02 Inspector: cdavis Action: PI PARTIAL INSPECTION Comment: 01/30/03 Exterior gyp sheeting approved Inspector: GCD Action: AP APPROVED Comment: OKpTO FINISH Item: 90 BLDG -Final Item: 21 PLAN -ILC Foundation Plan ** Approved ** 01/15/03 Inspector: ao Action: AP APPROVED Comment: REPT131 Run Id: 14382 TOWN OF PAIL Department of Community Development 75 South Frontage Road Vail, Colorado 81657 970 -479 -2138 FAX 970-479-2452 www.vailgov.com February 12, 2010 James M Kaufman Trustee 3405 Deephaven Ave Wayzata, MN 55391 Cop,, Re: Expired Permit: Permit # B05 -0245 Addition, 1476 Westhaven Dr, Unit 39 Dear Property Owner(s), A review of the Town of Vail Community Development files indicates that the permit listed above does not show a record of any work performed in the last 180 days. The permit must show work progressing within a 180 day period (an approved inspection must be completed) or an extension must be applied for per the 2009 International Building Code, section 105.5. The last approved inspection received on this permit was on 11/17/2005 and we do not show any record of an extension request. While contractors typically submit permit applications, property owners are ultimately responsible for the permits on their property per the 2009 International Building Code, section 105.1. I encourage you to call for a final inspection so we may close this permit out and ensure all life safety components have been completed. Please contact us within 30 days as of the date of this letter to schedule this inspection. If we do not hear from you within 30 days, we will expire this permit. That means any future work you are considering could not be applied for or approved until this expired permit is resolved. Further, it may affect any future property sales should the prospective buyers research our records in Community Development for this property before purchase. As you can see, it is desirable to finalize the permit now so your property records with the Town of Vail are free of this outstanding issue and to ensure life safety for the inhabitants. Please do not hesitate to contact me at (970) 479 -2142 with any questions. Sincerely, Martin A. Haeberle, C.B.O. Chief Building Official Town of Vail cc: contractor (regular mail) ice• RECYCLED PAPER