Loading...
HomeMy WebLinkAboutB12-0170 APPLICATION.pdf12-Mar-2012 Project Street Address: __________ ______________________________ ___________ (Number) (Street) (Suite #) Building/Complex Name: ________________________________ BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project #: __________________________________________ DRB #: ____________________________________________ Building Permit #: ___________________________________ Lot #: ____ Block #____ Subdivision: ___________________ Contractor Information Business Name: ________________________________________ Business Address: ______________________________________ City ______________________ State: _______ Zip: ____________ Contact Name: _________________________________________ Contact Phone: _________________________________________ Contact E-Mail: _________________________________________ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances of the Town applicable thereto. X___________________________________________________ Owner/Owner’s Representative Signature (Required) Applicant Information Applicant Name: ________________________________________ Applicant Phone: ________________________________________ Applicant E-Mail: ________________________________________ Detailed Scope and Location of Work: (use additional sheet if necessary) Work Class: New ( ) Addition ( ) Alteration ( ) Type of Building: Single-Family ( ) Duplex ( ) Multi-Family ( ) Commercial ( ) Other ( )__________________________ Work Type: Interior ( ) Exterior ( ) Both ( ) Project Information Owner Name: ________________________________________ Parcel #: ___________________________________________ (For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit www.eaglecounty.us/patie) Value of all work being performed: $______________ (value based on IBC Section 109.3 & IRC Section 108.3) Electrical Square Footage ______________ For Office Use Only: Fee Paid: _________________________________________ Received From: ____________________________________ Cash _________ Check # ___________ CC: Visa / MC Last 4 CC # _________ exp date: ________ Auth # _________ Date Received: Work Included Plans Included Valuation of Work Electrical ( )Yes ( )No ( )Yes ( )No __________ Mechanical ( )Yes ( )No ( )Yes ( )No __________ Plumbing ( )Yes ( )No ( )Yes ( )No __________ Building ( )Yes ( )No ( )Yes ( )No __________ Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator 004506 Spruce Way 19 Ridgeview Square Townhouses Davis Partnership Architects 0225 Main Street, Unit C101 Edwards CO 81632 Chandler Deimund 970-926-8960 cdeimund@davispartner.com Robert Fenstermacher 303-475-1850 rfenstermacher@yahoo.com Robert Fenstermacher 2101-123-04-019 $8,000 8 N/A Adding a staiway to the existing loft. The existing loft access is through a ladder and floor access. Received By Lynne Campbell at 11:07 am, May 04, 2012 PRJ12-0220 NA B12-0170 State of Colorado Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist Will not disturb more than the threshold limits identified above. Tested negative, or at 1% or below (1 copies of test results included) Tested positive at more than 1%, requires abatement (1 copies of test results included) My project falls into the category checked below: Tips & Facts: Even recent construction projects may include asbestos-containing materials, so buildings of any age require testing.  The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailgov.com www.cdphe.state.co.us 01-Jan-11 Received By Lynne Campbell at 11:07 am, May 04, 2012